This is a specification document for drydock repairs to the USCGC POLAR STAR (WAGB-10/400) covering fiscal years 2026-2030. The specification outlines 110 work items organized by repair category, including major undertakings such as drydocking and undocking operations, temporary facility services, project management, dock and sea trials support, hull inspections and preservation, propulsion system maintenance, crane and davit inspections, and various mechanical and structural repairs.

Key work items include hull plating inspection and ultrasonic testing of the underwater body; removal, inspection, and reinstallation of three controllable pitch propellers and associated shafting; cathodic protection and zinc anode renewal; annual maintenance and load testing of the Miranda Davit and three onboard cranes (two K280-70 knuckle boom cranes and one TB60-60 telescoping boom crane); propulsion shaft seal overhaul; main reduction gear inspection; gas turbine alignment; evaporator overhaul with tube bundle replacement and hydrostatic testing; boiler biennial maintenance and safety valve certification; and comprehensive preservation of underwater body surfaces, freeboard, stern tube interiors, and superstructure at varying preservation levels (100% or partial). Additional work includes elevator and dumbwaiter certification, fire suppression system inspection, deck covering renewal (polymeric, carpet, and slip-resistant systems), ventilation system cleaning, ship service diesel generator inspection, and specialized tasks such as inclining test support and engine mount renewal. The specification identifies government-furnished property including three controllable pitch propellers valued at $3.5 million each, bearing components, hydraulic seals, and various pumps and service kits. Critical inspection items must be completed within the first 25% of the contract period, with specific submission timelines for various condition and test reports throughout the availability period.

View the file

Other files

File Type Posted
Amendment 004-POLAR STAR DD FY26-30 IDIQ.doc DOC document
Amendment 004-Attch 1 Pricing Sheet_Rev3_5FEB2026.xlsx XLSX spreadsheet
Attachment 1 Pricing Sheet - 70Z08526RLREP0005_Rev1_23JAN2026.xlsx XLSX spreadsheet
Amendment 003-Attch 3 Consolidated List of References-Polar Star DD-22Jan26.pdf PDF
Attachment 10 Estimated Work Items for Each of the Ordering Periods_23JAN26.xlsx XLSX spreadsheet
Amendment 003-Attch 1 Pricing Sheet_Rev2_29JAN2026.xlsx XLSX spreadsheet
Attachment 2 Statement of Work Specification - 70Z08526LREP0005 - 23JAN2026.pdf PDF
Amendment 003-POLAR STAR DD FY26-30 IDIQ.doc DOC document
Attachment 3 Consolidated List of References - 70Z08526LREP0005_22Jan26.pdf PDF
Amendment 003-Attch 10-Estimated Work Items Each Ordering Period.xlsx XLSX spreadsheet
Solicitation 70Z08526RLREP0005 Amendment 002 - POLAR STAR DS FY26-30 IDIQ.pdf PDF
Amendment 002-Solicitation 70Z08526RLREP0005 -POLAR STAR.doc DOC document
RFP-FINAL-Polar Star-70Z08526RLREP0005-22JAN2026.docx DOCX document
Amendment 001 - CGC POLAR STAR DD.doc DOC document
Attachment 2 Specifications_Statement of Work - 70Z08526RLREP0005.pdf PDF
Attachment 4 Past Performance Information Form - 70Z08526RLREP0005.docx DOCX document
Attachment 8 Change Request Proposal Form - 70Z08526RLREP0005.xlsx XLSX spreadsheet
Attachment 7 Department of Homeland Security Non-Disclosure Agreement (NDA)_70Z08526RLREP0005.pdf PDF
Attachment 1 Pricing Sheet-Rev 1-70Z08526RLREP0005-6JAN2026.xlsx XLSX spreadsheet
RFP-Polar Star-FOR REVIEW-70Z08526RLREP0005-12JAN2026.docx DOCX document
Attachment 3 Consolidated List of References - 70Z08526LREP0005.pdf PDF
Attachment 10_Estimated Work Items for Each of the Ordering Periods.xlsx XLSX spreadsheet
Attachment 9 Past Performance Questionnaire - 70Z08526RLREP0005.docx DOCX document
Attachment 5 Request for Clarifications - 70Z08526RLREP0005.docx DOCX document
Attachment 6 Government Property Report - 70Z08526LREP0005.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC POLAR STAR (WAGB 10)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2026 – FY2030

Developed By: LCDR Justin Johnson

(Rev-1, 23 Jan 2026)

USCGC POLAR STAR (WAGB-400) DRYDOCK AVAILABILITY FY26 – FY30

ii (Rev-0) 14 AUG 2024

TABLE OF CONTENTS

Revisions Record ........................................................................................................................................... v Consolidated List of References ................................................................................................................... vi Consolidated List of Government-furnished Property ................................................................................ xx Consolidated List of Critical Inspection Items ......................................................................................... xxiv Principal Characteristics ........................................................................................................................... xxvi General Requirements WORK ITEM 1: Drydock WORK ITEM 2: Temporary Services, Contractor Facility, Provide WORK ITEM 3: Project Management and Planning, Perform WORK ITEM 4: Dock and Sea Trial Performance, Support, Provide WORK ITEM 5: Hull Plating (U/W Body), Inspect WORK ITEM 6: Hull Plating (U/W Body), Ultrasonic Testing WORK ITEM 7: Propulsion Shafting, Strain Gauge and Air Gap Readings (All) WORK ITEM 8: Centerline Propulsion Hub, Remove and Reinstall WORK ITEM 9: Port Propulsion Hub, Remove and Reinstall WORK ITEM 10: Starboard Propulsion Hub, Remove and Reinstall WORK ITEM 11: Sea Strainers (Hayward) Open, Clean, and Inspect WORK ITEM 12: Cathodic Protection / Zinc Anodes, Renew WORK ITEM 13: Miranda Davit, Annual Inspect WORK ITEM 14: Allied K280-70 Crane, Starboard, Annual Inspect and Repair WORK ITEM 15: Allied K280-70 Crane, Port, Annual Inspect and Repair WORK ITEM 16: Allied TB60-60 Crane, Annual Inspect and Repair WORK ITEM 17: Propulsion Shaft Seal, Clean, Inspect, and Overhaul WORK ITEM 18: Shaft Handling Equipment, Maintenance and Storage WORK ITEM 19: Elevators, Annual Maintenance and Certification WORK ITEM 20: Dumbwaiter, Annual Maintenance and Certification WORK ITEM 21: Fixed Fire Suppression Systems, Annual Inspection and Certification WORK ITEM 22: Fire Prevention, Provide WORK ITEM 23: Main Propulsion Motor (MPM), Clean and Inspect WORK ITEM 24: Main Propulsion Generator (MPG), Clean and Inspect WORK ITEM 25: Dishwasher, Annual Maintenance WORK ITEM 26: Anchor Windlass, Service and Inspect WORK ITEM 27: Anchors Chains and Ground Tackles, Inspect Repair and Preserve WORK ITEM 28: Chain Lockers, Clean and Inspect WORK ITEM 29: Chain Lockers, Preserve WORK ITEM 30: Warping Capstan, Inspect and Repair WORK ITEM 31: Boiler, Biennial Maintenance and Inspection WORK ITEM 32: Deck Covering (Polymeric), Renew WORK ITEM 33: Deck Coverings (Carpet), Renew WORK ITEM 34: Deck Covering (Slip-Resistant), Renew WORK ITEM 35: Deck Interior Preservation WORK ITEM 36: Vent Ducts (Galley and Scullery), Commercial Cleaning WORK ITEM 37: Vent Ducts (Laundry Exhaust), Commercial Cleaning WORK ITEM 38: Ship Service Diesel Generator, Clean & Inspect WORK ITEM 39: Gas Turbine, Align WORK ITEM 40: Engine Mounts, Renew WORK ITEM 41: Evaporators, Overhaul WORK ITEM 42: Inclining Test, Support iii (Rev-0) 14 AUG 2024

