Draft_RFP_Q&A_Set_2.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Fully Integrated Lifecycle Mission Support Services 2 (FILMSS 2) Federal contract opportunity
- Solicitation number
- 80ARC019R0004
About this file
The documents provide information on a forthcoming federal contract opportunity for Fully Integrated Lifecycle Mission Support Services 2 (FILMSS 2) to be issued by the National Aeronautics and Space Administration Ames Research Center. The contract is a recompete for support services encompassing all phases of mission and project lifecycles for flight programs, research and technology development, and other programs at ARC. Services will be performed at ARC located in Moffett Field, California. A draft RFP and SOW will be released in November 2018 seeking comments, with a final RFP to follow in February 2019. Proposals will be due 45 days later in March 2019. Subcontracting goals include 35% for small business and specific targets for small disadvantaged, women-owned, HBCU/OMEI, HUBZone, veteran-owned, and service-disabled veteran-owned businesses. The incumbent contract is currently held by two foreign nationals.
The pre-solicitation notice provides the anticipated procurement schedule and contact information for questions. The NAICS code is 541715 with a size standard of 1000 employees. The contract period is five years with a two-year base and three one-year options.
Draft RFP Q&A Set 2
View the file
Other files for this federal contract opportunity
Show all 50
Fully Integrated Lifecycle Mission Support Services 2 (FILMSS 2) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question # | DRFP Reference Volume/ Section | DRFP Page # | DRFP Paragraph | Question/Comment with Recommendation | Government Response | |
| 73 | Attachment J.(a)1 – Statement of Work (SOW) | SOW | The Technical Approach factors that map to the SOW aren’t consistent with the SOW. | The Technical Approach factors that map to the SOW aren’t consistent with the SOW. Will the government please clarify the SOW? | The SOW references were updated in the RFP. | |
| Section L.17(1)A.TA-1.1.6 | 109 | |||||
| 74 | B.1 | CLIN Table | Per the CLIN table, CLIN-0004 IDIQ has a Period of Performance (POP) of 60 months. However, the Core and CMO CLINs are two years, with three 1-year options. Based on these time periods, it is conceivable that the contract could have work on the the IDIQ CLIN being performed without Core Management. Will the governmet please clarify the POPs and related CLINs? | It is not our intent to continue IDIQ task orders without management support. | ||
| 75 | 98 | |||||
| 113 | Section L.10(d) | |||||
| MA-5 | L.10(d) The offeror shall require all service Subcontractors provide, as part of their proposal, the information identified in (a) through (c) of this provision for cost reimbursement, Time and Materials (T&M) or non-competitive fixed-price type subcontracts having a total potential value expected to exceed the threshold for requiring certified cost or pricing data ($2,000,000) as set forth in FAR 15.403-4 (Class Deviation 2018-00015). |
MA-5. The Offeror shall provide a Total Compensation Plan (TCP) for all personnel proposed, in accordance with NFS provision 1852.231-71, "Determination of Compensation Reasonableness," and FAR provision 52.222-46, "Evaluation of Compensation for Professional Employees. " Note, the Offeror shall require all service subcontractors (l) with proposed cost reimbursement or non-competitive fixed-price type subcontracts having a total potential value in excess of $3,000,000 and (2) the cumulative value of all their service subcontracts under the proposed prime contract in excess of 10 percent of the prime contract's total potential value, provide as part of their proposals the information identified in (a) through (c) of NFS provision 1852.231-71. as defined by FAR 22.1102 and 29 CFR 541. DRFP section L.10(d) states that all service subcontractors with a subcontract (cost reimbursement, Time and Materials (T&M) or non-competitive fixed-price type) having a a total potential value expected to exceed the threshold for requiring certified cost or pricing data ($2,000,000) must provide a TCP.
However, DRFP section MA5 states all service subcontractors (l) with proposed cost reimbursement or non-competitive fixed-price type subcontracts having a total potential value in excess of $3,000,000 and (2) the cumulative value of all their service subcontracts under the proposed prime contract in excess of 10 percent of the prime contract's total potential value, must submit a TCP.
