Project A Growden Energy Dissipater
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION (4/98) THIS RFQ IS IS NOT A SMALL BUSINESS SET- ASIDE PAGE OF PAGES
(THIS IS NOT AN ORDER) * [X]This project is set-aside for an SMALL BUSINESS HUBZONEs 1
1. REQUEST NO. 2. DATE
ISSUED
3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING
UNDER BDSA REG. 2 ----> AG-05G1-S-09-0010
Project A
Reference Amend. 2 from main solicitation
269184
06EW210939124
AND/OR DMS REG. 1
5a. ISSUED BY 6. DELIVER BY (Date)
USDA, Forest Service Reference Specifications
Colville National Forest Contract Time: June 12, 2009
765 South Main Estimated start date: May 2009
Colville, Washington 99114 5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY
NAME TELEPHONE NUMBER FOB DESTINATION X OTHER
(See Schedule)
AREA CODE NUMBER
Cathy E. Van Alyne, Contracting Officer
509 684-7114 9. DESTINATION
Colville National Forest
Gen Info: Bruce Bailey 509 684-7220 a. NAME OF CONSIGNEE
8. TO: Three Rivers Ranger District
a. NAME b. COMPANY b. STREET ADDRESS
255 West 11th
c. STREET ADDRESS c. CITY
Kettle Falls
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
Washington 99141
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5A ON OR BEFORE
Same as AG-05G1-S-09-0010 Close of Business
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5A. This Request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
Construction Project: Growden Energy Dissipater, Three Rivers Ranger District, Colville National Forest, Ferry County, Washington
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(a) (b) (c) (d) (e) (f)
Insert your prices on page 2.
The Government will issue a Task Order from one of the IDIQ contracts for Road Work on the Colville National Forest.
The Government estimate is between $25,000 through $100,000.
BASIS OF AWARD: Reference Solicitation AG-05G1-S-09-0010.
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT
NUMBER PERCENTAGE
XXXXXXXXX
NOTE: Additional provisions and representations X are are not attached.
13. NAME AND ADDRESS OF OFFEROR 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF
a. NAME SIGN OFFER OFFER
b. STREET ADDRESS 16. SIGNER
a. NAME (Type or print) b. TELEPHONE
c. COUNTY ( )
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) FAX
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (Rev. 6-95)
Growden Energy Dissipater Project A RFQ AG-05G1-S-09-0010 Three Rivers Ranger District Page 2
PART I - THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
AG-05G1-S-09-0010
Project A
Task Order
Growden Energy Dissipater
Three Rivers Ranger District
Colville National Forest
Ferry County, Washington
ITEM
NO.
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
Growden Energy Dissipater
1 Mobilization LSQ Job
1 $______
2 Energy Dissipater LSQ Job 1 $______
3 Diversion Culvert LSQ Job
1 $______
4 Produce Riprap AQ Cubic Yards
7,000 $______
Total Quote (All Items) $_____
**Designated Method of Measurement:
AQ - Actual Quantities. These quantities are determined from measurement of completed work.
LSQ - Lump Sum Quantities. These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.
The offeror must quote on all items.
Award of this requirement will result in a task order off one of the contracts for Road Work on the
Colville National Forest. The pricing for this project along with the technical factors will be evaluated when the Government evaluates the basic solicitation AG-05G1-S-09-0010. All terms and conditions of the
IDIQ contract are incorporated into this project.
Growden Energy Dissipater Project A RFQ AG-05G1-S-09-0010 Three Rivers Ranger District Page 3
Construction Project
This is a construction project.
Price Range
The Government’s estimate is between $25,000 and $100,000.
Payment Security
If the project is quoted with a total price greater than $30,000, payment security is required in the form of a Payment Bond or Letter of Credit at 100% of the total project price.
Growden Energy Dissipater Project A RFQ AG-05G1-S-09-0010 Three Rivers Ranger District Page 4
SECTION C - DESCRIPTION/SPECIFICATION/STATEMENT OF WORK
Description of Work or Scope of Contract
Growden Energy Dissipater – Work includes developing the Lane Creek Riprap Pit, including clearing the pit area, excavation of overburden, blasting and sorting to produce rock riprap. Work to construct the energy dissipater at the Growden Dam Heritage Site includes diverting Sherman Creek away from the energy dissipater site, excavation, sorting, hauling and placing riprap, and placing 2 polyethylene culvert sections. This is a construction project.
Project Location
Project is located on the Three Rivers Ranger District. See attached maps for exact location.