WORK ITEM 43: Main Reduction Gear (MRG), Maintenance and Inspection WORK ITEM 44: U/W Body, Preserve, 100% WORK ITEM 45: U/W Body, Preserve (Partial) WORK ITEM 46: Stern Tube Interior Surfaces, Preserve 100% WORK ITEM 47: Hull Plating Freeboard, Preserve, 100% WORK ITEM 48: Superstructure, Preserve, 100% WORK ITEM 49: Superstructure, Preserve, Partial WORK ITEM 50: Tenting (Superstructure), Provide WORK ITEM 51: Independent NACE Inspector (Level 3), Provide WORK ITEM 52: Miscellaneous Piping Repairs, Various Locations WORK ITEM 53: Fuel Oil Purifier (FOP), Clean and Inspect WORK ITEM 54: Hydraulic Oil Purifier (HOP), Overhaul, Intermediate WORK ITEM 55: Lube Oil Purifier (LOP), Overhaul, Intermediate WORK ITEM 56: Fuel Oil Purifier (FOP), Overhaul WORK ITEM 57: Hydraulic Oil Purifier (HOP) Overhaul, Major WORK ITEM 58: Lube Oil Purifier (LOP) Overhaul, Major WORK ITEM 59: Rudder And Rudder Stock, Remove Inspect WORK ITEM 60: Centerline Propulsion Shafting, Remove and Reinstall WORK ITEM 61: Port Propulsion Shafting, Remove and Reinstall WORK ITEM 62: Starboard Propulsion Shafting, Remove and Reinstall WORK ITEM 63: Port Shaft, Stern Tube Forward Bearing, Repair WORK ITEM 64: Shaft OD Box, Clean Inspect and Repair (30,000 hrs) WORK ITEM 65: Disconnect Coupling, Open and Inspect WORK ITEM 66: Propulsion Shaft Seal (Bulkhead), Tri-annual Replace WORK ITEM 67: Main Propulsion Generator, Align WORK ITEM 68: Ship Service Diesel Generator Exhaust Stack Uptakes, Commercial Clean WORK ITEM 69: Main Diesel Engine Exhaust Stack Uptakes, Commercial Clean WORK ITEM 70: Boiler Exhaust Stack Uptakes, Commercial Clean WORK ITEM 71: Sea Strainers (Hayward) Overhaul WORK ITEM 72: Tanks, MP Fuel Stowage and Overflow, Clean and Inspect 2026 WORK ITEM 73: Tanks, MP Fuel Stowage and Overflow, Clean and Inspect 2027 WORK ITEM 74: Tanks, MP Fuel Service, Clean and Inspect WORK ITEM 75: Tanks, MP Fuel Stowage and Overflow, Clean and Inspect 2029 WORK ITEM 76: Tanks, MP Fuel Stowage and Overflow, Clean and Inspect 2030 WORK ITEM 77: Tanks, Ballast, Clean and Inspect WORK ITEM 78: Fuel Oil Manifold Valve Overhaul, Part 1 WORK ITEM 79: Fuel Oil Manifold Valve Overhaul, Part 2 WORK ITEM 80: Fuel Oil Manifold Valve Overhaul, Part 3 WORK ITEM 81: Tanks, Aviation Fuel, Clean And Inspect WORK ITEM 82: Tanks, Dirty Oil and Waste, Clean and Inspect WORK ITEM 83: Tanks, Dirty Oil and Waste, Preserve, 100 Percent WORK ITEM 84: Tanks, Potable Water, Clean and Inspect WORK ITEM 85: Potable Water Pneumatic Tank and Hot Water Storage Tank, Clean, Inspect, and

Hydrotest WORK ITEM 86: Fathometer Transducer, Replace WORK ITEM 87: Fathometer Transducer, General Maintenance WORK ITEM 88: Sea Valves and Waster Pieces, Overhaul or Renew (2026, 2028, 2030) WORK ITEM 89: Sea Valves and Waster Pieces, Overhaul or Renew (2027, 2029) WORK ITEM 90: Voids, Accessible, Clean and Inspect WORK ITEM 91: Voids (Non-Accessible), Leak Test and Preserve (2026, 2029) WORK ITEM 92: Insulation and Sheathing Renewal iv (Rev-0) 14 AUG 2024

WORK ITEM 93: Appendages (U/W Body), Leak Test WORK ITEM 94: Piping Insulation Renewal WORK ITEM 95: Asbestos-Containing Material, 100% Abatement, Perform WORK ITEM 96: Lead Based Paint, Remediate WORK ITEM 97: Goosenecks (Fuel Oil Tanks), Overhaul WORK ITEM 98: Weather Deck Drain Piping, Clean and Flush WORK ITEM 99: Sea Chest Stud, Renew WORK ITEM 100: Oily Water Separator (OWS) System, Groom WORK ITEM 101: Air Handlers, System Groom WORK ITEM 102: Sewage Holding Tank(s), Clean and Inspect WORK ITEM 103: Vent Ducts, Diesel Engine Rooms 1 and 2, Commercial Cleaning WORK ITEM 104: Vent Ducts, Turbine and Motor Rooms, Commercial Cleaning WORK ITEM 105: Steering System, Groom WORK ITEM 106: Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift581 WORK ITEM 107: Condensate Tank, Replace WORK ITEM 108: Turbine Intake, Clean and Inspect WORK ITEM 109: Flight Deck Nets, Overhaul, 5 Year WORK ITEM 110: Sewage Piping, Clean and Flush

USCGC POLAR STAR (WAGB-400) DRYDOCK AVAILABILITY FY2026

v (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

23 Jan 2026 1 61 Updated note after paragraph 3.8.2.1

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

vi (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing Naval Engineering Division, Rev -, FL-1702-11, Inspection of Sheaves

Coast Guard Drawing 400 WAGB 0103-030, Rev C, General Arrangement Modifications Incidental to

Fwd Crane Replacement

Coast Guard Drawing 400 WAGB 103-003, Rev AM, Booklet of General Plans (POLAR STAR)

Coast Guard Drawing 400 WAGB 103-003, Rev AK, Booklet of General Plans

Coast Guard Drawing 400 WAGB 103-3, Rev T, Booklet Of General Plans

Coast Guard Drawing 400 WAGB 0103-32, Rev D, General Arrangement Modifications Incidental to Aft

Crane Replacements

Coast Guard Drawing 400 WAGB 103-9, Rev K, General Arrangement of 02 Level & Above

