This is a solicitation for the Washington Headquarters Services Acquisition Directorate Multiple Award Construction Contract II program. The requirement is a 100% HUBZone small business set-aside for design-build and design-bid-build construction, alteration, and repair services at various government facilities in Washington Headquarters Services' area of responsibility, including the District of Columbia, Maryland, Virginia, and Adams County, Pennsylvania. The types of work include renovation of commercial and industrial buildings, sustainment and modernization of existing facilities, repair of commercial buildings, design and installation of furniture and equipment, installation of energy management controls, and mechanical, electrical, and plumbing systems work. The agency expects to award indefinite-delivery, indefinite-quantity contracts to several contractors with a ceiling value of $150 million each and a potential 10-year ordering period. Task orders will range from $500 thousand to $15 million, with some up to $20 million. The minimum guarantee is $10,000 per contract. Proposals are due by June 23, 2021.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Continued on Next Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 31
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HQ003421R0003
X 9B. DATED (SEE ITEM 11)
12-May-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-May-2021
CODE
WHS - ACQUISITION DIRECTORATE
1155 DEFENSE PENTAGON RM 2E125
WASHINGTON DC 20301-1155
HQ0034 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
HQ003421R0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
Solicitation Amendment 0001 – SF30 Block 14, Continuation
The purpose of this amendment is to:
(1) Add the Section J Attachment 13 RFI Template;
(2) Correct Section L3.4 typographical errors;
(3) Correct a Section L6.1.C. spelling error;
(4) Correct Section L6.2.D.4. to "... Additionally, each member of such a JV or TA must have an active SECRET facility clearance in accordance with the Pass/Fail Qualifications identified under M4.2.;"
(5) Correct Section L6.5.A.2. to add the sentence "Any offeror that is a JV or TA must provide a copy of each JV or TA member's active SECRET facility clearance." and change the article before "facility through ..." from "the" to "each;"
(6) Correct a Section L6.5.B.3. typographical error;
(7) Correct paragraph numbering for Section M3.5. Government Rights Reservations;
(8) Correct paragraph numbering for Section M3.6 Pass/Fail Gateway Criteria;
(9) Correct Section M4.2. to "... Additionally, each member of such a JV or TA must have an active SECRET facility clearance by the proposal due date ...;"
(10) Correct a Section M6.1.B. typographical error;
(11) Correct a Section M6.2. typographical error;
(12) Correct Section M9.1. typographical errors.
The solicitation is otherwise unchanged by this amendment.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A Seed Project SOW Post 7 29 Mar 2021
74 29-MAR-2021
Exhibit B Seed Project Attachments
- 18 - 29 Mar 2021
29-MAR-2021
Exhibit C Task Order 1 Submission and Evaluation (11 May 2021)
11-MAY-2021
Exhibit D Seed Project Offer Schedule (11 May 2021)
11-MAY-2021
Exhibit E UNIFORMAT II Construction Cost Estimate Template (Apr 2021)
07-APR-2021
Exhibit F Contractor Modification Price Proposal Template (Apr 2021)
07-APR-2021
Exhibit G Experience - Offeror (Form)
2 16-APR-2021
Attachment 01 Pentagon Specifications 24-JAN-2020 Attachment 02 Pentagon SOW
Attachments
Attachment 03 RRMC Specifications 24-JAN-2020 Attachment 04 RRMC SOW
Attachment 05 Past Performance Questionnaire
Attachment 06 DD Form 254 Attachment 07 DD Form 254 RRMC Attachment 08 RRMC Visitor Access
Request (VAR) Form
Attachment 09 Davis-Bacon Act WD # VA20210013 R3 (7 May 2021)
8 07-MAY-2021
Attachment 10 Davis-Bacon Act WD # PA20210073 R5 (7 May 2021)
9 07-MAY-2021
Attachment 11 Key Personnel Qualifications
Attachment 12 Unified Master Reference List (UMRL)
282 01-JAN-2021
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A Seed Project SOW Post 7
29 Mar 2021
74 29-MAR-2021
Exhibit B Seed Project Attachments
- 18 - 29 Mar 2021
29-MAR-2021
Exhibit C Task Order 1 Submission and Evaluation (11 May 2021)
11-MAY-2021
Exhibit D Seed Project Offer Schedule (11 May 2021)
11-MAY-2021
Exhibit E UNIFORMAT II Construction Cost Estimate Template (Apr 2021)
07-APR-2021
Exhibit F Contractor Modification Price Proposal Template (Apr 2021)
07-APR-2021
Exhibit G Experience - Offeror (Form)
2 16-APR-2021
Attachment 01 Pentagon Specifications 24-JAN-2020 Attachment 02 Pentagon SOW
Attachment 03 RRMC Specifications 24-JAN-2020 Attachment 04 RRMC SOW
Attachment 05 Past Performance Questionnaire
Attachment 06 DD Form 254 Attachment 07 DD Form 254 RRMC Attachment 08 RRMC Visitor Access
Request (VAR) Form
