vulcan worklist 12.pdf

PDF 8 KB Posted

Attached to
Forest Road Work
Solicitation number
AG-05G1-S-09-0010
Issued by

About this file

Work Summary 12

View the file

Other files

File Type Posted
Amend 8 Roads. SF 30.pdf PDF
Amend 8 Evaluation Factors.pdf PDF
Amend 7 Roads. SF 30.pdf PDF
map vulcan water source.pdf PDF
Amend 6 Roads. SF 30.pdf PDF
Amend 6 Project B Schedule.pdf PDF
Picture 2113250.pdf PDF
Past Performance Survey.pdf PDF
Picture 2113200 A.pdf PDF
Project C Section 881.pdf PDF
Pictures 2113250 2113200.pdf PDF
Picture 2113400.pdf PDF
Picture 2113015a..pdf PDF
Project C 813_pbsc.pdf PDF
Project C 836.pdf PDF
Earth Mound Typical Drawing.pdf PDF
Pictures 2113200.pdf PDF
WA1 03202009.pdf PDF
Amend 5 Roads.pdf PDF
Project C 833_pbsc.pdf PDF
PreBid Conference Amend 5.pdf PDF
Amend 4 Attachment.pdf PDF
EXAMPLE C.pdf PDF
Wage_ Deter_ 1977_0209_37 05292008.pdf PDF
Amend 4 Roads.pdf PDF
Amend 3 Roads.pdf PDF
Est Quantity 3.pdf PDF
typrd Model 6.pdf PDF
Project B Vulcan.pdf PDF
Title Model 1.pdf PDF
Est Qty 5.pdf PDF
Vicinity Map Model 2.pdf PDF
EstQty 4.pdf PDF
vulcan_worklist 16.pdf PDF
Type II gate detail model 10.pdf PDF
culvert details model 7 pdf.pdf PDF
vulcan_worklist 13.pdf PDF
vulcan_worklist 11.pdf PDF
!Vulcan Specs Project B.pdf PDF
Drainage Details Model 8.pdf PDF
AT7&8.pdf PDF
cmplist Model 9.pdf PDF
vulcan_worklist 14.pdf PDF
vulcan_worklist 15.pdf PDF
Amend 2 Roads.pdf PDF
Project A Growden Energy Dissipater.pdf PDF
growden_energy_dis_plans.pdf PDF
Vicnity Map.pdf PDF
sf24_f.pdf PDF
Amend 1 Roads.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK SUMMARY SHEET TOTAL SHEETS

ROAD 2113200R (cont) ROAD 2113250R (cont)

STA MP WORK ITEMS STA WORK ITEMS

2.05 Begin constructing 12' roadbed 7+04 Construct DD

Repair fill failure by keying approximately 70 CY of class 4 rip rap 7+60 Jct 2113251 Right and building up roadway with approximately 8+70 Construct DD 8 CY of borrow from designated borrow source 10+60 Construct DD

2.06 End constructing 12' roadbed-Blend to existing 12+10 Begin constructing ditch right

2.08 End placing 6" of aggregate Construct DD-Intercept ditch right

2.19 Construct OSD 13+10 End constructing ditch right

2.40 Begin establishing clearing limits 14+80 Construct DD

Begin clearing and grubbing 16+70 Begin placing 6" of aggregate Begin constructing 12' roadbed Construct OSD Begin placing 6" of aggregate 20+35 Construct DD Construct DD 25+25 Jct 2113253R Left

2.42 End placing 6" of aggregate Begin constructing ditch left

2.52 Remove and dispose of existing culvert 26+00 End constructing ditch left

Install 18" X 26' cmp End placing 6" of aggregate

2.60 Construct DD End establishing clearing limits

0+00 2.74 Equation station MP 2.74 Back = STA 0+00 Ahead End clearing and grubbing 1+65 2.77 Construct OSD End blading and shaping 12' roadbed 6+00 2.85 Construct DD EOP 8+50 2.90 Begin placing 6" of aggregate 8+66 2.91 Construct OSD

11+40 2.96 End placing 6" of aggregate ROAD 2113253R 15+00 3.02 Construct DD STA WORK ITEMS 19+10 3.10 Construct DD 0+00 Jct 2113250R 21+00 3.14 Construct TOR and TAL Begin blading and shaping 12' roadbed 21+79 3.15 End establishing clearing limits Begin placing 6'' of aggregate

End clearing and grubbing Begin constructing ditch right End constructing 12' roadbed Blend with ditch at junction of 2113250R EOP 0+20 Install 24'' X 32' CMP

Haul and place 54 CY of unclassified borrow to achieve 12'' of cover over CMP-Blend cover ahead and back

ROAD 2113250R Haul borrow from designated borrow source STA WORK ITEMS Place Class 2 riprap on inlet fill slope 10' each side of 0+00 Jct 2113200R cmp to armor fill slope

Do not disturb roadway template from 0+00 to 4+00 1+55 End placing 6'' of aggregate Protect Existing Snotel Site End constructing ditch right

4+00 Begin establishing clearing limits 1+70 End blading and shaping 12' roadbed Begin clearing and grubbing EOP Begin constructing 12' roadbed Install type 2 gate, 16' as staked by CO

12 16