Will the government please clarify which requirement is correct? What is the correct dollar/percentage threshold? Does this apply to T&M subcontracts?
| Section MA5 of the RFP will be updated to reflect the same requirement as L.10. | |||||
| 76 | 102 | L.14(b) Format | L.14(b) specifies that Slides shall contain Times New Roman font text with a size not smaller than 14 point and must be on a white background. Offerors may use colors other than black and white/clear on graphical slides (e.g., bar charts, pie charts, graphs or figures) when color is useful in conveying information. Diagrams, charts, tables, and photographs shall contain Times New Roman font text in a size no smaller than 12 point. | L.14(b) specifies the use of Time New Roman (TNR) font for the Oral presentations. Will government consider revising the requirement to allow the use of Arial font for the Oral presentation? | The government has considered the request and will leave the font as Times New Roman. |
| 77 | 100 | L.13.a(3) | L.13.a (3) All proposal components except the past performance questionnaires shall be submitted through the FedBizOpps (FBO.gov) system by the date specified in Block 9 of the SF33. The requirements and procedures for offer submission are found in the FBO Vendor User Guide located on the FBO webpage at: https://www.fbo.gov/downloads,'FBO Vendor Guide.pdf. Updates related to this solicitation, to include the solicitation amendments, notices, and other information, will be made available on the FBO.gov website. Offerors are advised to continuously monitor the FBO.gov website for new information. Offerors are deemed to have knowledge of all information that is posted to the FBO.gov website. | In addition to other proposal documents, the government is requesting signed teaming agreements, which may be large in size. Will the government advise if FBO.gov has a file size limitation or proposal size limitation? Also, will the government allow proposal Volumes to be separated into multiple files for upload/submission? Is there at time limitation for uploading files before FBO.gov times out since large files may take an extended amount of time? | See L.13(3) for updated posting information including naming conventions of submitted files. Please see fbo link https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf. Please direct all remaining questions regarding fbo to FBO.Gov. |
| 78 | 78 | DRFP Section I |
I.18 (b)
| Errata: DRFP Clause I.18 (b) states "…..the Contractor with the following date:" Should this read "…..the Contractor with the following data:"? | This will be corrected in the final RFP. | |
| 79 | 102 | DRFP Section L |
L.14 (i)
| Please clarify that oral presentation clarifications will be limited to mission suitability related material presented in the oral presentations or, can offerors anticipate cost/price related clarifications or clarifications on any other written sections of the proposal? | Yes, if any clarifications are required in any other section of the proposal, they will be sent to the contractor via email at another time. | |||
| 80 | 102 | L.14 (g) and L.14 (j) | The last sentence of L.14 (j) states "If required after the conclusion of the oral presentation, clarification will be conducted in writing from the Government to the Offeror." Should offerors interpret this to mean that following the second 60 minute "Presentation" listed in the table at L.14 (g), the Government will provide offerors written requests for clarification, and offerors will then have 15 mins to prepare a maximum 5 minute oral response to each clarification request? | No, following the 60 minute presentation, the government will have 15 minutes to discuss and write down any clarification questions (Clarifications are defined in 15.306 (a)). The Offeror will receive the clarification(s) when they return to the room and have 5 minutes per clarification to provide an answer. |
| 81 | 5 | SOW Section 3 | The SOW Section 3 Applicable Documents list includes: |
● APR 7120.7, IT/Inst Infrastructure Prgm/Proj Reqmt's, and
● APR 8735.1, GIDEP
| We could not locate these documents on NODIS among the public listing of Ames Research Center’s policies and procedures. Could the Government provide offerors access to these documents? | These will be provided with the Final RFP. Doc 8735.1 can be located in the NASA Center Directives Management System - https://cdms.nasa.gov/directive/search. APR 7120.7, was changed to APR 7120.52 to align with NPR document numeraI. | ||||
| 82 | 37 | DRFP SOW 6.4.2 | APT Link | The link for the Analysis Planning and Tracking (APT) suite of tools is broken. Could the Government provide the URL for the intended APT link? | Link will be updated in final RFP to: |
https://www.techbriefs.com/component/content/article/tb/techbriefs/software/28320 83 43 DRFP SOW 6.5.2 GeneLab Intern Link The link https://genelab.nasa.gov/intern/ returns a"Page Not Found" error. Could the Government provide the URL for the intended link? Updated link will be provided in final RFP (https://genelab.nasa.gov/internships)
