This is Amendment 003 to a solicitation for dry-dock repair services for the U.S. Coast Guard Cutter Polar Star covering a five-year Indefinite Delivery Indefinite Quantity (IDIQ) contract from FY2026 through FY2030. The amendment, issued by the USCG Surface Forces Logistics Center on January 30, 2026, extends the proposal due date from February 5, 2026 to February 9, 2026. The amendment updates Attachments 1, 2, 3, and 10 (the pricing schedule, estimated work items for each ordering period, and consolidated list of references) and incorporates responses to 29 questions submitted by interested vendors regarding clarifications on work item scope, pricing methodology, technical requirements, and submission procedures.
Key clarifications address pricing requirements, including that work items shall be submitted as single lump sum prices with tables provided for scope definition rather than unit pricing, that eight previously unscheduled work items (D-30, D-39, D-48, D-64, D-71, D-77, D-83, D-102) shall be priced as optional items, and that contractors must submit a detailed work schedule only for the initial FY2026 ordering period with pricing required for the remaining four ordering periods. The amendment confirms contractors must use MIL-STD-881F as guidance for the Contract Work Breakdown Structure, clarifies that technical representative certifications must be submitted to the Contracting Officer at the arrival conference (though proposals are more favorable if they include anticipated subcontractor information), and specifies that proposal volumes may be submitted as separate document folders in PDF format with technical ability planning documents limited to 25 pages maximum. The request for clarifications deadline was extended to January 29, 2026, with final answers provided by February 2, 2026.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE
| PAGE |
| OF PAGES |
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1 |
| 10 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| Amendment 003 |
| 01/30/2026 |
| 6. ISSUED BY |
| CODE |
| 70Z085 |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
| 70Z085 |
USCG Surface Forces Logistics Center
U.S. Coast Guard Island, Building 55
Alameda CA 94501
USCG Surface Forces Logistics Center
U.S. Coast Guard Island, Building 55
Alameda CA 94501
| 8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) |
| ( |
| 9.A AMENDMENT OF SOLICITATION NO. |
70Z08526RLREP0005
| X |
| 9B. DATE (SEE ITEM 11) |
10A. MODIFICATION OF CONTRACT/ORDER NO. ?
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, FORMCHECKBOX is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
| ( |
| C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: |
D. OTHER (Specify type of modification and authority).
Contract Clause, H.4 Option Item; FAR 17.207©
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
POLAR STAR IDIQ DD FY26-30
The purpose of this amendment is to:
· Respond to questions received from interested vendors and add updated attachments 1, 2, 3, and 10 (attachments will be uploaded into SAM.gov).
· Extend the closing date of the solicitation from 02/05/2026 to 02/09/2026
· See continuation sheet for more information
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
Kiya Plummer-Dantzler
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
| BY |
| 30 January 2026 |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
30-105
STANDARD FORM 30 (REV. 10-83) PREVIOUS EDITION UNUSABLE
Prescribed by GSA, FAR (48 CFR) 53.243
Request for Clarification Solicitation No. 70Z08526RLREP0005
Question Submitted Number: 001
Section/Work Item Number: RFP, Questions
Paragraph Number, if applicable: N/A
Question:
Contractor received the RFP and the specifications on 1/12/26. Contractor notes in the RFP that all questions related to the solicitation must be received NLT 12:00PM 1/15/26.
Contractor has requested the required references delineated within the specifications and to date have not received them. Additionally, Contractor is asking to conduct a ship check to potentially corroborate specified work as specified in the specifications.
Contractor is diligently working towards putting together a comprehensive proposal to meet the USCG’s time constraints they have listed in the RFP.
Contractors and subcontractors will have questions once the references have been received, reviewed and validated, incorporating the scope of work delineated within the specifications.
Please consider the following:
· Please extend the deadline for questions from 12:00PM 1/15/26 to 12:00PM 1/29/26
The extension, if granted, would afford the opportunity for the contractor as well as subcontractors to identify or clarify any ambiguous scope of work that we may come across during the preparation of the proposal and incorporate the information into our submittal.
