This document is a Consolidated List of References that serves as an appendix to a federal specification for the USCG Polar Star icebreaker. The reference list does not specify required products or services, response dates, or award information. Instead, it identifies all technical standards, drawings, publications, and specifications that govern the design, construction, maintenance, and operation of the Polar Star vessel.

The references are organized into four categories: Coast Guard Drawings (over 100 detailed engineering drawings covering structural, mechanical, electrical, and systems components); Coast Guard Publications (technical manuals and instruction books for various shipboard systems including propulsion, auxiliary machinery, and fire suppression); Surface Forces Logistics Center (SFLC) Standard Specifications (standards for welding, electrical work, machinery systems, preservation, and drydocking); and Other References (including American Society standards, military specifications, naval standards, industry guidelines, and manufacturer instructions for specialized equipment such as gas turbines, hydraulic systems, bearings, and pollution prevention equipment). The documents cover comprehensive aspects of the vessel including hull structure, propulsion systems, steering gear, cargo handling equipment, piping and ventilation systems, electrical systems, and safety equipment. Contractors engaged in work on this vessel would be required to comply with all referenced documents, with specific versions identified by revision dates or numbers to ensure consistency throughout contract execution.

View the file

Other versions and copies of DD Form 22

Who attaches DD Form 22

Other files

File Type Posted
Amendment 004-POLAR STAR DD FY26-30 IDIQ.doc DOC document
Amendment 004-Attch 1 Pricing Sheet_Rev3_5FEB2026.xlsx XLSX spreadsheet
Attachment 1 Pricing Sheet - 70Z08526RLREP0005_Rev1_23JAN2026.xlsx XLSX spreadsheet
Amendment 003-Attch 2- Specification - 70Z08526LREP0005 - 23JAN2026.pdf PDF
Attachment 10 Estimated Work Items for Each of the Ordering Periods_23JAN26.xlsx XLSX spreadsheet
Amendment 003-Attch 1 Pricing Sheet_Rev2_29JAN2026.xlsx XLSX spreadsheet
Attachment 2 Statement of Work Specification - 70Z08526LREP0005 - 23JAN2026.pdf PDF
Amendment 003-POLAR STAR DD FY26-30 IDIQ.doc DOC document
Attachment 3 Consolidated List of References - 70Z08526LREP0005_22Jan26.pdf PDF
Amendment 003-Attch 10-Estimated Work Items Each Ordering Period.xlsx XLSX spreadsheet
Solicitation 70Z08526RLREP0005 Amendment 002 - POLAR STAR DS FY26-30 IDIQ.pdf PDF
Amendment 002-Solicitation 70Z08526RLREP0005 -POLAR STAR.doc DOC document
RFP-FINAL-Polar Star-70Z08526RLREP0005-22JAN2026.docx DOCX document
Amendment 001 - CGC POLAR STAR DD.doc DOC document
Attachment 2 Specifications_Statement of Work - 70Z08526RLREP0005.pdf PDF
Attachment 4 Past Performance Information Form - 70Z08526RLREP0005.docx DOCX document
Attachment 8 Change Request Proposal Form - 70Z08526RLREP0005.xlsx XLSX spreadsheet
Attachment 7 Department of Homeland Security Non-Disclosure Agreement (NDA)_70Z08526RLREP0005.pdf PDF
Attachment 1 Pricing Sheet-Rev 1-70Z08526RLREP0005-6JAN2026.xlsx XLSX spreadsheet
RFP-Polar Star-FOR REVIEW-70Z08526RLREP0005-12JAN2026.docx DOCX document
Attachment 3 Consolidated List of References - 70Z08526LREP0005.pdf PDF
Attachment 10_Estimated Work Items for Each of the Ordering Periods.xlsx XLSX spreadsheet
Attachment 9 Past Performance Questionnaire - 70Z08526RLREP0005.docx DOCX document
Attachment 5 Request for Clarifications - 70Z08526RLREP0005.docx DOCX document
Attachment 6 Government Property Report - 70Z08526LREP0005.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein.

Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing Naval Engineering Division, Rev -, FL-1702-11, Inspection of Sheaves Coast Guard Drawing 400 WAGB 0103-030, Rev C, General Arrangement Modifications

Incidental to Fwd Crane Replacement Coast Guard Drawing 400 WAGB 103-3, Rev AP, Booklet of General Plans (POLAR STAR) Coast Guard Drawing 400 WAGB 103-14, Rev T, Booklet of General Plans Coast Guard Drawing 400 WAGB 103-3, Rev T, Booklet of General Plans Coast Guard Drawing 400 WAGB 0103-32, Rev D, General Arrangement Modifications

Incidental to Aft Crane Replacements Coast Guard Drawing 400 WAGB 103-9, Rev K, General Arrangement of 02 Level & Above Coast Guard Drawing 400-WAGB-103-1, Rev F, General Arrangement Double Bottom Coast Guard Drawing 400-WAGB-103-2, Rev H, General Arrangement Tank Top Coast Guard Drawing 400-WAGB-103-010, Rev E, Inboard Profile Coast Guard Drawing 400-WAGB-103-016, Rev B, Arrangement - Main Deck Aft Coast Guard Drawing 400-WAGB-103-034, Rev -, General Arrangement 01 Level Coast Guard Drawing 400-WAGB-245-2, Rev E, CPP Hydraulic Schematic Open Loop Coast Guard Drawing 400-WAGB-556-150, Rev A, STBD CPP Hydraulic SYS Piping Arrangement & Hose List

