Attachment 1 Pricing Sheet - 70Z08526RLREP0005_Rev1_23JAN2026.xlsx
XLSX spreadsheet 44 KB Posted
- Attached to
- Drydock (DD): USCGC Polar Star FY26-30 Repair
- Solicitation number
- 70Z08526RLREP0005
About this file
This is a Pricing Sheet attachment for the USCGC Polar Star Dry Dock Repairs contract spanning five fiscal years (FY2026-FY2030). The pricing sheet establishes the cost structure for multiple task orders, with each task order corresponding to a specific fiscal year. Contractors are required to submit composite labor rates (with a baseline of 1,500 hours per task order), lay day rates, and all-inclusive mark-up/loading rates for materials and subcontractors (based on estimated $250,000 of material costs and $500,000 of subcontractor costs per ordering period). Additionally, pricing for sea trial performance support is required on a per-day basis, distinguishing between weekday and weekend rates. The pricing sheet also includes a preliminary USCGC Healy dry dock entry with separate labor hour and percentage-based pricing structures.
The Polar Star task orders detail extensive work items (WI) across five annual dry dock periods, including hull inspections, propulsion system maintenance, crane inspections, deck preservation, hazardous material abatement (asbestos and lead-based paint), and various equipment overhauls. Each work item is priced as a discrete job or series of jobs, with all estimated prices currently at $0.00 pending contractor submission. The contract structure allows for change requests to be issued against established composite labor rates and mark-up percentages. Solicitation Amendment 003 extended the proposal due date to February 9, 2026, and updated Attachments 1, 2, 3, and 10. The place of performance is at the contractor's facility.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet
| ATTACHMENT 1: Pricing Sheet | |||||
| USCGC HEALY DRY DOCK FY26 | |||||
| 70Z08526RLREP0005 | |||||
| Contract Line Item (CLIN) | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | TAB 1: Task Order Pricing Sheet | $ - 0 | Lump Sum | 1 | $0.00 |
| 2 | Additional Work To Be Ordered- Insert your Composite Labor Rate Unit Price: $______; Quantity: 7,886; Unit of Issue: Hour; Insert your Extended Price: [7,886 X hourly rate quoted] $____________. |
Insert your all inclusive mark-up/loading rate for materials and subcontractors: ____%. Unit Price: $100,000.00; Quantity: 1; Unit of Issue: Percent; Insert your Extended Price: [$100,000.00 X ( 1 + percentage quoted)] : $__________.
Lay Days: $____per day. The above rate and percentage will be incorporated into the contract and used on change requests (CRs). Work is ordered against this CLIN on authorized CRs by the Contracting Officer.
Total Pricing Sheet Estimated Price $0.00
Tab1 Task Order 1
| Tab 1 Task Order 1 | ||||||
| USCGC POLAR STAR DRY DOCK FY26 | ||||||
| 70Z08526RLREP0005 | ||||||
| Contract Line Item (CLIN) | Funding Code | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | 45 | WI #1 Drydock | $ - 0 | Job | 1 | $0.00 |
| 2 | 45 | WI #2 Temporary Services, Contractor Facility, Provide | $ - 0 | Job | 1 | $0.00 |
| 3 | 45 | WI #3 Project Management and Planning, Perform | $ - 0 | Job | 1 | $0.00 |
| 4 | 45 | Sea Trial Performance, Support, Provide - Price CLIN for five (5) weekdays1 and one (1) weekend day2. Insert price per day for weekdays1 here: $__________ . Insert price per day for weekend days2 here: $__________to be used in a change request. | $ - 0 | Day | 6 | $0.00 |
| 5 | 45 | WI# 5 Hull Plating (U/W Body), Inspect | $ - 0 | Job | 1 | $0.00 |
| 6 | 45 | WI #6 Hull Plating (U/W Body), Ultrasonic Testing | $ - 0 | Job | 1 | $0.00 |
| 7 | 45 | WI #7 Propulsion Shafting, Strain Gauge and Air Gap Readings (All) | $ - 0 | Job | 1 | $0.00 |
| 8 | 45 | WI #8 Centerline Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 9 | 45 | WI #9 Port Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 10 | 45 | WI #10 Starboard Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 11 | 45 | WI #11 Sea Strainers (Hayward), Open, Clean, and Inspect | $ - 0 | Job | 1 | $0.00 |
| 12 | 45 | WI #12 Cathodic Protection / Zinc Anodes, Renew | $ - 0 | Job | 1 | $0.00 |
| 13 | 45 | WI #13 Miranda Davit, Annual Inspect | $ - 0 | Job | 1 | $0.00 |
