Est Qty 5.pdf
PDF 8 KB Posted
- Attached to
- Forest Road Work
- Solicitation number
- AG-05G1-S-09-0010
About this file
Estimate of Quantities 5
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET TOTAL SHEETS
Project Road Number and Length
Item Number
Description Unit 2114510R
0.39 mi
Sheet Totals Project Totals
15101 Mobilization ls All All All 15219 Establishing clearing limits mile 0.39 0.39 9.98
20103 Clearing and grubbing, disposal of tops and limbs f,l, logs f, and stumps f. mile 0.39 0.39 7.73
20301 Removal of Culvert each 0 1
20402 Roadway excavation, compaction method C, finishing method C . mile 0.39 0.39 9.69
20404 Unclassified borrow, compaction method B, finishing method C cy 0 78
20420A Drainage excavation, type Drain Dip each 2 2 59
20420B Drainage excavation, type Outslope Drain each 0 38 23050 Roadside Brushing mile 0 2.25 25102 Placed riprap, c;ass 2 cy* 0 2 25103 Keyed riprap, class 4. cy 0 70
32222 Pit run maximum size 4" compaction method H cy 16 16 1762
60250A 18 inch corrugated metal pipe, 0.064 inch thickness for steel or 0.060 inch thickness for aluminum, method A ft 0 82
60250B 24 inch corrugated metal pipe, 0.064 inch thickness for steel or 0.060 inch thickness for aluminum, method B ft 0 32
62501 Seeding dry method acre 1.22 1.22 28.87
65001 Furnish and Install road closure device, type II gate, size 16' each 1 1 8
* Denotes Contract Quantities
Commercial source
Commercial source
Commercial source
Disposal Method A
Borrow source on 2114040
Quantities
5 16
ESTIMATE OF QUANTITES
Remarks
File details come from the government source that posted it. Updated .