Project C - Spec 881 Mobilization

View the file

Other files

File Type Posted
Amend 8 Roads. SF 30.pdf PDF
Amend 8 Evaluation Factors.pdf PDF
Amend 7 Roads. SF 30.pdf PDF
map vulcan water source.pdf PDF
Amend 6 Roads. SF 30.pdf PDF
Amend 6 Project B Schedule.pdf PDF
Picture 2113250.pdf PDF
Past Performance Survey.pdf PDF
Picture 2113200 A.pdf PDF
Pictures 2113250 2113200.pdf PDF
Picture 2113400.pdf PDF
Picture 2113015a..pdf PDF
Project C 813_pbsc.pdf PDF
Project C 836.pdf PDF
Earth Mound Typical Drawing.pdf PDF
Pictures 2113200.pdf PDF
WA1 03202009.pdf PDF
Amend 5 Roads.pdf PDF
Project C 833_pbsc.pdf PDF
PreBid Conference Amend 5.pdf PDF
Amend 4 Attachment.pdf PDF
EXAMPLE C.pdf PDF
Wage_ Deter_ 1977_0209_37 05292008.pdf PDF
Amend 4 Roads.pdf PDF
Amend 3 Roads.pdf PDF
Est Quantity 3.pdf PDF
typrd Model 6.pdf PDF
vulcan worklist 12.pdf PDF
Project B Vulcan.pdf PDF
Title Model 1.pdf PDF
Est Qty 5.pdf PDF
Vicinity Map Model 2.pdf PDF
EstQty 4.pdf PDF
vulcan_worklist 16.pdf PDF
Type II gate detail model 10.pdf PDF
culvert details model 7 pdf.pdf PDF
vulcan_worklist 13.pdf PDF
vulcan_worklist 11.pdf PDF
!Vulcan Specs Project B.pdf PDF
Drainage Details Model 8.pdf PDF
AT7&8.pdf PDF
cmplist Model 9.pdf PDF
vulcan_worklist 14.pdf PDF
vulcan_worklist 15.pdf PDF
Amend 2 Roads.pdf PDF
Project A Growden Energy Dissipater.pdf PDF
growden_energy_dis_plans.pdf PDF
Vicnity Map.pdf PDF
sf24_f.pdf PDF
Amend 1 Roads.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project C Spec 881 RFP AG-05G1-S-09-0010

IDIQ Road Work for the Colville NF Page 1 of 1

881 – MOBILIZATION/EQUIPMENT MOVING (09/10/04) 1

881 MOBILIZATION/EQUIPMENT MOVING

(PBSC)

881.01 Service Required

A. Mobilization of personnel, equipment, and material to the project site.

B. Moving of equipment outside the established work schedule as ordered.

881.02 Performance Standards

A. Mobilization is complete when 100% of the personnel, equipment, and materials necessary to complete the work have been moved to the project site.

B. Moving is complete, when the contractor has moved from the present work site to the ordered work site and returned to the previous location.

881.03 Location of Work:

As specified on roads listed on the road listing, SHOWN ON THE PLANS, or as ordered by the

Contracting Officer.

881.04 Measurement:

Measurement under this Section will be made by the total number of units for each item listed in the

SCHEDULE OF ITEMS completed and accepted.

A. Mile: Work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location of the move, to the ordered work site.

881.05 Payment

A. Payment will be made under:

Pay Item Pay Unit

881(1) Mobilization Lump Sum

881(2) Mobilization Each

881(3) Equipment Moving Miles

881.06 Acceptable Quality Levels

A. Mobilization is acceptable when all equipment, personnel, and incidentals are moved to the project site and work has been started.

B. Ordered moves shall be completed within designated hours, unless agreed otherwise.