Project may be reached by traveling west from Colville, Washington on Hwy 395 to the junction with State Route 20, west of Kettle Falls, Washington. Proceed west on State Route 20 approximately 11 miles to the Growden Heritage Site. From the Growden Heritage Site, proceed west on State Route 20, approximately 0.4 miles to the junction with the Lane Creek Road, Forest Service Road No. 2000220. Proceed north east on Forest Service road 2000220, approximately 0.5 miles to the junction with Forest Service Road 2000222. Proceed northwest on Forest Service Road 2000222 approximately 0.6 miles to the Lane Creek Riprap Pit.
AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
Special Project Specifications
The Special Project Specifications shown in the specification listing are applicable to this contract. All specifications not included in the specification listing, but referenced by listed specifications, are applicable. The Special Project Specifications shown on the specification list are physically attached to this contract.
Project Drawings
The attached listed drawings (4 pages) are part of this solicitation and any resultant contract.
Sheet 1 - Vicinity Map Sheet 2 – Growden Dam Diversion Plan Sheet 3 – Growden Dam Energy Dissipater Sheet 4 – Lane Creek Riprap it Development
Growden Energy Dissipater Project A RFQ AG-05G1-S-09-0010 Three Rivers Ranger District Page 5
ADDITIONAL CLAUSES
The Government will issue a task order against one of the contracts for Road Work, Colville National Forest. All terms and conditions listed in the main contract are also part of this solicitation and resulting task order.
In addition, the following clauses apply to this task order:
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than June 12, 2009. The time stated for completion shall include final cleanup of the premises.
Required Submittals
The following is a general summary of the required submittals. Other submittals may be required as specified elsewhere in this contract.
Submittal Title Referenced By
Specification No.
Submittal Date
Schedule of Work Section F of base contract
Prior to Work Starting
Job Specific Safety Plan Section H of base contract
Prior to Work Starting
Blasting Plan Section H of base contract.
Prior to Work Starting
AGAR 452.215-73 Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held after the date of contract award. The conference will be held at Colville National Forest Supervisor’s Office, 765 South Main, Colville, Washington 99114.
Government-Furnished Property
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained elsewhere in the contract.
Item No. Property Description Qty Location Date Available or
Delivery Date
3 Culvert Gasket Lubricant 1 Can At Job Site Start of Work
3 Polyethylene Culvert 2 Sections At Job Site Start of Work
Growden Energy Dissipater Project A RFQ AG-05G1-S-09-0010 Three Rivers Ranger District Page 6
Rights in and Use in Materials
A. The Contractor, with the written approval of the Contracting Officer, may use on the project suitable stone, gravel, and sand, or other material found in the excavation. Payment will be made both for the excavation of such materials at the corresponding contract unit price and for the pay items for which the excavated material is used. The Contractor shall replace without additional compensation sufficient suitable materials to complete the portion of the work which was originally contemplated to be constructed with such material.
B. Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to reimburse the Contractor for the cost of their production.
Job Specific Safety Plan
Prior to the prework meeting, the Contractor shall provide a written job specific safety plan that recognizes the inherently hazardous conditions that will exist on this contract. Some of these hazardous conditions are, but not limited to: blasting, heavy equipment operation, traffic control on haul routes, loading an unloading of materials, site security, noises and dust contract and the use of personal protective equipment (PPE) in the work area. The plan shall be in accordance with OSHA Regulations. The plan shall include all tasks and related activities anticipated to successfully complete the work.
Blasting
The Contractor shall comply with State and Federal laws in regards to transportation, storage and use of explosives.
The Contractor shall post a watchperson at a safe distance on all approaches to a blasting area on all approaching roads, trails or waterways.
Prior to the start of any blasting activities the contractor shall prepare and provide a safety plan for the activities involved that is consistent with the State OSHA regulations.
Safety Items
(a) Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the work site.
(b) The following checked activities have been identified by the Government as potential safety hazards.
[] Confined Entry Space.
[X] Temporary excavation/deep trenching/slope stability.
[X] Tree Felling.
[] Fall hazard from work heights exceeding six feet.
[X] Blasting.
[] Traffic control on high-volume and/or high-speed and/or limited visibility roads.
Growden Energy Dissipater Project A RFQ AG-05G1-S-09-0010 Three Rivers Ranger District Page 7
[X] Heavy equipment operation.
[] Tree climbing and/or tower climbing.
[] Fire hazards.
[X] Hazard materials handling.
[X] Electrical hazard.
[] Hydraulic and/or pneumatic and/or other high pressure hazards.
[] Mechanical hazards such as pulleys, springs, etc.
[] Power tool operation including eye protection.
[] Overhead hazards.
FSAR 4G52.222-704 Personal Protective Equipment (FEB 2007)
1. The Contractor will train in the safe operation and use of equipment to all workers using such equipment.
2. Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered in a manner capable of causing injury or impairment in the function of any part of the body.
