Project C - Spec 836 Road Decommissioning

View the file

Other files

File Type Posted
Amend 8 Roads. SF 30.pdf PDF
Amend 8 Evaluation Factors.pdf PDF
Amend 7 Roads. SF 30.pdf PDF
map vulcan water source.pdf PDF
Amend 6 Roads. SF 30.pdf PDF
Amend 6 Project B Schedule.pdf PDF
Picture 2113250.pdf PDF
Past Performance Survey.pdf PDF
Picture 2113200 A.pdf PDF
Project C Section 881.pdf PDF
Pictures 2113250 2113200.pdf PDF
Picture 2113400.pdf PDF
Picture 2113015a..pdf PDF
Project C 813_pbsc.pdf PDF
Earth Mound Typical Drawing.pdf PDF
Pictures 2113200.pdf PDF
WA1 03202009.pdf PDF
Amend 5 Roads.pdf PDF
Project C 833_pbsc.pdf PDF
PreBid Conference Amend 5.pdf PDF
Amend 4 Attachment.pdf PDF
EXAMPLE C.pdf PDF
Wage_ Deter_ 1977_0209_37 05292008.pdf PDF
Amend 4 Roads.pdf PDF
Amend 3 Roads.pdf PDF
Est Quantity 3.pdf PDF
typrd Model 6.pdf PDF
vulcan worklist 12.pdf PDF
Project B Vulcan.pdf PDF
Title Model 1.pdf PDF
Est Qty 5.pdf PDF
Vicinity Map Model 2.pdf PDF
EstQty 4.pdf PDF
vulcan_worklist 16.pdf PDF
Type II gate detail model 10.pdf PDF
culvert details model 7 pdf.pdf PDF
vulcan_worklist 13.pdf PDF
vulcan_worklist 11.pdf PDF
!Vulcan Specs Project B.pdf PDF
Drainage Details Model 8.pdf PDF
AT7&8.pdf PDF
cmplist Model 9.pdf PDF
vulcan_worklist 14.pdf PDF
vulcan_worklist 15.pdf PDF
Amend 2 Roads.pdf PDF
Project A Growden Energy Dissipater.pdf PDF
growden_energy_dis_plans.pdf PDF
Vicnity Map.pdf PDF
sf24_f.pdf PDF
Amend 1 Roads.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project C Spec. 836 RFP AG-05G1-S-09-0010

IDIQ Road Work for the Colville National Forest Page 1 of 4

836F ROAD DECOMMISSIONING (05/04)

A SCOPE

Work includes the closing and decommissioning of roads to use by motorized vehicles, restoring natural drainage patterns, and returning the roadway to resource production using one or a combination of methods. The roads are located on the Colville National Forest.

Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies, incidental supplies necessary to perform all work described in accordance with drawings and specifications of the contract. Contractor will be paid for actual work performed.

The Contractor shall assume all risk, loss, damage, or expense arising out of prosecution of the work, except as otherwise provided in the contract.

B DESCRIPTION OF WORK

Work includes removal and disposal of culverts and gates, scarifying or ripping roadbeds, roadbed treatments with excavator, water barring, seeding and mulching, and installing road closures devices.

This work may be ordered as individual work items.

C TECHNICAL SPECIFICATIONS

Description

This work shall consist of closing and decommissioning designated roads and restoring drainage facilities to the original hydrological function.

Items listed on the contract SCHEDULE OF ITEMS may require additional work requirements such as clearing in order to accomplish the work requirements. If no work item is listed for the additional work, it will be considered incidental and included in payment for pay items shown.

For the purpose of this specification the project Road List and Work Description Lists are considered part of the Drawings.

836F.00

Clearing and Slash Treatment

Clearing may be necessary in order to complete a work item. Remove vegetation from fill slope, back slope, and ditch lines prior to excavation and placement of excavated material. Unless otherwise shown on SCHEDULE OF ITEMS, clearing is incidental to other pay items and will not be paid separately.

(a) Performance. When clearing is needed, it shall be accomplished as follows:

(1) Clearing slash shall be scattered on disturbed areas and shall not be incorporated in embankment material unless otherwise SHOWN ON THE DRAWINGS.

(2) Unless otherwise SHOWN ON THE DRAWINGS, the materials generated will not need to be limbed and lopped.

(3) Materials shall be positioned in a stable position to prevent rolling.

IDIQ Road Work for the Colville National Forest Page 2 of 4

(4) Generated Materials that create such a deep or thick mat that they will prevent seeding, ripping, or other ground surface treatments called for shall be further scattered or moved off disturbed areas.

