Amend 6 Project B Schedule.pdf

PDF 75 KB Posted

Attached to
Forest Road Work
Solicitation number
AG-05G1-S-09-0010
Issued by

About this file

Amendment 6 Project B Vulcan Schedule of Items

View the file

Other files

File Type Posted
Amend 8 Roads. SF 30.pdf PDF
Amend 8 Evaluation Factors.pdf PDF
Amend 7 Roads. SF 30.pdf PDF
map vulcan water source.pdf PDF
Amend 6 Roads. SF 30.pdf PDF
Picture 2113250.pdf PDF
Past Performance Survey.pdf PDF
Picture 2113200 A.pdf PDF
Project C Section 881.pdf PDF
Pictures 2113250 2113200.pdf PDF
Picture 2113400.pdf PDF
Picture 2113015a..pdf PDF
Project C 813_pbsc.pdf PDF
Project C 836.pdf PDF
Earth Mound Typical Drawing.pdf PDF
Pictures 2113200.pdf PDF
WA1 03202009.pdf PDF
Amend 5 Roads.pdf PDF
Project C 833_pbsc.pdf PDF
PreBid Conference Amend 5.pdf PDF
Amend 4 Attachment.pdf PDF
EXAMPLE C.pdf PDF
Wage_ Deter_ 1977_0209_37 05292008.pdf PDF
Amend 4 Roads.pdf PDF
Amend 3 Roads.pdf PDF
Est Quantity 3.pdf PDF
typrd Model 6.pdf PDF
vulcan worklist 12.pdf PDF
Project B Vulcan.pdf PDF
Title Model 1.pdf PDF
Est Qty 5.pdf PDF
Vicinity Map Model 2.pdf PDF
EstQty 4.pdf PDF
vulcan_worklist 16.pdf PDF
Type II gate detail model 10.pdf PDF
culvert details model 7 pdf.pdf PDF
vulcan_worklist 13.pdf PDF
vulcan_worklist 11.pdf PDF
!Vulcan Specs Project B.pdf PDF
Drainage Details Model 8.pdf PDF
AT7&8.pdf PDF
cmplist Model 9.pdf PDF
vulcan_worklist 14.pdf PDF
vulcan_worklist 15.pdf PDF
Amend 2 Roads.pdf PDF
Project A Growden Energy Dissipater.pdf PDF
growden_energy_dis_plans.pdf PDF
Vicnity Map.pdf PDF
sf24_f.pdf PDF
Amend 1 Roads.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 1

TASK ORDER REQUEST

Contract Number Individual Task Order Number

This Individual Task Order is issued under contract number:

AG-5G1-C-09-00__

Solicitation No.: AG-05G1-S-09-0010 Project B

AG-05G1-D-09-________

ISSUING OFFICE: (Forest Service Unit Name) Task Order Date

Colville National Forest Acquisition Management 765 South Main Colville WA. 99114

Financial obligations and payments shall be processed via the Issuing Office.

PROJECT NAME

Vulcan Road Reconstruction, Project B Republic Ranger District, Colville National Forest

Itemized payment items, quantities, prices and detailed project requirements are attached

Proposal Request Date:

April 4, 2009 Amendment 3

AG-05G1-S-09-0010

Proposal Response Date/Time (close of business unless otherwise shown):

See AG-05G1-S-09-0010

A BID GUARANTEE is required for all offers exceeding $100,000.00.

OFFER:

Offeror Name (same as on contract) Offered by (Name, Title, Phone):

Offered Amounts attached in Section B. Authorized Signature:

Date:

This is a firm offer for 60 calendar days from the Response Date/Time. The offer agrees to furnish any required bonds and to perform the work at the prices offered.

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 2

PART I - THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

AG-05G1-S-09-0010

Project B

Task Order

Vulcan Road Reconstruction Republic Ranger District, Colville National Forest

Ferry County, Washington

ITEM

NO.