3. Defective or damaged personal protective equipment shall not be used.
4. The Contractor shall provide, at no cost to the employee, to each employee who operates a chain saw, chain saw chaps and assure the chaps are worn during saw operations. These chaps must be approved by Underwriters Laboratory or meet Forest Service specification 6170-47. The chaps shall cover the full length of the thigh to the top of the boot on each leg.
5. The Contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support. Employees operating chain saws shall wear foot protection that is constructed with cut-resistant material which will protect the employee against contact with a running chain saw.
6. The Contractor shall provide, at no cost to the employee, and assure that each employee who works in an area where there is potential for head injury from falling objects or flying objects wears a hard hat that meets the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.
7. The Contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects. This eye protection must meet the minimum requirements of ANSI standard Z87.1- 2003.
8. The Contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise e.g., chain saw operation.
Legal Relations and Responsibilities
A. Contractor's Responsibility for Utilities
Growden Energy Dissipater Project A RFQ AG-05G1-S-09-0010 Three Rivers Ranger District Page 8
In the event of interruption to utility services because of accidental breakage the Contractor shall promptly notify the utility authority and shall cooperate with that authority in the restoration of service.
Contractor’s Use of Existing Roads
The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. The authorization is limited to roads necessary for direct access between the construction area and storage sites, disposal areas, and other work areas designated in the contract.
The roads authorized for use will be subject to the following general conditions:
(1) State laws governing traffic rules and equipment requirements on State and County Highways.
(2) Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use in excess of State Codes for weight and size, damaging a road while using it, and blocking a road open to use by others.
The Contractor shall be responsible for and perform road maintenance commensurate with his use of Forest Service roads in the construction area.
Fire Precautionary Measure 2 Communications (R6-FS-6300-54)
The additional Fire Precautionary Measures 2 Communication (R6-FS-6300-54) is applicable to this task order.
The form is included in the base contract.
Contract Clauses
All basic and construction clauses in the main contract are applicable to this task order.
Payment Protection (FAR 52.228-13)
FAR 52.228-13 Alternative Payment Protections (JUL 2000) is applicable to this task order if the contract price is greater than $30,000. Reference basic contract.
The general wage determination applicable to this contract is attached in Section J: WA1 attached in the solicitation AG-05G1-S-09-0010 is applicable to this task order.
Growden Energy Dissipater Project A RFQ AG-05G1-S-09-0010 Three Rivers Ranger District Page 9
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
List of Attached Documents, Exhibits and Other Attachments
The following attachments are made a part of this solicitation and any resultant contract.
Title Pages
1. Specifications 2
2. Project Drawings (Attached) or (Separate) 4
Page No Description
1 Vicinity Map
2 Growden Dam Diversion Plan
3 Growden Dam Energy Dissipater
4 Lane Creek Riprap Pit Development
3. DOL Wage Decision No. WA1 (Reference Basic Solicitation)
Growden Energy Dissipater Project A RFQ AG-05G1-S-09-0010 Three Rivers Ranger District Page 10
Attachment A
Specifications
Growden Energy Dissipater
Cleaning of Off-Road Equipment. The Contractor shall wash all equipment except for hauling vehicles prior to entering National Forest Land. Remove all soil which could contain noxious weed seed. Remove grease and oil from drive mechanisms which would be discharged into the stream when equipment is operating. Prior to transporting equipment to the site, assure that the equipment's hydraulic, lubrication and fuel systems are free from leaks. Maintain equipment to be free of leaks in the hydraulic, lubrication and fuel systems while in the project area.
Mobilization. This work consists of moving personnel, equipment, material and incidentals to the project and performing all work necessary before beginning work at the project site. Mobilization includes obtaining permits, insurance and bonds.
Mobilization will be paid as a Lump Sum, at the bid amount, which will be complete payment for all work described in the contract, and necessary to complete the work for this item. Progress payments for mobilization will be paid as follows:
• Bond premiums will be reimbursed according to FAR Clause 52.232-5 Payments Under Fixed-price Construction Contracts, after receipt of the evidence of payment.
• When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item or 5 percent of the original contract amount, whichever is less will be paid.
• When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item , or 10 percent of the original contract amount, whichever is less, will be paid.
• Any portion of the mobilization item in excess of 10 percent of the orignal contract amount will be paid after final acceptance.
Developing the Lane Creek Riprap Pit. This work consists of all work, equipment and materials needed to clear, remove overburden, and produce 7,000 cubic yards of riprap. Produce riprap sizes predominately between 2’ cubic size (2’ by 2’ by 2’) and 5’ cubic size (5’ by 5’ by 5’).
Remove all overburden from the pit development limits, including all clearing slash. Cut merchantable trees and deck them at the location shown in the plans. Strip overburden and all clearing slash, including unmerchantable size trees in one operation and stockpile this material in the location shown on the plans.
Set up the drill hole pattern within the proposed development limits shown on the pit development plan. Begin the drill hole pattern adjacent to the uphill road edge and proceed uphill with the pattern until the quantity of 7,000 cubic yards is produced. Maximum drill hole depth is the elevation of the adjacent Forest Service Road 2000222.
Estimate the cubic yards of riprap produced by measuring each drill hole depth and multiplying the depth by one half the drill hole spacing squared, divided by 27 to get the cubic yards of material produced at each drill hole.
Sum the cubic yards produced at each drill hole to meet the riprap production quantity of 7,000 cubic yards.
Growden Energy Dissipater Project A RFQ AG-05G1-S-09-0010 Three Rivers Ranger District Page 11
Utilize controlled blasting techniques and other measures so that no fly rock reaches the high voltage power lines down hill of the Lane Creek Riprap Pit.
Constructing the Energy Dissipater. This work consists of excavating and sorting riprap in the Lane Creek Riprap Pit, hauling riprap to the energy dissipater at the Growden Dam Heritage Site, diverting Sherman Creek into the alternative channel, and excavating out the energy dissipater site and placing riprap to construct the energy dissipater.
Sort riprap so that 50 percent of the rock is between 16” and 24” cubic dimension and 50 percent of the rock is between 6” and 16” cubic dimension.
Dewater the energy dissipater area by excavating out the upstream end of the alternate channel shown in the plans. Excavate the upstream end of the channel to a sufficient depth that the surface flow out of the pool at the outlet of the box culvert through the dam is completely diverted into the alternate channel.
Excavate for the energy dissipater to the elevations and dimensions shown in the plans and staked by the COR.
Place excavated material to the upstream side of the energy dissipater so as to block off the existing outlet of the pool at the outlet of the box culvert. Compact the deposited material by operating equipment over it. Dump and haul riprap to the energy dissipater off the face of the dam and away from the pool at the outlet of the existing box culvert through the dam. Move the riprap material into place in the excavated energy dissipater and pack down with the excavator bucket to form a dense mat of rock which conforms with the configuration shown in the plans.
Measure excavation by the average end area method, in place prior to excavation. Measure riprap in place after the energy dissipater is constructed.
Complete Installation of Diversion Culvert. This work includes placing the inlet and outlet sections on the existing diversion culvert at the Growden Dam Heritage Site. Haul the culvert segments to the appropriate end of the existing diversion culvert. Access the outlet end of the culvert by traveling down the face of the dam or by another route agreed to by the Contracting Officer. Do not access the outlet by traveling over the existing diversion culvert. Cut the outlet section to fit the constructed energy dissipater and push the belled end onto the end of the existing culvert. Utilize culvert joint lube supplied by the Government to facilitate joining the culvert sections. At the inlet of the existing diversion culvert, cut the 48” to 36” culvert reducer section to the length specified by the Contracting Officer. Limit the flow into the culvert work area by building a berm with streambed material around the area. Clean out the belled end of the existing culvert and roughly grade out the culvert bed for the inlet culvert section. Lubricate the bell and spigot ends of the culvert segments to be joined with lubricant provided by the Government and install the culvert segments by pushing the spigot end of the reducer onto the belled end of the existing culvert. Pack material excavated from the streambank around the culvert haunches and backfill over the top of the inlet culvert segment at the joint as directed by the Contracting Officer. Grade the streambank as directed by the Contracting Officer to keep the stream in the existing stream channel.
Work Area Signs. Forest Service will install and maintain construction signs at the construction site and at the other locations shown in the plans.
Growden Energy Dissipater Project A RFQ AG-05G1-S-09-0010 Three Rivers Ranger District Page 12
General Information about Project A, Growden Energy Dissipater
AG-05G1-S-09-00010, Project A, Growden Energy Dissipater
Estimated range is between $25,000 and $100,000
This is a construction Project.
Contractor shall submit with Business Proposal.
1. Task Order Form: SF-18. Complete Block 5, 12 and13.
2. Schedule of Items (Page 2 of Project A): Provide pricing. Enter a price for all sub-items.
Contractor shall submit with Technical Proposal.
1. Technical Approach for the project.
2. Blasting Methods for the project.
3. Expected Schedule including sequence of work items and approximate time to complete the project.
All information above shall be labeled Project A and have Offeror’s firms name on top of page.