| 84 | 61,62 and 63 | DRFP SOW 6.8.4, 6.8.6 and 6.8.7. | Media Relations | Are contractor personnel performing activites under SOW 6.8.4, 6.8.6 and 6.8.7 serving solely in a support role, or are they required from time to time to be, for example, the subject of an interview or serve as a public event speaker? | As answered in the Industry Day, contractor personnel are occassionally required to serve as the public event speaker, interviewer or interviewee only after adequate training has been provided. |
| 85 | 113 | MA-5 | Total Compensation Plan - the first paragraph has the following sentence: Note, the Offeror shall require all service subcontractors (1) with proposed cost reimbursement or non-competitive fixed-price type subcontracts having a total potential value in excess of $3,000,000 and (2) the cumulative value of all their service subcontracts under the proposed prime contract in excess of 10 percent of the prime contract's total potential value,.... | Request clarification of this instruction. These instructions conflict with the requirements of FAR 52.222-46. | Have updated MA-5 in the final RFP to require TCP from subcontractors having a total potential value in excess of $2,000,000. Not sure how the original conflicted with FAR 52.222-46, however update now does not conflict with NFS 1852.231-71. |
| 86 | Do you plan to establish a Bidder's Library for various relevant artifacts for the proposed contract? | We will attach any relevant information to RFP | |||
| 87 | Will you be providing incumbent historical average direct labor rates similar to other NASA Center RFP's and similar to the NACS RFP? This information provides non-incumbents insight into the salaries required for this geographical area which has unique challenges due to competition with Silicon Valley companies. | It is not possible to provide incumbent historical average direct labor rates. | |||
| 88 | 122-123 | L.17 (b) Past Performance (Volume III), II.3.b | First sentence states: "the Offeror and major subcontractors shall provide the following information for all contracts performed within the last three years…….. | Request that the language be changed to read, "the Offeror and major subcontractors shall provide the following information for all relevant contracts performed within the last three years…... | We have considered the requested change and decided to leave the wording as is. |
| 89 | Volume IV | Attachment Jb7 – Standard Labor Category Descriptions | Attachment Jb7 – Standard Labor Category Descriptions | In Attachment J(b)7 – Standard Labor Category Descriptions Rev 1 Mar 19, there are three missing SLC descriptions that are in Attachment J(b)1 – FILMSS2 Cost Price Template Workbook. |
The following SLC descriptions are missing:
From Exhibit 9:
Data System and Comm Information Technology (IT) Level II (Only Information Technology IT Lead II is provided) Planning and Scheduler (Only Project Scheduler is
| provided) | These will be provided with the Final RFP. | |||||
| 90 | Volume IV | Attachment J(b)1 – FILMSS2 Cost Price Template Workbook | Attachment J(b)1 – FILMSS2 Cost Price Template Workbook | In Attachment J(b)1 – FILMSS2 Cost Price Template Workbook, Exhibits 5, 8, 9, and 10 do not have the same list of SLCs. Please clarify the rationale for different SLCs in Core Technical Elements versus IDIQ Technical Elements. i.e. Core Technical Elements lists an Operations Engineer while the IDIQ Technical Elements lists Operations Engineer I, II, and III. | The Core work labor descriptions and hours included in Exhibits 5 and 8 are the current estimate for that work. The IDIQ exhibits represent the diverse work that may be included on FILMSS 2. The skill sets are not necessarily the same. | |
| 91 | I.1, Clauses Incorporate by Reference | 52 | 52.219-9 Small Business Subcontracting Plan (Jan 2017) | 52.219-9 Small Business Subcontracting Plan (Jan 2017) is referenced in Section I.1, Clauses Incorporate by Reference. However, the most current version of this clause is Aug 2018. Will the RFP be updated to include the most current version of this clause? | This clause will be updated in the final RFP. | |
| 92 | L.14(b), Instructions for Oral Presentations | 102 | The RFP states, “Offerors may use colors other than black and white/clear on graphical slides (e.g. bar charts, pie charts, graphs or figures) when color is usefull in conveying information.” | Will the government please clarify if color can be used as part of the slide design and in headers/footers? | The instruction limits color to graphical slides when usefull in conveying information. | |
| 93 | Volume IV | Attachment Jb7 – Standard Labor Category Descriptions | Attachment Jb7 – Standard Labor Category Descriptions | In Attachment J(b)7 – Standard Labor Category Descriptions Rev 1 Mar 19, there are five SLC descriptions that have no corresponding hours in Attachment J(b)1 – FILMSS2 Cost Price Template Workbook. |
Will the government pleaes clarify for the following is the list of the 5 SLCs?