| 14 | 45 | WI #14 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 15 | 45 | WI #15 Allied K280-70 Crane, Port, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 16 | 45 | WI #16 Allied TB60-60 Crane, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 17 | 45 | WI #17 Propulsion Shaft Seal, Clean, Inspect, and Overhaul | $ - 0 | Job | 1 | $0.00 |
| 18 | 45 | WI #18 Shaft Handling Equipment, Maintenance and Storage | $ - 0 | Job | 1 | $0.00 |
| 19 | 45 | WI #19 Elevators, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 20 | 45 | WI #20 Dumbwaiter, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 21 | 45 | WI #21 Fixed Fire Suppression Systems, Annual Inspection and Certification | $ - 0 | Job | 1 | $0.00 |
| 22 | 45 | WI #22 Fire Prevention and Protection, Provide | $ - 0 | Job | 1 | $0.00 |
| 23 | 45 | WI #23 Main Propulsion Motor (MPM), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 24 | 45 | WI #24 Main Propulsion Generator (MPG), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 25 | 45 | WI #25 Dishwasher, Annual Maintenance | $ - 0 | Job | 1 | $0.00 |
| 26 | 45 | WI #26 Anchor Windlass, Service and Inspect | $ - 0 | Job | 1 | $0.00 |
| 31 | 45 | WI #31 Boiler, Biennial Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 34 | 45 | WI #34 Decks - Exterior, Preserve (“Non-Skid MIL-SPEC” System) | $ - 0 | Job | 2 | $0.00 |
| 35 | 45 | WI #35 Deck Preservation | $ - 0 | Job | 2 | $0.00 |
| 36 | 45 | WI #36 Vent Ducts (Galley and Scullery), Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 37 | 45 | WI #37 Vent Ducts (Laundry Exhaust), Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 38 | 45 | WI #38 Ship Service Diesel Generator, Clean & Inspect | $ - 0 | Job | 1 | $0.00 |
| 42 | 45 | WI #42 Inclining Test, Support | $ - 0 | Job | 1 | $0.00 |
| 43 | 45 | WI #43 Main Reduction Gear (MRG), Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 46 | 45 | WI #46 Stern Tube Interior Surfaces, Preserve 100% | $ - 0 | Job | 1 | $0.00 |
| 52 | 45 | WI #52 Miscellaneous Piping Repairs, Various Locations | $ - 0 | Job | 1 | $0.00 |
| 53 | 45 | WI #53 Fuel Oil Purifier (FOP), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 61 | 45 | WI #61 Port Propulsion Shafting, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 63 | 45 | WI #63 Port Shaft, Stern Tube Forward Bearing, Repair | $ - 0 | Job | 1 | $0.00 |
| 67 | 45 | WI #67 Main Propulsion Generator, Align | $ - 0 | Job | 1 | $0.00 |
| 72 | 45 | WI #72 Tanks, MP Fuel Stowage and Overflow, Clean and Inspect 2026 | $ - 0 | Job | 1 | $0.00 |
| 78 | 45 | WI #78 Fuel Oil Manifold Valve Overhaul, Part 1 | $ - 0 | Job | 1 | $0.00 |
| 81 | 45 | WI #81 Tanks, Aviation Fuel, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 86 | 45 | WI #86 Fathometer Transducer, Replace | $ - 0 | Job | 1 | $0.00 |
| 88 | 45 | WI #88 Sea Valves and Waster Pieces, Overhaul or Renew (2026, 2028, 2030) | $ - 0 | Job | 1 | $0.00 |
| 90 | 45 | WI #90 Voids (accessible), clean and inspect | $ - 0 | Job | 1 | $0.00 |
| 91 | 45 | WI #91 Voids (non-accessible) leak test and Preserve (2026, 2029) | $ - 0 | Job | 1 | $0.00 |
| 92 | 45 | WI #92 Insulation and Sheathing Renewal | $ - 0 | Job | 3 | $0.00 |
| 93 | 45 | WI #93 Appendages (U/W Body), Leak Test | $ - 0 | Job | 1 | $0.00 |
| 95 | 45 | WI #95 Asbestos-containing material, 100% Abatement | $ - 0 | Job | 2 | $0.00 |
| 96 | 45 | WI #96 Lead-based Paint, Remediate | $ - 0 | Job | 5 | $0.00 |
| 97 | 45 | WI #97 Goosenecks (Fuel Oil Tanks), Overhaul | $ - 0 | Job | 23 | $0.00 |
| 100 | 45 | WI #100 Oily Water Separator (OWS) System, Groom | $ - 0 | Job | 1 | $0.00 |
| 101 | 45 | WI #101 Air Handlers, System Groom | $ - 0 | Job | 1 | $0.00 |
| 103 | 45 | WI #103 Vent Ducts, Diesel Engine Rooms 1 and 2, Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 107 | 45 | WI #107 Condensate Tank, Replace | $ - 0 | Job | 1 | $0.00 |
| 45 | Composite Labor Rate | $ - 0 | Hours | 1500 | $0.00 | |
| 45 | Lay Days | $ - 0 | Days | 5 | $0.00 | |
| 45 | Mark Up Rate (Based on an estimated $250K of material cost and $500K of subcontractor cost in each ordering period.) | $ 750,000.00 | Rate Percentage | $0.00 | ||
| 45 | Total Task Order 1 Estimated Price | $0.00 | ||||
