A23 Exhibit E Construction Cost Estimate Template (Apr 2021).xlsx
XLSX spreadsheet 289 KB Posted
- Solicitation number
- HQ003421R0003
- Issued by
-
DOD Washington Headquarters Service
About this file
This solicitation is for the Washington Headquarters Services Acquisition Directorate Multiple Award Construction Contract II program. The requirement is a 100% HUBZone small business set-aside. The work acquired under the indefinite-delivery, indefinite-quantity contract is design-build and design-bid-build construction, alteration, and repair of Government facilities at various locations within Washington Headquarters Services' area of responsibility, including the District of Columbia, Maryland, Virginia, and Adams County, Pennsylvania. The types of work include renovation of commercial and industrial buildings, sustainment, restoration, and modernization of existing facilities and infrastructure, repair of commercial and industrial buildings, design and installation of furniture, fixtures, and equipment, installation of energy management controls, and renovation and/or installation of mechanical, electrical, and plumbing systems. The ceiling value for each contract is $150 million with up to a 10 year ordering period. Task orders are expected to range from $500 thousand to $15 million, with some up to $20 million. The minimum guarantee for each contract is $10,000 for the life of the contract.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Basis of Estimate
PROJECT INFORMATION REVISION NUMBER: 0
| Project: | MACC II Seed Project - RRMC Post 7 Renovations |
| Location | Raven Rock Mountain Complex |
| Agency | WHS/AD/EFCD |
| Solicitation No. | HQ003421R0003 |
| Estimate Date: | Estimate Date |
| Prepared By: | Estimator Name |
| Company: | Company |
| Address: | Address |
| City, State Zip: | City |
| Phone: | Phone |
BACKGROUND SUPPORTING MATERIAL (Scope of Work):
Briefly describe scope of work included in the estimate, plan dates, exclusions, etc. List any Government Furnished Property (GFP). (Attach additional information if necessary)
SOURCE OF COST DATA:
Document all sources of cost information used in the estimate. (Attach additional information if necessary)
ESTIMATE ASSUMPTIONS:
Describe any assumptions made to prepare estimate and highlight areas needing clarification for future estimates. (Attach additional information if necessary)
MAJOR CHANGES FROM PREVIOUS ESTIMATE:
Describe any major changes in scope of work, materials, systems, assumptions, etc. from the previous estimate version. (Attach additional information if necessary)
DESCRIPTION OF MARK-UP & ADD-ONS:
| Location Factor: | 0.00% | Describe source and rationale for location factor here |
| Federal Wage Rate Factor: | 0.00% | Explain method and justify value |
| State & Local Taxes: | 0.00% | Describe type of tax and rates used |
| General Conditions: | 0.00% | Explain & Justify |
| Contractor Overhead: | 0.00% | Explain & Justify |
| Contractor Profit: | 0.00% | Explain & Justify |
| Bond: | 0.00% | Explain & Justify |
| Annual Inflation Escalation Factor: | 0.00% | Projected annual inflation rate. |
| Time Until Project Midpoint (Months) | 0 | Number of months from estimate (or data) date until the projects midpoint of construction. |
OTHER COMMENTS:
Provide any additional information, qualifications, etc. Attach additional sheets as necessary to fully explain and justify the factors above.
&"Arial,Bold"Construction Cost Estimate&4
&13BASIS OF ESTIMATE
&6&F &A &11Page &P of &N &6Print Date: &D
When using City Cost Index (CCI) published by RS Means, a CCI of 112.1 should be converted to +12.1 location factor and a CCI of 93.5 converted to a -6.5 location factor.
When using a Federal Wage Rate Factor, the source of the factor must be provided. This factor is generally 0 in the National Capital Region.
Use when general conditions and project management costs are calculated a percentage of direct costs. Use a special use tab if your firm treats general conditions as direct costs.
May not exceed 10%.
May not exceed 10%.
Do not use for project durations of 15 months or less. When using an inflation escalation factor, the source of the factor and calculations associated with the factor are required.
Please ensure the proposed rate is as close as possible to your firm's actual bond rate.