Coast Guard Drawing 400-WAGB-0103-001, Rev F, General Arrangement Double Bottom

Coast Guard Drawing 400-WAGB-0103-002, Rev H, Gen Arrg Tank Top

Coast Guard Drawing 400-WAGB-0103-010, Rev E, Inboard Profile

Coast Guard Drawing 400-WAGB-0103-016, Rev B, Arrangement - Main Deck Aft

Coast Guard Drawing 400-WAGB-0103-034, Rev -, General Arrangement 01 Level

Coast Guard Drawing 400-WAGB-0245-002, Rev E, CPP Hydraulic Schematic Open Loop

Coast Guard Drawing 400-WAGB-0556-150, Rev A, Stbd CPP Hydraulic Sys Piping Arrangement &

Hose List

Coast Guard Drawing 400-WAGB-0556-151, Rev -, Stbd CPP Hyd Flushing Diagram

Coast Guard Drawing 400-WAGB-0801-009, Rev C, Tank Sounding Tables

Coast Guard Drawing 400-WAGB-0835-019, Rev B, Vents, Sounds & Overflows Flow Calcs

Coast Guard Drawing 400 WAGB 0700-1, Rev M, Polar Star Docking Plan

Coast Guard Drawing 400 WAGB 1100-1, Rev K, Structural Details & Notes

Coast Guard Drawing 400 WAGB 1101-002, Rev R, Shell Plating Fwd

Coast Guard Drawing 400 WAGB 1101-003, Rev R, Shell Plating Aft

Coast Guard Drawing 400-WAGB-1103-001, Rev K, Fore Peak Framing Fwd of CF-22 & CL Bhd

Coast Guard Drawing 400-WAGB-1103-002, Rev G, Floors Frs 25 to 56

Coast Guard Drawing 400-WAGB-1103-005, Rev R, Floors Frs 198 to 222

Coast Guard Drawing 400-WAGB-1103-010, Rev H, ICE Frames Bet C F 45 & Fr 57

Coast Guard Drawing 400-WAGB-1103-014, Rev O, ICE Frames 198 to 242 & Floor Fr 224 to 242 vii (Rev-0)

Coast Guard Drawing 400 WAGB 1105-059, Rev C, Miranda Davit Relocation Installation General

Arrangement and Structural

Coast Guard Drawing 400-WAGB 1105-011, Rev D, Chain Locker Bhds

Coast Guard Drawing 400 WAGB 1105-024, Rev J, Elevator Trk Bhd Fr 53-57 & FR 105-110

Coast Guard Drawing 400-WAGB 1105-036, Rev B, Structural Mods Main Deck

Coast Guard Drawing 400 WAGB 1105-41, Rev D, Flight Dk Modification

Coast Guard Drawing 400-WAGB 1105-048, Rev -, Structural Mods

Coast Guard Drawing 400-WAGB 1105-32, Rev J, Expanded Metal Bulkhead

Coast Guard Drawing 400 WAGB 1107-2, Rev B, Rudder Trunk

Coast Guard Drawing 400 WAGB 1108-1, Rev G, Ice Shoe

Coast Guard Drawing 400-WAGB-1109-001, Rev K, Pillars & Girder Below Mn Dk Fwd Fr 143

Coast Guard Drawing 400-WAGB 1112-1, Rev X, Fdn for Center LINE Prop Machy

Coast Guard Drawing 400 WAGB 1112-4, Rev G, FDN FOR PRPLN & SS DSL GEN IN DSL GEN

ROOMS 1 & 2

Coast Guard Drawing 400-WAGB-1112-024, Rev G, Fdns for Anchor Handling Gear

Coast Guard Drawing 400-WAGB-1201-002, Rev C, Hawse Pipe Dk & Shell Bolster

Coast Guard Drawing 400-WAGB-1201-003, Rev G, Chain Pipe, Bellmouth, Deck Bolster & Cover

Coast Guard Drawing 400 WAGB 1202-3, Rev K, Helicopter Safety Net

Coast Guard Drawing 400 WAGB 1202-5, Rev -, New Safety Nets for Aft Edge of Flight Deck

Coast Guard Drawing 400 WAGB 1205-4, Rev D, Lifting Pads for Rudder & Propellers Arrangement &

Details

Coast Guard Drawing 400 WAGB 1205-6, Rev -, Dets of Padeyes for Lifting Gear

Coast Guard Drawing 400 WAGB 1601-001, Rev C, Elevators at Fr 55 and Fr 108 Installation Details

Coast Guard Drawing 400 WAGB 185-110, Rev -, Centerline CPP Hyd Sys Reservoir Tank Fabrication

Coast Guard Drawing 400 WAGB 185-120, Rev -, Port CPP Hydraulic Reservoir Tank Fabrication

Details

Coast Guard Drawing 400 WAGB 185-152, Rev-, Stbd CPP Hyd Sys Reservoir Tank Fabrication

Coast Guard Drawing 400 WAGB 1906-1, Rev K, Zinc Protectors A/D

Coast Guard Drawing 400 WAGB 2200-10, Rev -, Rudder Stock Upper & Lower Bearings

Coast Guard Drawing 400 WAGB 2200-2, Rev D; Rudder Arrg’t & Det

Coast Guard Drawing 400 WAGB 2200-4, Rev M, Rudder Stock – Arrangement & Details

Coast Guard Drawing 400 WAGB 2200-8, Rev H, Rudder Stock Removal A/D

Coast Guard Drawing 400 WAGB 2200-9, Rev K, Arrgt of Steering Gear Rm

Coast Guard Drawing 400 WAGB 2601-1, Rev R, Anchor Handling Arrangement & Details

Coast Guard Drawing 400 WAGB 3601-006, Rev. C, Sewage Holding Tank Deck Gear Storeroom Aft

Bhd CF-21

Coast Guard Drawing 400 WAGB 3601-007, Rev. B, Sewage Holding Tank Lower Cargo Hold – Aft

Bhd 197

Coast Guard Drawing 400 WAGB 3901-1, Rev Z, Insulation A&D

Coast Guard Drawing 400 WAGB 4000-2, Rev F, Machinery and Piping Standard Details

Coast Guard Drawing 400 WAGB 4000-3, Rev V, Machinery Arrgt Plan View Lower Level & List Of

Mach'y viii (Rev-0)

Coast Guard Drawing 400-WAGB 4000-4, Rev R, Machinery Arrgt Plan View Platform Level

Coast Guard Drawing 400 WAGB 4000-7, Rev K, Machinery Arrgt Elevation Stbd - Looking Inbd

Coast Guard Drawing 400 WAGB 4105-1, Rev Z, Machinery Arrangement Main Propulsion Polar Class

Icebreaker.

Coast Guard Drawing 400 WAGB 4105-2, Rev Z, Assembly Drive end of Engine FI 16V 9X10-1/2

Coast Guard Drawing 400-WAGB 4105-3, Rev Z, Assembly Drive End of Engine FI 16V 9X10-1/2

Coast Guard Drawing 400 WAGB 4107-8, Rev D, Diagram Gas Turbine Intake & Exh. and Boiler Exh.

Sys

Coast Guard Drawing 400 WAGB 4112-3, Rev L, Propulsion Motor & Generator Interconnection & IWD

Coast Guard Drawing 400 WAGB 4301-1, Rev AA, Arrgt of Shafting

Coast Guard Drawing 400 WAGB 4301-1, Rev Y, Arrgt. of Shafting

Coast Guard Drawing 400 WAGB 4301-11, Rev 4, Propeller Tailshaft Assy

Coast Guard Drawing 400 WAGB 4301-12, Rev 6, Oil Transfer Shaft Assembly

Coast Guard Drawing 400 WAGB 4301-13, Rev 3, Outer Oil Pipe Assy (Center Shaft)

Coast Guard Drawing 400 WAGB 4301-14, Rev 3, Outer Oil Pipe Assy (Wing Shaft)

Coast Guard Drawing 400 WAGB 4301-17, Rev 1, Inner Oil Pipe Assy (Wing Shaft)

Coast Guard Drawing 400 WAGB 4301-2, Rev F, Bulkhead Seal Arrgt & Details

Coast Guard Drawing 400 WAGB 4301-23, Rev D, Static Shaft Alignment Analysis

Coast Guard Drawing 400 WAGB 4301-29, Rev -, Dowel, Propeller Hub To Tailshaft

Coast Guard Drawing 400 WAGB 4301-3, Rev J, Shaft Tubes - Arr & Dets C/L & P/S

Coast Guard Drawing 400 WAGB 4301-4, Rev 12, Center Tailshaft

Coast Guard Drawing 400 WAGB 4301-5, Rev 10, Wing Tailshaft

Coast Guard Drawing 400 WAGB 4301-5, Rev 11, Wing Tailshaft

Coast Guard Drawing 400 WAGB 4302-1, Rev S, Stern Tube Bearg & Shaft Seal Arrg

Coast Guard Drawing 400 WAGB 4302-4, Rev B, Stern Tube Bearing and Shaft Seals (With Modified

Aft Bearing) Arrgt and Details

Coast Guard Drawing 400 WAGB 4400-18, Rev -, Connecting Procedure for Operating Rod and Oil

Tube

Coast Guard Drawing 400 WAGB 4400-27, Rev -, CPP Right Hand Hub Assembly (Elev Section – Side

Profile)

Coast Guard Drawing 400 WAGB 4400-31, Rev -, CPP Right Hand Operating Rod

Coast Guard Drawing 400 WAGB 4400-34, Rev -, CPP 69” Diameter Left Hand Propeller Hub Assembly

(Elev Section)

Coast Guard Drawing 400 WAGB 4400-38, Rev -, CPP Left Hand Operating Rod

Coast Guard Drawing 400 WAGB 4400-41, Rev -, CPP Hub Cylinder (Common to LH & RH)

Coast Guard Drawing 400 WAGB 4400-46, Rev -, CPP Propeller Tailshaft Assembly (Common to LH &

RH)

Coast Guard Drawing 400 WAGB 4400-69, Rev -, Outer Oil Pipe Detail (Center Shaft)

Coast Guard Drawing 400 WAGB 4800-10, Rev U, Arr Hyd Interconnecting Piping Fwd Fr 150

Coast Guard Drawing 400 WAGB 4801-009, Rev U, Diagram of Bilge System

Coast Guard Drawing 400 WAGB 4803-1, Rev AA, Arr. Firemain 3rd. Dk. & Below

Coast Guard Drawing 400-WAGB-4803-9, Rev V, Diagram of Firemain, Flushing and Sprinkling System

Coast Guard Drawing 400 WAGB 4803-12, Rev G, Arrgt of CO2 Fixed Flood Sys ix (Rev-0)

Coast Guard Drawing 400 WAGB 4803-13, Rev C, Diag of CO2 Sys

Coast Guard Drawing 400 WAGB 4803-19, Rev -, Piping System Mod Range Guard Fire Ext Sys Instl

Arrgt Dets

Coast Guard Drawing 400 WAGB 4804-7, Rev M, Diag of H&C Potable Wtr Sys

Coast Guard Drawing 400 WAGB 4805-2, Rev V, Diagram S.W. Cooling System

Coast Guard Drawing 400 WAGB 4808-089, Rev. A, SLEP Sewage Transfer System Diagram

Coast Guard Drawing 400 WAGB 4808-17, Rev C, Operat Diag for Plumb & Interior Dk

Coast Guard Drawing 400 WAGB 4808-8, Rev N, Diag of Plumb & Inter Dk Drns

Coast Guard Drawing 400-WAGB-4808-20, Rev AE, Arr. Weather Deck Drains 01 Level & Above

Coast Guard Drawing 400-WAGB-4808-22, Rev G, Diagram of Weather Deck Drains

Coast Guard Drawing 400-WAGB-4808-29, Rev -, Weather Deck Drain Modifications

Coast Guard Drawing 400 WAGB 4823-1, Rev D, Seachest & Strainer Compts Fwd 113

Coast Guard Drawing 400 WAGB 4823-2, Rev H, Seachest & Strainer Compt Aft Fr 113

Coast Guard Drawing 400 WAGB 5101-1, Rev G, A/D Boiler Smoke Pipes & Smoke Indicators

Coast Guard Drawing 400 WAGB 5101-2, Rev F, Safety Valve Easing Gear

Coast Guard Drawing 400 WAGB 5101-3, Rev AC, Arr Stm Boiler Blow, Escape, and Feed Piping

Coast Guard Drawing 400 WAGB 5101-4, Rev J, A/D of Condensate Drn Tnk

Coast Guard Drawing 400 WAGB 5101-5, Rev F, Dia Steam Boil Blow, Escape and Feed Piping

Coast Guard Drawing 400 WAGB 5101-6, Rev N, Arrangement & Details Boiler Feedwater Tank

Coast Guard Drawing 400 WAGB 5101-7, Rev 1, SDW 350M Marine Auxiliary Boiler Bare Boiler

Design Arrangement

Coast Guard Drawing 400 WAGB 5200-10, Rev G, Arrangement of Emergency Generator Exhaust

Coast Guard Drawing 400 WAGB 5200-2, Rev H, Turbine Stack Arrgt & Det

Coast Guard Drawing 400 WAGB 5200-4, Rev P, Arrgt & Dets of Hangers for Gas Turb

Coast Guard Drawing 400 WAGB 5200-6, Rev D, Diagram of Diesel Generators Exhaust Piping

Coast Guard Drawing 400 WAGB 5200-7, Rev N, Arrangement of Diesel Exhaust Piping

Coast Guard Drawing 400 WAGB 6202-40, Rev N, Central Hydraulic System E & IWD

Coast Guard Drawing 400 WAGB 6504-5, Rev G, CO2 Release Alarm Sys Ckt FR E & IWDCoast

Coast Guard Drawing 400 WAGB 1106-004, Rev V, 3rd Deck Plating Aft FR 117 1/2

Coast Guard Drawing 400 WAGB 1106-005, Rev K, 2nd Dk Pltg Fwd Fr 143 1/2

Coast Guard Drawing 400 WAGB 1106-007, Rev J, Main Deck Plating Fwd Fr 143-1/2

Coast Guard Drawing 400 WAGB 1106-008, Rev J, Main Deck Plating Aft Fr 143 1/2

Coast Guard Drawing 400 WAGB 1106-010, Rev M, 01 Level Plating Fwd Fr 143 1/2

Coast Guard Drawing 400 WAGB 1106-011, Rev M, 01 Level Plat Aft Fr 143 1/2

Coast Guard Drawing 400 WAGB 1106-012, Rev K, 02 Level Plating

Coast Guard Drawing 400 WAGB 1106-013, Rev H, 03 Level Pltg & Top of Hangar

Coast Guard Drawing 400 WAGB 1106-014, Rev G, 04 Level Top of Pilot House & Pilot House Deck