836F.01

Road Closure Berm

Road Closure Berms shall be constructed as SHOWN ON THE DRAWINGS, at the locations designated by the Contracting Officer.

836F.02

Recontouring

Recontouring shall be completed as SHOWN ON THE DRAWINGS, at the locations designated by the

Contracting Officer. Recontouring consists of replacing the excavation material with the embankment material to approximate the original shape of the ground prior to road construction. The finished surface shall be sloped to drain, with the top 6 inches of material left in an uncompacted condition suitable for seeding.

836F.03

Ripping

This work, where SHOWN ON THE DRAWINGS, shall consist of ripping an existing roadbed, including turnouts and landings, by ripping or loosening the roadbed and other designated areas with a standard ripper.

The distance between multiple ripper shanks shall not exceed 4 feet. The design of the shank and tooth will be such that the treated soils are slightly lifted and fractured rather than plowed, mixed, or displaced.

Furrows made by ripping shall not exceed 3 feet apart.

Ripping shall be accomplished to within 2 feet of the back slope and 2 feet of the outer edge of the road unless otherwise SHOWN ON THE DRAWINGS.

Ripping shall be accomplished to a minimum depth of 18 inches. The Contracting Officer may agree to a lesser depth when excessive rock is encountered. Ripping will not be allowed when crossing draws, nor at waterbars.

Ripping shall be done in a sequence so that equipment will not be driven back over the areas thereby re-compacting the soils. The exception to this is when materials from Embankment Pullback or Draw

Rehabilitation are to be deposited on the roadbed. Where excavated material is placed on the roadbed and ripping is called for, the area shall first be ripped prior to placement of material.

836F.04

Outsloping

Designated roads or segments shall be outsloped by pulling material from the road fill section towards the back slope. Pullback material shall be spread over the roadbed and ditch forming a minimum outslope equal to the grade and dimensions SHOWN ON THE DRAWINGS or 10% where not shown. Any existing ditches at the toe of the back slope shall be filled.

IDIQ Road Work for the Colville National Forest Page 3 of 4

836F.05

Embankment Pullback

Designated roads or segments shall have embankment pulled back to limits and slopes SHOWN ON THE

DRAWINGS. Excavated material shall be placed at designated locations against back slopes or on flats, unless otherwise SHOWN ON THE DRAWINGS, sloped to drain, and left in an uncompacted condition.

836F.06

Seeding

Place specified seed mix on all disturbed areas where SHOWN ON THE DRAWINGS or directed by the

Contracting Officer. To control erosion as soon as ground disturbing work has been accepted. Hand operated seeding devices shall be used to apply seed.

Seed

Seed rates are based on pure live seed. If seed is unavailable for purchase, contact Ranger District

Specialist for substitutes. Seed as listed below shall be applied at the specified rate per acre:

Species lb/acre

Sheep Fescue, Covar 7

Intermediate Wheatgrass 7

Streambank Wheatgrass, Sodar 4

836F.07

Mulching

Furnish and place weed free straw or wood fiber mulch on disturbed areas where, and as SHOWN ON

THE DRAWINGS or directed by the Contracting Officer. Mulching shall be done following acceptance of ground disturbing work and 836F.12 Seeding, when listed on SCHEDULE OF ITEMS.

Mulch materials shall be applied at the application rate of at approximately 2 tons per acre.

836F.8

Measurement

Use the method of measurement that is designated in the SCHEDULE OF ITEMS. Only those items listed in the SCHEDULE OF ITEMS will be measured.

(a) Measurement for Pay Items with Pay Unit as EACH will be the actual count of the number of items.

(b) Measurement for Pay Items with Pay Units as MILE will be measured along the centerline of the roadway from the beginning of that work to the end of that work. Distance will be measured to the nearest one-hundredths mile.

(c) Measurement for Pay Items with Pay Units as LUMP SUM (L.S.) will be measured as one complete unit. All other items are considered incidental and will not be measured or paid separately.

(d) Measurement for Pay Items with Pay Units as ACRE will be the actual slope distance acres measured to the nearest one-hundredth (0.01) acre.

IDIQ Road Work for the Colville National Forest Page 4 of 4

836F.9

Payment

The accepted quantities will be paid for at the contract unit price for each PAY ITEM DESIGNATED IN

THE SCHEDULE OF ITEMS.

Payment will be made under:

Pay Item Pay Unit

836F(01) Road Closure Berm Each

836F(02) Recontouring Mile

836F(03) Ripping Mile

836F(04) Outsloping Mile

836F(05) Embankment Pullback Mile

836F(06) Seeding Acre

836F(07) Mulching Acre