A23 Exhibit C Task Order 01 Submission Requirements and Evaluation.pdf

PDF 88 KB Posted

Attached to
WHS Multiple Award Construction Contract II (MACC II)
Solicitation number
HQ003421R0003
Issued by

About this file

This document outlines the submission requirements and evaluation criteria for a seed project task order under the Washington Headquarters Services Multiple Award Construction Contract II vehicle. The task order will be awarded to the lowest priced technically acceptable offer submitted by an active MACC II contractor. Technical acceptability will already have been established under the MACC II contract. Price will be the sole determinant, with proposals sorted by total price and the lowest offer selected for award. The seed project task order is valued between $500,000 and $15 million and will involve design-build or design-bid-build construction, alteration, or repair services at government facilities in the District of Columbia, Maryland, Virginia, and Adams County, Pennsylvania areas.

View the file

Other files

File Type Posted
A23 Attachment 14 Pass-Fail Gateway Criteria Checklist R1.docx DOCX document
A23 Attachment 09 Davis-Bacon WD VA20210013 R7 (6 Aug 2021).pdf PDF
A23 Exhibit H DD254 Contract Security Classification Specification - Post 7 R1.pdf PDF
A23 Attachment 18 Answered RFIs R2 (18 Aug 2021).pdf PDF
A23 HQ003421R0003-0011 WHS MACC II Solicitation Amend 11 (20 Aug 2021).pdf PDF
A23 HQ003421R0003-0010 WHS MACC II Solicitation Amend 10 (27 Jul 2021).pdf PDF
A23 Attachment 10 Davis-Bacon WD PA20210073 R9 (23 Jul 2021).pdf PDF
A23 Attachment 18 Answered RFIs R1 (26 Jul 2021).pdf PDF
A23 Attachment 09 Davis-Bacon WD VA20210013 R6 (23 Jul 2021).pdf PDF
A23 Exhibit A SOW Post 7 R2 2021_0726 (Final).pdf PDF
A23 Exhibit K Pre-Proposal RFI 064 TR Room Location (9 Jun 2021).pdf PDF
A23 Exhibit F Contractor Modification Price Proposal Template (Jul 2021).xlsx XLSX spreadsheet
A23 Attachment 10 Davis-Bacon WD PA20210073 R8 (16 Jul 2021).pdf PDF
A23 Attachment 18 Answered RFIs (20 Jul 2021).pdf PDF
A23 HQ003421R0003-0009 WHS MACC II Solicitation Amend 9 (20 Jul 2021).pdf PDF
A23 Exhibit A SOW Post 7 R1 2021_0714 (Final).pdf PDF
A23 HQ003421R0003-0008 WHS MACC II Solicitation Amend 8 (19 Jul 2021).pdf PDF
A23 Attachment 05 Past Performance Questionnaire R2.docx DOCX document
A23 Attachment 17 DD2345 Militarily Critical Technical Data Agreement.pdf PDF
A23 Attachment 16 Joint Venture Participant Concerns Small Business Representations.docx DOCX document
A23 Attachment 10 Davis-Bacon WD PA20210073 R6 (9 Jul 2021).pdf PDF
A23 Attachment 15 Sample Client Authorization Language.pdf PDF
A23 Attachment 11 Key Personnel Qualifications (Seed Project) R2.docx DOCX document
A23 HQ003421R0003-0007 WHS MACC II Solicitation Amend 7 (9 Jul 2021).pdf PDF
A23 Attachment 14 Pass-Fail Gateway Criteria Checklist R0.docx DOCX document
A23 HQ003421R0003-0006 WHS MACC II Solicitation Amend 6 (2 Jul 2021).pdf PDF
A23 Attachment 11 Key Personnel Qualifications (Seed Project).docx DOCX document
A23 Exhibit B Seed Project Attachments (29 Mar 2021) - CUI.zip ZIP file
A23 Attachment 06 DD Form 254 MACC II IDIQ Pentagon R1 (Draft).pdf PDF
A23 Attachment 02 Pentagon SOW Attachments.zip ZIP file
A23 Exhibit G Experience-Offeror (12 Jun 2021).docx DOCX document
A23 Exhibit I 1st Floor Plan - Portal 7 RRMC-21-00010 17 May 2021 R1 - CUI.pdf PDF
A23 Attachment 11 Key Personnel Qualifications (Seed Project).docx DOCX document
A23 Exhibit J Site Walk Sign-in Sheets_Redacted.pdf PDF
A23 Exhibit H DD254 Contract Security Classification Specification - Post 7 R0.pdf PDF
A23 Attachment 01 Pentagon Requirements Document Sample.pdf PDF
A23 Attachment 09 Davis-Bacon WD VA20210013 R5 (4 Jun 2021).pdf PDF
A23 Attachment 07 DD Form 254 MACC II IDIQ RRMC R1 (Draft).pdf PDF
A23 HQ003421R0003-0005 WHS MACC II Solicitation Amend 5 (25 Jun 2021).pdf PDF
A23 Attachment 05 Past Performance Questionnaire R1.docx DOCX document
A23 HQ003421R0003-0004 WHS MACC II Solicitation Amend 4 (17 Jun 2021).pdf PDF
A23 HQ003421R0003-0003 WHS MACC II Solicitation Amend 3 (17 Jun 2021).pdf PDF
A23 HQ003421R0003-0002 WHS MACC II Solicitation Amend 2 (27 May 2021).pdf PDF
A23 Exhibit E Construction Cost Estimate Template (May 2021).xlsx XLSX spreadsheet
A23 HQ003421R0003-0001 WHS MACC II Solicitation Amend 1 (24 May 2021).pdf PDF
A23 Attachment 13 Site Walk RFI Template.docx DOCX document
A23 Attachment 07 DD Form 254 RRMC.pdf PDF
A23 Exhibit E Construction Cost Estimate Template (Apr 2021).xlsx XLSX spreadsheet
A23 Attachment 05 Past Performance Questionnaire.docx DOCX document
A23 Attachment 01 Pentagon_Specific Requirements.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C SEED PROJECT SUBMISSION REQUIREMENTS (11 May 2021)

A. SEED PROJECT EVALUATION

The evaluation of the seed project proposal for a task order award is entirely separate from the MACC II source selection.

Consideration for task order award does not begin until after the MACC II IDIQ contracts are awarded.

The Government intends to award one task order resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation is the Lowest Priced Technically Acceptable (LPTA) offer.

The Government intends to make an award without discussions; however, the Government reserves the right to conduct discussions. The Government may reject any or all proposals at its sole discretion if such action is in the public interest.

The Government may waive informalities and minor irregularities in offers received.

B. EVALUATION FACTORS

Factor I - Technical

The MACC II Volume I: Factor I – Technical proposal was evaluated during source selection for the MACC II contract.

All active pool MACC II contractors are considered to have an acceptable technical proposal for purposes of evaluation for task order award. There is no separate technical proposal for the seed project task order award.

Technical Acceptable/Unacceptable Rating Method

Adjectival Rating Description Acceptable Proposal meets the requirements of the solicitation.

Unacceptable Proposal does not meet the requirements of the solicitation.

Factor II - Price

The MACC II Volume III: Price (Seed Project, Task Order 0001) was evaluated during source selection for the MACC II contract. The prices for the seed project proposed by all active pool MACC II contractors were determined fair, reasonable, and realistic during source selection for the MACC II contract.

To evaluate price proposals, the Exhibit D Seed Project Offer Schedule offers will be sorted by total price in ascending order. The contractor that proposed the lowest price will receive the seed project task order.

File details come from the government source that posted it. Updated .