WORK SUMMARY SHEET TOTAL SHEETS
ROAD 2113400R Seg 2 (cont) ROAD 2114033R
MP WORK ITEMS MP WORK ITEMS
4.02 Construct DD 0.00 Begin establishing clearing limits
4.09 Construct DD Begin clearing and grubbing
4.15 Construct OSD Begin blading and shaping 12' roadbed
4.26 Install 18'' X 30' CMP Install type 2 gate, 16' as staked by CO
4.36 End establishing clearing limits Jct 2114000
End clearing and grubbing 0.04 Construct DD End blading and shaping 12' roadbed 0.28 Construct OSD EOP Segment 2 0.53 Construct OSD
0.62 Construct DD
0.66 End establishing clearing limits
ROAD 2114000R Seg 2 End clearing and grubbing MP STA WORK ITEMS End blading and shaping 12' roadbed
9.00 0+00 Equation Station Mp 9.00 Back = Sta 0+00 Ahead EOP
Remove berm and haul material to Jct of 2114400R to construct T-intersection Retain boulders and place around gate during installation
1+45 Begin roadside brushing ROAD 2114080R Install type 2 gate, 16' as staked by CO STA WORK ITEMS
13+65 End roadside brushing 0+00 Jct 2114000R EOP Begin establishing clearing limits Jct 2114080R Begin clearing and grubbing
Begin constructing 12' roadbed Begin constructing 2' CWR
ROAD 2114025R 0+75 End constructing 2' CWR STA WORK ITEMS Begin constructing 2' CWL 0+00 Jct 2114000 2+00 End constructing 2' CWL
Maintain 2114000 ditch line 6+55 Construct OSD with 15' LOD left Begin establishing clearing limits 9+50 Construct OSD Begin clearing and grubbing 11+45 End establishing clearing limits Begin blading and shaping 12' roadbed End clearing and grubbing Install type 2 gate, 16' as staked by CO End constructing 12' roadbed
2+25 Construct DD EOP 11+10 Construct TOL and TAR 12+50 Construct DD 16+60 Construct DD 19+65 End establishing clearing limits
End clearing and grubbing End blading and shaping 12' roadbed
EOP
14 16