Project Cost Summary
| Project: | MACC II Seed Project - RRMC Post 7 Renovations | Estimate By: | Estimator Name | ||
| Park: | Raven Rock Mountain Complex | Date: | Estimate Date | ||
| Park Alpha: | WHS/AD/EFCD | ||||
| PMIS Number: | HQ003421R0003 | Reviewed By: | Reviewer Name | ||
| Date: | Review Date | ||||
| Asset / Project Element | Size/Count | Units | |||
| Asset / Project Element Name | 1 | Unit |
| Item No. | WBS | Description | Material Cost/Unit | Total Material Cost | Installation Cost/Unit | Total Install Cost | Direct Cost/Unit | Total Direct Costs | NET Cost/Unit | Total NET Costs |
| 1 | A10 | Foundations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 2 | A20 | Basement Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 3 | B10 | Superstructure | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 4 | B20 | Exterior Enclosure | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 5 | B30 | Roofing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 6 | C10 | Interior Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 7 | C20 | Stairs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 8 | C30 | Interior Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 9 | D10 | Conveying Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 10 | D20 | Plumbing Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 11 | D30 | HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 12 | D40 | Fire Protection | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 13 | D50 | Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 14 | E10 | Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 15 | E20 | Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 16 | F10 | Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 17 | F20 | Selective Building Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 18 | G10 | Site Preparation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 19 | G20 | Site Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 20 | G30 | Site Mechanical Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 21 | G40 | Site Electrical Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 22 | G50 | Other Site Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 23 | XX | Special Use - 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 24 | XX | Special Use - 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 25 | XX | Special Use - 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| Subtotal Direct Construction Costs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0 | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| Total Value of Government Furnished Property (GFP) Included in Direct Costs . | $0.00 | $ - 0 | $ - 0 | $0 | In most cases GFP is normally zero - see footnote- | ||||
| Direct Cost Subtotal without GFP . | $ - 0 | $ - 0 | $0 | ||||||
| Published Location Factor | 0.00% | $0 | Notes & Comments: | ||||||
| Federal Wage Rate Factor | 0.00% | Generally applied against Labor Costs only. | $0 | ||||||
| State & Local Taxes | 0.00% | Generally applied against Material Costs only. Please Note if application differs. | $0 | ||||||
| Total Direct Construction Costs | $0 | ||||||||
| Standard General Conditions | 0.00% | Applied to Total Direct Construction Cost less GFP | $0 | ||||||
| Subtotal NET Construction Cost | $0 | ||||||||
| Overhead | 0.00% | $0 | |||||||
| Profit | 0.00% | $0 | |||||||
| Estimated NET Construction Cost | $0 | ||||||||
| Bonds | 0.00% | $0 | |||||||
| Inflation Escalation | 0 | Months | Annual Rate = | 0.00% | Inc. Bonds & CMA | $0 | |||
| Total Estimated NET Cost of Construction | $0 |
GFP costs are only used when the Government pre-purchases items, or provides other materials out of Government inventory, to be installed by contractor. Adjustments and Markup on GFP only include Inflation Escalation; No other adjustment factors or O&P markup have been applied.
&"Arial,Bold"Construction Cost Estimate&4 &"Arial,Regular" &"Arial,Bold"&13PROJECT COST SUMMARY
&6&F &A Page &P of &N &6Print Date: &D, &T
A10 - Foundations
| Project: | MACC II Seed Project - RRMC Post 7 Renovations | Estimate By: | Estimator Name |
| Location | Raven Rock Mountain Complex | Date: | Estimate Date |
| Agency | WHS/AD/EFCD | Reviewed By: | Reviewer Name |
| Solicitation No. | HQ003421R0003 | Date: | Review Date |
Summary Item A10 Foundations Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| A1010 | STANDARD FOUNDATIONS | |||||||||
| Optional Code | Description | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | STANDARD FOUNDATIONS | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| A1020 | SPECIAL FOUNDATIONS | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | SPECIAL FOUNDATIONS | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| A1030 | SLAB ON GRADE | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | SLAB ON GRADE | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | ||||||
| BASE CODE | BASE ELEMENT | ||||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Summary Item | A10 | Foundations | |||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
A10 Foundations 1 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
&"Arial,Bold" Construction Cost Estimate &8(expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
A20 - Basement
| Project: | MACC II Seed Project - RRMC Post 7 Renovations | Estimate By: | Estimator Name |
| Location | Raven Rock Mountain Complex | Date: | Estimate Date |
| Agency | WHS/AD/EFCD | Reviewed By: | Reviewer Name |
| Solicitation No. | HQ003421R0003 | Date: | Review Date |
Summary Item A20 Basement Construction Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| A2010 | BASEMENT EXCAVATION | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASEMENT EXCAVATION | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| A2020 | BASEMENT WALLS | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASEMENT WALLS | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | ||||||
| BASE CODE | BASE ELEMENT | ||||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Summary Item | A20 | Basement Construction | |||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
A20 Basement Construction 1 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
&"Arial,Bold"United States Department of the Interior National Park Service Class B Construction Cost Estimate &8(expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
B10 - Superstructure
| Project: | MACC II Seed Project - RRMC Post 7 Renovations | Estimate By: | Estimator Name |
| Location | Raven Rock Mountain Complex | Date: | Estimate Date |
| Agency | WHS/AD/EFCD | Reviewed By: | Reviewer Name |
| Solicitation No. | HQ003421R0003 | Date: | Review Date |