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

Road 2113010R

15101 Mobilization LSQ Job

1 $______

15219 Establish Clearing Limits

AQ Mile 1.80 $______

20402 Roadway Excavation, Compaction Method C, Finishing Method C

AQ Mile

0.62 $______

20420A Drainage Excavation, Type Drain Dip

AQ Each 4 $______

23050 Roadside Brushing AQ Mile 1.8 $______

32222 Pit Run Maximum Size 4 inches, Compaction Method H

CQ Cubic Yards

32 $______

62501 Seeding, Dry Method

CQ Acre 0.98 $______

65001 Furnish and Install Road Closure Device Type II Gate, Size 16 feet

AQ Each 1 $______

Total for Road 2113010R $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 3

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2113015R

15101 Mobilization

LSQ Job

AQ Mile 0.24 $______

20103 Clearing and Grubbing, Disposal of Tops and Limbs f, l, logs f and stumps f.

0.24 $______

Excavation, Compaction Method C, Finishing Method

AQ Mile 0.28 $______

Excavation, Type

Size 4 inches, 34 $______

CQ Acre 0.82 $______

Total for Road 2113015R $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 4

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2113040R

AQ Mile 0.39 $______

Grubbing, Disposal of Tops and Limbs, f, l, logs f, and stumps f

Excavation, Compaction Method

0.39 $______

AQ Each 2 $______

20420B Drainage

Outslope Dip

Size 4 inches, 105 $______

CQ Acre 1.23 $______

Total for Road 2113040R $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 5

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2113045R

AQ Mile 0.22 $______

Excavation, Compaction Method

0.22 $______

23050 Roadside Brushing

Size 4 inches, 8 $______

CQ Acre 0.35 $______

Total for Road 2113045R $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 6

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2113200R

AQ Mile 0.75 $______

Grubbing, Disposal of Tops and Limbs, AQ Mile 0.75 $______

20301 Removal of Culvert

LSQ Each 1 $______

Excavation, Compaction Method

0.91 $______

20404 Unclassified Borrow, Compaction Method

8 $______

AQ Each 7 $______

Outslope Drain

AQ Each 11 $______

25104 Keyed Riprap, Class

70 $______

Size 4 inches, Compaction Method H

CQ Cubic

433 $______

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 7

60250A 18 inch Corrugated Metal Pipe, .064 inch thickness for steel or .060 inch thickness for aluminum, Method A

AQ Feet 26 $______

CQ Acre 3.53 $______

Total for Road 2113200R $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 8

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2113250R

AQ Mile 0.40 $______

Grubbing, Disposal of Tops and Limbs, f, l, logs f, and

AQ Mile 0.40 $______

Excavation, Compaction Method

0.40 $______

Excavation, Type

AQ Each 6 $______

Size 4 inches, 264 $______

CQ Acre 1.26 $______

Road Closure Device Type II Gate, Size 16

Total for Road 2113250R $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 9

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2113253R

Excavation, Compaction Method

0.03 $______

Compaction Method

54 $______

25101 Place Riprap, Class 2 CQ Cubic

2 $______

Size 4 inches, 37 $______

60250B 24 inch Corrugated Metal Pipe, .064 inch thickness for steel or .060 inch thickness

Method C

AQ Feet 32 $______

CQ Acre 0.05 $______

Total for Road 2113253R $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 10

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2113300R

Excavation, Compaction Method

0.34 $______

AQ Each 9 $______

AQ Each 5 $______

Size 4 inches, 188 $______

CQ Acre 1.01 $______

Total for Road 2113300R $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 11

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2113360R

15101 Mobilization LSQ Job 1 $______

AQ Mile 0.18 $______

Grubbing, Disposal of Tops and Limbs, AQ Mile 0.18 $______

Excavation, Compaction Method

0.18 $______

AQ Each 3 $______

Size 4 inches, CQ Acre 0.57 $______

Road Closure Device Type II Gate, Size 16

Total for Road 2113360R $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 12

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2113400R S.1

Excavation, Compaction Method

0.52 $______

Size 4 inches, 266 $______

Metal Pipe, .064 inch thickness for steel or .060 inch thickness

AQ Feet 26 $______

CQ Acre 0.86 $______

Total for Road 2113400R S.1 $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 13

