Amend 6 Project B Schedule.pdf
PDF 75 KB Posted
- Attached to
- Forest Road Work
- Solicitation number
- AG-05G1-S-09-0010
About this file
Amendment 6 Project B Vulcan Schedule of Items
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 1
TASK ORDER REQUEST
Contract Number Individual Task Order Number
This Individual Task Order is issued under contract number:
AG-5G1-C-09-00__
Solicitation No.: AG-05G1-S-09-0010 Project B
AG-05G1-D-09-________
ISSUING OFFICE: (Forest Service Unit Name) Task Order Date
Colville National Forest Acquisition Management 765 South Main Colville WA. 99114
Financial obligations and payments shall be processed via the Issuing Office.
PROJECT NAME
Vulcan Road Reconstruction, Project B Republic Ranger District, Colville National Forest
Itemized payment items, quantities, prices and detailed project requirements are attached
Proposal Request Date:
April 4, 2009 Amendment 3
AG-05G1-S-09-0010
Proposal Response Date/Time (close of business unless otherwise shown):
See AG-05G1-S-09-0010
A BID GUARANTEE is required for all offers exceeding $100,000.00.
OFFER:
Offeror Name (same as on contract) Offered by (Name, Title, Phone):
Offered Amounts attached in Section B. Authorized Signature:
Date:
This is a firm offer for 60 calendar days from the Response Date/Time. The offer agrees to furnish any required bonds and to perform the work at the prices offered.
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 2
PART I - THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
AG-05G1-S-09-0010
Project B
Task Order
Vulcan Road Reconstruction Republic Ranger District, Colville National Forest
Ferry County, Washington
ITEM
NO.
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
Road 2113010R
15101 Mobilization LSQ Job
1 $______
15219 Establish Clearing Limits
AQ Mile 1.80 $______
20402 Roadway Excavation, Compaction Method C, Finishing Method C
AQ Mile
0.62 $______
20420A Drainage Excavation, Type Drain Dip
AQ Each 4 $______
23050 Roadside Brushing AQ Mile 1.8 $______
32222 Pit Run Maximum Size 4 inches, Compaction Method H
CQ Cubic Yards
32 $______
62501 Seeding, Dry Method
CQ Acre 0.98 $______
65001 Furnish and Install Road Closure Device Type II Gate, Size 16 feet
AQ Each 1 $______
Total for Road 2113010R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 3
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113015R
15101 Mobilization
LSQ Job
AQ Mile 0.24 $______
20103 Clearing and Grubbing, Disposal of Tops and Limbs f, l, logs f and stumps f.
0.24 $______
Excavation, Compaction Method C, Finishing Method
AQ Mile 0.28 $______
Excavation, Type
Size 4 inches, 34 $______
CQ Acre 0.82 $______
Total for Road 2113015R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 4
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113040R
AQ Mile 0.39 $______
Grubbing, Disposal of Tops and Limbs, f, l, logs f, and stumps f
Excavation, Compaction Method
0.39 $______
AQ Each 2 $______
20420B Drainage
Outslope Dip
Size 4 inches, 105 $______
CQ Acre 1.23 $______
Total for Road 2113040R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 5
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113045R
AQ Mile 0.22 $______
Excavation, Compaction Method
0.22 $______
23050 Roadside Brushing
Size 4 inches, 8 $______
CQ Acre 0.35 $______
Total for Road 2113045R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 6
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113200R
AQ Mile 0.75 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 0.75 $______
20301 Removal of Culvert
LSQ Each 1 $______
Excavation, Compaction Method
0.91 $______
20404 Unclassified Borrow, Compaction Method
8 $______
AQ Each 7 $______
Outslope Drain
AQ Each 11 $______
25104 Keyed Riprap, Class
70 $______
Size 4 inches, Compaction Method H
CQ Cubic
433 $______
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 7
60250A 18 inch Corrugated Metal Pipe, .064 inch thickness for steel or .060 inch thickness for aluminum, Method A
AQ Feet 26 $______
CQ Acre 3.53 $______
Total for Road 2113200R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 8
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113250R
AQ Mile 0.40 $______
Grubbing, Disposal of Tops and Limbs, f, l, logs f, and
AQ Mile 0.40 $______
Excavation, Compaction Method
0.40 $______
Excavation, Type
AQ Each 6 $______
Size 4 inches, 264 $______
CQ Acre 1.26 $______
Road Closure Device Type II Gate, Size 16
Total for Road 2113250R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 9
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113253R
Excavation, Compaction Method
0.03 $______
Compaction Method
54 $______
25101 Place Riprap, Class 2 CQ Cubic
2 $______
Size 4 inches, 37 $______
60250B 24 inch Corrugated Metal Pipe, .064 inch thickness for steel or .060 inch thickness
Method C
AQ Feet 32 $______
CQ Acre 0.05 $______
Total for Road 2113253R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 10
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113300R
Excavation, Compaction Method
0.34 $______
AQ Each 9 $______
AQ Each 5 $______
Size 4 inches, 188 $______
CQ Acre 1.01 $______
Total for Road 2113300R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 11
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113360R
15101 Mobilization LSQ Job 1 $______
AQ Mile 0.18 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 0.18 $______
Excavation, Compaction Method
0.18 $______
AQ Each 3 $______