Coast Guard Drawing 400-WAGB-556-151, Rev -, STBD CPP Hydraulic Flushing Diagram

Coast Guard Drawing 400-WAGB 2901-3, Rev E, Tank Capacity Tables Coast Guard Drawing 400-WAGB 835-019, Rev B, Vents, Sounds & Overflows Flow Calcs Coast Guard Drawing 400 WAGB 700-1, Rev M, Polar Star Docking Plan Coast Guard Drawing 400 WAGB 1100-1, Rev K, Structural Details & Notes Coast Guard Drawing 400 WAGB 1101-002, Rev R, Shell Plating Fwd Coast Guard Drawing 400 WAGB 1101-003, Rev R, Shell Plating Aft Coast Guard Drawing 400-WAGB-1103-001, Rev K, Fore Peak Framing Fwd of CF-22 & CL

Bhd Coast Guard Drawing 400-WAGB-1103-2, Rev G, Floors Frs 25 to 56 Coast Guard Drawing 400-WAGB-1103-5, Rev R, Floors Frs 198 to 222 Coast Guard Drawing 400-WAGB-1103-10, Rev H, ICE Frames Bet C F 45 & Fr 57

Coast Guard Drawing 400-WAGB-1103-14, Rev O, ICE Frames 198 to 242 & Floor Fr 224 to

Coast Guard Drawing 400 WAGB 1105-059, Rev C, Miranda Davit Relocation Installation General Arrangement and Structural

Coast Guard Drawing 400-WAGB 1105-11, Rev D, Chain Locker Bhds Coast Guard Drawing 400 WAGB 1105-024, Rev J, Elevator Trk Bhd Fr 53-57 & FR 105-110 Coast Guard Drawing 400-WAGB 1105-36, Rev B, Structural Mods Main Deck Coast Guard Drawing 400 WAGB 1105-41, Rev D, Flight Dk Modification Coast Guard Drawing 400-WAGB 1105-48, Rev -, Structural Mods Coast Guard Drawing 400-WAGB 1105-32, Rev J, Expanded Metal Bulkhead Coast Guard Drawing 400 WAGB 1107-2, Rev B, Rudder Trunk Coast Guard Drawing 400 WAGB 1108-1, Rev G, Ice Shoe Coast Guard Drawing 400-WAGB-1109-1, Rev K, Pillars & Girder Below Mn Dk Fwd Fr 143 Coast Guard Drawing 400-WAGB 1112-1, Rev X, Fdn for Center LINE Prop Machy Coast Guard Drawing 400 WAGB 1112-4, Rev G, FDN FOR PRPLN & SS DSL GEN IN DSL

GEN ROOMS 1 & 2

Coast Guard Drawing 400-WAGB-1112-24, Rev G, Fdns for Anchor Handling Gear Coast Guard Drawing 400-WAGB-1201-2, Rev C, Hawse Pipe Dk & Shell Bolster Coast Guard Drawing 400-WAGB-1201-3, Rev G, Chain Pipe, Bellmouth, Deck Bolster & Cover Coast Guard Drawing 400 WAGB 1202-3, Rev K, Helicopter Safety Net Coast Guard Drawing 400 WAGB 1202-5, Rev -, New Safety Nets for Aft Edge of Flight Deck Coast Guard Drawing 400 WAGB 1205-4, Rev D, Lifting Pads for Rudder & Propellers

Arrangement & Details Coast Guard Drawing 400 WAGB 1205-6, Rev -, Dets of Padeyes for Lifting Gear Coast Guard Drawing 400 WAGB 1601-001, Rev C, Elevators at Fr 55 and Fr 108 Installation

Details Coast Guard Drawing 400 WAGB 185-110, Rev -, Centerline CPP Hyd Sys Reservoir Tank

Fabrication Coast Guard Drawing 400 WAGB 185-120, Rev -, Port CPP Hydraulic Reservoir Tank

Fabrication Details Coast Guard Drawing 400 WAGB 185-152, Rev-, Stbd CPP Hyd Sys Reservoir Tank Fabrication Coast Guard Drawing 400 WAGB 1906-1, Rev K, Zinc Protectors A/D Coast Guard Drawing 400 WAGB 2200-10, Rev -, Rudder Stock Upper & Lower Bearings Coast Guard Drawing 400 WAGB 2200-2, Rev D; Rudder Arrg’t & Det Coast Guard Drawing 400 WAGB 2200-4, Rev M, Rudder Stock – Arrangement & Details Coast Guard Drawing 400 WAGB 2200-8, Rev H, Rudder Stock Removal A/D Coast Guard Drawing 400 WAGB 2200-9, Rev K, ARR of Steering Gear Rm Coast Guard Drawing 400 WAGB 2601-1, Rev R, Anchor Handling Arrangement & Details Coast Guard Drawing 400 WAGB 3601-6, Rev. C, Sewage Holding Tank Deck Gear

Storeroom Aft Bhd CF-21

Coast Guard Drawing 400 WAGB 3601-7, Rev. B, Sewage Holding Tank Lower Cargo Hold Aft Bhd 197

Coast Guard Drawing 400 WAGB 3901-1, Rev Z, Insulation A&D Coast Guard Drawing 400 WAGB 4000-2, Rev F, Machinery and Piping Standard Details Coast Guard Drawing 400 WAGB 4000-3, Rev V, Machinery Arrgt Plan View Lower Level &

List Of Mach'y Coast Guard Drawing 400-WAGB 4000-4, Rev R, Machinery Arrgt Plan View Platform Level Coast Guard Drawing 400 WAGB 4000-7, Rev K, Machinery Arrgt Elevation Stbd - Looking

Inbd Coast Guard Drawing 400 WAGB 4105-1, Rev Z, Machinery Arrangement Main Propulsion

Polar Class Icebreaker.