Answer:
Deadline for questions until 1/29/2026 approved. Final answers to questions will be provided no later than 02 February 2026, 1:00 PM Pacific Time
Question Submitted Number: 002
Section/Work Item Number: D-30, D-39, D-48, D-64, D-71, D-77, D-83, D-102
Paragraph Number, if applicable: N/A
Question:
The following work items do not have ordering periods for any of the ordering periods listed in Attachment 10_ Estimated Work Items for Each of the Ordering Periods:
| D-30 |
| WI #30 Warping Capstan, Inspect and Repair |
| D-39 |
| WI #39 NR3 Gas Turbine, Align |
| D-48 |
| WI #48 Superstructure, Preserve 100% |
| D-64 |
| WI #64 Shaft OD Box, Clean Inspect and Repair (30,000 hrs.) |
| D-71 |
| WI #71 Sea Strainers (Hayward) Overhaul |
| D-77 |
| WI #77 Tanks, Ballast, Clean and Inspect |
| D-83 |
| WI #83 Tanks, Dirty oil and Waste, preserve 100% |
| D-102 |
| WI #102 Sewage Holding Tank(s), Clean and Inspect |
Please advise if any of the above work items above have order periods.
If the above work items do not have ordering periods, does the contractor need to price them?
Please advise.
Answer:
The above work items shall be priced as optional items, so they can be turned on easily if they are identified as needing to be completed.
Question Submitted Number: 003
Section/Work Item Number: D-61, D-63
Paragraph Number, if applicable: N/A
Question:
WI 61 states the Port side FWD stern tube bearing has been permanently installed in /Chock fast and cannot be removed.
WI 63 directs us to complete the work needed to permanently install the Port Forward bearing in chock-fast.
The two work items seem to have conflicting directions for the PORT FWD bearing, please advise which scope of work applies to the PORT FWD bearing.
Answer:
Work Item 63 is correct.
Correction: In work item 61, the note after paragraph 3.8.2.1 should read: “The STBD Fwd Stern Tube Bearing Housing Shells have been permanently mounted in place with chock fast.” Correction was incorporated into Rev-1 SOW that will be issued in amendment.
Question Submitted Number: 004
Section/Work Item Number: Attachment 3, Consolidated List of References
Paragraph Number, if applicable: N/A
Question:
Contractor has verified the following references cited in Attachment 3 Consolidated List of References were not included with the initial references provided.
Answer:
Updated consolidated list of references was provided to Contracting Officer; revised technical information package will be sent from CG Technical Library to all vendors.
Question Submitted Number: 005
Section/Work Item Number: 52
Paragraph Number:1.1 & Table 1
Question: WI 52, Table 1 has a list of various types and sizes of piping to be priced as units for renewal, but the price sheet has a lump sum with a quantity of 2. These unit prices are not useful as a lump sum.
Please confirm this is how you would like the price for these units submitted.
Answer:
1. Pricing Method: You are to submit a single lump sum price for Work Item 52.
2. Purpose of Table 1: Table 1 is provided to define the complete scope of work that must be included in your lump sum calculation. The various types and sizes of piping listed in the table are for your reference to build your estimate. They are not to be priced as individual units. For bidding purposes use the higher end of the pipe diameter in each row – example: quote 2” for less than or equal to 2.
3. Required Quantity: The quantity on the pricing schedule is now one (1). Your total lump sum bid must cover the cost of performing the entire scope of work described in Table 1, one time. Attachment 1 is the pricing schedule that needs to be filled out. Attachment 10 is the estimated work items for all five ordering periods.
Question Submitted Number: 006
Section/Work Item Number: 1
Paragraph Number:3.9
Question:
Para 3.9 directs the contractor to provide a sewage barge twice to offload sewage from the vessel.
If the contractor has the services in place to offload sewage from the vessel without the need for a barge, will contractor still need to provide a barge?
Please advise.
Answer:
NO. When the contractor has the services in place to offload sewage from the vessel, the Contractor is not required to provide a barge to offload sewage from the vessel.
Question Submitted Number: 007
Section/Work Item Number: Sol. Vol. 1
Paragraph Number: 1. & 4.
Question:
The Offeror shall provide the following in its Volume I in order to be considered complete and clearly label each document in its proposal as noted below.:
Para. 1. Of Volume 1 – Technical states 1. “Document titled “Work Schedule” which provides details on the offeror’s proposed scheduling of the estimated work for each of the five ordering periods. (Reference attached “Estimated Work Items for Each of the Five Ordering Periods.”) 20 page maximum.”
Para. 4. Of Volume 1 -Technical states 4. “The following technical ability information for ONLY the initial task order in Ordering Period 1 for the dry-docking of CGC Polar Star as noted below”.
Please advise if contractor is to submit a work schedule with the bid submission for (5) ordering periods or (1) ordering period?
Answer:
The contractor is required to submit a work schedule/planning document for only the first ordering period, FY2026 drydock. Pricing is required for the remaining four ordering periods.
Question Submitted Number: 009
Section/Work Item Number: 32
Paragraph Number: Table 1
Question:
Table 1 details location of work for two separate locations TBD to accomplish approximately 300 SF of PRC renewal.
Please provide the locations where the new deck coverings will be required.
Answer:
In accordance with paragraph 1.1, the COR will provide Actual Compartment Names and Numbers as at time of availability. Contractor shall provide pricing for 300 sqft in accordance with Table 1.
Question Submitted Number: 010
Section/Work Item Number: 33
Paragraph Number: Table 1
Question:
Table 1 details location of work for two separate locations TBD to accomplish approximately 300 SF of carpet renewal.
Please provide the locations where the carpet renewal will be required.
Answer:
In accordance with paragraph 1.1, the COR will provide Actual Compartment Names and Numbers as at time of availability. Contractor shall provide pricing for 300 sqft in accordance with Table 1.
Question Submitted Number: 011
Section/Work Item Number: 34
Paragraph Number: Table 1
Question:
Table 1 details location of work for two separate locations TBD to accomplish approximately 600 SF of non-skid renewal.
Please provide the locations where the non-skid renewal will be required.
Answer:
In accordance with paragraph 1.1, the COR will provide Actual Compartment Names and Numbers as at time of availability. Contractor shall provide pricing for 600 sqft in accordance with Table 1.
Question Submitted Number: 012
Section/Work Item Number: 35
Paragraph Number: Table 1
Question:
Table 1 details location of work for two separate locations, TBD, to accomplish approximately 300 SF of interior decks to inspect and coat.
Please provide the locations where the inspections and coatings will be required.
Answer:
In accordance with paragraph 1.1, the COR will provide Actual Compartment Names and Numbers as at time of availability. Contractor shall provide pricing for 300 sqft in accordance with Table 1.
Question Submitted Number: 013
Section/Work Item Number: Multiple WI’s
Paragraph Number:
Question:
All the work items below do not provide oil type of quantity.
WI#7: No oil change in this work item.
WI#14: Information located in (TP) 4979. Oil needed: 4.5 gallons of Mobil Delvac Synthetic Transmission Fluid-Arctic.
WI#15: Information located in (TP) 4979. Oil needed: 4.5 gallons of Mobil Delvac Synthetic Transmission Fluid-Arctic.
WI#16: Information located in (TP) 4978. Oil needed: 4.5 gallons of Mobil Delvac Synthetic Transmission Fluid – Arctic.
WI#26: Information located in (TP) 4415. Oil type Mobil DTE 10 Excel 32 hydraulic fluid. Amount is not listed in TP. For estimating purposes, use 350 gallons.
WI#30: Information located in (TP) 3205. Worm chamber oil capacity 26 gallons, helical chamber oil capacity 2 gallons. Oil type: Worm gear Mobil SHC-634; helical gear MIL-L-2105 80W 90.
Please provide.
Answer:
Answers above.
Question Submitted Number: 014
Section/Work Item Number: RFP- Instructions to Offerors
Paragraph Number, if applicable: Page 27
Question:
We would like to request an extension of the RFC due date. It is currently listed in the RFP as 1200 PT 15 JAN 2026. A two-week RFC due date extension would be ideal to properly bid the extensive work package for the Polar Star.
Answer:
Extend RFC deadline to 1/29/2026.
Question Submitted Number: 015
Section/Work Item Number: RFP-Proposal Content
Paragraph Number, if applicable: Page 29
Question:
PROPOSAL FORMATTING:
RFP Document requires each submittal volume to be submitted as a separate word document file.
A) Can we submit each volume as its own document folder containing multiple files?
B) Can we also use PDF format?
Due to the amount of information required in the technical ability planning document (Volume 1, item 4):
C) Can we amend the planning document submittal format to: 50-page max, and 11”x17” PDF format?
Answer:
A) Yes, each volume can be submitted as its own document folder
B) Yes, PDF format can be used
C) No, keep it to 25 pages max.
Question Submitted Number: 016
Section/Work Item Number: WI-03 Project Management and Planning Perform Paragraph Number, if applicable: 3.6
Question:
In the Specification (WI-03, para 3.6) it says:
“The Contractor must develop, update, and maintain the Government-approved Contract Work Breakdown Structure (CWBS), providing clear traceability of all work.”
Does the government have a preferred format for the CWBS? If so, please provide.
Answer:
While the government does not mandate a single, rigid format for all contracts, there is an established standard that provides the necessary framework and definitions. For defense-related projects, the MIL-STD-881F, “Work Breakdown Structures for Defense Materiel Items,” is the governing document.
Please use the latest version of MIL-STD-881 as the primary guide for developing and maintaining the CWBS for this contract. This standard will ensure the structure is logical, consistent, and provides the level of detail required for program planning, budgeting, and status reporting.
Additionally, the specific data content and reporting format requirements are detailed in the Data Item Description (DID) DI-MGMT-81861C, “Integrated Program Management Data and Analysis Report (IPMDAR).”
This document works in conjunction with MIL-STD-881F to define how the CWBS data should be structured and delivered.
By adhering to these standards, you will satisfy the requirements outlined in the Statement of Work, paragraph 3.6, and ensure clear traceability for all work performed.
While both a Contract Work Breakdown Structure (CWBS) and a Gantt chart are crucial project management documents, they serve fundamentally different purposes. Think of it this way: the CWBS defines what work needs to be done, while a Gantt chart outlines when that work will happen. It is the foundation of the Gannt.
Example:
| WBS Element |
| Description |
| Notes |
| 1 |
| USS Neptune DPMA |
| The entire contract scope. The top-level deliverable is a fully maintained and certified ship. |
| 1.1 |
| Project Management |
| Includes all oversight, planning, reporting, and administrative tasks required for the contract. |
| 1.1.1 |
| Contract & Subcontractor Management |
| 1.1.2 |
| Planning and Scheduling |
| 1.1.3 |
| Quality Assurance (QA) |
| 1.1.4 |
| CWBS and Reporting |
| 1.2 |
| Hull Structure |
| All work related to the ship’s hull. |
| 1.2.1 |
| Drydocking Services |
| 1.2.2 |
| Hull Plating Repair |
| 1.2.3 |
| Tank Preservation |
1.2.3.1
1.2.3.2
| 1.3 |
| Propulsion System |
| All work related to the ship’s main engines and propulsion train. |
| 1.3.1 |
| Main Engine Overhaul |
| 1.3.2 |
| Shaft and Propeller Work |
| 1.4 |
| Combat Systems |
| All work on designated weapon and sensor systems. |
| 1.4.1 |
| Radar System Modernization |
| 1.4.2 |
| Missile Launcher Maintenance |
| 1.5 |
| System Integration and Testing |
| Final phase to ensure all new and repaired components work together. |
| 1.5.1 |
| Post-Repair System Testing |
| 1.5.2 |
| Sea Trials |
Question Submitted Number: 017 Section/Work Item Number: WI-52 Miscellaneous Piping Repairs, Various Locations
Paragraph Number, if applicable: Table 1
Question:
In RFP Attachment 1 Pricing Sheet for WI-52 Period 1 it states a quantity of 2 to be ordered. To clarify: Does this double the quantities of each line item in WI-52, Table 1?
Answer:
1. Pricing Method: You are to submit a single lump sum price for Work Item 52.
2. Purpose of Table 1: Table 1 is provided to define the complete scope of work that must be included in your lump sum calculation. The various types and sizes of piping listed in the table are for your reference to build your estimate. They are not to be priced as individual units. For bidding purposes use the higher end of the pipe diameter in each row – example: quote 2” for less than or equal to 2.
3. Required Quantity: The quantity on the pricing schedule is now one (1). Your total lump sum bid must cover the cost of performing the entire scope of work described in Table 1, one time. Attachment 1 is the pricing schedule that needs to be filled out. Attachment 10 is the estimated work items for all five ordering periods.
Question Submitted Number: 018
Section/Work Item Number: WI-92 & 93
Paragraph Number, if applicable: N/A
Question:
In the Specification WI-92 & 93 are listed as:
WORK ITEM 92: Insulation and Sheathing Renewal
WORK ITEM 93: Appendages (U/W Body), Leak Test
In RFP Attch. 1 Pricing sheet & Attch. 10 Estimated Work per Ordering Period WI -92 & 93 are listed as:
WI #92 Appendages (U/W) leak test
WI #93 Insulation and Sheathing Renewal
Are the work items correctly labeled in the Specification? If so, please send revised RFP Attachment 1 and Attachment 10.
Answer:
The specification is labeled correctly. Attachment 1 and Attachment 10 are updated to reflect changes and will be sent with upcoming amendment.
Question Submitted Number: 019
Section/Work Item Number: Attachment 1 Pricing Sheet, Rev 1 Paragraph Number, if applicable: CLIN 4 Sea Trial Performance
Question:
The Pricing sheet is requesting a per day unit price for the WI. Bidder is unable to bid the specification as a daily unit price, as it includes tug & pilot costs which are not incurred daily.
Respectfully request CLIN 4 of the pricing sheet be revised to a lump sum price. If not possible, please provide further guidance as to how to calculate the requested unit pricing.
Answer:
The requirement for a “per day” unit price is a standard practice that allows the Government to make fair and simple price adjustments if the duration of the sea trial period needs to be modified via change order. Revising the CLIN to a lump sum price is not possible as it would complicate potential adjustments.
To prepare your bid for CLIN 4, please use the following method:
1. Calculate Total Cost: Determine your total price for the entire scope of the Sea Trial work item as if it were a single lump sum. This calculation should include all variable daily costs (e.g., labor, equipment) and all fixed one-time costs (e.g., tug services, pilot fees, materials).
2. Prorate the Total Cost: Distribute your total calculated price across the number of days specified in the CLIN (five weekdays and one weekend day) to create an averaged “per day” unit price.
3. Enter Unit Prices: Enter the resulting prorated figures into the respective “price per day” fields for weekdays and weekend days on the pricing sheet.
The resulting “per day” prices will be considered the fully burdened daily rates for the sea trial performance.
Question Submitted Number: 020
Section/Work Item Number: Solicitation, Volume III – Price
Paragraph Number: NA
The following instruction to offeror is stated in Volume III – Price, page 32 of the solicitation.
Volume III – Price:
The Offeror shall provide the following in its Volume III in order to be considered complete:
· ALL Technical Representative Certifications for BOTH PRIME AND SUBCONTRACTORS as specified in the specification.
The instructions to offerors listed in Volume III for the tech rep certs allude to contractor providing all the technical reps certs with the submission of the proposal.
The requirements for the tech rep certs submission requirements specified in the specifications vary by work item but at a minimum require the contractor to submit to the COR at arrival conference.
Question:
Please clarify if it is the intention of the USCG for the contractor to submit all technical representative’s certifications with the submission of the proposal or to the COR at the arrival conference.
Answer:
At a minimum, contractor is required to submit technical representative’s certifications to the COR at the arrival conference. As a matter of responsibility, listed in instructions to offeror’s, your proposal will be considered more favorable if it includes a list of ALL subcontractors that the offeror anticipates subcontracting to in proposal. The list shall include the subcontractor’s name, address, point of contract and phone number; the work item listed in the Pricing Schedule the subcontractor will perform work under; and the percentage of work the subcontractor will perform. If a work item requires a Certified Technical Representative or Qualified Technical Representative, the Offeror shall confirm in writing the subcontractor meets the stated requirement. Technical Representatives include Certified Coating Inspectors, Certified Non-Destructive Test Inspectors, Weld Examination Inspectors, and Marine Chemists.
Question Submitted Number: 021
Section/Work Item Number: Work Item Number: 92, 93
Paragraph Number: NA
Questions:
Work item Appendages (U/W) leak test is listed as WI 92 on price sheet but shown as WI 93 in specification.
Work item Insulation and sheathing is listed as WI 93 on the price sheet but shown as WI 92 in specification
Please confirm WI # and provide revised specification or price sheet accordingly.
Answer:
The specification is labeled correctly. Attachment 1 and Attachment 10 are updated to reflect changes and will be sent with upcoming amendment.
Question Submitted Number: 022
Section/Work Item Number: Work Item Number: 92, 93
Paragraph Number: NA
Question:
WI-92 or 93, Table 1 has a list of various types and sizes insulation & sheathing to be priced as units for renewal, but the price sheet has a lump sum with a quantity of 3. These unit prices are not useful as a lump sum.
Please confirm this is how you would like the price for these units submitted.
Answer:
This question is related to WI 92, Insulation and Sheathing Renewal.
1. Pricing Method: You are to submit a single lump sum price for Work Item 92.
2. Purpose of Table 1: Table 1 is provided to define the complete scope of work that must be included in your lump sum calculation. The various types and sizes of insulation/sheathing listed in the table are for your reference to build your estimate. They are not to be priced as individual units. For bidding purposes use the higher end of the thickness in each row – example: quote 2 inches for 1 to 2 inches.
3. Required Quantity: The quantity on the pricing schedule is 3. Your total lump sum bid must cover the cost of performing the entire scope of work described in Table 1, three times.
Question Submitted Number: 023
Section/Work Item Number: Work Item Number: 94
Paragraph Number: NA
Question:
WI-94, Table 1 has a list of various types and sizes of pipe insulation to be priced as units for renewal, but the price sheet has a lump sum. These unit prices are not useful as a lump sum.
Please confirm this is how you would like the price for these units submitted.
Answer:
Work item 94, Piping Insulation Renewal pricing:
1. Pricing Method: You are to submit a single lump sum price for Work Item 94.
2. Purpose of Table 1: Table 1 is provided to define the complete scope of work that must be included in your lump sum calculation. The various types and sizes of insulation listed in the table are for your reference to build your estimate. They are not to be priced as individual units. For bidding purposes use the higher end of the diameter in each row – example: quote 3 inches for less than or equal to 3 inches.
3. Required Quantity: The quantity on the pricing schedule is 1. Your total lump sum bid must cover the cost of performing the entire scope of work described in Table 1, one time.
Question Submitted Number: 024
Section/Work Item Number: Attachment 1 Pricing Sheet-Rev 1
Paragraph Number: NA
Question:
Contractor has identified several issues with Attachment 1 Pricing Sheet-Rev 1.
1. The Total Task Order Price cell formula is not correct on each of the Ordering Period tabs, it does not sum all of the WI prices.
· subsequent line items.
· Tab2 Cell G65 only sums thru WI 73, omitting 15 Wis.
· Tab3 Cell G65 only sums thru WI 74, omitting 15 Wis.
· Tab4 Cell G68 only sums thru WI 75, omitting 18 Wis
· Tab5 Cell G69 only sums thru WI 62, omitting 19 Wis
2. Contractor has been directed to price the following items as optional items that did not have any ordering periods via Amendment 002, USCG response for RFC 002
· D-30, D-39, D-48, D-64, D-71, D-77, D-83, D-102
The current pricing sheet, Attachment 1 pricing Sheet-Rev 1, does not currently have a place to price the items as directed.
Please provide a revised Attachment 1 Pricing Sheet incorporating the issues identified above.
Answer:
Updated Attachment 1 Pricing Sheet (Rev2_29Jan2026)
The above work items shall be optional items. Pricing is not required for bid submission.
Question Submitted Number: 025
Section/Work Item Number: WI-95 Asbestos-Containing Material, 100% Abatement, Perform
Paragraph Number, if applicable: 1.1, 3.3
Question:
Para 1.1 Intent: This work item describes the requirements for the Contractor to replace up to ten asbestos panels per year at the discretion of the COR in accordance with Asbestos-Containing Material (ACM) handling requirements
Para 3.3 Panel Replacement. The Contractor must replace ten square feet of asbestos-containing Nomex joiner bulkheads with an aluminum, asbestos-free version of the bulkhead panel that meets the requirements of NAVSEA 804-4623540. Finishes of the new bulkhead panels must be USCG Approved.
Please provide clarification, are 10panels or 10SF being replaced?
Answer:
Intent is to price out the removal of one joiner panel ( pprox. 10 sqft) and adjust the number of panels to be abated per Task Order year.
Question Submitted Number: 026
Section/Work Item Number: RFP Attachment 1 Pricing Sheet-Rev 1-70Z08526RLREP0005-6JAN2026 Paragraph Number, if applicable:
Question:
Per Amendment 001, all work items are to be priced even if not scheduled for an ordering period. The current “Attachment 1 Pricing Sheet-Rev 1-70Z08526RLREP0005-6JAN2026” does not allow for inactive work items to be priced.
A) Please provide a revised pricing sheet with all items listed for each ordering period tab, with the quantity column used to extend out the pricing for that particular ordering period, OR, please advise on how to submit unordered item pricing per period.
B) The Mark up rate cell (Bottom column D, Unit price) is formatted as accounting, I’m assuming that this is intended to be a percentage? Please advise.
C) The sum calculation for the “Total CLIN Price” Column (G) does not include the entire column of pricing. Are we adjusting the formula? Please advise.
Answer:
Updated Attachment 1 Pricing Sheet (Rev2_29Jan2026)
Question Submitted Number: 027 Section/Work Item Number: WI 1 Drydock
Paragraph Number: NA
Question:
Contractor requests the following information to assist us with the drydocking calcs that need to be submitted with the proposal:
1. Which of the 3 positions are to be assumed for the drydock calculations?
2. Anticipated loading conditions/drafts.
Answer:
Docking positions are detailed in drawing 400-WAGB_700_1. Year one (FY26) will start at position 3
Liquid load conditions will be sent by the COR in advance of docking for the contractor to request changes to accommodate dock capacities and work being performed.
Question Submitted Number: 028 Section/Work Item Number: RFP Attachment 1 Pricing Sheet-Rev 1-70Z08526RLREP0005-6JAN2026 Paragraph Number, if applicable:
Question:
Per Amendment 001, all work items are to be priced even if not scheduled for an ordering period. The current “Attachment 1 Pricing Sheet-Rev 1-70Z08526RLREP0005-6JAN2026” does not allow for inactive work items to be priced.
A) Please provide a revised pricing sheet with all items listed for each ordering period tab, with the quantity column used to extend out the pricing for that particular ordering period, OR, please advise on how to submit unordered item pricing per period.
B) The Mark up rate cell (Bottom column D, Unit price) is formatted as accounting, I’m assuming that this is intended to be a percentage? Please advise.
C) The sum calculation for the “Total CLIN Price” Column (G) does not include the entire column of pricing. Are we adjusting the formula? Please advise.
Answer:
1. Provide pricing only for items listed in each ordering period with the associated grand total price. Any work item not in the Pricing sheet list, will not be priced at this time within that particular ordering period.
2. Information on cell D65 [$750,000] is a government estimated dollar figure of potential additional combined material and subcontractor costs, which may be necessary as part of additional work after contract award.
3. Formula corrected to include all required lines
Question Submitted Number: 029 Section/Work Item Number: Solicitation Paragraph Number: NA Question:
Amendment 002 was issued 1/27/26. USCG Response to submitted question 004 is the following:
Updated consolidated list of references was provided to Contracting Officer; revised technical information package will be sent from CG Technical Library to all vendors.
To date, contractor has not received an updated Consolidated List of References as well as a revised technical package from the CG Technical Library.
Contractor is working diligently on creating a comprehensive proposal that meets all of the USCG solicitation requirements towards the current due date of 2/5/26 without the information delineated in the missing references.
Additionally, contractor has numerous subcontractors and technical representatives that are asking for the missing references in order to provide a quote for the Polar Star 5-year IDIQ.
Once the updated Consolidated List of References as well as a revised technical package from the CG Technical Library is received, contractor will need to issue the references to our subcontractors as well as review them in order to obtain the actual scope of work that we will be pricing to the USCG.
Please consider the following:
1. Please issue the updated Consolidated List of References as well as the revised technical package of missing references.
2. Please extend the proposal due date of 2/5/26 to 2/12/26 The extension, if granted, would afford the contractor as well as our subcontractors the opportunity to review and incorporate the required missing information into our proposal.
Answer:
1. Consolidated List of Reference issued.
2. Due date extended until 02/09/2026.