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. | ||||||
| 2 Weekend day is Saturday and Sunday |
Tab 2 Task Order 2
| Tab 2 Task Order 2 | ||||||
| USCGC POLAR STAR DRY DOCK FY27 | ||||||
| 70Z08526RLREP0005 | ||||||
| Contract Line Item (CLIN) | Funding Code | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | 45 | WI #1 Drydock | $ - 0 | Job | 1 | $0.00 |
| 2 | 45 | WI #2 Temporary Services, Contractor Facility, Provide | $ - 0 | Job | 1 | $0.00 |
| 3 | 45 | WI #3 Project Management and Planning, Perform | $ - 0 | Job | 1 | $0.00 |
| 4 | 45 | Sea Trial Performance, Support, Provide - Price CLIN for five (5) weekdays1 and one (1) weekend day2. Insert price per day for weekdays1 here: $__________ . Insert price per day for weekend days2 here: $__________to be used in a change request. | $ - 0 | Day | 6 | $0.00 |
| 5 | 45 | WI# 5 Hull Plating (U/W Body), Inspect | $ - 0 | Job | 1 | $0.00 |
| 6 | 45 | WI #6 Hull Plating (U/W Body), Ultrasonic Testing | $ - 0 | Job | 1 | $0.00 |
| 7 | 45 | WI #7 Propulsion Shafting, Strain Gauge and Air Gap Readings (All) | $ - 0 | Job | 1 | $0.00 |
| 8 | 45 | WI #8 Centerline Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 9 | 45 | WI #9 Port Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 10 | 45 | WI #10 Starboard Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 11 | 45 | WI #11 Sea Strainers (Hayward), Open, Clean, and Inspect | $ - 0 | Job | 1 | $0.00 |
| 12 | 45 | WI #12 Cathodic Protection / Zinc Anodes, Renew | $ - 0 | Job | 1 | $0.00 |
| 13 | 45 | WI #13 Miranda Davit, Annual Inspect | $ - 0 | Job | 1 | $0.00 |
| 14 | 45 | WI #14 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 15 | 45 | WI #15 Allied K280-70 Crane, Port, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 16 | 45 | WI #16 Allied TB60-60 Crane, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 17 | 45 | WI #17 Propulsion Shaft Seal, Clean, Inspect, and Overhaul | $ - 0 | Job | 1 | $0.00 |
| 18 | 45 | WI #18 Shaft Handling Equipment, Maintenance and Storage | $ - 0 | Job | 1 | $0.00 |
| 19 | 45 | WI #19 Elevators, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 20 | 45 | WI #20 Dumbwaiter, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 21 | 45 | WI #21 Fixed Fire Suppression Systems, Annual Inspection and Certification | $ - 0 | Job | 1 | $0.00 |
| 22 | 45 | WI #22 Fire Prevention and Protection, Provide | $ - 0 | Job | 1 | $0.00 |
| 23 | 45 | WI #23 Main Propulsion Motor (MPM), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 24 | 45 | WI #24 Main Propulsion Generator (MPG), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 25 | 45 | WI #25 Dishwasher, Annual Maintenance | $ - 0 | Job | 1 | $0.00 |
| 27 | 45 | WI #27 Anchor Chain(s) and Ground Tackle, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 28 | 45 | WI #28 Chain Lockers, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 32 | 45 | WI #32 Deck Covering (Polymeric), Renew | $ - 0 | Job | 3 | $0.00 |
| 34 | 45 | WI #34 Decks - Exterior, Preserve (“Non-Skid MIL-SPEC” System) | $ - 0 | Job | 3 | $0.00 |
| 35 | 45 | WI #35 Deck Preservation | $ - 0 | Job | 3 | $0.00 |
| 38 | 45 | WI #38 Ship Service Diesel Generator, Clean & Inspect | $ - 0 | Job | 1 | $0.00 |
| 41 | 45 | WI #41 Evaporators (General), Overhaul | $ - 0 | Job | 1 | $0.00 |
| 43 | 45 | WI #43 Main Reduction Gear (MRG), Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 44 | 45 | WI #44 U/W Body, Preserve, 100% | $ - 0 | Job | 1 | $0.00 |
| 46 | 45 | WI #46 Stern Tube Interior Surfaces, Preserve 100% | $ - 0 | Job | 1 | $0.00 |
| 51 | 45 | WI #51 Independent NACE Inspector (Level 3) Provide | $ - 0 | Job | 1 | $0.00 |
| 52 | 45 | WI #52 Miscellaneous Piping Repairs, Various Locations | $ - 0 | Job | 2 | $0.00 |
| 54 | 45 | WI #54 Hydraulic Oil Purifier (HOP), Overhaul, intermediate | $ - 0 | Job | 1 | $0.00 |
| 56 | 45 | WI #56 Fuel Oil Purifier (FOP) Overhaul | $ - 0 | Job | 1 | $0.00 |
| 62 | 45 | WI #62 Starboard Propulsion Shafting, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 65 | 45 | WI #65 Disconnect Coupling, Open and Inspect | $ - 0 | Job | 1 | $0.00 |
| 66 | 45 | WI #66 Propulsion Shaft Seal (Bulkhead), Tri-annual Replace | $ - 0 | Job | 1 | $0.00 |