Coast Guard Drawing 400 WAGB 4105-2, Rev Z, Assembly Drive end of Engine FI 16V 9X10-

1/2 Coast Guard Drawing 400-WAGB 4105-3, Rev Z, Assembly Drive End of Engine FI 16V 9X10-

1/2 Coast Guard Drawing 400 WAGB 4107-8, Rev D, Diagram Gas Turbine Intake & Exh. and

Boiler Exh. Sys Coast Guard Drawing 400 WAGB 4112-3, Rev L, Propulsion Motor & Generator Interconnection

& IWD

Coast Guard Drawing 400 WAGB 4301-1, Rev AA, Arrgt of Shafting Coast Guard Drawing 400 WAGB 4301-1, Rev Y, Arrgt. of Shafting Coast Guard Drawing 400 WAGB 4301-11, Rev 4, Propeller Tailshaft Assy Coast Guard Drawing 400 WAGB 4301-12, Rev 6, Oil Transfer Shaft Assembly Coast Guard Drawing 400 WAGB 4301-13, Rev 3, Outer Oil Pipe Assy (Center Shaft) Coast Guard Drawing 400 WAGB 4301-14, Rev 3, Outer Oil Pipe Assy (Wing Shaft) Coast Guard Drawing 400 WAGB 4301-17, Rev 1, Inner Oil Pipe Assy (Wing Shaft) Coast Guard Drawing 400 WAGB 4301-2, Rev F, Bulkhead Seal Arrgt & Details Coast Guard Drawing 400 WAGB 4301-23, Rev D, Static Shaft Alignment Analysis Coast Guard Drawing 400 WAGB 4301-29, Rev -, Dowel, Propeller Hub To Tailshaft Coast Guard Drawing 400 WAGB 4301-3, Rev J, Shaft Tubes - Arr & Dets C/L & P/S Coast Guard Drawing 400 WAGB 4301-4, Rev 12, Center Tailshaft Coast Guard Drawing 400 WAGB 4301-5, Rev 10, Wing Tailshaft Coast Guard Drawing 400 WAGB 4301-5, Rev 11, Wing Tailshaft Coast Guard Drawing 400 WAGB 4302-4, Rev B, Stern Tube Bearing and shaft seals (with modified aft bearing) arrangement and details.

Coast Guard Drawing 400 WAGB 4400-18, Rev -, Connecting Procedure for Operating Rod and

Oil Tube Coast Guard Drawing 400 WAGB 4400-27, Rev -, CPP Right Hand Hub Assembly (Elev Section

– Side Profile) Coast Guard Drawing 400 WAGB 4400-31, Rev -, CPP Right Hand Operating Rod Coast Guard Drawing 400 WAGB 4400-34, Rev -, CPP 69” Diameter Left Hand Propeller Hub

Assembly (Elev Section)

Coast Guard Drawing 400 WAGB 4400-38, Rev -, CPP Left Hand Operating Rod Coast Guard Drawing 400 WAGB 4400-41, Rev -, CPP Hub Cylinder (Common to LH & RH) Coast Guard Drawing 400 WAGB 4400-46, Rev -, CPP Propeller Tailshaft Assembly (Common to LH & RH) Coast Guard Drawing 400 WAGB 4400-69, Rev -, Outer Oil Pipe Detail (Center Shaft) Coast Guard Drawing 400 WAGB 4800-10, Rev U, Arr Hyd Interconnecting Piping Fwd Fr 150 Coast Guard Drawing 400 WAGB 4801-009, Rev U, Diagram of Bilge System Coast Guard Drawing 400 WAGB 4803-1, Rev AA, Arr. Firemain 3rd. Dk. & Below Coast Guard Drawing 400-WAGB-4803-9, Rev V, Diagram of Firemain, Flushing and Sprinkling

System Coast Guard Drawing 400 WAGB 4803-12, Rev G, Arrgt of CO2 Fixed Flood Sys Coast Guard Drawing 400 WAGB 4803-13, Rev C, Diag of CO2 Sys Coast Guard Drawing 400 WAGB 4803-19, Rev -, Piping System Mod Range Guard Fire Ext

Sys Instl Arrgt Dets Coast Guard Drawing 400 WAGB 4804-10 Diagram Hot & Cold Potable Water Sys Coast Guard Drawing 400 WAGB 4805-2, Rev V, Diagram S.W. Cooling System Coast Guard Drawing 400 WAGB 4808-089, Rev. A, SLEP Sewage Transfer System Diagram Coast Guard Drawing 400 WAGB 4808-3, Rev AE, ARRGT of Plumb & INTER DK DRNS

MN DK

Coast Guard Drawing 400 WAGB 4808-8, Rev N, Diagram Plumbing and Interior Deck Drains Coast Guard Drawing 400-WAGB-4808-17, Rev C, Operating Diagram for Plumbing and Interior Deck Drains Coast Guard Drawing 400-WAGB-4808-20, Rev AE, Arr. Weather Deck Drains 01 Level &

Above Coast Guard Drawing 400-WAGB-4808-22, Rev G, Diagram of Weather Deck Drains Coast Guard Drawing 400-WAGB-4808-29, Rev -, Weather Deck Drain Modifications Coast Guard Drawing 400 WAGB 4823-1, Rev D, Seachest & Strainer Compts Fwd 113 Coast Guard Drawing 400 WAGB 4823-2, Rev H, Seachest & Strainer Compt Aft Fr 113 Coast Guard Drawing 400 WAGB 5101-1, Rev G, A/D Boiler Smoke Pipes & Smoke Indicators Coast Guard Drawing 400 WAGB 5101-2, Rev F, Safety Valve Easing Gear Coast Guard Drawing 400 WAGB 5101-3, Rev AC, Arr Stm Boiler Blow, Escape, and Feed

Piping Coast Guard Drawing 400 WAGB 5101-4, Rev J, A/D of Condensate Drn Tnk Coast Guard Drawing 400 WAGB 5101-5, Rev F, Dia Steam Boil Blow, Escape and Feed Piping Coast Guard Drawing 400 WAGB 5101-6, Rev N, Arrangement & Details Boiler Feedwater

Tank Coast Guard Drawing 400 WAGB 5101-7, Rev 1, SDW 350M Marine Auxiliary Boiler Bare

Boiler Design Arrangement Coast Guard Drawing 400 WAGB 5200-10, Rev G, ARRGT. Of Emergency Gen. Exhaust Coast Guard Drawing 400 WAGB 5200-2, Rev H, Turbine Stack A/D Coast Guard Drawing 400 WAGB 5200-4, Rev P, A/D HGRS. Gas Turbine EXH. PIP.