Summary Item B10 Superstructure Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| B1010 | FLOOR CONSTRUCTION | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | FLOOR CONSTRUCTION | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| B1020 | ROOF CONSTRUCTION | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | ROOF CONSTRUCTION | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | ||||||
| BASE CODE | BASE ELEMENT | ||||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Summary Item | B10 | Superstructure | |||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
B10 Superstructure 1 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
&"Arial,Bold"United States Department of the Interior National Park Service Class B Construction Cost Estimate &8(expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
B20 - Exterior Enclosure
| Project: | MACC II Seed Project - RRMC Post 7 Renovations | Estimate By: | Estimator Name |
| Location | Raven Rock Mountain Complex | Date: | Estimate Date |
| Agency | WHS/AD/EFCD | Reviewed By: | Reviewer Name |
| Solicitation No. | HQ003421R0003 | Date: | Review Date |
Summary Item B20 Exterior Enclosure Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| B2010 | EXTERIOR WALLS | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | EXTERIOR WALLS | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| B2020 | EXTERIOR WINDOWS | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | EXTERIOR WINDOWS | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| B2030 | EXTERIOR DOORS | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | EXTERIOR DOORS | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | ||||||
| BASE CODE | BASE ELEMENT | ||||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Summary Item | B20 | Exterior Enclosure | |||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
B20 Exterior Enclosure 1 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
&"Arial,Bold"Construction Cost Estimate&8 (expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
B30 - Roofing
| Project: | MACC II Seed Project - RRMC Post 7 Renovations | Estimate By: | Estimator Name |
| Location | Raven Rock Mountain Complex | Date: | Estimate Date |
| Agency | WHS/AD/EFCD | Reviewed By: | Reviewer Name |
| Solicitation No. | HQ003421R0003 | Date: | Review Date |
Summary Item B30 Roofing Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| B3010 | ROOF COVERINGS | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | ROOF COVERINGS | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| B3020 | ROOF OPENINGS | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | ROOF OPENINGS | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | ||||||
| BASE CODE | BASE ELEMENT | ||||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Summary Item | B30 | Roofing | |||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
B30 Roofing 1 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
C10 - Interior Construction
| Project: | MACC II Seed Project - RRMC Post 7 Renovations | Estimate By: | Estimator Name |
| Location | Raven Rock Mountain Complex | Date: | Estimate Date |
| Agency | WHS/AD/EFCD | Reviewed By: | Reviewer Name |
| Solicitation No. | HQ003421R0003 | Date: | Review Date |
Summary Item C10 Interior Construction Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| C1010 | INTERIOR PARTITIONS | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | INTERIOR PARTITIONS | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| C1020 | INTERIOR DOORS | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | INTERIOR DOORS | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| C1030 | FITTINGS | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | FITTINGS | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | ||||||
| BASE CODE | BASE ELEMENT | ||||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Summary Item | C10 | Interior Construction | |||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
C10 Interior Construction 1 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
C20 - Stairs
| Project: | MACC II Seed Project - RRMC Post 7 Renovations | Estimate By: | Estimator Name |
| Location | Raven Rock Mountain Complex | Date: | Estimate Date |
| Agency | WHS/AD/EFCD | Reviewed By: | Reviewer Name |
| Solicitation No. | HQ003421R0003 | Date: | Review Date |
Summary Item C20 Stairs Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| C2010 | STAIR CONSTRUCTION | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | STAIR CONSTRUCTION | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| C2020 | STAIR FINISHES | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | STAIR FINISHES | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | ||||||
| BASE CODE | BASE ELEMENT | ||||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Summary Item | C20 | Stairs | |||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
C20 Stairs 1 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
C30 Interior Finishes
| Project: | MACC II Seed Project - RRMC Post 7 Renovations | Estimate By: | Estimator Name |
| Location | Raven Rock Mountain Complex | Date: | Estimate Date |
| Agency | WHS/AD/EFCD | Reviewed By: | Reviewer Name |
| Solicitation No. | HQ003421R0003 | Date: | Review Date |
Summary Item C30 Interior Finishes Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| C3010 | WALL FINISHES | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | WALL FINISHES | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| C3020 | FLOOR FINISHES | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | FLOOR FINISHES | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| C3030 | CEILING FINISHES | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | CEILING FINISHES | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | ||||||
| BASE CODE | BASE ELEMENT | ||||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | BASE ELEMENT | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Summary Item | C30 | Interior Finishes | |||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
C30 Interior Finishes 1 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
D10 Conveying Systems
| Project: | MACC II Seed Project - RRMC Post 7 Renovations | Estimate By: | Estimator Name |
| Location | Raven Rock Mountain Complex | Date: | Estimate Date |
| Agency | WHS/AD/EFCD | Reviewed By: | Reviewer Name |
| Solicitation No. | HQ003421R0003 | Date: | Review Date |
Summary Item D10 Conveying Systems Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| D1010 | ELEVATORS | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | ELEVATORS | 1 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| D1020 | ESCALATORS & MOVING WALKS | |||||||||
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Optional Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .