Amendment 003-Attch 1 Pricing Sheet_Rev2_29JAN2026.xlsx
XLSX spreadsheet 43 KB Posted
- Attached to
- Drydock (DD): USCGC Polar Star FY26-30 Repair
- Solicitation number
- 70Z08526RLREP0005
About this file
This is a pricing sheet template for five task orders covering the U.S. Coast Guard Cutter POLAR STAR dry-dock repairs scheduled for fiscal years 2026 through 2030 (Contract Number 70Z08526RLREP0005). The pricing sheet requires vendors to provide unit prices and calculate total costs for approximately 40-50 work items (WIs) per task order, with work items spanning major ship maintenance categories including drydock services, hull inspections and repairs, propulsion system maintenance, deck preservation, fire suppression systems, environmental remediation (asbestos abatement and lead-based paint remediation), and various equipment overhauls. Each task order includes a composite labor rate, lay days pricing, and a markup rate based on estimated material costs of $250,000 and subcontractor costs of $500,000 per ordering period. CLIN 4 under Sea Trial Performance requires separate pricing for weekday and weekend support services at a rate per day, with pricing intended for use in change requests.
Vendors must complete pricing for each of the five fiscal year task orders with corresponding work scope variations. The solicitation was issued as Amendment 003 on 29 January 2026, extending the proposal due date to 9 February 2026. Performance will be at the vendor's facility, and the Coast Guard requires detailed pricing for labor, materials, equipment, overhead, and profit across the five-year repair period. The pricing template includes breakout sheets for detailed labor rate composition and other cost elements, enabling comprehensive cost visibility throughout the multi-year contract performance period.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tab1 Task Order 1
| Tab 1 Task Order 1 | ||||||
| USCGC POLAR STAR DRY DOCK FY26 | ||||||
| 70Z08526RLREP0005 | ||||||
| Contract Line Item (CLIN) | Funding Code | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | 45 | WI #1 Drydock | $ - 0 | Job | 1 | $0.00 |
| 2 | 45 | WI #2 Temporary Services, Contractor Facility, Provide | $ - 0 | Job | 1 | $0.00 |
| 3 | 45 | WI #3 Project Management and Planning, Perform | $ - 0 | Job | 1 | $0.00 |
| 4 | 45 | Sea Trial Performance, Support, Provide - Price CLIN for five (5) weekdays1 and one (1) weekend day2. Insert price per day for weekdays1 here: $__________ . Insert price per day for weekend days2 here: $__________to be used in a change request. | $ - 0 | Day | 6 | $0.00 |
| 5 | 45 | WI# 5 Hull Plating (U/W Body), Inspect | $ - 0 | Job | 1 | $0.00 |
| 6 | 45 | WI #6 Hull Plating (U/W Body), Ultrasonic Testing | $ - 0 | Job | 1 | $0.00 |
| 7 | 45 | WI #7 Propulsion Shafting, Strain Gauge and Air Gap Readings (All) | $ - 0 | Job | 1 | $0.00 |
| 8 | 45 | WI #8 Centerline Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 9 | 45 | WI #9 Port Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 10 | 45 | WI #10 Starboard Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 11 | 45 | WI #11 Sea Strainers (Hayward), Open, Clean, and Inspect | $ - 0 | Job | 1 | $0.00 |
| 12 | 45 | WI #12 Cathodic Protection / Zinc Anodes, Renew | $ - 0 | Job | 1 | $0.00 |
| 13 | 45 | WI #13 Miranda Davit, Annual Inspect | $ - 0 | Job | 1 | $0.00 |
| 14 | 45 | WI #14 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 15 | 45 | WI #15 Allied K280-70 Crane, Port, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 16 | 45 | WI #16 Allied TB60-60 Crane, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 17 | 45 | WI #17 Propulsion Shaft Seal, Clean, Inspect, and Overhaul | $ - 0 | Job | 1 | $0.00 |
| 18 | 45 | WI #18 Shaft Handling Equipment, Maintenance and Storage | $ - 0 | Job | 1 | $0.00 |
| 19 | 45 | WI #19 Elevators, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 20 | 45 | WI #20 Dumbwaiter, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 21 | 45 | WI #21 Fixed Fire Suppression Systems, Annual Inspection and Certification | $ - 0 | Job | 1 | $0.00 |
| 22 | 45 | WI #22 Fire Prevention and Protection, Provide | $ - 0 | Job | 1 | $0.00 |
| 23 | 45 | WI #23 Main Propulsion Motor (MPM), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 24 | 45 | WI #24 Main Propulsion Generator (MPG), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 25 | 45 | WI #25 Dishwasher, Annual Maintenance | $ - 0 | Job | 1 | $0.00 |
| 26 | 45 | WI #26 Anchor Windlass, Service and Inspect | $ - 0 | Job | 1 | $0.00 |
| 31 | 45 | WI #31 Boiler, Biennial Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 34 | 45 | WI #34 Decks - Exterior, Preserve (“Non-Skid MIL-SPEC” System) | $ - 0 | Job | 2 | $0.00 |
| 35 | 45 | WI #35 Deck Preservation | $ - 0 | Job | 2 | $0.00 |
| 36 | 45 | WI #36 Vent Ducts (Galley and Scullery), Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 37 | 45 | WI #37 Vent Ducts (Laundry Exhaust), Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 38 | 45 | WI #38 Ship Service Diesel Generator, Clean & Inspect | $ - 0 | Job | 1 | $0.00 |
| 42 | 45 | WI #42 Inclining Test, Support | $ - 0 | Job | 1 | $0.00 |
| 43 | 45 | WI #43 Main Reduction Gear (MRG), Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 46 | 45 | WI #46 Stern Tube Interior Surfaces, Preserve 100% | $ - 0 | Job | 1 | $0.00 |
| 52 | 45 | WI #52 Miscellaneous Piping Repairs, Various Locations | $ - 0 | Job | 1 | $0.00 |
| 53 | 45 | WI #53 Fuel Oil Purifier (FOP), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 61 | 45 | WI #61 Port Propulsion Shafting, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 63 | 45 | WI #63 Port Shaft, Stern Tube Forward Bearing, Repair | $ - 0 | Job | 1 | $0.00 |
| 67 | 45 | WI #67 Main Propulsion Generator, Align | $ - 0 | Job | 1 | $0.00 |
| 72 | 45 | WI #72 Tanks, MP Fuel Stowage and Overflow, Clean and Inspect 2026 | $ - 0 | Job | 1 | $0.00 |
| 78 | 45 | WI #78 Fuel Oil Manifold Valve Overhaul, Part 1 | $ - 0 | Job | 1 | $0.00 |
| 81 | 45 | WI #81 Tanks, Aviation Fuel, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 86 | 45 | WI #86 Fathometer Transducer, Replace | $ - 0 | Job | 1 | $0.00 |
| 88 | 45 | WI #88 Sea Valves and Waster Pieces, Overhaul or Renew (2026, 2028, 2030) | $ - 0 | Job | 1 | $0.00 |
| 90 | 45 | WI #90 Voids (accessible), clean and inspect | $ - 0 | Job | 1 | $0.00 |
| 91 | 45 | WI #91 Voids (non-accessible) leak test and Preserve (2026, 2029) | $ - 0 | Job | 1 | $0.00 |
| 92 | 45 | WI #92 Insulation and Sheathing Renewal | $ - 0 | Job | 3 | $0.00 |
| 93 | 45 | WI #93 Appendages (U/W Body), Leak Test | $ - 0 | Job | 1 | $0.00 |
| 95 | 45 | WI #95 Asbestos-containing material, 100% Abatement | $ - 0 | Job | 2 | $0.00 |
| 96 | 45 | WI #96 Lead-based Paint, Remediate | $ - 0 | Job | 5 | $0.00 |
| 97 | 45 | WI #97 Goosenecks (Fuel Oil Tanks), Overhaul | $ - 0 | Job | 23 | $0.00 |
| 100 | 45 | WI #100 Oily Water Separator (OWS) System, Groom | $ - 0 | Job | 1 | $0.00 |
| 101 | 45 | WI #101 Air Handlers, System Groom | $ - 0 | Job | 1 | $0.00 |
| 103 | 45 | WI #103 Vent Ducts, Diesel Engine Rooms 1 and 2, Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 107 | 45 | WI #107 Condensate Tank, Replace | $ - 0 | Job | 1 | $0.00 |
| 45 | Composite Labor Rate | $ - 0 | Hours | 1500 | $0.00 | |
| 45 | Lay Days | $ - 0 | Days | 200 | $0.00 | |
| 45 | Mark Up Rate (Based on an estimated $250K of material cost and $500K of subcontractor cost in each ordering period.) | $ 750,000.00 | Job | Vendor shall insert its proposed markup percentage rate in this block | ERROR:#VALUE! | |
| 45 | Total Task Order 1 Estimated Price | ERROR:#VALUE! |
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. |
| 2 Weekend day is Saturday and Sunday |
Tab 2 Task Order 2
| Tab 2 Task Order 2 | ||||||
| USCGC POLAR STAR DRY DOCK FY27 | ||||||
| 70Z08526RLREP0005 | ||||||
| Contract Line Item (CLIN) | Funding Code | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | 45 | WI #1 Drydock | $ - 0 | Job | 1 | $0.00 |
| 2 | 45 | WI #2 Temporary Services, Contractor Facility, Provide | $ - 0 | Job | 1 | $0.00 |
| 3 | 45 | WI #3 Project Management and Planning, Perform | $ - 0 | Job | 1 | $0.00 |
| 4 | 45 | Sea Trial Performance, Support, Provide - Price CLIN for five (5) weekdays1 and one (1) weekend day2. Insert price per day for weekdays1 here: $__________ . Insert price per day for weekend days2 here: $__________to be used in a change request. | $ - 0 | Day | 6 | $0.00 |
| 5 | 45 | WI# 5 Hull Plating (U/W Body), Inspect | $ - 0 | Job | 1 | $0.00 |
| 6 | 45 | WI #6 Hull Plating (U/W Body), Ultrasonic Testing | $ - 0 | Job | 1 | $0.00 |
| 7 | 45 | WI #7 Propulsion Shafting, Strain Gauge and Air Gap Readings (All) | $ - 0 | Job | 1 | $0.00 |
| 8 | 45 | WI #8 Centerline Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 9 | 45 | WI #9 Port Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 10 | 45 | WI #10 Starboard Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 11 | 45 | WI #11 Sea Strainers (Hayward), Open, Clean, and Inspect | $ - 0 | Job | 1 | $0.00 |
| 12 | 45 | WI #12 Cathodic Protection / Zinc Anodes, Renew | $ - 0 | Job | 1 | $0.00 |
| 13 | 45 | WI #13 Miranda Davit, Annual Inspect | $ - 0 | Job | 1 | $0.00 |
| 14 | 45 | WI #14 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 15 | 45 | WI #15 Allied K280-70 Crane, Port, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 16 | 45 | WI #16 Allied TB60-60 Crane, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 17 | 45 | WI #17 Propulsion Shaft Seal, Clean, Inspect, and Overhaul | $ - 0 | Job | 1 | $0.00 |
| 18 | 45 | WI #18 Shaft Handling Equipment, Maintenance and Storage | $ - 0 | Job | 1 | $0.00 |
| 19 | 45 | WI #19 Elevators, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 20 | 45 | WI #20 Dumbwaiter, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 21 | 45 | WI #21 Fixed Fire Suppression Systems, Annual Inspection and Certification | $ - 0 | Job | 1 | $0.00 |
| 22 | 45 | WI #22 Fire Prevention and Protection, Provide | $ - 0 | Job | 1 | $0.00 |
| 23 | 45 | WI #23 Main Propulsion Motor (MPM), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 24 | 45 | WI #24 Main Propulsion Generator (MPG), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 25 | 45 | WI #25 Dishwasher, Annual Maintenance | $ - 0 | Job | 1 | $0.00 |
| 27 | 45 | WI #27 Anchor Chain(s) and Ground Tackle, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 28 | 45 | WI # 28 Chain Lockers, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 32 | 45 | WI #32 Deck Covering (Polymeric), Renew | $ - 0 | Job | 3 | $0.00 |
| 34 | 45 | WI #34 Decks - Exterior, Preserve (“Non-Skid MIL-SPEC” System) | $ - 0 | Job | 3 | $0.00 |
| 35 | 45 | WI #35 Deck Preservation | $ - 0 | Job | 3 | $0.00 |
| 38 | 45 | WI #38 Ship Service Diesel Generator, Clean & Inspect | $ - 0 | Job | 1 | $0.00 |
| 41 | 45 | WI #41 Evaporators (General), Overhaul | $ - 0 | Job | 1 | $0.00 |
| 43 | 45 | WI #43 Main Reduction Gear (MRG), Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 44 | 45 | WI #44 U/W Body, Preserve, 100% | $ - 0 | Job | 1 | $0.00 |
| 46 | 45 | WI #46 Stern Tube Interior Surfaces, Preserve 100% | $ - 0 | Job | 1 | $0.00 |
| 51 | 45 | WI #51 Independent NACE Inspector (Level 3) Provide | $ - 0 | Job | 1 | $0.00 |
| 52 | 45 | WI #52 Miscellaneous Piping Repairs, Various Locations | $ - 0 | Job | 2 | $0.00 |
| 54 | 45 | WI #54 Hydraulic Oil Purifier (HOP), Overhaul, intermediate | $ - 0 | Job | 1 | $0.00 |
| 56 | 45 | WI #56 Fuel Oil Purifier (FOP) Overhaul | $ - 0 | Job | 1 | $0.00 |
| 62 | 45 | WI #62 Starboard Propulsion Shafting, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 65 | 45 | WI #65 Disconnect Coupling, Open and Inspect | $ - 0 | Job | 1 | $0.00 |
| 66 | 45 | WI #66 Propulsion Shaft Seal (Bulkhead), Tri-annual Replace | $ - 0 | Job | 1 | $0.00 |
| 67 | 45 | WI #67 Main Propulsion Generator, Align | $ - 0 | Job | 2 | $0.00 |
| 70 | 45 | WI #70 Boiler Exhaust Stack Uptakes, Commercial Clean | $ - 0 | Job | 1 | $0.00 |
| 73 | 45 | WI #73 Tanks, MP Fuel Stowage and Overflow, Clean and Inspect 2027 | $ - 0 | Job | 1 | $0.00 |
| 79 | 45 | WI #79 Fuel Oil Manifold Valve Overhaul, Part 2 | $ - 0 | Job | 1 | $0.00 |
| 85 | 45 | WI #85 Potable Water Pneumatic Tank and Hot Water Storage Tank, Clean, Inspect, and Hydrotest | $ - 0 | Job | 1 | $0.00 |
| 87 | 45 | WI #87 Fathometer Transducer, General Maintenance | $ - 0 | Job | 1 | $0.00 |
| 89 | 45 | WI #89 Sea Valves and Waster Pieces, Overhaul or Renew (2027, 2029) | $ - 0 | Job | 1 | $0.00 |
| 92 | 45 | WI #92 Insulation and Sheathing Renewal | $ - 0 | Job | 3 | $0.00 |
| 93 | 45 | WI #93 Appendages (U/W Body), Leak Test | $ - 0 | Job | 1 | $0.00 |
| 94 | 45 | WI #94 Piping Insulation Renewal | $ - 0 | Job | 1 | $0.00 |
| 95 | 45 | WI #95 Asbestos-containing material, 100% Abatement | $ - 0 | Job | 1 | $0.00 |
| 96 | 45 | WI #96 Lead-based Paint, Remediate | $ - 0 | Job | 1 | $0.00 |
| 97 | 45 | WI #97 Goosenecks (Fuel Oil Tanks), Overhaul | $ - 0 | Job | 9 | $0.00 |
| 99 | 45 | WI #99 Sea Chest Stud Renewal | $ - 0 | Job | 1 | $0.00 |
| 104 | 45 | WI #104 Vent Ducts, Turbine and Motor Rooms, Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 108 | 45 | WI #108 Turbine Intake, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 45 | Composite Labor Rate | $ - 0 | Hours | 1500 | $0.00 | |
| 45 | Lay Days | $ - 0 | Days | 200 | $0.00 | |
| 45 | Mark Up Rate (Based on an estimated $250K of material cost and $500K of subcontractor cost in each ordering period.) | $ 750,000.00 | Job | Vendor shall insert its proposed markup percentage rate in this block | ERROR:#VALUE! | |
| 45 | Total Task Order 1 Estimated Price | ERROR:#VALUE! | ||||
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. | ||||||
| 2 Weekend day is Saturday and Sunday |
Tab 3 Task Order 3
| Tab 3 Task Order 3 | ||||||
| USCGC POLAR STAR DRY DOCK FY28 | ||||||
| 70Z08526RLREP0005 | ||||||
| Contract Line Item (CLIN) | Funding Code | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | 45 | WI #1 Drydock | $ - 0 | Job | 1 | $0.00 |
| 2 | 45 | WI #2 Temporary Services, Contractor Facility, Provide | $ - 0 | Job | 1 | $0.00 |
| 3 | 45 | WI #3 Project Management and Planning, Perform | $ - 0 | Job | 1 | $0.00 |
| 4 | 45 | Sea Trial Performance, Support, Provide - Price CLIN for five (5) weekdays1 and one (1) weekend day2. Insert price per day for weekdays1 here: $__________ . Insert price per day for weekend days2 here: $__________to be used in a change request. | $ - 0 | Day | 6 | $0.00 |
| 5 | 45 | WI# 5 Hull Plating (U/W Body), Inspect | $ - 0 | Job | 1 | $0.00 |
| 6 | 45 | WI #6 Hull Plating (U/W Body), Ultrasonic Testing | $ - 0 | Job | 1 | $0.00 |
| 7 | 45 | WI #7 Propulsion Shafting, Strain Gauge and Air Gap Readings (All) | $ - 0 | Job | 1 | $0.00 |
| 8 | 45 | WI #8 Centerline Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 9 | 45 | WI #9 Port Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 10 | 45 | WI #10 Starboard Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 11 | 45 | WI #11 Sea Strainers (Hayward), Open, Clean, and Inspect | $ - 0 | Job | 1 | $0.00 |
| 12 | 45 | WI #12 Cathodic Protection / Zinc Anodes, Renew | $ - 0 | Job | 1 | $0.00 |
| 13 | 45 | WI #13 Miranda Davit, Annual Inspect | $ - 0 | Job | 1 | $0.00 |
| 14 | 45 | WI #14 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 15 | 45 | WI #15 Allied K280-70 Crane, Port, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 16 | 45 | WI #16 Allied TB60-60 Crane, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 17 | 45 | WI #17 Propulsion Shaft Seal, Clean, Inspect, and Overhaul | $ - 0 | Job | 1 | $0.00 |
| 18 | 45 | WI #18 Shaft Handling Equipment, Maintenance and Storage | $ - 0 | Job | 1 | $0.00 |
| 19 | 45 | WI #19 Elevators, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 20 | 45 | WI #20 Dumbwaiter, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 21 | 45 | WI #21 Fixed Fire Suppression Systems, Annual Inspection and Certification | $ - 0 | Job | 1 | $0.00 |
| 22 | 45 | WI #22 Fire Prevention and Protection, Provide | $ - 0 | Job | 1 | $0.00 |
| 23 | 45 | WI #23 Main Propulsion Motor (MPM), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 24 | 45 | WI #24 Main Propulsion Generator (MPG), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 25 | 45 | WI #25 Dishwasher, Annual Maintenance | $ - 0 | Job | 1 | $0.00 |
| 26 | 45 | WI #26 Anchor Windlass, Service and Inspect | $ - 0 | Job | 1 | $0.00 |
| 31 | 45 | WI #31 Boiler, Biennial Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 32 | 45 | WI #32 Deck Covering (Polymeric), Renew | $ - 0 | Job | 2 | $0.00 |
| 34 | 45 | WI #34 Decks - Exterior, Preserve (“Non-Skid MIL-SPEC” System) | $ - 0 | Job | 2 | $0.00 |
| 35 | 45 | WI #35 Deck Preservation | $ - 0 | Job | 2 | $0.00 |
| 36 | 45 | WI #36 Vent Ducts (Galley and Scullery), Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 37 | 45 | WI #37 Vent Ducts (Laundry Exhaust), Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 38 | 45 | WI #38 Ship Service Diesel Generator, Clean & Inspect | $ - 0 | Job | 1 | $0.00 |
| 40 | 45 | WI #40 Engine Mounts, Renew | $ - 0 | Job | 2 | $0.00 |
| 43 | 45 | WI #43 Main Reduction Gear (MRG), Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 46 | 45 | WI #46 Stern Tube Interior Surfaces, Preserve 100% | $ - 0 | Job | 1 | $0.00 |
| 47 | 45 | WI #47 Hull Plating, Freeboard, Preserve, 100% | $ - 0 | Job | 1 | $0.00 |
| 52 | 45 | WI #52 Miscellaneous Piping Repairs, Various Locations | $ - 0 | Job | 1 | $0.00 |
| 53 | 45 | WI #53 Fuel Oil Purifier (FOP), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 55 | 45 | WI #55 Lube Oil Purifier (LOP), Overhaul, Intermediate | $ - 0 | Job | 1 | $0.00 |
| 59 | 45 | WI #59 Rudder And Rudder Stock, Remove and Inspect | $ - 0 | Job | 1 | $0.00 |
| 60 | 45 | WI #60 Centerline Propulsion Shafting, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 65 | 45 | WI #65 Disconnect Coupling, Open and Inspect | $ - 0 | Job | 1 | $0.00 |
| 67 | 45 | WI #67 Main Propulsion Generator, Align | $ - 0 | Job | 1 | $0.00 |
| 74 | 45 | WI #74 Tanks, MP Fuel Stowage and Overflow, Clean and Inspect 2028 | $ - 0 | Job | 1 | $0.00 |
| 80 | 45 | WI #80 Fuel Oil Manifold Valve Overhaul, Part 3 | $ - 0 | Job | 1 | $0.00 |
| 84 | 45 | WI #84 Tanks (potable water), clean and inspect | $ - 0 | Job | 1 | $0.00 |
| 87 | 45 | WI #87 Fathometer Transducer, General Maintenance | $ - 0 | Job | 1 | $0.00 |
| 88 | 45 | WI #88 Sea Valves and Waster Pieces, Overhaul or Renew (2026, 2028, 2030) | $ - 0 | Job | 1 | $0.00 |
| 92 | 45 | WI #92 Insulation and Sheathing Renewal | $ - 0 | Job | 1 | $0.00 |
| 93 | 45 | WI #93 Appendages (U/W Body), Leak Test | $ - 0 | Job | 1 | $0.00 |
| 94 | 45 | WI #94 Piping Insulation Renewal | $ - 0 | Job | 1 | $0.00 |
| 95 | 45 | WI #95 Asbestos-containing material, 100% Abatement | $ - 0 | Job | 1 | $0.00 |
| 96 | 45 | WI #96 Lead-based Paint, Remediate | $ - 0 | Job | 1 | $0.00 |
| 97 | 45 | WI #97 Goosenecks (Fuel Oil Tanks), Overhaul | $ - 0 | Job | 4 | $0.00 |
| 98 | 45 | WI #98 Weather Deck Drain Piping, Clean and Flush | $ - 0 | Job | 1 | $0.00 |
| 101 | 45 | WI #101 Air Handlers, System Groom | $ - 0 | Job | 1 | $0.00 |
| 109 | 45 | WI #109 Flight Deck Nets, Overhaul, 5 Year | $ - 0 | Job | 1 | $0.00 |
| 45 | Composite Labor Rate | $ - 0 | Hours | 1500 | $0.00 | |
| 45 | Lay Days | $ - 0 | Days | 200 | $0.00 | |
| 45 | Mark Up Rate (Based on an estimated $250K of material cost and $500K of subcontractor cost in each ordering period.) | $ 750,000.00 | Job | Vendor shall insert its proposed markup percentage rate in this block | ERROR:#VALUE! | |
| 45 | Total Task Order 1 Estimated Price | ERROR:#VALUE! |
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. |
| 2 Weekend day is Saturday and Sunday |
Tab 4 Task Order 4
| Tab 4 Task Order 4 | ||||||
| USCGC POLAR STAR DRY DOCK FY29 | ||||||
| 70Z08526RLREP0005 | ||||||
| Contract Line Item (CLIN) | Funding Code | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | 45 | WI #1 Drydock | $ - 0 | Job | 1 | $0.00 |
| 2 | 45 | WI #2 Temporary Services, Contractor Facility, Provide | $ - 0 | Job | 1 | $0.00 |
| 3 | 45 | WI #3 Project Management and Planning, Perform | $ - 0 | Job | 1 | $0.00 |
| 4 | 45 | Sea Trial Performance, Support, Provide - Price CLIN for five (5) weekdays1 and one (1) weekend day2. Insert price per day for weekdays1 here: $__________ . Insert price per day for weekend days2 here: $__________to be used in a change request. | $ - 0 | Day | 6 | $0.00 |
| 5 | 45 | WI# 5 Hull Plating (U/W Body), Inspect | $ - 0 | Job | 1 | $0.00 |
| 6 | 45 | WI #6 Hull Plating (U/W Body), Ultrasonic Testing | $ - 0 | Job | 1 | $0.00 |
| 7 | 45 | WI #7 Propulsion Shafting, Strain Gauge and Air Gap Readings (All) | $ - 0 | Job | 1 | $0.00 |
| 8 | 45 | WI #8 Centerline Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 9 | 45 | WI #9 Port Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 10 | 45 | WI #10 Starboard Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 11 | 45 | WI #11 Sea Strainers (Hayward), Open, Clean, and Inspect | $ - 0 | Job | 1 | $0.00 |
| 12 | 45 | WI #12 Cathodic Protection / Zinc Anodes, Renew | $ - 0 | Job | 1 | $0.00 |
| 13 | 45 | WI #13 Miranda Davit, Annual Inspect | $ - 0 | Job | 1 | $0.00 |
| 14 | 45 | WI #14 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 15 | 45 | WI #15 Allied K280-70 Crane, Port, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 16 | 45 | WI #16 Allied TB60-60 Crane, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 17 | 45 | WI #17 Propulsion Shaft Seal, Clean, Inspect, and Overhaul | $ - 0 | Job | 1 | $0.00 |
| 18 | 45 | WI #18 Shaft Handling Equipment, Maintenance and Storage | $ - 0 | Job | 1 | $0.00 |
| 19 | 45 | WI #19 Elevators, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 20 | 45 | WI #20 Dumbwaiter, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 21 | 45 | WI #21 Fixed Fire Suppression Systems, Annual Inspection and Certification | $ - 0 | Job | 1 | $0.00 |
| 22 | 45 | WI #22 Fire Prevention and Protection, Provide | $ - 0 | Job | 1 | $0.00 |
| 23 | 45 | WI #23 Main Propulsion Motor (MPM), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 24 | 45 | WI #24 Main Propulsion Generator (MPG), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 25 | 45 | WI #25 Dishwasher, Annual Maintenance | $ - 0 | Job | 1 | $0.00 |
| 32 | 45 | WI #32 Deck Covering (Polymeric), Renew | $ - 0 | Job | 2 | $0.00 |
| 33 | 45 | WI #33 Deck Coverings (Interior Carpet) Renew | $ - 0 | Job | 2 | $0.00 |
| 34 | 45 | WI #34 Decks - Exterior, Preserve (“Non-Skid MIL-SPEC” System) | $ - 0 | Job | 2 | $0.00 |
| 35 | 45 | WI #35 Deck Preservation | $ - 0 | Job | 2 | $0.00 |
| 38 | 45 | WI #38 Ship Service Diesel Generator, Clean & Inspect | $ - 0 | Job | 1 | $0.00 |
| 41 | 45 | WI #41 Evaporators (General), Overhaul | $ - 0 | Job | 1 | $0.00 |
| 43 | 45 | WI #43 Main Reduction Gear (MRG), Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 46 | 45 | WI #46 Stern Tube Interior Surfaces, Preserve 100% | $ - 0 | Job | 1 | $0.00 |
| 49 | 45 | WI #49 Superstructure, Preserve Partial | $ - 0 | Job | 1 | $0.00 |
| 50 | 45 | WI #50 Tenting (Superstructure), Provide | $ - 0 | Job | 1 | $0.00 |
| 51 | 45 | WI #51 Independent NACE Inspector (Level 3) Provide | $ - 0 | Job | 1 | $0.00 |
| 52 | 45 | WI #52 Miscellaneous Piping Repairs, Various Locations | $ - 0 | Job | 2 | $0.00 |
| 56 | 45 | WI #56 Fuel Oil Purifier (FOP) Overhaul | $ - 0 | Job | 1 | $0.00 |
| 57 | 45 | WI #57 Hydraulic Oil Purifier (HOP) Overhaul, Major | $ - 0 | Job | 1 | $0.00 |
| 61 | 45 | WI #61 Port Propulsion Shafting, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 65 | 45 | WI #65 Disconnect Coupling, Open and Inspect | $ - 0 | Job | 1 | $0.00 |
| 67 | 45 | WI #67 Main Propulsion Generator, Align | $ - 0 | Job | 1 | $0.00 |
| 68 | 45 | WI #68 Ship Service Diesel Generator Exhaust Stack Uptakes, Commercial Clean | $ - 0 | Job | 1 | $0.00 |
| 69 | 45 | WI #69 Main Diesel Engine Exhaust Stack Updates, Commercial Clean | $ - 0 | Job | 1 | $0.00 |
| 75 | 45 | WI #75 Tanks, MP Fuel Stowage and Overflow, Clean and Inspect 2029 | $ - 0 | Job | 1 | $0.00 |
| 81 | 45 | WI #81 Tanks, Aviation Fuel, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 82 | 45 | WI #82 Tanks, Dirty Oil and Waste, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 87 | 45 | WI #87 Fathometer Transducer, General Maintenance | $ - 0 | Job | 1 | $0.00 |
| 89 | 45 | WI #89 Sea Valves and Waster Pieces, Overhaul or Renew (2027, 2029) | $ - 0 | Job | 1 | $0.00 |
| 90 | 45 | WI #90 Voids (accessible), clean and inspect | $ - 0 | Job | 1 | $0.00 |
| 91 | 45 | WI #91 Voids (non-accessible) leak test and Preserve (2026, 2029) | $ - 0 | Job | 1 | $0.00 |
| 92 | 45 | WI #92 Insulation and Sheathing Renewal | $ - 0 | Job | 1 | $0.00 |
| 93 | 45 | WI #93 Appendages (U/W Body), Leak Test | $ - 0 | Job | 1 | $0.00 |
| 94 | 45 | WI #94 Piping Insulation Renewal | $ - 0 | Job | 1 | $0.00 |
| 95 | 45 | WI #95 Asbestos-containing material, 100% Abatement | $ - 0 | Job | 1 | $0.00 |
| 96 | 45 | WI #96 Lead-based Paint, Remediate | $ - 0 | Job | 1 | $0.00 |
| 97 | 45 | WI #97 Goosenecks (Fuel Oil Tanks), Overhaul | $ - 0 | Job | 6 | $0.00 |
| 99 | 45 | WI #99 Sea Chest Stud Renewal | $ - 0 | Job | 1 | $0.00 |
| 103 | 45 | WI #103 Vent Ducts, Diesel Engine Rooms 1 and 2, Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 106 | 45 | WI #106 Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift | $ - 0 | Job | 1 | $0.00 |
| 45 | Composite Labor Rate | $ - 0 | Hours | 1500 | $0.00 | |
| 45 | Lay Days | $ - 0 | Days | 200 | $0.00 | |
| 45 | Mark Up Rate (Based on an estimated $250K of material cost and $500K of subcontractor cost in each ordering period.) | $ 750,000.00 | Job | Vendor shall insert its proposed markup percentage rate in this block | ERROR:#VALUE! | |
| 45 | Total Task Order 1 Estimated Price | ERROR:#VALUE! |
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. |
| 2 Weekend day is Saturday and Sunday |
Tab 5 Task Order 5
| Tab 5 Task Order 5 | ||||||
| USCGC POLAR STAR DRY DOCK FY30 | ||||||
| 70Z08526RLREP0005 | ||||||
| Contract Line Item (CLIN) | Funding Code | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | 45 | WI #1 Drydock | $ - 0 | Job | 1 | $0.00 |
| 2 | 45 | WI #2 Temporary Services, Contractor Facility, Provide | $ - 0 | Job | 1 | $0.00 |
| 3 | 45 | WI #3 Project Management and Planning, Perform | $ - 0 | Job | 1 | $0.00 |
| 4 | 45 | Sea Trial Performance, Support, Provide - Price CLIN for five (5) weekdays1 and one (1) weekend day2. Insert price per day for weekdays1 here: $__________ . Insert price per day for weekend days2 here: $__________to be used in a change request. | $ - 0 | Day | 6 | $0.00 |
| 5 | 45 | WI# 5 Hull Plating (U/W Body), Inspect | $ - 0 | Job | 1 | $0.00 |
| 6 | 45 | WI #6 Hull Plating (U/W Body), Ultrasonic Testing | $ - 0 | Job | 1 | $0.00 |
| 7 | 45 | WI #7 Propulsion Shafting, Strain Gauge and Air Gap Readings (All) | $ - 0 | Job | 1 | $0.00 |
| 8 | 45 | WI #8 Centerline Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 9 | 45 | WI #9 Port Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 10 | 45 | WI #10 Starboard Propulsion Hub, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 11 | 45 | WI #11 Sea Strainers (Hayward), Open, Clean, and Inspect | $ - 0 | Job | 1 | $0.00 |
| 12 | 45 | WI #12 Cathodic Protection / Zinc Anodes, Renew | $ - 0 | Job | 1 | $0.00 |
| 13 | 45 | WI #13 Miranda Davit, Annual Inspect | $ - 0 | Job | 1 | $0.00 |
| 14 | 45 | WI #14 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 15 | 45 | WI #15 Allied K280-70 Crane, Port, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 16 | 45 | WI #16 Allied TB60-60 Crane, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 17 | 45 | WI #17 Propulsion Shaft Seal, Clean, Inspect, and Overhaul | $ - 0 | Job | 1 | $0.00 |
| 18 | 45 | WI #18 Shaft Handling Equipment, Maintenance and Storage | $ - 0 | Job | 1 | $0.00 |
| 19 | 45 | WI #19 Elevators, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 20 | 45 | WI #20 Dumbwaiter, Annual Maintenance and Certification | $ - 0 | Job | 1 | $0.00 |
| 21 | 45 | WI #21 Fixed Fire Suppression Systems, Annual Inspection and Certification | $ - 0 | Job | 1 | $0.00 |
| 22 | 45 | WI #22 Fire Prevention and Protection, Provide | $ - 0 | Job | 1 | $0.00 |
| 23 | 45 | WI #23 Main Propulsion Motor (MPM), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 24 | 45 | WI #24 Main Propulsion Generator (MPG), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 25 | 45 | WI #25 Dishwasher, Annual Maintenance | $ - 0 | Job | 1 | $0.00 |
| 26 | 45 | WI #26 Anchor Windlass, Service and Inspect | $ - 0 | Job | 1 | $0.00 |
| 27 | 45 | WI #27 Anchor Chain(s) and Ground Tackle, Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| 28 | 45 | WI # 28 Chain Lockers, Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 29 | 45 | WI # 29 Chain Lockers, Preserve | $ - 0 | Job | 1 | $0.00 |
| 31 | 45 | WI #31 Boiler, Biennial Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 32 | 45 | WI #32 Deck Covering (Polymeric), Renew | $ - 0 | Job | 1 | $0.00 |
| 34 | 45 | WI #34 Decks - Exterior, Preserve (“Non-Skid MIL-SPEC” System) | $ - 0 | Job | 1 | $0.00 |
| 35 | 45 | WI #35 Deck Preservation | $ - 0 | Job | 1 | $0.00 |
| 36 | 45 | WI #36 Vent Ducts (Galley and Scullery), Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 37 | 45 | WI #37 Vent Ducts (Laundry Exhaust), Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 38 | 45 | WI #38 Ship Service Diesel Generator, Clean & Inspect | $ - 0 | Job | 1 | $0.00 |
| 43 | 45 | WI #43 Main Reduction Gear (MRG), Maintenance and Inspection | $ - 0 | Job | 1 | $0.00 |
| 45 | 45 | WI #45 U/W Body, Preserve (partial) | $ - 0 | Job | 1 | $0.00 |
| 46 | 45 | WI #46 Stern Tube Interior Surfaces, Preserve 100% | $ - 0 | Job | 1 | $0.00 |
| 51 | 45 | WI #51 Independent NACE Inspector (Level 3) Provide | $ - 0 | Job | 1 | $0.00 |
| 52 | 45 | WI #52 Miscellaneous Piping Repairs, Various Locations | $ - 0 | Job | 1 | $0.00 |
| 53 | 45 | WI #53 Fuel Oil Purifier (FOP), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| 54 | 45 | WI #54 Hydraulic Oil Purifier (HOP), Overhaul, intermediate | $ - 0 | Job | 1 | $0.00 |
| 58 | 45 | WI #58 Lube Oil Purifier (LOP) Overhaul, Major | $ - 0 | Job | 1 | $0.00 |
| 62 | 45 | WI #62 Starboard Propulsion Shafting, Remove and Reinstall | $ - 0 | Job | 1 | $0.00 |
| 65 | 45 | WI #65 Disconnect Coupling, Open and Inspect | $ - 0 | Job | 1 | $0.00 |
| 66 | 45 | WI #66 Propulsion Shaft Seal (Bulkhead), Tri-annual Replace | $ - 0 | Job | 1 | $0.00 |
| 67 | 45 | WI #67 Main Propulsion Generator, Align | $ - 0 | Job | 1 | $0.00 |
| 76 | 45 | WI #76 Tanks, MP Fuel Stowage and Overflow, Clean and Inspect 2030 | $ - 0 | Job | 1 | $0.00 |
| 87 | 45 | WI #87 Fathometer Transducer, General Maintenance | $ - 0 | Job | 1 | $0.00 |
| 88 | 45 | WI #88 Sea Valves and Waster Pieces, Overhaul or Renew (2026, 2028, 2030) | $ - 0 | Job | 1 | $0.00 |
| 92 | 45 | WI #92 Insulation and Sheathing Renewal | $ - 0 | Job | 1 | $0.00 |
| 93 | 45 | WI #93 Appendages (U/W Body), Leak Test | $ - 0 | Job | 1 | $0.00 |
| 95 | 45 | WI #95 Asbestos-containing material, 100% Abatement | $ - 0 | Job | 1 | $0.00 |
| 96 | 45 | WI #96 Lead-based Paint, Remediate | $ - 0 | Job | 1 | $0.00 |
| 97 | 45 | WI #97 Goosenecks (Fuel Oil Tanks), Overhaul | $ - 0 | Job | 3 | $0.00 |
| 99 | 45 | WI #99 Sea Chest Stud Renewal | $ - 0 | Job | 1 | $0.00 |
| 100 | 45 | WI #100 Oily Water Separator (OWS) System, Groom | $ - 0 | Job | 1 | $0.00 |
| 101 | 45 | WI #101 Air Handlers, System Groom | $ - 0 | Job | 1 | $0.00 |
| 104 | 45 | WI #104 Vent Ducts, Turbine and Motor Rooms, Commercial Cleaning | $ - 0 | Job | 1 | $0.00 |
| 105 | 45 | WI #105 Steering System, Groom | $ - 0 | Job | 1 | $0.00 |
| 110 | 45 | WI #110 Sewage and Grey Water Piping, Clean and Acid Flush | $ - 0 | Job | 1 | $0.00 |
| 45 | Composite Labor Rate | $ - 0 | Hours | 1500 | $0.00 | |
| 45 | Lay Days | $ - 0 | Days | 200 | $0.00 | |
| 45 | Mark Up Rate (Based on an estimated $250K of material cost and $500K of subcontractor cost in each ordering period.) | $ 750,000.00 | Job | Vendor shall insert its proposed markup percentage rate in this block | ERROR:#VALUE! | |
| 45 | Total Task Order 1 Estimated Price | ERROR:#VALUE! | ||||
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. | ||||||
| 2 Weekend day is Saturday and Sunday |
Tab 6 Task Order 1 Break Down
| Tab2 Task Order 1 Break Down |
| USCGC POLAR STAR DRY DOCK FY26 |
| 70Z08526RLREP0005 |
| Instructions: |
| Provide pricing including materials, labor, equiptment, and overhead & profit. |
Tab7 Comp Labor Rate Break Down
| Tab 3Composite Labor Rate Break Down |
| USCGC POLAR STAR DRY DOCK FY26 |
| 70Z08526RLREP0005 |
| Instructions: |
| Provide average of the direct labor rates used, G&A and Profit. |
Rate Info-Other Periods
| Ordering Period | Composite Labor Rate | Lay Day Rate | Mark Up Rate (Based on an estimated $250K of material cost and $500K of subcontractor cost in each ordering period.) |
| Ordering Period 1 | |||
| Ordering Period 2 | |||
| Ordering Period 3 | |||
| Ordering Period 4 | |||
| Ordering Period 5 |
File details come from the government source that posted it. Updated .