Size 4 inches, CQ Acre 0.57 $______
Road Closure Device Type II Gate, Size 16
Total for Road 2113360R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 12
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113400R S.1
Excavation, Compaction Method
0.52 $______
Size 4 inches, 266 $______
Metal Pipe, .064 inch thickness for steel or .060 inch thickness
AQ Feet 26 $______
CQ Acre 0.86 $______
Total for Road 2113400R S.1 $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 13
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113400R S.2
AQ Mile 0.68 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 0.68 $______
Excavation, Compaction Method
0.68 $______
Size 4 inches, 40 $______
Metal Pipe, .064 inch thickness for steel or .060 inch thickness
AQ Feet 30 $______
CQ Acre 2.14 $______
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 14
Road Closure Device
Total for Road 2113400R S.2 $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 15
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2114000R S.2
AQ Mile 0.23 $______
Excavation, Compaction Method
0.03 $______
23050 Roadside Brushing
CQ Mile 0.23 $______
CQ Acre 0.05 $______
Road Closure Device
Total for Road 21134000R S.2 $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 16
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2114025R
AQ Mile 0.37 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 0.37 $______
Excavation, Compaction Method
0.37 $______
Size 4 inches, 24 $______
CQ Acre 1.17 $______
Road Closure Device
Total for Road 2114025R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 17
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2114033R
AQ Mile 0.66 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 0.66 $______
Excavation, Compaction Method C, Finishing Method
0.66 $______
Size 4 inches, CQ Acre 2.08 $______
Road Closure Device Type II Gate, Size 16
Total for Road 2114033R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 18
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2114080R
Grubbing, Disposal of Tops and Limbs, Excavation, Compaction Method
0.22 $______
32222 Pit run maximum size 4 inches, 16 $______
CQ Acre 0.68 $______
Total for Road 2114080R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 19
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2114400R
AQ Mile 0.92 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 0.92 $______
Excavation, Compaction Method
0.92 $______
Compaction Method
Size 4 inches, CQ Acre 2.90 $______
Total for Road 2114400R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 20
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2114500R S.1
AQ Mile 2.18 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 2.18 $______
Excavation, Compaction Method
2.18 $______
AQ Each 6 $______
AQ Each 7 $______
Size 4 inches, 155 $______
CQ Acre 6.87 $______
Total for Road 2114500R S.1 $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 21
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2114500R S.3
AQ Mile 0.35 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 0.35 $______
Excavation, Compaction Method
0.35 $______
Size 4 inches, CQ Acre 1.10 $______
Total for Road 2144500R S.3 $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 22
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2114510R
Grubbing, Disposal of Tops and Limbs, Excavation, Compaction Method
0.39 $______
Size 4 inches, CQ Acre 1.22 $______
Road Closure Device
Total for Road 2114510R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 23
SUMMARY OF OFFER
Road Number Total Price
2113010R $_______________
2113015R $_______________
2113040R $_______________
2113045R $_______________
2113200R $_______________
2113250R $_______________
2113253R $_______________
2113300R $_______________
2113360R $_______________
2113400R Segment 1 $_______________
2113400R Segment 2 $_______________
2114000R Segment 2 $_______________
2114025R $_______________
2114033R $_______________
2114080R $_______________
2114400R $_______________
2114500R Segment 1 $_______________
2114500R Segment 3 $_______________
2114510R $_______________
Total Offer for All Roads $_______________
The offeror must provide a price on all items.
Award of this requirement will result in a task order off one of the contracts for Road Work on the Colville National Forest. The pricing for this project along with the technical factors will be evaluated when the Government evaluates the basic solicitation AG-05G1-S-09-0010. All terms and conditions of the IDIQ contract are incorporated into this project.
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Amendment 6 Page 24
* Designated Method of Measurement
CQ - Contract Quantities. These quantities are based upon the original design data available prior to advertising the project.
AQ - Actual Quantities. These quantities are determined from measurement of completed work.
LSQ - Lump Sum Quantities. These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.
Construction Project
This is a construction project.
Price Range
The Government’s estimate is between $100,000 and $250,000.
Bonding
A Bid Guarantee of 20% is required (reference FAR 52.228-1, Bid Guarantee).
Performance and Payment Bonds are also required (reference FAR 52.228-15, Performance and Payment Bonds – Construction).
All referenced clauses are in the basic solicitation/contract.
File details come from the government source that posted it. Updated .