| 67 | 45 | WI #67 Main Propulsion Generator, Align | $ - 0 | Job | 1 | $0.00 |
| 70 | 45 | WI #70 Boiler Exhaust Stack Uptakes, Commercial Clean | $ - 0 | Job | 1 | $0.00 |
| 73 | 45 | WI #73 Tanks, MP Fuel Stowage and Overflow, Clean and Inspect 2027 | $ - 0 | Job | 1 | $0.00 |
| 79 | 45 | WI #79 Fuel Oil Manifold Valve Overhaul, Part 2 | $ - 0 | Job | 1 | $0.00 |
| 85 | 45 | WI #85 Potable Water Pneumatic Tank and Hot Water Storage Tank, Clean, Inspect, and Hydrotest | $ - 0 | Job | 1 | $0.00 |
| 87 | 45 | WI #87 Fathometer Transducer, General Maintenance | $ - 0 | Job | 1 | $0.00 |
| 89 | 45 | WI #89 Sea Valves and Waster Pieces, Overhaul or Renew (2027, 2029) | $ - 0 | Job | 1 | $0.00 |
| 92 | 45 | WI #92 Insulation and Sheathing Renewal | $ - 0 | Job | 3 | $0.00 |
| 93 | 45 | WI #93 Appendages (U/W Body), Leak Test | $ - 0 | Job | 1 | $0.00 |
| 94 | 45 | WI #94 Piping Insulation Renewal | $ - 0 | Job | 1 | $0.00 |
| 95 | 45 | WI #95 Asbestos-containing material, 100% Abatement | $ - 0 | Job | 1 | $0.00 |
| 96 | 45 | WI #96 Lead-based Paint, Remediate | $ - 0 | Job | 1 | $0.00 |
| 97 | 45 | WI #97 Goosenecks (Fuel Oil Tanks), Overhaul | $ - 0 | Job | 9 | $0.00 |
| 99 | 45 | WI #99 Sea Chest Stud Renewal | $ - 0 | Job | 1 | $0.00 |
| 104 | 45 | WI #104 Vent Ducts, Turbine and Motor Rooms, Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 108 | 45 | WI #108 Turbine Intake, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 45 | Composite Labor Rate | $ - 0 | Hours | 1500 | $0.00 | |
| 45 | Lay Days | $ - 0 | Days | 5 | $0.00 | |
| 45 | Mark Up Rate (Based on an estimated $250K of material cost and $500K of subcontractor cost in each ordering period.) | $ 750,000.00 | Rate Percentage | $0.00 | ||
| 45 | Total Task Order 2 Estimated Price | $0.00 | ||||
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. | ||||||
| 2 Weekend day is Saturday and Sunday |
Tab 3 Task Order 3
| Tab 3 Task Order 3 | ||||||
| USCGC POLAR STAR DRY DOCK FY28 | ||||||
| 70Z08526RLREP0005 | ||||||
| Contract Line Item (CLIN) | Funding Code | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | 45 | WI #1 Drydock | $ - 0 | Job | 1 | $0.00 |
| 2 | 45 | WI #2 Temporary Services, Contractor Facility, Provide | $ - 0 | Job | 1 | $0.00 |
| 3 | 45 | WI #3 Project Management and Planning, Perform | $ - 0 | Job | 1 | $0.00 |
| 4 | 45 | Sea Trial Performance, Support, Provide - Price CLIN for five (5) weekdays1 and one (1) weekend day2. Insert price per day for weekdays1 here: $__________ . Insert price per day for weekend days2 here: $__________to be used in a change request. | $ - 0 | Day | 6 | $0.00 |
| 5 | 45 | WI# 5 Hull Plating (U/W Body), Inspect | $ - 0 | Job | 1 | $0.00 |
| 6 | 45 | WI #6 Hull Plating (U/W Body), Ultrasonic Testing | $ - 0 | Job | 1 | $0.00 |
| 7 | 45 | WI #7 Propulsion Shafting, Strain Gauge and Air Gap Readings (All) | $ - 0 | Job | 1 | $0.00 |
| 8 | 45 | WI #8 Centerline Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 9 | 45 | WI #9 Port Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 10 | 45 | WI #10 Starboard Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 11 | 45 | WI #11 Sea Strainers (Hayward), Open, Clean, and Inspect | $ - 0 | Job | 1 | $0.00 |
| 12 | 45 | WI #12 Cathodic Protection / Zinc Anodes, Renew | $ - 0 | Job | 1 | $0.00 |
| 13 | 45 | WI #13 Miranda Davit, Annual Inspect | $ - 0 | Job | 1 | $0.00 |
| 14 | 45 | WI #14 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 15 | 45 | WI #15 Allied K280-70 Crane, Port, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 16 | 45 | WI #16 Allied TB60-60 Crane, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 17 | 45 | WI #17 Propulsion Shaft Seal, Clean, Inspect, and Overhaul | $ - 0 | Job | 1 | $0.00 |
| 18 | 45 | WI #18 Shaft Handling Equipment, Maintenance and Storage | $ - 0 | Job | 1 | $0.00 |
| 19 | 45 | WI #19 Elevators, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 20 | 45 | WI #20 Dumbwaiter, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 21 | 45 | WI #21 Fixed Fire Suppression Systems, Annual Inspection and Certification | $ - 0 | Job | 1 | $0.00 |
| 22 | 45 | WI #22 Fire Prevention and Protection, Provide | $ - 0 | Job | 1 | $0.00 |
