WORK SUMMARY SHEET TOTAL SHEETS
ROAD 2113300R ROAD 2113400R Seg 1
MP WORK ITEMS MP WORK ITEMS
0.00 Jct 2113200R 0.00 Jct 2113000
0.07 Construct DD 0.28 Begin placing 6" of aggregate
0.16 Construct DD Construct DD
0.28 Construct DD 0.35 Construct DD
0.38 Construct OSD End placing 6" of aggregate
0.58 Construct OSD 0.45 Begin placing 6" of aggregate
0.74 Construct OSD 0.51 End placing 6" of aggregate
1.01 Construct DD Construct DD
1.05 Begin placing 6'' of aggregate 1.36 Begin constructing ditch right
1.11 End placing 6'' of aggregate Begin placing 6" of aggregate
Construct DD 1.37 Construct OSD
1.20 Construct DD 1.38 End constructing ditch right
1.42 Construct DD End placing 6" of aggregate
1.48 Construct DD 2.02 Begin placing 6'' of aggregate
1.57 Begin blading and shaping 12' roadbed 2.06 End placing 6'' of aggregate
1.59 Construct OSD 2.65 Begin constructing ditch right
1.63 Construct OSD 2.68 End constructing ditch right
Haul and place additional 8 CY of aggregate in OSD 2.83 Install 18'' X 26' CMP
1.69 Construct DD 3.12 Construct DD
1.85 Jct 2113360R Right 3.38 Begin blading and shaping 12' roadbed
End blading and shaping 12' roadbed 3.60 Construct OSD EOP 3.68 End blading and shaping 12' roadbed
EOP Segment 1 Jct 2113400R Segment 2
ROAD 2113360R Jct 2114500R Segment 3 Right
STA WORK ITEMS
0+00 Jct 2113300R
Do not disturb roadway template From 0+00 to 2+00 ROAD 2113400R Seg 2 Protect Existing Snotel Site MP WORK ITEMS
2+00 Begin establishing clearing limits 3.68 2113400R Segment 1 EOP Begin clearing and grubbing Jct 2114500R Segment 3 Right Begin constructing 12' roadbed Begin establishing clearing limits Install type 2 gate, 16' as staked by CO Begin clearing and grubbing
4+17 Construct DD Begin blading and shaping 12' roadbed 6+98 Construct DD Install type 2 gate, 16' as staked by CO 8+40 Construct OSD 3.74 Construct DD
11+42 Construct DD Begin realignment by shifting roadbed right, as staked by CO 12+00 Construct TOL and TAR 3.75 Fill failure, existing roadbed is 8 ft. wide 12+50 End establishing clearing limits Shift alignment 6' right into cut bank to gain roadbed width
End clearing and grubbing 3.77 End realignment blend to existing template End constructing 12' roadbed 3.85 Construct DD
EOP
13 16