Coast Guard Drawing 400 WAGB 5200-6, Rev D, Diagram of Diesel Generators Exhaust Piping Coast Guard Drawing 400 WAGB 5200-7, Rev N, Arrangement of Diesel Exhaust Piping Coast Guard Drawing 400 WAGB 6202-40, Rev N, Central Hydraulic System E & IWD

Coast Guard Drawing 400 WAGB 6504-5, Rev G, CO2 Release Alarm Sys Ckt FR E & IWDCoast

Coast Guard Drawing 400 WAGB 1106-004, Rev V, 3rd Deck Plating Aft FR 117 1/2 Coast Guard Drawing 400 WAGB 1106-005, Rev K, 2nd Dk Pltg Fwd Fr 143 1/2 Coast Guard Drawing 400 WAGB 1106-007, Rev J, Main Deck Plating Fwd Fr 143-1/2 Coast Guard Drawing 400 WAGB 1106-008, Rev J, Main Deck Plating Aft Fr 143 1/2 Coast Guard Drawing 400 WAGB 1106-010, Rev M, 01 Level Plating Fwd Fr 143 1/2 Coast Guard Drawing 400 WAGB 1106-011, Rev M, 01 Level Plat Aft Fr 143 1/2 Coast Guard Drawing 400 WAGB 1106-012, Rev K, 02 Level Plating Coast Guard Drawing 400 WAGB 1106-013, Rev H, 03 Level Pltg & Top of Hangar Coast Guard Drawing 400 WAGB 1106-014, Rev G, 04 Level Top of Pilot House & Pilot House

Deck Level Coast Guard Drawing 400-WAGB 1400-1, Rev R, Schedule of Deck Coverings Coast Guard Drawing 400-WAGB 1602-11, Rev -, 36 X 36 & 30 X 36 W.T. Hatch Coast Guard Drawing 400-WAGB-1602-6, Rev AF, Schedule of Steel Closures Coast Guard Drawing 400-WAGB 5501-8, Rev J, Diagram of Dies Oil Transfer & Purification

System Coast Guard Drawing 400-WAGB 1901-1, Rev AC, Painting Schedule Coast Guard Drawing 400-WAGB 2901-3, Rev E, Tank Capacity Tables – POLAR STAR Coast Guard Drawing 400-WAGB 3802-1, Rev M, Arrg of Steam Heat 02 Lvl & Abv Coast Guard Drawing 400 WAGB 3802-2, Rev AB, Arr. Steam Heat 01 Lvl. & Bel. Fwd 113 Coast Guard Drawing 400-WAGB 3802-3, Rev AF, Arrg Steam Heat 01 Lvl & Blw Aft 113 Coast Guard Drawing 400-WAGB 3802-4, Rev J, Dia. Steam Heating and Condensate System Coast Guard Drawing 400-WAGB 3802-7, Rev A, Diag Stm Heat & Condensate System

(POLAR STAR)

Coast Guard Drawing 400-WAGB 3803-1, Rev M, Vent & A/C Diag Coast Guard Drawing 400-WAGB 3803-2, Rev L, Vent & A/C Equipment List Coast Guard Drawing 400-WAGB 3803-4, Rev N, Vent & A/C Fan Rm Arrg 02 & 03 Lvl Coast Guard Drawing 400-WAGB 3803-5, Rev M, Vent & A/C Fan Rm Arrg Mn Dk FR 113

Fwd Coast Guard Drawing 400-WAGB 3803-6, Rev M, Vent & A/C Fan Rm Arrg Mn & 2nd Dk FR

113 Aft Coast Guard Drawing 400 WAGB 3803-9, Rev S, Vent & A/C Arrg 01 Lvl Fr 67 Fwd Coast Guard Drawing 400 WAGB 3803-14, Rev H, Vent & A/C Arrg Mn Dk Fr 25-57 (S) Coast Guard Drawing 400 WAGB 3803-15, Rev G, Vent & A/C Arrg Mn Dk Fr 57-85 (P) Coast Guard Drawing 400 WAGB 3803-16, Rev G, Vent & A/C Arrg Mn Dk Fr 57-85 (S) Coast Guard Drawing 400 WAGB 3803-35, Rev C, Vent & A/C Heating & Cooling Load

Calculations Coast Guard Drawing 400-WAGB 4200-1, Rev G, A/D Lifting Gear Motor & Gear Rms Coast Guard Drawing FL 6713-203, Rev D, CRP-V850 Transducer (SS505) Adapter Assembly Coast Guard Drawing FL-1204-3, Rev A, Fleet Welded Padeyes and Links Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem

Coast Guard Fleet Drawing FL 2804-022, Rev A, Consolidated Visual ID for Cutters (Vessels 65 ft and Over in Length)

Coast Guard Drawing FL-184-002, Rev B, SS164 Shallow Water Transducer Adapter Assembly Coast Guard Drawing FL-6713-203, Rev. D, CRP-V850 SST XDCR, (SS505) Adapter Assembly NAVSEA Drawing 803-5184182, Rev B, Insulation, Passive Fire Protection- Installation Details NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation for Compartments

Installation Details NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes Coast Guard Drawing 400 WAGB 5801-2, Rev F, Diagram Distilling Plant Coast Guard Drawing 400-WAGB-3902-1, Rev B, Machinery Insulation Schedule Coast Guard Drawing 400-WAGB 3902-2, Rev E, Piping Insulation Schedule Coast Guard Drawing 400-WAGB-424-001, Rev. A, Doppler Speed Log Installation Coast Guard Drawing 400-WAGB-423-11, 1SG38-SINS2(V)49/AIS(V)2 Installation BWD and

Details Coast Guard Drawing 400-WAGB 4800-17, Rev F, Steering Gear Inter Hyd Piping ARR & DET Coast Guard Drawing 400 WAGB 4112-8, Rev S, Arrangement Compressed Air Diesel Engine

Starting Coast Guard Drawing 400 WAGB 4112-9, Rev H, Diagram of Engine Starting, Clutch, & G.T.

Fuel Atomizing Air Coast Guard Drawing 400 WAGB 4112-220, Rev A, Rip Arrangement Starting Air System

Modifications – POLAR STAR Coast Guard Drawing 400 WAGB 4112-221, Rev A, Rip Diagram Starting Air System

Modifications – POLAR STAR Coast Guard Drawing 400 WAGB 4901-8, Rev R, Diagram of Compressed Air System

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jan 2014, Coatings and Colors

Manual Coast Guard Technical Publication (TP) 1991, Engineers Operating Manual Coast Guard Technical Publication (TP) 2019, Engineers Operating Manual Coast Guard Technical Publication (TP) 1992, Engineers Operating Manual Coast Guard Technical Publication (TP) 1994A, 29-JAN-19, Ship Information Book - Piping, Ventilation, Heating and Air Conditioning System Coast Guard Technical Publication (TP) 1994B, 31-JAN-19, Ship Information Book - Piping, Ventilation, Heating and Air Conditioning System Coast Guard Technical Publication (TP) 2029, Manufacturer's Instruction Book - SWBS

Group(s) 242-262 Coast Guard Technical Publication (TP) 2029, Manufacturer's Instruction Book - SWBS

Group(s) 243-262 Coast Guard Technical Publication (TP) 2029, Prop Shaft Coast Guard Technical Publication (TP) 2031, SWBS 500, Section A, 1971, Group Control

Center Coast Guard Technical Publication (TP) 2031, SWBS 500, Section B, 1974, Group Control

Center, Parts/Material List

Coast Guard Technical Publication (TP) 2032, 23-JAN-15, Manufacturer's Instruction Book – SWBS Group(s) 500

Coast Guard Technical Publication (TP) 2033, 26-MAR-19, Manufacturer's Instruction Book- SWBS Group(s) 503-510

Coast Guard Technical Publication (TP) 2033, Manufacturer's Instruction Book-SWBS Group(s) 503-510

Coast Guard Technical Publication (TP) 2034A, SWBS 512, Jan 2020, Ventilation Fans, Buffalo Forge

Coast Guard Technical Publication (TP) 2035, SWBS 517, Section A, Rev -, Auxiliary Boiler Coast Guard Technical Publication (TP) 2036, SWBS 531, Section A, Rev -, Distilling Plant Coast Guard Technical Publication (TP) 344_261_A, 02/18/2000, FOP Model USPX 413 –

Operation, Maintenance & Repair Manual Coast Guard Technical Publication (TP) 344_261_B, 02/18/2000, FOP Model USPX 413 – FOP

– Technical Manual for Ancillary Equipment Coast Guard Technical Publication (TP) 2037, SWBS 555, Section C, Fire Extinguishing System

CO2

Coast Guard Technical Publication (TP) 2039, Manufacturer's Instruction Book-SWBS Group(s)

Coast Guard Technical Publication (TP) 2042, Manufacturer's Instruction Book - SWBS Group

Coast Guard Technical Publication (TP) 2761, 1984, Nomex Joiner Bulkheads Repair Manual Coast Guard Technical Publication (TP) 3205, Manufacturer's Instruction Book-SWBS Group(s)

Coast Guard Technical Publication (TP) 3255H, Marine Gas Turbine (FT4) Coast Guard Technical Publication (TP) 3255D, Main Gas Turbine (FT4) – Service Bulletins Coast Guard Technical Publication (TP) 3442, FOP Model USPX 413 – Operation, Maintenance

& Repair Manual Coast Guard Technical Publication (TP) 3442-261-A, FOP Model USPX 413 – Operation, Maintenance & Repair Manual Coast Guard Technical Publication (TP) 3442-261-B, FOP Model USPX 413 – Operation, Maintenance & Repair Manual Coast Guard Technical Publication (TP) 3443A, 03/17/2017, Lube Oil Purifier (LOP) Model

WHPX 405

Coast Guard Technical Publication (TP) 3443A, 2017, Lube Oil Purifier (LOP) Model WHPX

Coast Guard Technical Publication (TP) 4390A, Coupling, Flexible Diaphragm Coast Guard Technical Publication (TP) 4391, Manufacturer's Instruction Book-SWBS Group(s)

Coast Guard Technical Publication (TP) 4391, Manufacturer's Instruction Book-SWBS Group(s)

235-241 Coast Guard Technical Publication (TP) 4391, Propulsion A.C. Generator Coast Guard Technical Publication (TP) 4391, Propulsion Generator and Main Motor Coast Guard Technical Publication (TP) 4391, Reduction Gear Coast Guard Technical Publication (TP) 4391, SWBS 235, Section A, Propulsion A.C. Generator Coast Guard Technical Publication (TP) 4395, 2019, SWBS 243 Propulsion Shafting and CPP

System

Coast Guard Technical Publication (TP) 4395, Manufacturer's Instruction Book-SWBS Group(s)

Coast Guard Technical Publication (TP) 4397A, 2016, Ship Service Diesel Generator (SSDG) – Generator

Coast Guard Technical Publication (TP) 4397A, Ship Service Diesel Generator (SSDG) - Generator

Coast Guard Technical Publication (TP) 4411, Manufacturer's Instruction Book-SWBS Group(s)

Coast Guard Technical Publication (TP) 4415, Manufacturer's Instruction Book, 2012, SWBS 581 Section A Anchor Handling and Stowage Systems

Coast Guard Technical Publication (TP) 4415, SWBS 581, Section A, Anchor Windlass System Coast Guard Technical Publication (TP) 4650, 2019, Main Propulsion Diesel Engine – Model

251 – 16 Cylinder, Ops & Maint. Manual.

Coast Guard Technical Publication (TP) 4668, 29-NOV-07, Miranda Davit - Model Mrt 3900 Coast Guard Technical Publication (TP) 4978, Telescoping Boom Crane, Model TB60-60 Coast Guard Technical Publication (TP) 4979, 20-JAN-2019, Knuckle Boom Model K280-70 Coast Guard Technical Publication (TP) 4986, Modified Controllable Pitch Propeller System Coast Guard Technical Publication (TP) 4989, Manufacturer's Instruction Book - SWBS

Group(s) 241 Coast Guard Technical Publication (TP) 4989, Rev -, Main Reduction Gear Drives Coast Guard Technical Publication (TP) 5502, Fire Suppression System - Model WHDR Coast Guard Technical Publication (TP) 9168, Pallet Truck - Model E16N-1266-120 Coast Guard Technical Publication (TP) 9168, Pallet Truck - MODEL E16N-1266-120 Coast Guard Technical Publication (TP) LR-H5-001-V0, 2023, Oily Water Separator Model 5015 Coast Guard Technical Publication (TP) S9073-A2-HBK-010, 2005, Resilient Mount Handbook Fire Prevention and Response Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2022, General

Requirements Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 0850 (SFLC Std Spec 0850), 2022, General Requirements for Drawing Preparation Surface Forces Logistics Center Standard Specification 0860 (SFLC Std Spec 0860), 2022, General Requirements for Technical Publication Surface Forces Logistics Center Standard Specification 2350 (SFLC Std Spec 2350), 2022, Inspect, Test and Recondition DC Generators & Motors In-Place Surface Forces Logistics Center Standard Specification 2351 (SFLC Std Spec 2351), 2022

Overhaul DC Generators & Motors, Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3020, 2022, Overhaul

AC Electrical Motors

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation

Surface Forces Logistics Center Standard Specification 3100 (SFLC Std Spec 3100), 2022, Inspect, Test And Recondition AC Synchronous Machines In-Place

Surface Forces Logistics Center Standard Specification 3101 (SFLC Std Spec 3101), 2022, Overhaul AC Synchronous Machines

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems

Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100, 2022, Clean Shipboard Ventilation Systems

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2022, Install Interior Deck Covering Systems

Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8364), 2022, Drydocking

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2022, Temporary Services

Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2022, Temporary Hull Accesses

Coast Guard Drawing FL-184-2, Rev B, Shallow Water Transducer Adapter Assy

OTHER REFERENCES

Abrasive Blast Cleaning Airmar SS164 Owner’s Guide and Installation Instructions Airmar Drawing D-14044, Rev. I, SS164 Outline Drawing Allis Chalmers Corporation (DWG) 9016-T-3; Dowel Pin Allis Chalmers Corporation (DWG) 9024-F-1; Outer Oil Pipe Detail (Center Shaft) Allis Chalmers Corporation (DWG) 9024-H-1, Outer Oil Pipe Detail (Wing Shaft) Allis Chalmers Corporation (DWG) 9024-J-2, Outer Oil Pipe Assy (Center Shaft) Allis-Chalmers Corporation (DWG) 9025-AG-3, Spacer Ring Rev.( 02) Allis-Chalmers Corporation (DWG) 9025-AG-3, Spacer Ring, Rev 02 American National Standards Institute/American Water Works Association (ANSI/AWWA)

C652, 2011, Disinfection of Water-Storage Facilities American National Standards Institute/American Water Works Association (ANSI/AWWA)

C652, 2019, Disinfection of Water-Storage Facilities American National Standards Institute/NSF International (ANSI/NSF) 61, 2020, Drinking Water

System Components - Health Effects American Society of Mechanical Engineers (ASME) B16.34, 2020, Valves-Flanged, Threaded, and Welding End

American Society for Nondestructive Testing (ASNT), Recommended Practice No. SNT-TC-1A, 2020, Personnel Qualification and Certification in Nondestructive Testing

American Society for Nondestructive Testing (ASNT), Standard No. ANSI/ASNT CP-189-2020, 2020, ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel

American Society of Mechanical Engineers (ASME) B16.34, 2020, Valves-Flanged, Threaded, and Welding End

American Welding Society (AWS) B1.10M/ B1.10, 2016, Guide for Nondestructive Examination of Welds

American Welding Society (AWS) B1.11M/B1.11, 2015, Guide for the Visual Examination of Welds

American Welding Society (AWS) D1.1/D1.1M, 2020, Structural Welding Code – Steel American Welding Society (AWS) D3.5, 2000, Guide for Steel Hull Welding Annex 21, Resolution MEPC .285(70), 2016, Amendments to the Revised Guidelines and

Specifications for Pollution Prevention Equipment for Machinery Space Bilges of Ships.

ANSI/ASME B40.100-2013, 2013, Pressure Gauges and Gauge Attachments ANSI/MSS SP-58-2009, 2009, Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation ASTM Standard Specification A106, March 2021, Standard Specification for Seamless Carbon

Steel Pipe for High Temperature Service ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D1330, Series, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D3359, 2009, Standard Test Methods for Measuring Adhesion by

Tape Test ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film

Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single-

Component Adhesives (An) ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-

Component Adhesives (AN) ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates ASTM International D1330, 2004, Standard Specification for Rubber sheet Gaskets.

ASTM International (ASTM) F1508-96, 2016, Standard Specification for Angle Style, Pressure

Relief Valves for Steam, Gas, and Liquid Services Chockfast Technical Bulletin 632A, Sterntube & Strut Bearings CHOCKFAST Orange Installation Stern Tube Bearing USCG Polar Class Ice Breaker. 4/8/2005 Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health

Standards for Shipyard Employment Code of Federal Regulations (CFR) Title 29, Part 1910, 2017, Occupational Safety and Health

Standards Code of Federal Regulations (CFR) Title 40, 2013, Protection of the Environment

Code of Federal Regulations (CFR) Title 46, Chapter I, Part 176, Subpart H, Section 810, 2019, Fire Protection

Code of Federal Regulations (CFR) Title 46, Part 61.05, 2013, Tests and Inspections of Boilers Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound, Antiseize, Zinc

Dust-Petrolatum CID A-A-59313, 2019, Thread Compound, Antiseize, Zinc Dust-Petrolatum Compressed Gas Association, Inc. (CGA) C-6-2007, Standards for Visual Inspection of Steel

Compressed Gas Cylinders Eaton Hydraulics LLC, Filtration Division, Installation, Operation & Maintenance Manual Model

570 Duplex Basket Strainer, 06/2011 Eaton Hydraulics LLC, Filtration Division, Installation, Operation & Maintenance Manual Model

570 Duplex Basket Strainer, 06/2011 Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections Federal Specification (Fed Spec) QQ-N-281D (2), Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections Federal Specification (Fed Spec) QQ-N-281D(2), Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections Federal Specification (Fed Spec) QQ-N-281D Amendment 2, 2020, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip Wire, Forgings, and Structural and Special Shaped Sections Federal Specification (Fed Spec) RR-C-271H w/ Attachment 1, Series, Chain and Attachments, Carbon and Alloy Steel

GAS TURBINE MODULE INTERFACE CONNECTIONS 400’ POLAR ICEBREAKER MPL-

1274-13.0 (DRAWING FROM TP 3255)

General Specifications for Overhaul of Surface Ships (GSO), 2004, Section 581 Anchor Stowage and Handling Gooseneck Renewal.pdf IEEE Std 56-2016, IEEE Guide for Insulation Maintenance of Electric Machines IEEE Std 62.2-2005, Guide for Diagnostic Field Testing Electrical Machinery IEEE Std 43-2013, IEEE Recommended Practice for Testing Insulation Resistance of Electric

Machinery IEEE Std 2455-2023, IEEE Recommended Practice for the Repair and Maintenance of Direct

Current Electric Machines International Organization for Standardization (ISO) 4406, 7/13/2004, Hydraulic Fluid Power --

Fluids -- Method for Coding the Level of Contamination by Solid Particles International Organization for Standardization (ISO) 4406, 7/13/2004; Hydraulic Fluid Power --

Fluids -- Method for Coding the Level of Contamination by Solid Particles Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2019

Edition, Pressure Testing Of Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017

Edition, Butterfly Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010

Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2019

Edition, Bronze Gate, Globe, Angle and Check Val

MIL PRF-16173 w/Interim Amendment 2, 2017, Corrosion Prevention Compound, Solvent Cut Back, Cold Application

MIL-A-21016, May 1990, Adhesive, Resilient Deck Covering MIL-A-22262B Amendment 2, 2021, Abrasive Blasting Media Ship Hull Blast Cleaning MIL-C-24633A, 2014, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded MIL-C-24757, Nov 1990, Cloth, Fiberglass, Coated Military Specification MIL-C-20079, July 1987, Cloth, Glass; Tape, Textile Glass; And Thread, Glass and Wire-Reinforced Glass MIL-D-18873, Jul 1982, Deck Covering Magnesia Aggregate Mixture MIL-D-21631, Dec 1990, Deck Covering, Latex Concrete MIL-D-23134, Jul 1999, Deck Underlay and Covering, Insulating, Magnesia Aggregate Mixture MIL-DTL-23549D, 2021, Grease, General Purpose CID A-A-59313, 2019, Thread Compound, Antiseize, Zinc Dust-Petrolatum MIL-A-18001, 2015, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418) Military Detail Specification MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy

(Commercially Accepted - ASTM B418) Military Detail Specification MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast

Cleaning Military Detail Specification MIL-D-16791, Rev G, Detergents, General Purpose (Liquid, NonIonic) Military Detail Specification MIL-I-24092, Rev A, Insulating Resin, Solventless, Baking, Semi-

Rigid, for Dip Processing, Grade SH, Class 155 to 200 Thermal Class Military Detail Specification MIL-I24092/1, Sep 1993, Insulating Varnish, Solvent Containing

Air-Dry for Spot Patching and Emergency Repairs. Grade CA, Class 130 and 155 Thermal Class Requirements

Military Detail Specification MIL-R-21252B, May 1991, Rubber Sheet, Solid, Synthetic, Shipboard Water Evaporator Gasketing

Military Performance Specification MIL-PRF-1149, Jun 1998, Gasket Materials, Synthetic Rubber, 50 and 65 Durometer

Military Performance Specification MIL-S-45180, 1998, Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant

MIL-PRF-24176C, 2020, Cement, Epoxy, Metal Repair and Hull Smoothing MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric MIL-PRF-3135, Nov 1986, Deck Covering Underlay Materials MIL-PRF-900, 2020, Rubber Gasket Material, 45 Durometer Hardness MIL-PRF-900, Mar 1991, Rubber Gasket Material, 45 Durometer Hardness MIL-S-45180D, 1998, Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant MIL-STD-1689, Nov 1990, Fabrication, Welding and Inspection of Ships Structure MIL-STD-1689A, 1990, Fabrication, Welding, and Inspection of Ships Structure MIL-STD-419, 1987, Cleaning and Protecting Piping Tubing, and Fittings for Hydraulic Power

Transmission Equipment MIL-STD-777, 2012, Schedule of Piping, Valves, Fittings, and Associated Piping Components for Naval Surface Ships.

MIL-STD-2199B(SH), Jul 2010, Coverings for Waterborne Main Propulsion Shafting on U.S.

Naval Surface Ships and Submarines.

MIL-STD-3026A, 2017, Chemical Cleaning of Sewage Collection Piping Systems on Navy Surface Ships

Military Specification MIL-T-16420K, April 1978, Tube, Copper-Nickel Alloy, Seamless and Welded

Military Specification MIL-T-24108B, October 1987, Tube, Copper (Seamless) National Board of Boiler and Pressure Vessel Inspectors (NBBI), NBIC, 2023, National Board

Inspection Code National Fire Protection Association (NFPA) 12, 2018, Standard on Carbon Dioxide

Extinguishing Systems National Fire Protection Association (NFPA) 12A, 2018, Standard on Halon 1301 Fire

Extinguishing Systems National Fire Protection Association (NFPA) 17A, 2017, Standard for Wet Chemical

Extinguishing Systems Naval Sea Systems Command (NAVSEA) S9555-AT-MMA-010, Rev 4, Technical Manual for

HALON 1301 Fixed Fire Extinguishing System, Naval Sea Systems Command (NAVSEA) Technical Publication T9074-AS-GIB-010/271, Apr

1997, Requirements for Nondestructive Testing Methods Naval Sea Systems Command (NAVSEA) Technical Publication,T9074-AS-GIB-010/271, Apr

1997, Requirements for Nondestructive Testing Methods Naval Sea Systems Command (NAVSEA)Technical Publication T9074-AS-GIB-010/271, Apr

1997, Requirements for Nondestructive Testing Methods Naval Sea Systems Command (NAVSEA)Technical Publication T9074-AS-GIB-010/271, Requirements for Non-Destructive Testing Methods Naval Sea Systems Command (NAVSEA) Instruction S9AA0-AB-GOS-010 General

Specifications for Overhaul of Surface Ships (GSO) Naval Sea Systems Command (NAVSEA) Type and Standard Drawing 804-8436625, Rev -, Safety Nets, Deck Edge, Aluminum Frame, Synthetic Net Naval Ships Technical Manual (NSTM) Chapter 079, Practical Damage Control Naval Ships Technical Manual (NSTM), Chapter 581, Anchoring Naval Ships Technical Manual S9086-GY-STM-010, 2021, Chapter 221 Naval Ships’ Technical Manual (NSTM) Ch 244, 2011, Propulsion Bearings and Seals NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments

Installation Details NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments

Installation Details NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure NAVSHIP Dwg 810-138579, Rev. F, Deck Drain Fittings Preparation Standard SSPC-SP 10 (WAB)/NACE WAB-2, 2015, Near-White Metal Wet Preparation Standard SSPC-SP 11 2013, Power Tool Cleaning to Bare Metal Rucker Control System Drawing 82002-J-044, Anchor Windlass Assy. Icebreaker Machinery Rucker Control System Drawing 82002-J-738, Control Valve, Operator Arrangement

S9086-S4-STM-010/CH-556R4 Hydraulic Equipment Power Transmission and Control SAE International (SAE) AMS-STD-595A, 2017, Colors Used in Government Procurement SNT-TC-1A, 2016, Recommended Practice for Personnel Qualification and Certification in

Nondestructive Testing Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 1998, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Corkand Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183A, 2013, Cork and Rubber Composition Sheet, For Aromatic Fuel and Oil Resistant Gaskets Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183A, 2019, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183B, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets Society of Automotive Engineers (SAE) J1273, 2014, Recommended Practices for Hydraulic

Hose Assemblies Society of Automotive Engineers (SAE)/Aerospace Material Specification (AMS) C 6183, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets Society Of Naval Architects and Marine Engineers (SNAME) T&R 3-39, Guide for Shop and

Installation Tests Society Of Naval Architects and Marine Engineers (SNAME) T&R 3-47, Guide for Sea Trials The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2016, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP

11), 2014, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP

11), 2020, Bare Metal Power Tool Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP

11), Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC) Surface Preparation Specification No.15 (SSPC-SP

15), 2004, Commercial Grade Power Tool Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2018, Power Tool Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), Power Tool Cleaning) The Society for Protective Coatings (SSPC), August 2016, Paint Application Specification No. 2

(PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements The Society for Protective Coatings (SSPC), Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10 (WAB)/NACE WAB-2, 2015, Near-White Metal Wet Abrasive Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-4/NACE WJ-4, 2017, Waterjet Cleaning of Metals – Light Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Metal Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10 (WAB)/NACE WAB-2, 2015, Near-White Metal Wet Abrasive Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 6 (WAB)/NACE WAB-3, 2015, Commercial Abrasive Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2/NACE WJ-2, 2016, Waterjet Cleaning of Metals – Very Thorough Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP

10/NACE No.2, 2004, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface

Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning The Society for Protective Coatings SSPC-SP 10/NACE No.2, Jan 2007, Near-White Metal Blast

Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface

Preparation Standard SSPC-SP WJ-4/NACE WJ-4, 2012, Waterjet Cleaning of Metals – Light Cleaning

The Society for Protective Coatings SSPC-SP 10/NACE No.2, Near-White Blast Cleaning The Society for Protective Coatings SSPC-SP 11, Nov 2013, Power Tool Cleaning to Bare Metal Thordon Double Key XL Bearing Installation Manual 10 May 2006 Thordon XL Double Key Bearing Assembly DWG No. TG-17321 (Thordon Bearing Inc.)

Thordon XL Double Key Bearing Carrier DWG No. TG-17344 (Thordon Bearing Inc.)

USCG Polar Class Aft Sterntube Bearing Design Study, Final Report, September 16, 2005 USCG Polar Class Propulsion Shaft 2005 Alignment Plan Report, Oct 27, 2005 US Environmental Protection Agency Method 1664, Feb 1999, N-Hexane Extractable Material and Silica Gel Treated N-Hexane Extractable Material by Extraction and Gravimetry.

Westinghouse Drawing 639F283 Westinghouse Drawing 7142D39 Westinghouse Torque Table

COAST GUARD DRAWINGS
OTHER REFERENCES