Level

Coast Guard Drawing 400-WAGB 1400-1, Rev R, Schedule of Dk Coverings

Coast Guard Drawing 400-WAGB 1602-11, Rev -, 36 X 36 & 30 X 36 W.T. Hatch

Coast Guard Drawing 400-WAGB-1602-006, Rev AF, Schedule of Steel Closures

Coast Guard Drawing 400-WAGB 5501-8, Rev J, Diagram of Dies Oil Transfer & Purification System x (Rev-0)

Coast Guard Drawing 400-WAGB 1901-1, Rev AC, Painting Schedule

Coast Guard Drawing 400-WAGB 2901-3, Rev E, Tank Capacity Tables – POLAR STAR

Coast Guard Drawing 400-WAGB 3802-1, Rev M, Arrg of Steam Heat 02 Lvl & Abv

Coast Guard Drawing 400 WAGB 3802-2, Rev AB, Arr. Steam Heat 01 Lvl. & Bel. Fwd 113

Coast Guard Drawing 400-WAGB 3802-3, Rev AF, Arrg Steam Heat 01 Lvl & Blw Aft 113

Coast Guard Drawing 400-WAGB 3802-4, Rev J, Dia. Steam Heating and Condensate System

Coast Guard Drawing 400-WAGB 3802-7, Rev A, Diag Stm Heat & Condensate System (POLAR

STAR)

Coast Guard Drawing 400-WAGB 3803-1, Rev M, Vent & A/C Diag

Coast Guard Drawing 400-WAGB 3803-2, Rev L, Vent & A/C Equipment List

Coast Guard Drawing 400-WAGB 3803-4, Rev N, Vent & A/C Fan Rm Arrg 02 & 03 Lvl

Coast Guard Drawing 400-WAGB 3803-5, Rev M, Vent & A/C Fan Rm Arrg Mn Dk FR 113 Fwd

Coast Guard Drawing 400-WAGB 3803-6, Rev M, Vent & A/C Fan Rm Arrg Mn & 2nd Dk FR 113 Aft

Coast Guard Drawing 400 WAGB 3803-9, Rev S, Vent & A/C Arrg 01 Lvl Fr 67 Fwd

Coast Guard Drawing 400 WAGB 3803-14, Rev H, Vent & A/C Arrg Mn Dk Fr 25-57 (S)

Coast Guard Drawing 400 WAGB 3803-15, Rev G, Vent & A/C Arrg Mn Dk Fr 57-85 (P)

Coast Guard Drawing 400 WAGB 3803-16, Rev G, Vent & A/C Arrg Mn Dk Fr 57-85 (S)

Coast Guard Drawing 400 WAGB 3803-35, Rev C, Vent & A/C Heating & Cooling Load Calculations

Coast Guard Drawing 400-WAGB 4200-1, Rev G, A/D Lifting Gear Motor & Gear Rms

Coast Guard Drawing FL 6713-203, Rev D, CRP-V850 Transducer (SS505) Adapter Assembly

Coast Guard Drawing FL-1204-3, Rev A, Fleet Welded Padeyes and Links

Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem

Coast Guard Fleet Drawing FL 2804-022, Rev A, Consolidated Visual ID for Cutters (Vessels 65 ft and

Over in Length)

Coast Guard Drawing FL-184-002, Rev B, SS164 Shallow Water Transducer Adapter Assembly

Coast Guard Drawing FL-6713-203, Rev. D, CRP-V850 SST XDCR, (SS505) Adapter Assembly

NAVSEA Drawing 803-5184182, Rev B, Insulation, Passive Fire Protection- Installation Details

NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation for Compartments Installation

Details

NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes

Coast Guard Drawing 400 WAGB 5801-2, Rev F, Diagram Distilling Plant

Coast Guard Drawing 400-WAGB-3902-1, Rev B, Machinery Insulation Schedule

Coast Guard Drawing 400-WAGB 3902-2, Rev E, Piping Insulation Schedule

Coast Guard Drawing 400-WAGB-424-001, Rev. A, Doppler Speed Log Installation

Coast Guard Drawing 400-WAGB-423-011, Rev 7.0, 1SG38-SINS2(V)49/AIS(V)2 Installation BWD and Details

SINS-2(V)49 Block Diagram CGC POLAR STAR (WAGB-399

Coast Guard Drawing 400-WAGB 4800-17, Rev F, Steer Gear Interconn Hyd Piping

Coast Guard Drawing 400 WAGB 4112-8, Rev S, Arrangement Compressed Air Diesel Engine Starting

Coast Guard Drawing 400 WAGB 4112-9, Rev G, Diagram of Engine Starting, Clutch, & G.T. Fuel

Atomizing Air

Coast Guard Drawing 400 WAGB 4112-220, Rev A, Rip Arrangement Starting Air System Modifications

– POLAR STAR

xi (Rev-0)

Coast Guard Drawing 400 WAGB 4112-221, Rev A, Rip Diagram Starting Air System Modifications –

POLAR STAR

Coast Guard Drawing 400 WAGB 4901-8, Rev R, Diagram of Compressed Air System

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3,Jan 2014, Coatings and Colors Manual

Coast Guard Technical Publication (TP) 1991, 2019, Engineers Operating Manual Coast Guard Technical

Publication (TP) 1992, Engineers Operating Manual

Coast Guard Technical Publication (TP) 1994A, 29-JAN-19, Ship Information Book - Piping, Ventilation, Heating and Air Conditioning System

Coast Guard Technical Publication (TP) 1994B, 31-JAN-19, Ship Information Book - Piping, Ventilation, Heating and Air Conditioning System

Coast Guard Technical Publication (TP) 2029, Manufacturer's Instruction Book - SWBS Group(s) 242-

Coast Guard Technical Publication (TP) 2029, Manufacturer's Instruction Book - SWBS Group(s) 243-

Coast Guard Technical Publication (TP) 2029, Prop Shaft

Coast Guard Technical Publication (TP) 2031, SWBS 500, Section A, 1971, Group Control Center

Coast Guard Technical Publication (TP) 2031, SWBS 500, Section B, 1974, Group Control Center, Parts/Material List

Coast Guard Technical Publication (TP) 2032, 23-JAN-15, Manufacturer's Instruction Book – SWBS

Group(s) 500

Coast Guard Technical Publication (TP) 2033, 26-MAR-19, Manufacturer's Instruction Book-SWBS

Group(s) 503-510

Coast Guard Technical Publication (TP) 2033, Manufacturer's Instruction Book-SWBS Group(s) 503-510

Coast Guard Technical Publication (TP) 2034A, SWBS 512, Jan 2020, Ventilation Fans, Buffalo Forge

Coast Guard Technical Publication (TP) 2035, SWBS 517, Section A, Rev -, Auxiliary Boiler

Coast Guard Technical Publication (TP) 2036, SWBS 531, Section A, Rev -, Distilling Plant

Coast Guard Technical Publication (TP) 344_261_A, 02/18/2000, FOP Model USPX 413 – Operation, Maintenance & Repair Manual

Coast Guard Technical Publication (TP) 344_261_B, 02/18/2000, FOP Model USPX 413 – FOP –

Technical Manual for Ancillary Equipment

Coast Guard Technical Publication (TP) 2037, SWBS 555, Section C, Fire Extinguishing System CO2

Coast Guard Technical Publication (TP) 2039, Manufacturer's Instruction Book-SWBS Group(s) 651

Coast Guard Technical Publication (TP) 2042, Manufacturer's Instruction Book - SWBS Group 772

Coast Guard Technical Publication (TP) 2761, 1984, Nomex Joiner Bulkheads Repair Manual

Coast Guard Technical Publication (TP) 3205, Manufacturer's Instruction Book-SWBS Group(s) 582

Coast Guard Technical Publication (TP) 3255, Gas Turbine

Coast Guard Technical Publication (TP) 3442, FOP Model USPX 413 – Operation, Maintenance &

Repair Manual

Coast Guard Technical Publication (TP) 3442-261-A, FOP Model USPX 413 – Operation, Maintenance

& Repair Manual

Coast Guard Technical Publication (TP) 3442-261-B, FOP Model USPX 413 – Operation, Maintenance

& Repair Manual

Coast Guard Technical Publication (TP) 3443A, 03/17/2017, Lube Oil Purifier (LOP) Model WHPX 405 xii (Rev-0)

Coast Guard Technical Publication (TP) 3443A, 2017, Lube Oil Purifier (LOP) Model WHPX 405

Coast Guard Technical Publication (TP) 4390A, Coupling, Flexible Diaphragm

Coast Guard Technical Publication (TP) 4391, Manufacturer's Instruction Book-SWBS Group(s) 235

Coast Guard Technical Publication (TP) 4391, Manufacturer's Instruction Book-SWBS Group(s) 235-241

Coast Guard Technical Publication (TP) 4391, Propulsion A.C. Generator

Coast Guard Technical Publication (TP) 4391, Propulsion Generator and Main Motor

Coast Guard Technical Publication (TP) 4391, Reduction Gear

Coast Guard Technical Publication (TP) 4391, SWBS 235, Section A, Propulsion A.C. Generator

Coast Guard Technical Publication (TP) 4395, 2019, SWBS 243 Propulsion Shafting and CPP System

Coast Guard Technical Publication (TP) 4395, Manufacturer's Instruction Book-SWBS Group(s) 243

Coast Guard Technical Publication (TP) 4397A, 2016, Ship Service Diesel Generator (SSDG) –Generator

Coast Guard Technical Publication (TP) 4397A, Ship Service Diesel Generator (SSDG) - Generator

Coast Guard Technical Publication (TP) 4411, Manufacturer's Instruction Book-SWBS Group(s) 561

Coast Guard Technical Publication (TP) 4415, Manufacturer's Instruction Book, 2012, SWBS 581

Section A Anchor Handling and Stowage Systems

Coast Guard Technical Publication (TP) 4415, SWBS 581, Section A, Anchor Windlass System

Coast Guard Technical Publication (TP) 4650, 2019, Main Propulsion Diesel Engine – Model 251 – 16

Cylinder, Ops & Maint. Manual.

Coast Guard Technical Publication (TP) 4668, 29-NOV-07, Miranda Davit - Model Mrt 3900

Coast Guard Technical Publication (TP) 4978, Telescoping Boom Crane, Model TB60-60

Coast Guard Technical Publication (TP) 4979, 20-JAN-2019, Knuckle Boom Model K280-70

Coast Guard Technical Publication (TP) 4986, Modified Controllable Pitch Propeller System

Coast Guard Technical Publication (TP) 4989, Manufacturer's Instruction Book - SWBS Group(s) 241

Coast Guard Technical Publication (TP) 4989, Rev -, Main Reduction Gear Drives

Coast Guard Technical Publication (TP) 5502, Fire Suppression I am not sure who packages all of this information, but we will need to tell them to look for this document on the HEALY in CG LIMS. IT is listed there, but not for polar star

System - Model WHDR

Coast Guard Technical Publication (TP) 9168, Pallet Truck - Model E16N-1266-120

Coast Guard Technical Publication (TP) 9168, Pallet Truck - MODEL E16N-1266-120

Coast Guard Technical Publication (TP) LR-H5-001-V0, 2023, Oily Water Separator Model 5015

Coast Guard Technical Publication (TP) S9073-A2-HBK-010, 2005, Resilient Mount Handbook

Fire Prevention and Response

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2022, General

Requirements

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, 2022, Welding and Allied

Processes

Surface Forces Logistics Center Standard Specification 0850 (SFLC Std Spec 0850), 2022, General

Requirements for Drawing Preparation

Surface Forces Logistics Center Standard Specification 0860 (SFLC Std Spec 0860), 2022, General

Requirements for Technical Publication

Surface Forces Logistics Center Standard Specification 2350 (SFLC Std Spec 2350), 2022, Inspect, Test and Recondition DC Generators & Motors In-Place xiii (Rev-0)

Surface Forces Logistics Center Standard Specification 2351 (SFLC Std Spec 2351), 2022 Overhaul DC

Generators & Motors, Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3020, 2022, Overhaul AC

Electrical Motors

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard

Electrical Cable Test

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard

Electrical Cable Removal, Relocation, Splice, Repair, and Installation

Surface Forces Logistics Center Standard Specification 3100 (SFLC Std Spec 3100), 2022, Inspect, Test

And Recondition AC Synchronous Machines In-Place

Surface Forces Logistics Center Standard Specification 3101 (SFLC Std Spec 3101), 2022, Overhaul AC

Synchronous Machines

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary

Machine Systems

Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100, 2022, Clean

Shipboard Ventilation Systems

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire

Prevention and Response

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2022, Install Interior

Deck Covering Systems

Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8364), 2022, Drydocking

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2022, Temporary

Services

Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2022, Temporary

Hull Accesses

Coast Guard Drawing FL-184-002, Rev B, SS164 Shallow Water Transducer Adapter Assembly

OTHER REFERENCES

Abrasive Blast Cleaning

Airmar SS164 Owner’s Guide and Installation Instructions

Airmar Drawing D-14044, Rev. I, SS164 Outline Drawing

Allis Chalmers Corporation (DWG) 9016-T-3; Dowel Pin

Allis Chalmers Corporation (DWG) 9024-F-1; Outer Oil Pipe Detail (Center Shaft)

Allis Chalmers Corporation (DWG) 9024-H-1, Outer Oil Pipe Detail (Wing Shaft)

Allis Chalmers Corporation (DWG) 9024-J-2, Outer Oil Pipe Assy (Center Shaft)

Allis-Chalmers Corporation (DWG) 9025-AG-3, Spacer Ring Rev.( 02)

Allis-Chalmers Corporation (DWG) 9025-AG-3, Spacer Ring, Rev 02

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2019, Disinfection of Water-Storage Facilities

American National Standards Institute/NSF International (ANSI/NSF) 61, 2020, Drinking Water System

Components - Health Effects xiv (Rev-0)

American Society of Mechanical Engineers (ASME) B16.34, 2020, Valves-Flanged, Threaded, and

Welding End

American Society for Nondestructive Testing (ASNT), Recommended Practice No. SNT-TC-1A, 2020, Personnel Qualification and Certification in Nondestructive Testing

American Society for Nondestructive Testing (ASNT), Standard No. ANSI/ASNT CP-189-2020, 2020, ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel

American Society of Mechanical Engineers (ASME) B16.34, 2020, Valves-Flanged, Threaded, and

Welding End

American Welding Society (AWS) B1.10M/ B1.10, 2016, Guide for Nondestructive Examination of

Welds

American Welding Society (AWS) B1.11M/B1.11, 2015, Guide for the Visual Examination of Welds

American Welding Society (AWS) D1.1/D1.1M, 2020, Structural Welding Code – Steel

American Welding Society (AWS) D3.5, 2000, Guide for Steel Hull Welding

Annex 21, Resolution MEPC .285(70), 2016, Amendments to the Revised Guidelines and Specifications for Pollution Prevention Equipment for Machinery Space Bilges of Ships.

