Project C Spec 881 RFP AG-05G1-S-09-0010
IDIQ Road Work for the Colville NF Page 1 of 1
881 – MOBILIZATION/EQUIPMENT MOVING (09/10/04) 1
881 MOBILIZATION/EQUIPMENT MOVING
(PBSC)
881.01 Service Required
A. Mobilization of personnel, equipment, and material to the project site.
B. Moving of equipment outside the established work schedule as ordered.
881.02 Performance Standards
A. Mobilization is complete when 100% of the personnel, equipment, and materials necessary to complete the work have been moved to the project site.
B. Moving is complete, when the contractor has moved from the present work site to the ordered work site and returned to the previous location.
881.03 Location of Work:
As specified on roads listed on the road listing, SHOWN ON THE PLANS, or as ordered by the
Contracting Officer.
881.04 Measurement:
Measurement under this Section will be made by the total number of units for each item listed in the
SCHEDULE OF ITEMS completed and accepted.
A. Mile: Work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location of the move, to the ordered work site.
881.05 Payment
A. Payment will be made under:
Pay Item Pay Unit
881(1) Mobilization Lump Sum
881(2) Mobilization Each
881(3) Equipment Moving Miles
881.06 Acceptable Quality Levels
A. Mobilization is acceptable when all equipment, personnel, and incidentals are moved to the project site and work has been started.
B. Ordered moves shall be completed within designated hours, unless agreed otherwise.