Configuration Management Specialist Information Technology IT Lead II Program Manager Project Scheduler
| Software Developer/Engineer | The SLCS have been updated for the final RFP. | |||||
| 94 | Attachment_Jb7__Standard_Labor_Category_Descriptions | Data System and Comm & Planning and Scheduler are labor categories listed in attachment Jb1, but isn't listed in attachment Jb7. Please add the labor category descriptions for the following (2) LCats to attachment Jb7: Data System and Comm & Planning and Scheduler. | Senior Scheduler is a labor category for the CORE task. Data System and Comm & Planning will be updated on the Jb7 in the final RFP. | |||
| 95 | DRFP Section L | 136 | L.17 © Cost/Price (Volume IV) Exhibit 16 | The instructions for Phase-In state: "For proposal purposes only, assume the start date of the Phase-In Period to be January 31, 2019." Please clarify the assumed start date for Phase-In. | Will Change Date in final RFP. | |
| 96 | DRFP Att J-2 CDRL | 3 of 55 | Table entry for CDRL # 22 | Should the SOW reference for CDRL 22 - Phase-out Plan be SOW 4.5, not SOW 4.3? | This change has been made in the final RFP | |
| 97 | 1) Section H.2(f)(1), page 27: Submit a detailed written proposed Safety and |
Health Plan with its proposal for solicitation 80ARC019R0012; 2) Attachment Ja2, Contract Date Requirements List (CDRL), No. 10 – Safety and Health Plan “…The Plan is required within 30 days of the effective date of the contract and in accordance with NFS clause 1852.223-70, Safety
| and Health” | Could the Government resolve the Draft RFP discrepancy regarding the Safety and Health Plan due date? | The final RFP will include changes to the H.2 clause to reflect the same due date as the CDRL. | |||
| 98 | Section L.9(b) | Page 97 | Oral presentation font face requirement | To improve readability, would the Government allow the Oral Presentation to be | |
| formatted with Arial family fonts? | Yes, this font has been added in section L.9. | ||||
| 99 | Section L.9(b) | Page 97 | Orals presentation requirement for graphic font size | To increase comprehension of graphical concepts, would the Government allow the | |
| Oral Presentation graphics and tables to be formatted with a font size no smaller than 11 point? | Yes, this font size has been included for graphics and tables. | ||||
| 100 | L.9 |
L.14(b)
| In section L.9(b), the RFP states, “(b) A page is defined as one side of a sheet, 8 1/2" x 11", with at least one inch margins on all sides, using not smaller than 12 point type.” In section L.14(b), the RFP states, “Diagrams, charts, tables, and photographs shall contain Times New Roman font text in a size no smaller than 12 point.” | Does the 12pt type requirement pertain to headers and footers? Would the government allow smaller font to be used in headers and footers? Can company logos be used per design, regardless of font style? | Paragraph L.9 has been updated in the final RFP to allow smaller font size for headers and footers and allow company logos per design. | |||
| 101 | L.14(b), Instructions for Oral Presentations | “Diagrams, charts, tables, and photographs shall contain Times New Roman font text in a size no smaller than 12 point.” | We request that diagrams, charts, tables, and photographs, as well as header and footer material such as disclosure statements, page numbers, etc. contain Times New Roman font text in a size no smaller than 10 point. | Section L.14 of the final RFP will update this font size to no smaller than 11 point. | |
| 102 | We request that cover slides and section breaker/agenda slides not be counted against the 90 slide count. | L.9 will be updated in the final RFP to include that section breakers and agendas are not included in page count. | |||
| 103 | Does the Government expect the contractor to employ foreign nationals on FILMSS 2? | Yes | |||
| 104 | Can the Government provide an estimate of how many foreign nationals are currently utilized on this contract? | There are currently 2 foreign nationals on the FILMSS contract. |