ANSI/ASME B40.100-2013, 2013, Pressure Gauges and Gauge Attachments

ANSI/MSS SP-58-2009, 2009, Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation

ASTM Standard Specification A106, March 2021, Standard Specification for Seamless Carbon Steel Pipe for High Temperature Service

ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D1330, Series, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D3359, 2009, Standard Test Methods for Measuring Adhesion by Tape

Test

ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means

ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single-Component

Adhesives (An)

ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component

Adhesives (AN)

ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates

ASTM International D1330, 2004, Standard Specification for Rubber sheet Gaskets.

ASTM International (ASTM) F1508-96, 2016, Standard Specification for Angle Style, Pressure Relief

Valves for Steam, Gas, and Liquid Services

Chockfast Technical Bulletin 632A, Sterntube & Strut Bearings

CHOCKFAST Orange Installation Stern Tube Bearing USCG Polar Class Ice Breaker. 4/8/2005

Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for

Shipyard Employment

Code of Federal Regulations (CFR) Title 29, Part 1910, 2017, Occupational Safety and Health Standards

Code of Federal Regulations (CFR) Title 40, 2013, Protection of the Environment

Code of Federal Regulations (CFR) Title 46, Chapter I, Part 176, Subpart H, Section 810, 2019, Fire

Protection xv (Rev-0)

Code of Federal Regulations (CFR) Title 46, Part 61.05, 2013, Tests and Inspections of Boilers

Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound, Antiseize, Zinc Dust-

Petrolatum

CID A-A-59313, 2019, Thread Compound, Antiseize, Zinc Dust-Petrolatum

Compressed Gas Association, Inc. (CGA) C-6-2007, Standards for Visual Inspection of Steel Compressed

Gas Cylinders

Eaton Hydraulics LLC, Filtration Division, Installation, Operation & Maintenance Manual Model 570

Duplex Basket Strainer, 06/2011

Eaton Hydraulics LLC, Filtration Division, Installation, Operation & Maintenance Manual Model 570

Duplex Basket Strainer, 06/2011

Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections

Federal Specification (Fed Spec) QQ-N-281D (2), Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections

Federal Specification (Fed Spec) QQ-N-281D(2), Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections

Federal Specification (Fed Spec) QQ-N-281D Amendment 2, 2020, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip Wire, Forgings, and Structural and Special Shaped Sections

Federal Specification (Fed Spec) RR-C-271H w/ Attachment 1, Series, Chain and Attachments, Carbon and Alloy Steel

GAS TURBINE MODULE INTERFACE CONNECTIONS 400’ POLAR ICEBREAKER MPL-1274-

13.0 (DRAWING FROM TP 3255)

General Specifications for Overhaul of Surface Ships (GSO), 2004, Section 581 Anchor Stowage and

Handling

Gooseneck Renewal.pdf

IEEE Std 56-2016, IEEE Guide for Insulation Maintenance of Electric Machines

IEEE Std 62.2-2005, Guide for Diagnostic Field Testing Electrical Machinery

IEEE Std 43-2013, IEEE Recommended Practice for Testing Insulation Resistance of Electric Machinery

IEEE Std 2455-2023, IEEE Recommended Practice for the Repair and Maintenance of Direct Current

Electric Machines

International Organization for Standardization (ISO) 4406, 7/13/2004, Hydraulic Fluid Power -- Fluids --

Method for Coding the Level of Contamination by Solid Particles

International Organization for Standardization (ISO) 4406, 7/13/2004; Hydraulic Fluid Power -- Fluids --

Method for Coding the Level of Contamination by Solid Particles

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2019 Edition, Pressure Testing Of Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service

Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2019 Edition, Bronze Gate, Globe, Angle and Check Val

MIL PRF-16173 w/Interim Amendment 2, 2017, Corrosion Prevention Compound, Solvent Cut Back, Cold Application

MIL-A-21016, May 1990, Adhesive, Resilient Deck Covering xvi (Rev-0)

MIL-A-22262B Amendment 2, 2021, Abrasive Blasting Media Ship Hull Blast Cleaning

MIL-C-24633A, 2014, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded

MIL-C-24757, Nov 1990, Cloth, Fiberglass, Coated

Military Specification MIL-C-20079, July 1987, Cloth, Glass; Tape, Textile Glass; And Thread, Glass and Wire-Reinforced Glass

MIL-D-18873, Jul 1982, Deck Covering Magnesia Aggregate Mixture

MIL-D-21631, Dec 1990, Deck Covering, Latex Concrete

MIL-D-23134, Jul 1999, Deck Underlay and Covering, Insulating, Magnesia Aggregate Mixture

MIL-DTL-23549D, 2021, Grease, General Purpose

CID A-A-59313, 2019, Thread Compound, Antiseize, Zinc Dust-Petrolatum

MIL-A-18001, 2015, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)

Military Detail Specification MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially

Accepted - ASTM B418)

Military Detail Specification MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast

Cleaning

Military Detail Specification MIL-D-16791, Rev G, Detergents, General Purpose (Liquid, NonIonic)

Military Detail Specification MIL-I-24092, Rev A, Insulating Resin, Solventless, Baking, Semi-Rigid, for

Dip Processing, Grade SH, Class 155 to 200 Thermal Class

Military Detail Specification MIL-I24092/1, Sep 1993, Insulating Varnish, Solvent Containing Air-Dry for Spot Patching and Emergency Repairs. Grade CA, Class 130 and 155 Thermal Class

Requirements

Military Detail Specification MIL-R-21252B, May 1991, Rubber Sheet, Solid, Synthetic, Shipboard

Water Evaporator Gasketing

Military Performance Specification MIL-PRF-1149, Jun 1998, Gasket Materials, Synthetic Rubber, 50 and 65 Durometer

Military Performance Specification MIL-S-45180, 1998, Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant

MIL-PRF-24176C, 2020, Cement, Epoxy, Metal Repair and Hull Smoothing

MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric

MIL-PRF-3135, Nov 1986, Deck Covering Underlay Materials

MIL-PRF-900, 2020, Rubber Gasket Material, 45 Durometer Hardness

MIL-PRF-900, Mar 1991, Rubber Gasket Material, 45 Durometer Hardness

MIL-S-45180D, 1998, Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant

MIL-STD-1689, Nov 1990, Fabrication, Welding and Inspection of Ships Structure

MIL-STD-1689A, 1990, Fabrication, Welding, and Inspection of Ships Structure

MIL-STD-419, 1987, Cleaning and Protecting Piping Tubing, and Fittings for Hydraulic Power

Transmission Equipment

MIL-STD-777, 2012, Schedule of Piping, Valves, Fittings, and Associated Piping Components for Naval

Surface Ships.

MIL-STD-2199B(SH), Jul 2010, Coverings for Waterborne Main Propulsion Shafting on U.S. Naval

Surface Ships and Submarines.