| 23 | 45 | WI #23 Main Propulsion Motor (MPM), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 24 | 45 | WI #24 Main Propulsion Generator (MPG), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 25 | 45 | WI #25 Dishwasher, Annual Maintenance | $ - 0 | Job | 1 | $0.00 |
| 26 | 45 | WI #26 Anchor Windlass, Service and Inspect | $ - 0 | Job | 1 | $0.00 |
| 31 | 45 | WI #31 Boiler, Biennial Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 32 | 45 | WI #32 Deck Covering (Polymeric), Renew | $ - 0 | Job | 2 | $0.00 |
| 34 | 45 | WI #34 Decks - Exterior, Preserve (“Non-Skid MIL-SPEC” System) | $ - 0 | Job | 2 | $0.00 |
| 35 | 45 | WI #35 Deck Preservation | $ - 0 | Job | 2 | $0.00 |
| 36 | 45 | WI #36 Vent Ducts (Galley and Scullery), Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 37 | 45 | WI #37 Vent Ducts (Laundry Exhaust), Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 38 | 45 | WI #38 Ship Service Diesel Generator, Clean & Inspect | $ - 0 | Job | 1 | $0.00 |
| 40 | 45 | WI #40 Engine Mounts, Renew | $ - 0 | Job | 2 | $0.00 |
| 43 | 45 | WI #43 Main Reduction Gear (MRG), Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 46 | 45 | WI #46 Stern Tube Interior Surfaces, Preserve 100% | $ - 0 | Job | 1 | $0.00 |
| 47 | 45 | WI #47 Hull Plating, Freeboard, Preserve, 100% | $ - 0 | Job | 1 | $0.00 |
| 52 | 45 | WI #52 Miscellaneous Piping Repairs, Various Locations | $ - 0 | Job | 1 | $0.00 |
| 53 | 45 | WI #53 Fuel Oil Purifier (FOP), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 55 | 45 | WI #55 Lube Oil Purifier (LOP), Overhaul, Intermediate | $ - 0 | Job | 1 | $0.00 |
| 59 | 45 | WI #59 Rudder And Rudder Stock, Remove and Inspect | $ - 0 | Job | 1 | $0.00 |
| 60 | 45 | WI #60 Centerline Propulsion Shafting, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 65 | 45 | WI #65 Disconnect Coupling, Open and Inspect | $ - 0 | Job | 1 | $0.00 |
| 67 | 45 | WI #67 Main Propulsion Generator, Align | $ - 0 | Job | 1 | $0.00 |
| 74 | 45 | WI #74 Tanks, MP Fuel Stowage and Overflow, Clean and Inspect 2028 | $ - 0 | Job | 1 | $0.00 |
| 80 | 45 | WI #80 Fuel Oil Manifold Valve Overhaul, Part 3 | $ - 0 | Job | 1 | $0.00 |
| 84 | 45 | WI #84 Tanks (potable water), clean and inspect | $ - 0 | Job | 1 | $0.00 |
| 87 | 45 | WI #87 Fathometer Transducer, General Maintenance | $ - 0 | Job | 1 | $0.00 |
| 88 | 45 | WI #88 Sea Valves and Waster Pieces, Overhaul or Renew (2026, 2028, 2030) | $ - 0 | Job | 1 | $0.00 |
| 92 | 45 | WI #92 Insulation and Sheathing Renewal | $ - 0 | Job | 1 | $0.00 |
| 93 | 45 | WI #93 Appendages (U/W Body), Leak Test | $ - 0 | Job | 1 | $0.00 |
| 94 | 45 | WI #94 Piping Insulation Renewal | $ - 0 | Job | 1 | $0.00 |
| 95 | 45 | WI #95 Asbestos-containing material, 100% Abatement | $ - 0 | Job | 1 | $0.00 |
| 96 | 45 | WI #96 Lead-based Paint, Remediate | $ - 0 | Job | 1 | $0.00 |
| 97 | 45 | WI #97 Goosenecks (Fuel Oil Tanks), Overhaul | $ - 0 | Job | 4 | $0.00 |
| 98 | 45 | WI #98 Weather Deck Drain Piping, Clean and Flush | $ - 0 | Job | 1 | $0.00 |
| 101 | 45 | WI #101 Air Handlers, System Groom | $ - 0 | Job | 1 | $0.00 |
| 109 | 45 | WI #109 Flight Deck Nets, Overhaul, 5 Year | $ - 0 | Job | 1 | $0.00 |
| 45 | Composite Labor Rate | $ - 0 | Hours | 1500 | $0.00 | |
| 45 | Lay Days | $ - 0 | Days | 5 | $0.00 | |
| 45 | Mark Up Rate (Based on an estimated $250K of material cost and $500K of subcontractor cost in each ordering period.) | $ 750,000.00 | Rate Percentage | $0.00 | ||
| 45 | Total Task Order 3 Estimated Price | $0.00 | ||||
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. | ||||||
| 2 Weekend day is Saturday and Sunday |
Tab 4 Task Order 4
| Tab 4 Task Order 4 | ||||||
| USCGC POLAR STAR DRY DOCK FY29 | ||||||
| 70Z08526RLREP0005 | ||||||
| Contract Line Item (CLIN) | Funding Code | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | 45 | WI #1 Drydock | $ - 0 | Job | 1 | $0.00 |
| 2 | 45 | WI #2 Temporary Services, Contractor Facility, Provide | $ - 0 | Job | 1 | $0.00 |
| 3 | 45 | WI #3 Project Management and Planning, Perform | $ - 0 | Job | 1 | $0.00 |
| 4 | 45 | Sea Trial Performance, Support, Provide - Price CLIN for five (5) weekdays1 and one (1) weekend day2. Insert price per day for weekdays1 here: $__________ . Insert price per day for weekend days2 here: $__________to be used in a change request. | $ - 0 | Day | 6 | $0.00 |
| 5 | 45 | WI# 5 Hull Plating (U/W Body), Inspect | $ - 0 | Job | 1 | $0.00 |
| 6 | 45 | WI #6 Hull Plating (U/W Body), Ultrasonic Testing | $ - 0 | Job | 1 | $0.00 |
| 7 | 45 | WI #7 Propulsion Shafting, Strain Gauge and Air Gap Readings (All) | $ - 0 | Job | 1 | $0.00 |
| 8 | 45 | WI #8 Centerline Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 9 | 45 | WI #9 Port Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 10 | 45 | WI #10 Starboard Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 11 | 45 | WI #11 Sea Strainers (Hayward), Open, Clean, and Inspect | $ - 0 | Job | 1 | $0.00 |
| 12 | 45 | WI #12 Cathodic Protection / Zinc Anodes, Renew | $ - 0 | Job | 1 | $0.00 |
| 13 | 45 | WI #13 Miranda Davit, Annual Inspect | $ - 0 | Job | 1 | $0.00 |
| 14 | 45 | WI #14 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 15 | 45 | WI #15 Allied K280-70 Crane, Port, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 16 | 45 | WI #16 Allied TB60-60 Crane, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 17 | 45 | WI #17 Propulsion Shaft Seal, Clean, Inspect, and Overhaul | $ - 0 | Job | 1 | $0.00 |
| 18 | 45 | WI #18 Shaft Handling Equipment, Maintenance and Storage | $ - 0 | Job | 1 | $0.00 |
| 19 | 45 | WI #19 Elevators, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 20 | 45 | WI #20 Dumbwaiter, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 21 | 45 | WI #21 Fixed Fire Suppression Systems, Annual Inspection and Certification | $ - 0 | Job | 1 | $0.00 |
| 22 | 45 | WI #22 Fire Prevention and Protection, Provide | $ - 0 | Job | 1 | $0.00 |
| 23 | 45 | WI #23 Main Propulsion Motor (MPM), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 24 | 45 | WI #24 Main Propulsion Generator (MPG), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 25 | 45 | WI #25 Dishwasher, Annual Maintenance | $ - 0 | Job | 1 | $0.00 |
| 32 | 45 | WI #32 Deck Covering (Polymeric), Renew | $ - 0 | Job | 2 | $0.00 |
| 33 | 45 | WI #33 Deck Coverings (Interior Carpet) Renew | $ - 0 | Job | 2 | $0.00 |
| 34 | 45 | WI #34 Decks - Exterior, Preserve (“Non-Skid MIL-SPEC” System) | $ - 0 | Job | 2 | $0.00 |
| 35 | 45 | WI #35 Deck Preservation | $ - 0 | Job | 2 | $0.00 |
| 38 | 45 | WI #38 Ship Service Diesel Generator, Clean & Inspect | $ - 0 | Job | 1 | $0.00 |
| 41 | 45 | WI #41 Evaporators (General), Overhaul | $ - 0 | Job | 1 | $0.00 |
| 43 | 45 | WI #43 Main Reduction Gear (MRG), Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 46 | 45 | WI #46 Stern Tube Interior Surfaces, Preserve 100% | $ - 0 | Job | 1 | $0.00 |
| 49 | 45 | WI #49 Superstructure, Preserve Partial | $ - 0 | Job | 1 | $0.00 |
| 50 | 45 | WI #50 Tenting (Superstructure), Provide | $ - 0 | Job | 1 | $0.00 |
| 51 | 45 | WI #51 Independent NACE Inspector (Level 3) Provide | $ - 0 | Job | 1 | $0.00 |
| 52 | 45 | WI #52 Miscellaneous Piping Repairs, Various Locations | $ - 0 | Job | 2 | $0.00 |
| 56 | 45 | WI #56 Fuel Oil Purifier (FOP) Overhaul | $ - 0 | Job | 1 | $0.00 |
| 57 | 45 | WI #57 Hydraulic Oil Purifier (HOP) Overhaul, Major | $ - 0 | Job | 1 | $0.00 |
| 61 | 45 | WI #61 Port Propulsion Shafting, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 65 | 45 | WI #65 Disconnect Coupling, Open and Inspect | $ - 0 | Job | 1 | $0.00 |
| 67 | 45 | WI #67 Main Propulsion Generator, Align | $ - 0 | Job | 1 | $0.00 |
| 68 | 45 | WI #68 Ship Service Diesel Generator Exhaust Stack Uptakes, Commercial Clean | $ - 0 | Job | 1 | $0.00 |
| 69 | 45 | WI #69 Main Diesel Engine Exhaust Stack Updates, Commercial Clean | $ - 0 | Job | 1 | $0.00 |
| 75 | 45 | WI #75 Tanks, MP Fuel Stowage and Overflow, Clean and Inspect 2029 | $ - 0 | Job | 1 | $0.00 |
| 81 | 45 | WI #81 Tanks, Aviation Fuel, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 82 | 45 | WI #82 Tanks, Dirty Oil and Waste, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 87 | 45 | WI #87 Fathometer Transducer, General Maintenance | $ - 0 | Job | 1 | $0.00 |
| 89 | 45 | WI #89 Sea Valves and Waster Pieces, Overhaul or Renew (2027, 2029) | $ - 0 | Job | 1 | $0.00 |
| 90 | 45 | WI #90 Voids (accessible), clean and inspect | $ - 0 | Job | 1 | $0.00 |
| 91 | 45 | WI #91 Voids (non-accessible) leak test and Preserve (2026, 2029) | $ - 0 | Job | 1 | $0.00 |
| 92 | 45 | WI #92 Insulation and Sheathing Renewal | $ - 0 | Job | 1 | $0.00 |
| 93 | 45 | WI #93 Appendages (U/W Body), Leak Test | $ - 0 | Job | 1 | $0.00 |
| 94 | 45 | WI #94 Piping Insulation Renewal | $ - 0 | Job | 1 | $0.00 |
| 95 | 45 | WI #95 Asbestos-containing material, 100% Abatement | $ - 0 | Job | 1 | $0.00 |
| 96 | 45 | WI #96 Lead-based Paint, Remediate | $ - 0 | Job | 1 | $0.00 |
| 97 | 45 | WI #97 Goosenecks (Fuel Oil Tanks), Overhaul | $ - 0 | Job | 6 | $0.00 |
| 99 | 45 | WI #99 Sea Chest Stud Renewal | $ - 0 | Job | 1 | $0.00 |
| 103 | 45 | WI #103 Vent Ducts, Diesel Engine Rooms 1 and 2, Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 106 | 45 | WI #106 Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift | $ - 0 | Job | 1 | $0.00 |
| 45 | Composite Labor Rate | $ - 0 | Hours | 1500 | $0.00 | |
| 45 | Lay Days | $ - 0 | Days | 5 | $0.00 | |
| 45 | Mark Up Rate (Based on an estimated $250K of material cost and $500K of subcontractor cost in each ordering period.) | $ 750,000.00 | Rate Percentage | $0.00 | ||
| 45 | Total Task Order 4 Estimated Price | $0.00 | ||||
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. | ||||||
| 2 Weekend day is Saturday and Sunday |
Tab 5 Task Order 5
| Tab 5 Task Order 5 | ||||||
| USCGC POLAR STAR DRY DOCK FY30 | ||||||
| 70Z08526RLREP0005 | ||||||
| Contract Line Item (CLIN) | Funding Code | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | 45 | WI #1 Drydock | $ - 0 | Job | 1 | $0.00 |
| 2 | 45 | WI #2 Temporary Services, Contractor Facility, Provide | $ - 0 | Job | 1 | $0.00 |
| 3 | 45 | WI #3 Project Management and Planning, Perform | $ - 0 | Job | 1 | $0.00 |
| 4 | 45 | Sea Trial Performance, Support, Provide - Price CLIN for five (5) weekdays1 and one (1) weekend day2. Insert price per day for weekdays1 here: $__________ . Insert price per day for weekend days2 here: $__________to be used in a change request. | $ - 0 | Day | 6 | $0.00 |
| 5 | 45 | WI# 5 Hull Plating (U/W Body), Inspect | $ - 0 | Job | 1 | $0.00 |
| 6 | 45 | WI #6 Hull Plating (U/W Body), Ultrasonic Testing | $ - 0 | Job | 1 | $0.00 |
| 7 | 45 | WI #7 Propulsion Shafting, Strain Gauge and Air Gap Readings (All) | $ - 0 | Job | 1 | $0.00 |
| 8 | 45 | WI #8 Centerline Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 9 | 45 | WI #9 Port Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 10 | 45 | WI #10 Starboard Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 11 | 45 | WI #11 Sea Strainers (Hayward), Open, Clean, and Inspect | $ - 0 | Job | 1 | $0.00 |
| 12 | 45 | WI #12 Cathodic Protection / Zinc Anodes, Renew | $ - 0 | Job | 1 | $0.00 |
| 13 | 45 | WI #13 Miranda Davit, Annual Inspect | $ - 0 | Job | 1 | $0.00 |
| 14 | 45 | WI #14 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 15 | 45 | WI #15 Allied K280-70 Crane, Port, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 16 | 45 | WI #16 Allied TB60-60 Crane, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 17 | 45 | WI #17 Propulsion Shaft Seal, Clean, Inspect, and Overhaul | $ - 0 | Job | 1 | $0.00 |
| 18 | 45 | WI #18 Shaft Handling Equipment, Maintenance and Storage | $ - 0 | Job | 1 | $0.00 |
| 19 | 45 | WI #19 Elevators, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 20 | 45 | WI #20 Dumbwaiter, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 21 | 45 | WI #21 Fixed Fire Suppression Systems, Annual Inspection and Certification | $ - 0 | Job | 1 | $0.00 |
| 22 | 45 | WI #22 Fire Prevention and Protection, Provide | $ - 0 | Job | 1 | $0.00 |
| 23 | 45 | WI #23 Main Propulsion Motor (MPM), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 24 | 45 | WI #24 Main Propulsion Generator (MPG), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 25 | 45 | WI #25 Dishwasher, Annual Maintenance | $ - 0 | Job | 1 | $0.00 |
| 26 | 45 | WI #26 Anchor Windlass, Service and Inspect | $ - 0 | Job | 1 | $0.00 |
| 27 | 45 | WI #27 Anchor Chain(s) and Ground Tackle, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 28 | 45 | WI # 28 Chain Lockers, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 29 | 45 | WI # 29 Chain Lockers, Preserve | $ - 0 | Job | 1 | $0.00 |
| 31 | 45 | WI #31 Boiler, Biennial Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 32 | 45 | WI #32 Deck Covering (Polymeric), Renew | $ - 0 | Job | 1 | $0.00 |
| 34 | 45 | WI #34 Decks - Exterior, Preserve (“Non-Skid MIL-SPEC” System) | $ - 0 | Job | 1 | $0.00 |
| 35 | 45 | WI #35 Deck Preservation | $ - 0 | Job | 1 | $0.00 |
| 36 | 45 | WI #36 Vent Ducts (Galley and Scullery), Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 37 | 45 | WI #37 Vent Ducts (Laundry Exhaust), Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 38 | 45 | WI #38 Ship Service Diesel Generator, Clean & Inspect | $ - 0 | Job | 1 | $0.00 |
| 43 | 45 | WI #43 Main Reduction Gear (MRG), Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 45 | 45 | WI #45 U/W Body, Preserve (partial) | $ - 0 | Job | 1 | $0.00 |
| 46 | 45 | WI #46 Stern Tube Interior Surfaces, Preserve 100% | $ - 0 | Job | 1 | $0.00 |
| 51 | 45 | WI #51 Independent NACE Inspector (Level 3) Provide | $ - 0 | Job | 1 | $0.00 |
| 52 | 45 | WI #52 Miscellaneous Piping Repairs, Various Locations | $ - 0 | Job | 1 | $0.00 |
| 53 | 45 | WI #53 Fuel Oil Purifier (FOP), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 54 | 45 | WI #54 Hydraulic Oil Purifier (HOP), Overhaul, intermediate | $ - 0 | Job | 1 | $0.00 |
| 58 | 45 | WI #58 Lube Oil Purifier (LOP) Overhaul, Major | $ - 0 | Job | 1 | $0.00 |
| 62 | 45 | WI #62 Starboard Propulsion Shafting, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 65 | 45 | WI #65 Disconnect Coupling, Open and Inspect | $ - 0 | Job | 1 | $0.00 |
| 66 | 45 | WI #66 Propulsion Shaft Seal (Bulkhead), Tri-annual Replace | $ - 0 | Job | 1 | $0.00 |
| 67 | 45 | WI #67 Main Propulsion Generator, Align | $ - 0 | Job | 1 | $0.00 |
| 76 | 45 | WI #76 Tanks, MP Fuel Stowage and Overflow, Clean and Inspect 2030 | $ - 0 | Job | 1 | $0.00 |
| 87 | 45 | WI #87 Fathometer Transducer, General Maintenance | $ - 0 | Job | 1 | $0.00 |
| 88 | 45 | WI #88 Sea Valves and Waster Pieces, Overhaul or Renew (2026, 2028, 2030) | $ - 0 | Job | 1 | $0.00 |
| 92 | 45 | WI #92 Insulation and Sheathing RenewaL | $ - 0 | Job | 1 | $0.00 |
| 93 | 45 | WI #93 Appendages (U/W Body), Leak Test | $ - 0 | Job | 1 | $0.00 |
| 95 | 45 | WI #95 Asbestos-containing material, 100% Abatement | $ - 0 | Job | 1 | $0.00 |
| 96 | 45 | WI #96 Lead-based Paint, Remediate | $ - 0 | Job | 1 | $0.00 |
| 97 | 45 | WI #97 Goosenecks (Fuel Oil Tanks), Overhaul | $ - 0 | Job | 3 | $0.00 |
| 99 | 45 | WI #99 Sea Chest Stud Renewal | $ - 0 | Job | 1 | $0.00 |
| 100 | 45 | WI #100 Oily Water Separator (OWS) System, Groom | $ - 0 | Job | 1 | $0.00 |
| 101 | 45 | WI #101 Air Handlers, System Groom | $ - 0 | Job | 1 | $0.00 |
| 104 | 45 | WI #104 Vent Ducts, Turbine and Motor Rooms, Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 105 | 45 | WI #105 Steering System, Groom | $ - 0 | Job | 1 | $0.00 |
| 110 | 45 | WI #110 Sewage and Grey Water Piping, Clean and Acid Flush | $ - 0 | Job | 1 | $0.00 |
| 45 | Composite Labor Rate | $ - 0 | Hours | 1500 | $0.00 | |
| 45 | Lay Days | $ - 0 | Days | 5 | $0.00 | |
| 45 | Mark Up Rate (Based on an estimated $250K of material cost and $500K of subcontractor cost in each ordering period.) | $ 750,000.00 | Rate Percentage | $0.00 | ||
| 45 | Total Task Order 5 Estimated Price | $0.00 | ||||
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. | ||||||
| 2 Weekend day is Saturday and Sunday |
Tab 6 Task Order 1 Break Down
| Tab2 Task Order 1 Break Down |
| USCGC POLAR STAR DRY DOCK FY26 |
| 70Z08526RLREP0005 |
| Instructions: |
| Provide pricing including materials, labor, equiptment, and overhead & profit. |
Tab7 Comp Labor Rate Break Down
| Tab 3Composite Labor Rate Break Down |
| USCGC POLAR STAR DRY DOCK FY26 |
| 70Z08526RLREP0005 |
| Instructions: |
| Provide average of the direct labor rates used, G&A and Profit. |
Rate Info-Other Periods
| Ordering Period | Composite Labor Rate | Lay Day Rate | Mark Up Rate (Based on an estimated $250K of material cost and $500K of subcontractor cost in each ordering period.) |
| Ordering Period 2 | |||
| Ordering Period 3 | |||
| Ordering Period 4 | |||
| Ordering Period 5 |
File details come from the government source that posted it. Updated .