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2113400R S.2

AQ Mile 0.68 $______

Grubbing, Disposal of Tops and Limbs, AQ Mile 0.68 $______

Excavation, Compaction Method

0.68 $______

Size 4 inches, 40 $______

Metal Pipe, .064 inch thickness for steel or .060 inch thickness

AQ Feet 30 $______

CQ Acre 2.14 $______

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 14

Road Closure Device

Total for Road 2113400R S.2 $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 15

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2114000R S.2

AQ Mile 0.23 $______

Excavation, Compaction Method

0.03 $______

23050 Roadside Brushing

CQ Mile 0.23 $______

CQ Acre 0.05 $______

Road Closure Device

Total for Road 21134000R S.2 $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 16

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2114025R

AQ Mile 0.37 $______

Grubbing, Disposal of Tops and Limbs, AQ Mile 0.37 $______

Excavation, Compaction Method

0.37 $______

Size 4 inches, 24 $______

CQ Acre 1.17 $______

Road Closure Device

Total for Road 2114025R $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 17

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2114033R

AQ Mile 0.66 $______

Grubbing, Disposal of Tops and Limbs, AQ Mile 0.66 $______

Excavation, Compaction Method C, Finishing Method

0.66 $______

Size 4 inches, CQ Acre 2.08 $______

Road Closure Device Type II Gate, Size 16

Total for Road 2114033R $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 18

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2114080R

Grubbing, Disposal of Tops and Limbs, Excavation, Compaction Method

0.22 $______

32222 Pit run maximum size 4 inches, 16 $______

CQ Acre 0.68 $______

Total for Road 2114080R $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 19

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2114400R

AQ Mile 0.92 $______

Grubbing, Disposal of Tops and Limbs, AQ Mile 0.92 $______

Excavation, Compaction Method

0.92 $______

Compaction Method

Size 4 inches, CQ Acre 2.90 $______

Total for Road 2114400R $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 20

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2114500R S.1

AQ Mile 2.18 $______

Grubbing, Disposal of Tops and Limbs, AQ Mile 2.18 $______

Excavation, Compaction Method

2.18 $______

AQ Each 6 $______

AQ Each 7 $______

Size 4 inches, 155 $______

CQ Acre 6.87 $______

Total for Road 2114500R S.1 $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 21

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2114500R S.3

AQ Mile 0.35 $______

Grubbing, Disposal of Tops and Limbs, AQ Mile 0.35 $______

Excavation, Compaction Method

0.35 $______

Size 4 inches, CQ Acre 1.10 $______

Total for Road 2144500R S.3 $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 22

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

Road 2114510R

Grubbing, Disposal of Tops and Limbs, Excavation, Compaction Method

0.39 $______

Size 4 inches, CQ Acre 1.22 $______

Road Closure Device

Total for Road 2114510R $_____

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 23

SUMMARY OF OFFER

Road Number Total Price

2113010R $_______________

2113015R $_______________

2113040R $_______________

2113045R $_______________

2113200R $_______________

2113250R $_______________

2113253R $_______________

2113300R $_______________

2113360R $_______________

2113400R Segment 1 $_______________

2113400R Segment 2 $_______________

2114000R Segment 2 $_______________

2114025R $_______________

2114033R $_______________

2114080R $_______________

2114400R $_______________

2114500R Segment 1 $_______________

2114500R Segment 3 $_______________

2114510R $_______________

Total Offer for All Roads $_______________

The offeror must provide a price on all items.

Award of this requirement will result in a task order off one of the contracts for Road Work on the Colville National Forest. The pricing for this project along with the technical factors will be evaluated when the Government evaluates the basic solicitation AG-05G1-S-09-0010. All terms and conditions of the IDIQ contract are incorporated into this project.

Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 24

* Designated Method of Measurement

CQ - Contract Quantities. These quantities are based upon the original design data available prior to advertising the project.

AQ - Actual Quantities. These quantities are determined from measurement of completed work.

LSQ - Lump Sum Quantities. These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.

Construction Project

This is a construction project.

Price Range

The Government’s estimate is between $100,000 and $250,000.

Bonding

A Bid Guarantee of 20% is required (reference FAR 52.228-1, Bid Guarantee).

Performance and Payment Bonds are also required (reference FAR 52.228-15, Performance and Payment Bonds – Construction).

All referenced clauses are in the basic solicitation/contract.

File details come from the government source that posted it. Updated .