Attachment 09 Davis-Bacon Act WD # VA20210013 R3 (7 May 2021)
8 07-MAY-2021
Attachment 10 Davis-Bacon Act WD # PA20210073 R5 (7 May 2021)
9 07-MAY-2021
Attachment 11 Key Personnel Qualifications
Attachment 12 Unified Master Reference List (UMRL)
282 01-JAN-2021
Attachment 13 Attachment 13 RFI Template
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
L INSTRUCTIONS TO OFFERORS
SECTION L INSTRUCTIONS TO OFFERORS TABLE OF CONTENTS
L1.0 GENERAL
1.1. Instructions Supplemental to FAR 52.215-1
1.2. Solicitation Schedule
1.3. Important Offeror Responsibility
1.4. No Assumption of Advance Government Knowledge
1.5. Pre-Proposal Site Walk and Conference
1.6. Unconditional Acceptance of Terms Required
1.7. Electronic Data Submission Required
1.8. Electronic Data Submission Points of Contact
1.9. Late Proposals
1.10. Proposal Terms
L2.0 PASS/FAIL GATEWAY CRITERIA
2.1. Pass/Fail Gateway Criteria
2.2. Pass/Fail Criteria
L3.0 PRE- PROPOSAL REQUESTS FOR INFORMATION (RFI)
3.1. Pre-Proposal Requests for Information (RFIs)
3.2. Complete, Concise RFIs Required
3.3. Offeror Duty to Inquire
3.4. Requests for Information (RFIs)
L4.0 PROPOSAL SUBMISSION INSTRUCTIONS
4.1. Proposal Volumes
4.2. Electronic Proposal Submission Required
4.3. Incomplete Proposals
4.4. System for Award Management, Representations, and Certifications
4.5. Marking Required for Confidential and Proprietary Information
L5.0 PROPOSAL CONTENT
L6.0 VOLUME ORGANIZATION AND CONTENT
6.1. VOLUME I: FACTOR I –TECHNICAL
6.2. VOLUME II: FACTOR II -- PAST PERFORMANCE
6.3. General
6.4. VOLUME III: FACTOR III – PRICE
6.5. VOLUME IV – OTHER CONTRACTUAL INFORMATION
L7.0 RESPONSIBILITY DETERMINATION
7.1. General Standards for Responsibility
7.2. Information Obtained from Third Parties
L8.0 ORGANIZATIONAL CONFLICT OF INTEREST NOTIFICATION
8.1. Disclosure of Organizational Conflict(s) of Interest Required
8.2. Unmitigated Organizational Conflict(s) of Interest May Prohibit Award
L9.0 CONTRACTOR DISCLOSURE OF ACTUAL OR POTENTIAL CONFLICT OF INTEREST
9.1. Other Actual or Potential Conflict(s) of Interest
9.2. Mitigation Plan
9.3. Final Authority
9.4. Remedies
L1.0 GENERAL
1.1. Instructions Supplemental to FAR 52.215-1.
These instructions supplement the other requirements of Section L -- Instructions, Conditions and Notices to Bidders, including, but not limited to, the provision FAR 52.215-1 Instructions to Offerors— Competitive Acquisition provided in full text. In the case of a conflict, the terms of Section L FAR and DFARS provisions take precedence over these supplemental instructions.
1.2. Solicitation Schedule.
The anticipated solicitation schedule is:
Event Date/Time RFP Release 12 May 2021 Conference/Site Walk 1 25 May 2021 at 0900 AM ET Conference/Site Walk 2 25 May 2021 at 1300 PM ET (If Req) Conference/Site Walk 3 26 May 2021 at 0900 AM ET (If Req) Conference/Site Walk 4 26 May 2021 at 1300 PM ET (If Req) Conference/Site Walk 5 27 May 2021 at 0900 AM ET (If Req) Conference/Site Walk 6 27 May 2021 at 1300 PM ET (If Req) RFIs Due 2 Jun 2021 at 3:00 PM ET RFI Answers Due 8 Jun 2021 End of Day Proposal Due Date 23 Jun 2021 at 3:00 PM ET
The solicitation schedule is subject to change. Any change to the solicitation schedule is accomplished by a written SF30 solicitation amendment.
1.3. Important Offeror Responsibility.
Offerors must read and consider the requirements of the entire request for proposal (RFP) solicitation, including all attachments and reference publications, before proposal preparation. RFPs are used in negotiated acquisitions to communicate Government requirements to prospective contractors and to solicit proposals. The pre-proposal conference(s) and site walk(s) provide opportunities to improve understanding of the requirement, RFP, investigate the site and conditions affecting the work, and identify questions for the Government to answer. The Government is not responsible for offeror business decisions to do other than fully read and consider the entire RFP solicitation, any failure to adequately investigate site conditions, or any failure to inquire about any questions before proposal submission.
1.4. No Assumption of Advance Government Knowledge.
When preparing proposals, offerors must assume that the Government has no prior knowledge of contractor facilities, capabilities, experience, or personnel. The Government evaluates the information included in the proposal; no assumptions are made about contractor facilities, capabilities, experience, or personnel. The sole exceptions to this rule are for past performance and responsibility determinations, where we may consider your proposal and additional information from any source during our evaluation.
1.5. Pre-Proposal Site Walk and Conference.
Offerors must attend and actively participate in any pre-preproposal conference(s) and site walk(s).