MIL-STD-3026A, 2017, Chemical Cleaning of Sewage Collection Piping Systems on Navy Surface Ships

Military Specification MIL-T-16420K, April 1978, Tube, Copper-Nickel Alloy, Seamless and Welded

Military Specification MIL-T-24108B, October 1987, Tube, Copper (Seamless) xvii (Rev-0)

National Board of Boiler and Pressure Vessel Inspectors (NBBI), NBIC, 2023, National Board Inspection

Code

National Fire Protection Association (NFPA) 12, 2018, Standard on Carbon Dioxide Extinguishing

Systems

National Fire Protection Association (NFPA) 12A, 2018, Standard on Halon 1301 Fire Extinguishing

Systems

National Fire Protection Association (NFPA) 17A, 2017, Standard for Wet Chemical Extinguishing

Systems

Naval Sea Systems Command (NAVSEA) S9555-AT-MMA-010, Rev 4, Technical Manual for HALON

1301 Fixed Fire Extinguishing System, Naval Sea Systems Command (NAVSEA) Technical Publication T9074-AS-GIB-010/271, Apr 1997, Requirements for Nondestructive Testing Methods

Naval Sea Systems Command (NAVSEA) Technical Publication,T9074-AS-GIB-010/271, Apr 1997, Requirements for Nondestructive Testing Methods

Naval Sea Systems Command (NAVSEA)Technical Publication T9074-AS-GIB-010/271, Apr 1997, Requirements for Nondestructive Testing Methods

Naval Sea Systems Command (NAVSEA)Technical Publication T9074-AS-GIB-010/271, Requirements for Non-Destructive Testing Methods

Naval Sea Systems Command (NAVSEA) Instruction S9AA0-AB-GOS-010 General Specifications for

Overhaul of Surface Ships (GSO)

Naval Sea Systems Command (NAVSEA) Type and Standard Drawing 804-8436625, Rev -, Safety

Nets, Deck Edge, Aluminum Frame, Synthetic Net

Naval Ships Technical Manual (NSTM) Chapter 079, Practical Damage Control

Naval Ships Technical Manual (NSTM), Chapter 581, Anchoring

Naval Ships Technical Manual S9086-GY-STM-010, 2021, Chapter 221

Naval Ships’ Technical Manual (NSTM) Ch 244, 2011, Propulsion Bearings and Seals

NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation

Details

NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation

Details

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for

Fabrication, Welding, and Inspection of Submarine Structure

NAVSHIP Dwg 810-138579, Rev. F, Deck Drain Fittings

Preparation Standard SSPC-SP 10 (WAB)/NACE WAB-2, 2015, Near-White Metal Wet

Preparation Standard SSPC-SP 11 2013, Power Tool Cleaning to Bare Metal

Rucker Control System Drawing 82002-J-044, Anchor Windlass Assy. Icebreaker Machinery

Rucker Control System Drawing 82002-J-738, Control Valve, Operator Arrangement

S9086-S4-STM-010/CH-556R4 Hydraulic Equipment Power Transmission and Control

SAE International (SAE) AMS-STD-595A, 2017, Colors Used in Government Procurement

SNT-TC-1A, 2016, Recommended Practice for Personnel Qualification and Certification in

Nondestructive Testing

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 1998, Cork and

Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Corkand

Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets xviii (Rev-0)

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183A, 2013, Cork and Rubber Composition Sheet, For Aromatic Fuel and Oil Resistant Gaskets

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183A, 2019, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183B, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets

Society of Automotive Engineers (SAE) J1273, 2014, Recommended Practices for Hydraulic Hose

Assemblies

Society of Automotive Engineers (SAE)/Aerospace Material Specification (AMS) C 6183, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets

Society Of Naval Architects and Marine Engineers (SNAME) T&R 3-39, Guide for Shop and Installation

Tests

Society Of Naval Architects and Marine Engineers (SNAME) T&R 3-47, Guide for Sea Trials

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2016, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), Solvent

Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2014, Power Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2020, Bare Metal Power Tool Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), Power Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.15 (SSPC-SP 15), 2004, Commercial Grade Power Tool Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2018, Power Tool Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), Power

Tool Cleaning)

The Society for Protective Coatings (SSPC), August 2016, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements

The Society for Protective Coatings (SSPC), Paint Application Specification No. 2 (PA-2), Procedure for

Determining Conformance to Dry Coating Thickness Requirements

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP 10 (WAB)/NACE WAB-2, 2015, Near-White Metal Wet Abrasive Blast

Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP WJ-4/NACE WJ-4, 2017, Waterjet Cleaning of Metals – Light Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP 10/NACE No.2, 2007, Near-White Metal Blast Cleaning xix (Rev-0)

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by

Waterjetting Prior to Recoating

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP 10 (WAB)/NACE WAB-2, 2015, Near-White Metal Wet Abrasive Blast

Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP 6 (WAB)/NACE WAB-3, 2015, Commercial Abrasive Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP WJ-2/NACE WJ-2, 2016, Waterjet Cleaning of Metals – Very Thorough

Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface

The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP

10/NACE No.2, 2004, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation

Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning

The Society for Protective Coatings SSPC-SP 10/NACE No.2, Jan 2007, Near-White Metal Blast

Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP WJ-4/NACE WJ-4, 2012, Waterjet Cleaning of Metals – Light Cleaning

The Society for Protective Coatings SSPC-SP 10/NACE No.2, Near-White Blast Cleaning

The Society for Protective Coatings SSPC-SP 11, Nov 2013, Power Tool Cleaning to Bare Metal

Thordon Double Key XL Bearing Installation Manual 10 May 2006

Thordon XL Double Key Bearing Assembly DWG No. TG-17321 (Thordon Bearing Inc.)

Thordon XL Double Key Bearing Carrier DWG No. TG-17344 (Thordon Bearing Inc.)

USCG Polar Class Aft Sterntube Bearing Design Study, Final Report, September 16, 2005

USCG Polar Class Propulsion Shaft 2005 Alignment Plan Report, Oct 27, 2005

US Environmental Protection Agency Method 1664, Feb 1999, N-Hexane Extractable Material and Silica

Gel Treated N-Hexane Extractable Material by Extraction and Gravimetry.

Westinghouse Drawing 639F283

Westinghouse Drawing 7142D39

Westinghouse Torque Table xx (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY

EST COST

($/UNIT)

8 Y

*POLAR Propeller Flange-end

Lifting Fixture, including 4 (ea) 4in x 6in bolts for one Fixture

N/A 1 $5,000.00

8 Y *POLAR Propeller Shipping

Cradles: 6,500 lbs, 12'W x 17' L N/A 2 $34,250.00

8 Y

*POLAR Propeller Cylinder-end

Lifting Fixture, including 8 (ea)

1.5in x 4in bolts

N/A 1 $5,000.00

8 Y POLAR Righthand Controllable

Pitch Propeller: 88,000 lbs Escher Wyss 1 $3,500,000.00

8 Y **Centrax Bulkhead Carbon sealing Elements Tyton Div Fematics, Canada 2 $10,250.00

8 Y **Half Cage and Roller Assembly

(Lower) Cooper Bearing Co. 2 $120,000.00

8 Y **Bottom Half Outer Race Cooper Bearing Co. 2 $90,000.00

8 Y **Inner Race Halves (Lower) Cooper Bearing Co. 2 $40,000.00

8 Y **Inner Race Halves (Upper) Cooper Bearing Co. 2 $400,000.00

8 Y **Half Cage and Roller Assembly

(Upper) Cooper…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .