Work Summary 14

View the file

Other files

File Type Posted
Amend 8 Roads. SF 30.pdf PDF
Amend 8 Evaluation Factors.pdf PDF
Amend 7 Roads. SF 30.pdf PDF
map vulcan water source.pdf PDF
Amend 6 Roads. SF 30.pdf PDF
Amend 6 Project B Schedule.pdf PDF
Picture 2113250.pdf PDF
Past Performance Survey.pdf PDF
Picture 2113200 A.pdf PDF
Project C Section 881.pdf PDF
Pictures 2113250 2113200.pdf PDF
Picture 2113400.pdf PDF
Picture 2113015a..pdf PDF
Project C 813_pbsc.pdf PDF
Project C 836.pdf PDF
Earth Mound Typical Drawing.pdf PDF
Pictures 2113200.pdf PDF
WA1 03202009.pdf PDF
Amend 5 Roads.pdf PDF
Project C 833_pbsc.pdf PDF
PreBid Conference Amend 5.pdf PDF
Amend 4 Attachment.pdf PDF
EXAMPLE C.pdf PDF
Wage_ Deter_ 1977_0209_37 05292008.pdf PDF
Amend 4 Roads.pdf PDF
Amend 3 Roads.pdf PDF
Est Quantity 3.pdf PDF
typrd Model 6.pdf PDF
vulcan worklist 12.pdf PDF
Project B Vulcan.pdf PDF
Title Model 1.pdf PDF
Est Qty 5.pdf PDF
Vicinity Map Model 2.pdf PDF
EstQty 4.pdf PDF
vulcan_worklist 16.pdf PDF
Type II gate detail model 10.pdf PDF
culvert details model 7 pdf.pdf PDF
vulcan_worklist 13.pdf PDF
vulcan_worklist 11.pdf PDF
!Vulcan Specs Project B.pdf PDF
Drainage Details Model 8.pdf PDF
AT7&8.pdf PDF
cmplist Model 9.pdf PDF
vulcan_worklist 15.pdf PDF
Amend 2 Roads.pdf PDF
Project A Growden Energy Dissipater.pdf PDF
growden_energy_dis_plans.pdf PDF
Vicnity Map.pdf PDF
sf24_f.pdf PDF
Amend 1 Roads.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK SUMMARY SHEET TOTAL SHEETS

ROAD 2113400R Seg 2 (cont) ROAD 2114033R

MP WORK ITEMS MP WORK ITEMS

4.02 Construct DD 0.00 Begin establishing clearing limits

4.09 Construct DD Begin clearing and grubbing

4.15 Construct OSD Begin blading and shaping 12' roadbed

4.26 Install 18'' X 30' CMP Install type 2 gate, 16' as staked by CO

4.36 End establishing clearing limits Jct 2114000

End clearing and grubbing 0.04 Construct DD End blading and shaping 12' roadbed 0.28 Construct OSD EOP Segment 2 0.53 Construct OSD

0.62 Construct DD

0.66 End establishing clearing limits

ROAD 2114000R Seg 2 End clearing and grubbing MP STA WORK ITEMS End blading and shaping 12' roadbed

9.00 0+00 Equation Station Mp 9.00 Back = Sta 0+00 Ahead EOP

Remove berm and haul material to Jct of 2114400R to construct T-intersection Retain boulders and place around gate during installation

1+45 Begin roadside brushing ROAD 2114080R Install type 2 gate, 16' as staked by CO STA WORK ITEMS

13+65 End roadside brushing 0+00 Jct 2114000R EOP Begin establishing clearing limits Jct 2114080R Begin clearing and grubbing

Begin constructing 12' roadbed Begin constructing 2' CWR

ROAD 2114025R 0+75 End constructing 2' CWR STA WORK ITEMS Begin constructing 2' CWL 0+00 Jct 2114000 2+00 End constructing 2' CWL

Maintain 2114000 ditch line 6+55 Construct OSD with 15' LOD left Begin establishing clearing limits 9+50 Construct OSD Begin clearing and grubbing 11+45 End establishing clearing limits Begin blading and shaping 12' roadbed End clearing and grubbing Install type 2 gate, 16' as staked by CO End constructing 12' roadbed

2+25 Construct DD EOP 11+10 Construct TOL and TAR 12+50 Construct DD 16+60 Construct DD 19+65 End establishing clearing limits

End clearing and grubbing End blading and shaping 12' roadbed

EOP

14 16