You must submit an email request to the POCs listed in section L1.8 to request assignment to a conference/site walk. Each individual Offeror is limited to no more than three (3) site walk attendees. You must include your company CAGE Code and DUNS number with your request, and a list of desired attendees. You must submit an RRMC Visit Access Request (VAR) form we provide promptly. Each attendee must pass a background check before visit approval. Offerors must have an active facility clearance sufficient to safeguard materials classified as SECRET to attend the site walk.
We reserve the right to add additional site walk groups as necessary by solicitation amendment to accommodate qualified, responsible potential offerors that ask to attend the site walk.
The RRMC Visit Access Request (VAR) includes the following data requirements. Do not provide this information until we ask for it.
• Last name
• First name
• Middle name
• Employer
• Date of Birth (DOB) (mm/dd/yyyy)
• Place of Birth (POB)
• Citizenship
• Social Security Number (SSN)
• Clearance Type
• Clearance Investigation Type (if known)
• Clearance Investigation Closed Date (if known)
• DoD Common Access Card (CAC) (Y or N)
• Pentagon Facility Access Credential (PFAC) (Y or N)
• Email address
Offerors must comply with all pre-proposal site walk and conference pre-registration requirements. The pre-proposal conference(s) and site walk(s) provide opportunities to improve understanding of the requirement, RFP, investigate the site and conditions affecting the work, and identify questions for the Government to answer.
Site Visit Location
The Raven Rock Mountain Complex (site) main entrance is at the intersection of Harbaugh Valley Road and Gladhill Road. As you travel away from Highway 16 on Harbaugh Valley Road, the entrance is on your left. Global Positioning System (GPS) Address: 450 Harbaugh Valley Road, Fairfield, PA 17320
Directions from Washington DC:
• Take I-270 North to Frederick, MD. I-270 turns into US-15 in Frederick.
• Continue on US-15 through Thurmont, MD, then past Mount Saint Mary’s University.
• Exit to MD-140 to Emmitsburg, MD. Turn Left at the stop sign towards Emmitsburg.
• Continue straight on MD-140 through the Emmitsburg Square. MD-140 becomes PA-16 at the Maryland/Pennsylvania state line. Travel 6.8 miles from the Emmitsburg Square and then turn left (south) onto Harbaugh Valley Road.
• After approximately 0.8 miles on Harbaugh Valley Road, turn left up an incline into the site guard booth. Gladhill Road is directly opposite the site entrance.
Site Visit Parking
The Government recommends parking in the lot at the main entrance. The Schungle Security Building is located near the parking lot we recommended. You should arrive in the parking lot no less than 40 minutes before the site visit. Leave all cell phones, laptops, cameras, Wi-Fi & Bluetooth capable devices in your vehicle. You must not bring any of these devices inside the site.
• You and all your attendees must arrive inside the Schungle Security Building no less than 20 minutes early to ensure we can depart on time.
• No person that is sick, has a known exposure to COVID-19 less than 14 days before your visit, has recovered from COVID-19 less than 14 days before the visit, has a cough, or any other symptom of respiratory illness may attend the site walk We may take your temperature before entry. You cannot enter the facility if your temperature is 100.2 degrees or higher.
• You must wear a proper cloth face covering during your visit. Your cloth face covering must extend above your nose without interfering with eyewear, and below your chin to cover your mouth and nostrils completely. Your face covering must fit snugly but comfortably against the sides of your face and be secured.
• Each attendee must bring two (2) forms of Government-issued identification, one of which must be photo identification. The kinds of photo identification that are acceptable are described at https://www.pfpa.mil/Portals/93/Images/190828-D-KU026-0001.pdf?ver=2019-08-28-143617- 280.
• After you enter through the metal detectors/baggage check-point, meet and gather outside the visitor’s area near our point of contact. After gathering, you will be processed through security and escorted into the site.
Pre-Proposal Conference
• We will hold a pre-proposal conference to familiarize you with the requirement.
• The full technical package contains controlled unclassified information (CUI). After a briefing on handling and protection requirements, you must sign a hand receipt to receive the full technical package.
• The technical package remains Government property. You must handle, safeguard, and return materials as instructed.
Site Walk
• We will tour site locations associated with this requirement. Consistent with clause and provision requirements, you must inspect the area to ascertain the nature and location of the work. You must satisfy yourself regarding all general and local conditions that may affect the cost of contract performance to the extent that the information is reasonably obtainable.
Ground Rules
• You must be on time. You must arrive inside the Schungle Security Building main entrance no less than 20 minutes early.
• All visitors must follow the rules and regulations as well as direction from Government personnel.
• You must stay with the group.
• You must keep track of your own requests for information (RFIs).
• You must submit RFIs in writing no later than the date specified. We cannot accept RFIs during the site visit. None of our comments during the site visit are binding on the Government.
• We must answer your RFIs in writing by an amendment to the solicitation/request for proposal.
• The only RFI responses that are binding on us are those answered in writing through a solicitation/request for proposal amendment.
• We cannot accept oral RFIs or telephone inquiries. You must submit all RFIs in writing.
• You and your attendees may take notes.
• Photographs and video recordings are prohibited.
• Cell phones, laptops, cameras, Wi-Fi & Bluetooth capable devices are prohibited. You should leave these devices in your privately-owned or company-owned vehicles. If you attempt to enter the facility with one of these devices, you may be denied entry.
• The Government is not obligated to reschedule a visit because of a denied entry or late arrival.
1.6. Unconditional Acceptance of Terms Required.
By submission of a proposal, all Offerors unconditionally accept all solicitation terms and conditions without any deviations, conditions, or exceptions. Proposals that contain exceptions, conditions, or other deviations from the solicitation terms and conditions render the entire proposal unacceptable and ineligible for an award. No portion of any offeror proposal is incorporated into the contract.
1.7. Electronic Data Submission Required.
This solicitation requires electronic submission of data through the Department of Defense Safe Access File Exchange (SAFE) at https://safe.apps.mil/ and electronic mail. Offerors must request a DoD Safe drop-off code from the primary and secondary points of contact identified above in advance of your submission. We recommend you ask for your drop-off code by email to the POCs in item L1.8 below at least three (3) business days prior to the due date for the type of submission involved. The Government is not responsible for late drop-off code requests or their impacts. Early submission is recommended. The Government is not responsible for delivery problems or delays.
1.8. Electronic Data Submission Points of Contact.
Offerors must submit all electronic information (questions, site visit names, proposal submissions) electronically to:
A. Primary point of contact: Mr. Juan C. Gomez at juan.c.gomez2.civ@mail.mil “AND”
B. Secondary point of contact: Mr. Kyle R. Blake at kyle.r.blake5.civ@mail.mil
1.9. Late Proposals
Any proposals received after the exact time specified for receipt are treated as a late submission IAW the Federal Acquisition Regulation (FAR) 52.215-1.
https://safe.apps.mil/
1.10. Proposal Terms
The Offeror’s proposal must be valid for no less than 180 calendar days from the date of submission.
L2.0 PASS/FAIL GATEWAY CRITERIA
2.1. Pass/Fail Gateway Criteria.
Pass/Fail gateway criteria are included in this solicitation. Pass/Fail gateway criteria are considered before all other evaluation criteria. Offerors must demonstrate and substantiate pass/fail criteria are met or exceeded for all stated criteria before we can evaluate your full proposal. If any one or more of the pass/fail criteria are rated “fail,” your proposal is not eligible for further consideration or an award.
2.2. Pass/Fail Criteria.
The pass/fail criteria are:
A. Active Certified HUBZone small business on the date of proposal submission, AND, B. Secret Facility Clearance (FCL) by the proposal due date, AND, C. Bonding Capacity of $15 million per project and $30 million per aggregate project amount, AND, D. Key Personnel Qualifications that meet or exceed MACC II SOW Section 2.0 Requirements for all
Key Personnel is demonstrated on section J Attachment 11 Key Personnel Qualifications.
L3.0 PRE- PROPOSAL REQUESTS FOR INFORMATION (RFI)
3.1. Pre-Proposal Requests for Information (RFIs).
All questions concerning this solicitation must be submitted timely in writing as Requests for Information (RFI) as specified by the solicitation. The Government is not obligated to answer any RFI received after the specified date and time.
3.2. Complete, Concise RFIs Required.
Your RFIs must include a reference to the RFP section, paragraph, document, attachment number (i.e.
JSC J-4, drawing….) you have a question about. Offerors carry the duty to seek clarification of all questions timely before proposal submission. RFIs must be complete and concise. The Government is not obligated to ask any offeror to clarify an RFI we cannot understand. The Government’s sole responsibility is our best effort to answer RFIs as presented by offerors.
3.3. Offeror Duty to Inquire.
By failing to inquire about any question or topic timely before proposal submission, the offeror forfeits the opportunity to rely on its unilateral, uninformed interpretation and bears all risks and consequences of misinterpretation.
3.4. Requests for Information (RFIs).
Offerors must submit all questions concerning this solicitation in writing as Requests for Information (RFI) by email to the points of contact specified in Section L1.8. if the total message size is 10 MB or less. If the total message size for your RFIs exceeds 10 MB, you must request a DoD Safe drop-off code as described in Section L1.7. above. The DoD email system does not accept electronic mail messages greater than 10 MB in size.
L4.0 PROPOSAL SUBMISSION INSTRUCTIONS
4.1. Proposal Volumes.
Proposals must be separated into volumes. Include a cover page for each volume and volume indexes as described in this section and section L5.0 PROPOSAL CONTENT. Do not include any price information in the technical volume.
A. Volume I: Factor 1 -- Technical
B. Volume II: Factor 2 -- Past Performance
C. Volume III: Factor 3 -- Price
D. Volume IV: Other Contractual Information
4.2. Electronic Proposal Submission Required.
Proposals must be submitted electronically through DoD Safe as described in Section L1.7. Offerors must request a DoD Safe drop-off code from the primary and secondary points of contact identified in Section L1.8. in advance of your submission. We recommend you ask for your drop-off code by email to the POCs in item L1.8 at least three (3) business days prior to the proposal due date. The Government is not responsible for late drop-off code requests or their impacts. Early submission is recommended. The Government is not responsible for delivery problems or delays.
A. Each Proposal Volume must include a cover page and a table of contents.
B. The offeror must submit an electronic copy of the Technical Proposal in its own volume (not included with the Price Proposal). Omit all price or cost details from the Technical Proposal. The Technical Proposal must not have margins smaller than .75" and must not contain text smaller than 12-point Times New Roman font. Each paragraph shall be separated by at least one 12- point line.
Page numbers must be included and may be within the margins. The Technical Proposal may include graphics and tables provided that graphics and tables do not contain text smaller than 10-point font. The electronic copy of the Technical Proposal must be provided in either .doc or searchable .pdf format.
C. Pages must be numbered and paragraphs identified by a commonly used and consistent system to assist in referencing specific areas of the proposal. Enclosures must be identified on all pages.
D. Before preparing the Technical Proposal, the offeror is advised to fully read and consider the MACC II Statement of Work (SOW), the SOW Attachments, and the Technical Evaluation Factors (Section M). In preparing its Technical Proposal, the offeror should avoid reciting or outlining the SOW, and should avoid simply restating information about the project.
E. Technical Proposals that simply state that the offeror has the understanding, knowledge, experience and ability to perform under this contract do not demonstrate an understanding of the contract requirements. The offeror should demonstrate the quality of its understanding, knowledge, experience and ability to perform under this contract by providing a detailed technical description in its Technical Proposal. General statements that the Contractor can or will comply with the requirements, that standard procedures will be used, that well known techniques will be used, or paraphrases of the Statement of Work (SOW), will not constitute compliance, and will be determined unacceptable.
F. Labeling – Each volume must be submitted in separate PDF, MS Word and/or MS Excel (files), identified by the Volume Number.
4.3. Incomplete Proposals.
The Government reserves the right to not evaluate or consider any incomplete proposal. An incomplete proposal is defined as one that is lacking the information required below and will be considered unacceptable. Contractors must assume that the Government has no prior knowledge of their facilities and experience and will base its evaluation on the information presented in the Contractor’s proposal.
4.4. System for Award Management, Representations, and Certifications.
Register in the System for Award Management (SAM) (www.beta.sam.gov) and complete all representations and certifications required by this solicitation. Offerors must have an active SAM registration at the time of proposal submission and at the time of award. If an Offeror does not have an active SAM registration or an exclusion is reported at the time of proposal submission or award, the Offeror is not eligible for an award.
4.5. Marking Required for Confidential and Proprietary Information.
Ensure that all confidential information within the submission is marked IAW the paragraph below entitled, “Confidential Information.”
A. Confidential Information: The Freedom of Information Act (FOIA) and its amendments have resulted in an increasing number of requests from outside the Government for copies of contract qualifications and proposals submitted to federal agencies. If the Contractor’s submissions contain information that he/she believes should be withheld from such requestors under FOIA on the grounds that they contain “trade secrets and commercial or financial information” (5 USC§552(b)(4)), the Contractor should mark its submissions in the following manner:
B. The following notice should be placed on the title page: “Some parts of this document, as identified on individual pages, are considered by the submitter to be privileged or confidential trade secrets or commercial or financial information not subject to mandatory disclosure under the Freedom of Information Act. Material considered privileged or confidential on such grounds is contained on page(s) _______.”
C. Each individual item considered privileged or confidential under FOIA should be marked with the following notice: “The data or information is considered confidential or privileged, and is not subject to mandatory disclosure under the Freedom of Information Act.”
L5.0 PROPOSAL CONTENT
VOLUME FACTOR PAGE LIMITATION
Volume I Factor 1: Technical Forty-Seven (47) Pages Total Technical Subfactor 1: Design Build Plan and
Approach Twenty (20) Pages
Technical Subfactor 2: Experience Fifteen (15) Pages (Certificates excluded)
Volume II Factor 2: Past Performance Twelve (12) Pages Volume III Factor 3: Price No Page Limitation Volume IV Other Contractual Information
Tab A) –
• SBA Active HUBZone Small Business
Certification
No Page Limitation
VOLUME FACTOR PAGE LIMITATION
• Confirmation of the current Facility
Clearance (minimum SECRET)
• Documentation from the Bonding
Company to establish current bonding capacity
• Key Personnel Qualifications Tab B) Signed and completed SF1442, Amendment Acknowledgement, Bid Bond No Page Limitation
Tab C) RFP Sections I thru K - Representations and Certifications and Fill-in Clauses
No Page Limitation
Tab D) Financial Statements and Bank Letter No page Limitation Tab E) COI Disclosure Statement No page Limitation
L6.0 VOLUME ORGANIZATION AND CONTENT
6.1. VOLUME I: FACTOR I –TECHNICAL.
A. In this section, the offeror must demonstrate its understanding, knowledge, and ability to perform all task areas of the MACC and how its technical capability will be applied under this contract.
Proposals must demonstrate the Offeror’s technical approach, methods and procedures, by narrative, demonstrating the ability to meet the requirements in the MACC SOW. The Offeror must submit sufficient information for the Government to make a comprehensive evaluation of its approach in providing the requirements for successful performance.
B. The Offeror’s Technical Approach must address the following subfactors:
1. Subfactor 1-- Design Build Plan/Approach to address the following areas:
a. Explain your design/build approach and how that approach must be used to its greatest advantage to best benefit the Government.
b. Describe interactions with the Government and the roles different team members play when dealing with design changes, construction changes, resolving potential delays/differing site conditions/problems and concerns, reviewing and approving submittals, attending progress meetings, and facilitating contract completion and closeout.
c. Discuss how the design and construction process will be managed, to include a discussion on authority levels and interaction between the construction and design teams.
d. Integration of primary subcontractor(s), including mechanical, electrical, EMCS, fire protection and fire suppression subcontractor.
e. Demonstrate Offerors understanding of the design/build process including ability to effectively coordinate and interaction between architectural and engineering professionals, subcontractors, and construction personnel in a team effort/environment.
f. Discuss Offerors project, design, and construction management philosophy as it relates to the design/build process and the benefits it will bring to the Government.
g. Discuss the design and construction process for possible LEED rating.
C. Subfactor 2 – Offeror Experience.
Submission Instructions: Submit three (3) relevant design-build construction projects that best demonstrate your experience on projects that are similar in size, scope, and complexity to projects that may be ordered under the MACC II. The basis of evaluation for experience includes the offeror’s demonstrated depth and breadth of experience performing work similar to anticipated core work under the MACC II program
To demonstrate this experience, offerors must submit the Exhibit G Construction Experience Project Data Sheet for each of the three (3) relevant projects. Use of the project data sheets specified is mandatory. The Government will not consider offeror experience submitted in any other manner or form. Each project data sheet may be up to five (5) pages long. The Government will not review or evaluate more than five (5) pages of data for each project, and a maximum of fifteen (15) pages in total for the three (3) projects submitted for the experience SubFactor. A page is the data shown on a single side of an 8 ½ x 11 inch piece of paper using the margins and font sizes established on the Exhibit G form.
Offerors must submit relevant projects that represent at least three (3) of the following four (4) general characteristics for evaluation:
1. A relevant design-build project with a final contract price of $5 million or more and that demonstrates at least some element of sustainable design and/or historic preservation.
2. A relevant design-build project that includes construction and accreditation in accordance with the Intelligence Community Directive (ICD)/ Intelligence Community Standard (ICS) 705 as a definable feature of work with a final contract price of $1 million or more.
3. A relevant design-build project that includes renovation/repair of a 2,500 sq ft space or larger in a secure office building with occupied adjacent spaces. The renovation/repair must include life safety, electrical, HVAC, and IT elements that required significant design coordination with stakeholders a final contract price of $1 million or more.
4. A relevant design-build project of the Offeror’s choice with a final contract price of $1 million or more that best represents the Offeror’s experience on a project of similar size, scope, and complexity to projects that may be ordered under the MACC II.
For purposes of evaluation, relevant projects for experience include design-build new construction, repair, and/or renovation of secure commercial and institutional facilities that were 100% complete within the five (5) years prior to the solicitation issue date. A project for purposes of evaluation is defined as a discrete design-build project with a single starting point and a single ending point of a delivered and accepted complete, usable project. Examples of relevant size, scope, and complexity include design-build work for administration buildings, command headquarters buildings, operations centers, training facilities, communication facilities, maintenance/repair facilities, heating and refrigeration plants, and similar. The smallest value projects that are deemed relevant are valued at $1 million. Higher value projects are considered more complex than smaller value projects for evaluation purposes.
For Joint Venture Prime Offerors Only: If the offeror is a Joint Venture, project experience should be work completed by the Joint Venture legal entity. Joint Venture prime offerors are treated the same as all other prime offerors. If the Joint Venture entity does not have experience, projects may be submitted for each joint venture member if the Joint Venture entity can clearly establish why the project is relevant to Joint Venture experience as the prime offeror. If an offeror uses experience information from affiliates, subsidiaries, parent/LLC/LTD member companies, Exhibits G and H must demonstrate the affiliates, subsidiaries, parent/LLC/LTD member companies meaningful involvement of the offeror and the affiliates, subsidiaries, parent/LLC/LTD member companies in the project and relevance to the MACC II requirement or the project(s) will not be considered relevant or evaluated.
HUBZone small business concerns may not utilize the experience of large business concerns to demonstrate construction experience under this evaluation factor. This prohibition does not apply to the offeror’s first tier subcontractor large business architect-engineer firms that were hired by the prime offeror as the designer of record for a contract or task order awarded to the HUBZone small business concern.
6.2. VOLUME II: FACTOR II -- PAST PERFORMANCE
A. The Offeror’s past performance proposal must address corporate past performance in performing projects similar in size and scope to the effort required by the MACC II Statement of Work (Design- Build projects). To be considered, all projects must be recent and relevant. (See Attachment 5, Past Performance Questionnaire.) To be recent, the projects referenced by the contractor must have been completed within three (3) years from the date of solicitation issuance or currently ongoing and have completed at least six (6) months of performance by solicitation issuance. If currently ongoing, the extent of actual performance will be considered in determining the project’s relevance.
B. The Contractor's relevant Past Performance will be evaluated to assess the extent of its ability to perform the contract successfully (quality of product or service, accuracy and completeness, timeliness of delivery/work, business relations, customer satisfaction, key personnel and staffing, including subcontractors/partners).
C. The Offeror must submit with its proposal up to three (3) total projects that are representative of the
Offeror’s recent, relevant past performance. To be considered, the referenced project must, at a minimum, involve construction design-build projects, similar in terms of size, scope, and complexity to the MACC II Seed Project Task Order (Task Order Limitations); total contract value over $500k for any federal or commercial projects.
1. Past performance by subcontractors or predecessor companies will be considered for the prime offerors three (3) total projects if recent and relevant, provided the prime offeror describes how the subcontractor, predecessor company, or key personnel significantly contributed to the referenced project and the subcontractor or key personnel will significantly contribute to the solicited work. A sufficient nexus between a predecessor company’s management and the offeror must be established for a project performed by a predecessor company to be considered.
2. The offeror must address the following for each project submitted for past performance evaluation:
a. The nature of the effort and period of performance
b. Information on the design-build team, including management and organizational structure, contractual arrangements, and lines of authority.
c. Discuss the design-build implementation approach utilized. Address proposed vs. actual schedule, including any concurrent design and construction activities.
d. Approach used to ensure the as-built construction satisfied all approved design requirements, including shop drawing review and approval process, and inspection, testing, and quality control procedures.
e. Discuss the design team’s associated interactions with and on behalf of the owner.
f. Approach used to maintain control of project costs without compromising technical requirements and standards.
g. Address any value engineering opportunities and recommendations.
h. Identify any challenges to successful completion of the project using the design-build procurement method.
i. Point of contact, telephone, and email address for each contact listed.
D. Teaming Partners Project Listing.
1. This submission applies only if you are teaming as defined in FAR 9.6, including but not limited to teaming with affiliated companies or operating divisions within the parent company or joint ventures of the parent company. You must decide which three (3) projects best represent the past performance of the teaming partners as the prime. You may not submit more than three (3) projects to support prime contractor past performance.
2. A teaming partner prime offeror proposal is treated the same as a proposal from an individual firm prime offeror. If the team consists of a construction contractor and a firm that serves as the designer of record, the three (3) projects must best represent the construction work of the teamed prime contractor.
3. To demonstrate the full range of teamed prime offeror capabilities, offerors may submit past performance data on recent and relevant contracts of teaming partners, affiliated companies or operating divisions within the parent company or joint ventures of the parent company when it is reasonable to attribute the experience of these past efforts to the proposed effort and when the document clearly demonstrates the resources (e.g. financial resources, overall oversight and management or other resources) of the parent or affiliated division will meaningfully affect performance of the instant acquisition. Information on these projects must be provided as described above and must identify the names of the firms and their roles in the specific project.
The offeror must address the following questions, in specific detail, when submitting past performance data on recent and relevant contracts of affiliated and parent companies.
4. Contractors who have a Joint Venture (JV) or Teaming Agreement (TA) must provide a signed copy of their Agreement conveying who the controlling entity will be for this contract.
Additionally, each member of such a JV or TA must have an active SECRET facility clearance in accordance with the Pass/Fail Qualifications identified under M4.2.
a. Who will manage the contract?
b. Which party possess the background, expertise and qualifications relevant to the contract requirements and necessary for contract performance.
c. Are there discreet tasks to be performed by each of the teaming partners in the performance of the contract? If so please identify in detail.
d. What’s the relative amount of work to be performed by each party?
e. Which party will perform the more complex and costly contract functions?
f. Is there a commingling of personnel and resources? If so, please specify in detail.
g. What is the business size of the other party or parties?
6.3. General.
A. In accordance with FAR 15.305(a) (2)(iv), an Offeror without a record of relevant past performance or for whom information on past performance is not available will not be evaluated favorably or unfavorably on past performance (neutral evaluation).
B. The Government may consider past or current contracts (including Federal, State and local
Government and commercial) for efforts similar to the Government requirement. The Government may consider information provided on problems encountered on the identified contracts and associated corrective actions. Contractors with a negative past performance rating will be afforded an opportunity to address alleged deficiencies. The Government may also consider information obtained from any other sources when evaluating past performance. Failure of a contractor to disclose a relevant Government contract with poor past performance may affect the contractor's past performance rating. The evaluation may include additional information, not limited to, Government databases such as Past Performance Information Retrieval System (PPIRS).
C. The Government may consider past performance information regarding predecessor companies, key personnel who have relevant experience or subcontractors that will perform major or critical aspects of the requirement when such information is relevant. Past performance information about the proposal as a prime contractor may be considered more significant and given more weight in the past performance evaluation.
6.4. VOLUME III: FACTOR III – PRICE.
A. The offeror must submit pricing on the Proposal Schedule, Exhibit D and Exhibit E, Construction
Cost Estimate, using the UNIFORMAT II work breakdown structure.
B. The pricing volume must be submitted as a separate document in PDF.
C. The pricing volume must differentiate between prime, subcontractor, and (if any) teaming partner labor.
D. The Offerors price proposal must include a breakout of the proposed labor categories and the rates for each category.
6.5. VOLUME IV – OTHER CONTRACTUAL INFORMATION.
A. Tab A: RFP Pass/Fail Criteria
In this section, the offeror must submit the required documents for the “Qualifications” evaluation which include:
1. Active Certified HUBZone Small Business Documentation: The offeror must include a copy of the U.S. Small Business Administration (SBA) letter certifying the prime offeror as an active Certified HUBZone Small Business. The date of proposal submission must be within the active period specified on the letter. The offeror must ensure the SBA’s Dynamic Small Business Search tool reports the prime offeror as an active Certified HUBZone small business under the DUNS and CAGE code associated with the prime offeror’s System for Award Management (SAM) record on the date of proposal submission.
2. Facility Clearance: The offeror must include a copy of the Offeror’s active SECRET facility clearance. Any offeror that is a JV or TA must provide a copy of each JV or TA member’s active SECRET facility clearance. The Government must verify the status of each facility through the Industrial Security Facilities Database.
3. Bonding Capacity: The offeror must submit a Letter of Bondability on a Surety’s letterhead signed by an individual authorized to bind the Surety stating the offeror has, as a minimum, both a current bonding capacity of least $15 million per project and at least $30 million aggregate bonding capacity as of the date of proposal submission.
a. The letter must include the name and telephone number of the Surety or Sureties.
b. Such bonding capacity should meet the requirements of FAR 52.228-15, Performance and Payment Bonds - Construction.
c. The Surety must have at least a $30 million underwriting limitation and authority to issue bonds in Pennsylvania, Virginia, Maryland, and the District of Columbia reported on Treasury Circular 570 and any supplemental changes to the circular on the date of proposal submission.
d. The list of acceptable Sureties and their underwriting limitations and authorized states of issue are found on Treasury Circular 570 published at https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html. Only Sureties acting within their underwriting limitation and authorized states of issue as listed on Treasury Circular 570 and any supplemental changes to the circular on the date of proposal submission are acceptable.
4. Key Personnel: In this section, the Offeror must provide responses to establish the key personnel requirements referenced in the MACC SOW, Paragraph 2.0, are met by completing Attachment 11: Key Personnel Qualifications.
B. Tab B: Completed Standard Form 1442, Acknowledgement of Amendments, and Bid Bond for Task
Order 0001 - Seed Project
In this section, the offeror must include a cover page with the Offeror’s corporate name, address, phone, fax, Data Universal Numbering System (DUNS) number, Tax Identification Number (TIN), Point of Contact (POC) name, POC title, POC phone, and POC email address. This section must also include a table of contents identifying the sections identified below. In this section, offerors must complete/submit the following:
1. Completed SF 1442: Sign blocks 14-20 of the RFP Section A, SF1442. By signing Block 20b of the SF1442, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K.
2. Acknowledgement of Amendments
3. Bid Bond for the Seed Project – Task Order 0001: The offeror must submit an electronic copy of an SF 24 Bid Bond with signatures, seals, individual surety information, and power of attorney documents for the seed project as required by FAR 52.228-1 Bid Guarantee (Sep 1996). The amount of the bid (offer guarantee must be 20% of the seed project bid (offer) price or $3,000,000.00, whichever is less. The seed project Bid Bond Surety must have an underwriting limitation equal to or exceeding the penal value of the SF24 Bid Bond and authority to issue bonds in Pennsylvania reported on Treasury Circular 570 and any supplemental changes to the circular on the date of proposal submission. The list of acceptable Sureties and their underwriting limitations and authorized states of issue are found on Treasury Circular 570 published at https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html. Only Sureties acting within their underwriting limitation and authorized states of issue as listed on Treasury Circular 570 and any supplemental changes to the circular on the date of proposal submission are acceptable.
https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html
C. Tab C: Sections I thru K - Representation and Certifications and Fill-In Clauses and (If Applicable) Teaming Agreement
1. In this section, the offeror must include a completed copy of all representations and certifications required by Section K of this solicitation. Additionally, the offeror must submit the completed FAR/DFARS fill-in clauses/provisions within Section I through K. Section K must be returned in its entirety.
2. If applicable, the offeror must provide a copy of the joint venture agreement, mentor-protégé agreement, or teaming/partnership agreement that is signed and dated by all joint venture members. If the Offeror is not any of these entities, this item must be omitted.
D. Tab D: Financial Statements
1. In this section, the offeror must include the following certified audited financial statements for the past 3 completed fiscal years and a bank letter that verifies sufficient funds are available to finance the work under this project.
The specific financial statements required are:
a. Balance Sheet
b. Income Statement
c. Statement of Cash Flows
2. Note: The Government will obtain a Dunn & Bradstreet Comprehensive Report, which will be used for evaluation and responsibility determination purposes.
E. Tab E: Conflict of Interest Disclosure Statement
1. In this section, the offeror must include the COI Disclosure Statement required by the Section K provision, Organizational Conflict of Interest Certification and the Section L provision, Organizational Conflict of Interest Notification.
2. If the offeror can certify that it is not aware of any information bearing on the existence of any potential organizational conflict of interest, it must include only a statement in this appendix that it has so certified and that a COI Disclosure Statement is not required.
L7.0 RESPONSIBILITY DETERMINATION
7.1. General Standards for Responsibility.
The Offeror must be found responsible, without regard to the evaluation methodology outlined in this Request for Proposal, prior to the award of the resultant contract. In accordance with FAR 9.104-1, to be determined responsible, a prospective contractor must:
A. Have adequate financial resources to perform the contract, or the ability to obtain them;
B. Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and…