The file's text, extracted by GovTribe without its formatting.
ATTACHMENT F
BUILDINGS 1 & 2 DRAWINGS/ROOM NUMBERS//ACM-LEAD LOCATIONS
E-55
E-56
E-57
E-58
| _10878160 USCG FINAL DB-RFP STA-FMB REBUILD & WATERFRONT (06 October FINAL R3) (28 July 2020 R1) |
| 10878160 - DB RFP Cover STA-FMB |
| 10887160 - Table of Contents STA-FMB |
| 10887160 - Design Build Criteria - Specfications |
| 10878160_SECTION 01110 Design Build General Paragraphs |
| 10878160_SECTION 01115 Dedication Plaque |
| 10878160_SECTION 01200 Design Build Prog Paymts |
| 10878160_SECTION 01320 Design Build Prog Schd Complex Projects |
| 10878160_SECTION 01330 Submittal Procedures |
| 10878160_SECTION 01450 Quality Control |
| 10878160_SECTION 01500 Temp COR Facilities and Equp |
| 10878160_SECTION 01505 Project Meetings |
| 10878160_SECTION 01781 O and M Documentation |
| 01781 APPENDIX O and M - Part 1 |
| 01781 APPENDIX O and M - Part 2 |
| 01781 APPENDIX O and M - Part 3 |
| 10878160 Section 01800 1 01 Design Build Criteria (ECH & HDR) |
| 10878160 Section 01800 1 02 Role of RFP - Specs Dwgs (ECH) |
| 10878160 Section 01800 1 03 Design Related Permits & Certs (ECH) |
| 10878160 Section 01800 1 04 Civil and Site Work |
| 10878160 Section 01800 1 05 Geotechinical Design |
| 10878160 Section 01800 1 06 Landscape Design (ECH) |
| 10878160 Section 01800 1 07 Architectural Design (ECH) |
| 10878160 Section 01800 1 08 Structural |
| 10878160 Section 01800 1 09 Fire |
| 10878160 Section 01800 1 10 Plumbing |
| 10878160 Section 01800 1 11 HVAC |
| 10878160 Section 01800 1 12-1 Electrical |
| 10878160 Section 01800 1 12-2 Electrical-Estimated Load |
| 10878160 Section 01800 1 12-3 Electical One Line Diagram |
| 10878160 Section 01800 1 13-1 Telecommunications Preface |
| 10878160 Section 01800 1 13-2 Telecommunicaitons |
| 10878160 Section 01800 1 14 Security |
| 10878160 Section 01800 1 15 FF&E (ECH) |
| 10878160 Section 01800 1.18 Environmental |
| 10878160 Section 01801_Temporary Facilities |
| 10878160 Section 01802_Construction Design Docs |
| 10878160 Section 01803_Record Documents and Drawings |
| 10878160 Section 01900_List of Drawings |
| APPENDIX SECTIONS - A, B, C, D & E |
| Appendix A-ComputerGenDrwgs-Sept2019 |
| Appendix B -ElectDeliv-Sept2019 |
| Appendix C -FDCC File Naming-SEP 2019 |
| Appendix D - Design Narrative-Sept2012 |
| Appendix E - Industry Standards for Const Docs-Sept2012 |
| APPENDIX SECTIONS - F & G |
| APPENDIX F - 10878160 - A100 STA-FMB SPACE ADJACENCY DIAGRAM |
| APPENDIX F - 10878160 - C-101 STA-FMB -Base Bid Layout with Options (2020-07-22) |
| APPENDIX F - 10878160 - C-102 STA-FMB - Site Criteria Plan (2020-07-22) |
| APPENDIX F - 10878160 - M-SERIES STA-FMB (2020-07-22) |
| M-01 PLAN-M-01 OVERALL SITE PLAN |
| M-01A PLAN-M-01 OVERALL SITE PLAN |
| M-02 SECTIONS-M-02 TYPICAL SECTIONS |
| M-03 UTILITIES-M-03 UTILITIES |
| M-05 UTILITIES-M-04 UTILITIES |
| APPENDIX G 10878160 BFR & SPACE CRITERIA SHEETS |
| BFR - STA-Fort Myers Beach - 3 pages |
| SPACE CRITERIA SHEETS - 97 pages |
| BID OPTION 1 - MSD OFFICE SUITE (pages 94-97) |
| ATTACHMENT SECTIONS - A, B, C, D & E |
| ATTACHMENT A - (ELECTRONIC ON DVD ONLY) - NO CONTENT IN THIS DOCUMENT |
| ATTACHMENT B - 10878160 - USCG - Ft Myers_10878160_Survey_FINAL 20 May2020 |
| V001 Survey As-Built - Shore Work (p.1) |
| V001 Survey As-Built - Waterfront Workf (p.2) |
| V002 |
| V003 |
| ATTACHMENT C - 10878160 - USCG-Ft Myers Beach_10878160_Waterfront Inspection FINAL Report 04-02-2020 |
| COVER |
| Summary of Work |
| Findings |
| 41 Pier Floating Dock (RPUID 10694) and 41 UTB Pier (RPUID 10713) |
| Bulkhead (RPUID 10708) |
| Travel Lift Pier (RPUID 10709) and Travel Lift Floating Dock (RPUID 10714) |
| Visiting Ship Pier (RPUID 10711) |
| WPB Pier (RPUID 10712) |
| Whip Antenna T01 Pier (RPUID 811064) |
| ATTACHMENTS D - 10878160 -FIIELD SURVEYS - SHORE AND WATERFRONT |
| ATTACHMENT D.1 10878160 - USCG - Ft_Myers_10878160_Geotechnical_Report_FINAL 17May2020 |
| 1.0 INTRODUCTION |
| 1.1 Project Information |
| 1.2 Scope of Work |
| 2.0 DATA GATHERING |
| 2.1 Data Review |
| 2.2 Site Description |
| 2.3 Field Exploration |
| 2.4 Test Pits |
| 2.5 Laboratory Testing |
| 3.0 SUBSURFACE CONDITIONS |
| 3.1 Site and Area Geology |
| 3.2 Soil Survey Information |
| 3.3 Interpreted Stratigraphy |
| 3.3.1 Strata 1 – Reworked/Densified Sands |
| 3.3.2 Strata 2 – Very Loose Sand |
| 3.3.3 Strata 3 – Loose to Medium Dense Sand |
| 3.3.4 Strata 4 – Silty or Clayey Sand and Sandy Silt |
| 3.4 Groundwater |
| 4.0 CONCLUSIONS AND RECOMMENDATIONS |
| 4.1 Demolition |
| 4.2 Site Preparation |
| 4.2.1 Excavation |
| 4.2.2 Fill Placement |
| 4.2.3 Surface and Groundwater Control |
| 4.3 Building Foundations (Driven Piles) |
| 4.3.1 Pile Capacity |
| 4.3.2 Pile Interaction |
| 4.3.3 Pile Splicing |
| 4.3.4 Pile Testing Program |
| 4.4 Minor Structure Foundations |
| 4.5 Bulkhead Design |
| 4.5.1 Design Parameters |
| 4.5.2 Deadman Anchors |
| 4.5.3 Grouted Soil Anchors |
| 4.5.4 Environmental Corrosion Classification |
| 4.6 Pavement Design |
| 4.7 Construction Inspection and Testing |
| 5.0 REPORT LIMITATIONS |
| 6.0 CLOSURE |
| ATTACHMENT D.2 10878160 - USCG -Ft_Myers_10878160_Env_Soils_Report_FINAL 17May2020 |
| Report Cover |
| Letter |
| 1.0 INTRODUCTION |
| 2.0 ENVIRONMENTAL SOIL SAMPLING |
| 3.0 CONCLUSIONS |
| 4.0 LIMITATIONS |
| FIGURES |
| TABLES |
| APPENDICES |
| ATTACHMENT D.3 10878160 - USCG_Ft_Myers_10878160_Hydrant_Flow_Report_FINAL 17May2020 |
| Letter Report |
| Hydrant Flow Testing Cover Sheet |
| Hydrant Flow Test Field Sketch |
| Test #1 – One Outlet |
| Test #2 – Two Outlets |
| Test #3 – One Outlet |
| Test #4 – Two Outlets |
| ATTACHMENT D.4 10878160 -USCG_Ft_Myers_10878160_Hazmat_Report_FINAL 17May2020 |
| HAZARDOUS MATERIALS REPORT |
| Attachment A - CERTIFICATIONS |
| Attachment B - XRF UNIT CALIBRATION DATA AND RESULTS |
| Attachment C - ASBESTOS SAMPLE ANALYSIS RESULTS |
| Attachment D - PHOTOGRAPHIC DOCUMENTATION |
| Attachment E (1) - HAZARDOUS MATERIALS OBSERVATIONS |
| Attachment E (2) - HAZARDOUS MATERIALS OBSERVATIONS |
| Attachment F - BUILDINGS 1 & 2 DRAWINGS/ROOM NUMBERS//ACM-LEAD LOCATIONS |
| ATTACHMENT D.5 10878160 -USCG_Ft_Myers_10878160_Benthic_Survey_Report |
| Cover |
| Table of Contents |
| 1.0 Introduction |
| 2.0 Existing Conditions |
| 3.0 Methods |
| 4.0 Results |
| 5.0 Conclusion |
| 6.0 References |
| Tables |
| Figures |
| Appendix A |
| Appendix B |
| ATTACHMENT E - Draft National Environmental Policy Act (NEPA) Document |
| _10878160 ATTACHMENT E - STA-FMB_Compiled Draft EA & Appendices_100120 |
| Fort Myers Beach_Draft EA_091020 |
| CONTENTS |
| APPENDICES |
| ACRONYMS AND ABBREVIATIONS |
| SECTION 1 PURPOSE AND NEED FOR ACTION |
| 1.1 Introduction |
| 1.2 Background |
| 1.3 Overview |
| 1.3.1 USCG Mission |
| 1.3.2 Sector St. Petersburg |
| 1.3.3 Station Fort Myers Beach |
| 1.3.3.1 Existing Facilities |
| 1.3.3.2 Existing Vessels |
| 1.4 Surrounding Land Uses |
| 1.5 Purpose of the Proposed Action |
| 1.6 Need for the Proposed Action |
| 1.7 Agency and Public Involvement Process |
| 1.8 Summary of Environmental Study Requirements |
| 1.8.1 National Environmental Policy Act |
| 1.8.2 Endangered Species Act |
| 1.8.3 Magnuson-Stevens Fishery Conservation and Management Act |
| 1.8.4 Marine Mammal Protection Act |
| 1.8.5 Clean Air Act and Conformity Requirements |
| 1.8.6 Wetland and Water Resources Regulatory Requirements |
| 1.8.7 National Pollutant Discharge Elimination System Program |
| 1.8.8 Coastal Zone Consistency Determination |
| 1.8.9 Cultural Resources Regulatory Requirements |
| 1.8.10 Invasive Species |
1.9 Scope of the Environmental Assessment
| SECTION 2 DESCRIPTION OF THE PROPOSED ACTION AND ALTERNATIVES |
| 2.1 Proposed Action |
| 2.1.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| 2.1.1.1 Temporary Relocation |
| 2.1.1.2 Landside Demolition Activities |
| 2.1.1.3 Construction of a Single Consolidated Multi-Mission Building |
| 2.1.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 2.1.2.1 Landside and In-Water Demolition Activities |
| 2.1.2.2 Landside and In-Water Construction Activities |
| Landside Facilities |
| In-Water Facilities |
| Single Floating Finger Pier |
| Boat Ramp / Launch Dock |
| Bulkhead |
2.1.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
| 2.2 No-Action Alternative |
| 2.3 Alternatives Identified but not Carried Forward for Detailed Analysis |
| 2.3.1 Permanent Relocation to Another Location |
| 2.3.2 Demolition and Reconstruction of the In-Water Facilities |
| 2.3.3 Construction of Two Floating Finger Piers |
| 2.4 Construction Requirements |
| 2.4.1 Memorandum of Agreement between Coast Guard Atlantic Area and the National Marine Fisheries Service |
| 2.4.2 USCG Operational Guidance Related to Marine Resources |
| 2.4.3 Sea Turtle and Smalltooth Sawfish Construction Conditions (2006) |
| 2.4.4 Standard Manatee Conditions for In-Water Work (2011) |
| 2.4.5 Soil Management Plan |
| 2.4.6 Additional Construction Best Management Practices |
| SECTION 3 AFFECTED ENVIRONMENT |
| 3.1 Air Quality |
| 3.1.1 Definition of Resources |
| 3.1.1.1 Criteria Pollutants |
| 3.1.1.2 Clean Air Act Amendments |
| 3.1.1.3 Florida Administrative Code |
| 3.1.2 Existing Conditions |
| Regional Air Quality |
| Emissions at Station Fort Myers Beach |
| 3.2 Biological Resources |
| 3.2.1 Definition of Resource |
| 3.2.2 Existing Conditions |
| 3.2.2.1 Terrestrial Biological Resources |
| Vegetation |
| Terrestrial Habitats |
| Terrestrial Wildlife |
| Special Status Species |
| 3.2.2.2 Nesting Birds |
| 3.2.2.3 Aquatic Biological Resources |
| Existing Marine Conditions |
| Benthic Resources |
| Seagrasses |
| Invertebrates |
| Algal Communities |
| Critical Habitat |
| Essential Fish Habitat |
| Essential Fish Habitat |
| Aquatic Species |
| Special Status Aquatic Species |
3.2.2.4 Invasive Species
| 3.3 Geological Resources |
| 3.3.1 Definition of Resource |
| 3.3.2 Existing Conditions |
| Geology |
| Topography |
| Soils |
| Geologic Hazards |
| Sinkholes |
| Flooding and Erosion |
| Problem Soils |
| Geochemical Hazards |
| Tsunami |
| 3.4 Hazardous Materials and Wastes |
| 3.4.1 Definition of Resource |
| 3.4.2 Existing Conditions |
| 3.4.2.1 Hazardous Materials and Wastes in the Vicinity of Station Fort Myers Beach |
| 3.4.2.2 Hazardous Materials and Wastes at Station Fort Myers Beach |
| Soil Contamination at Station Fort Myers Beach |
| Asbestos-Containing Material at Station Fort Myers Beach |
| Lead-Based Paint at Station Fort Myers Beach |
| 3.5 Land Use and Recreation |
| 3.5.1 Definition of Resource |
| 3.5.2 Existing Conditions |
| 3.5.2.1 Land Use |
| Coastal Zone |
3.5.2.2 Recreation
| 3.6 Water Resources |
| 3.6.1 Definition of Resource |
| 3.6.1.1 Upland Surface Water |
| 3.6.1.2 Groundwater |
| 3.6.1.3 Wetlands |
| 3.6.1.4 Floodplains |
| 3.6.1.5 Marine Waters |
| 3.6.1.6 Shorelines |
| 3.6.1.7 Stormwater Management |
| 3.6.2 Existing Conditions |
| Upland Surface Waters |
| Marine Waters and Shorelines |
| Groundwater |
| Wetlands |
| Floodplains and Flood Hazards |
| Sea Level Rise |
| 3.7 Visual Resources |
| 3.7.1 Definition of Resource |
| 3.7.2 Existing Conditions |
| San Carlos Island |
| Station Fort Myers Beach |
| Historic Structures |
| SECTION 4 ENVIRONMENTAL CONSEQUENCES |
| 4.1 Air Quality |
| 4.1.1 Approach to Analysis |
| 4.1.2 Impacts from the Action Alternatives |
| 4.1.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Short-term Construction Emissions |
| Fugitive Dust Emissions |
| Combustion Emissions |
| Long-term Operational Emissions |
| General Conformity |
| 4.1.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.1.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.1.3 Impacts from the No-Action Alternative |
| 4.1.4 Special Procedures |
| 4.2 Biological Resources |
| 4.2.1 Approach to Analysis |
| 4.2.2 Impacts from the Action Alternatives |
| 4.2.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Terrestrial Biological Resources |
| Vegetation |
| Special Status Species |
| Migratory Birds |
Aquatic Biological Resources
| 4.2.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| Terrestrial Biological Resources |
| Aquatic Biological Resources |
| Turbidity |
| Underwater Noise |
| Essential Fish Habitat and Benthic Resources |
| Special Status Species |
Invasive Species
| 4.2.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| Terrestrial Biological Resources |
| Aquatic Biological Resources |
| 4.2.3 Impacts from the No-Action Alternative |
| 4.2.4 Special Procedures |
| Bats |
| Nesting Birds |
| Water Quality |
| Noise and Turbidity |
| Invasive Species |
| 4.3 Geological Resources |
| 4.3.1 Approach to Analysis |
| 4.3.2 Impacts from the Action Alternatives |
| 4.3.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Geology and Topography |
| Soils |
| Geologic Hazards |
| 4.3.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.3.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.3.3 Impacts from the No-Action Alternative |
| 4.3.4 Special Procedures |
| 4.4 Hazardous Materials and Wastes |
| 4.4.1 Approach to Analysis |
| 4.4.2 Impacts from the Action Alternatives |
| 4.4.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Hazardous Materials and Waste Storage and Generation |
| Soil Contamination |
| Asbestos and Lead |
| 4.4.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.4.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.4.3 Impacts from the No-Action Alternative |
| 4.4.4 Special Procedures |
| 4.5 Land Use and Recreation |
| 4.5.1 Approach to Analysis |
| 4.5.2 Impacts from the Action Alternatives |
| 4.5.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| 4.5.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.5.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.5.3 Impacts from the No-Action Alternative |
| 4.5.4 Special Procedures |
| 4.6 Water Resources |
| 4.6.1 Approach to Analysis |
| 4.6.2 Impacts from the Action Alternatives |
| 4.6.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Surface Waters and Marine Waters |
| Short-term Construction Impacts |
| Long-term Operational Impacts |
| Groundwater |
| Wetlands |
| Floodplains and Sea Level Rise |
| 4.6.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| Surface Waters and Marine Waters |
| Short-term Construction Impacts |
| Long-term Operational Impacts |
| Groundwater |
| Wetlands |
| Floodplains and Sea Level Rise |
4.6.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
| 4.6.3 Impacts from the No-Action Alternative |
| 4.6.4 Special Procedures |
| Water Quality |
| Hazardous Materials and Wastes |
| 4.7 Visual Resources |
| 4.7.1 Approach to Analysis |
| 4.7.2 Impacts from the Action Alternatives |
| 4.7.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Construction-Related Impacts |
| Operations-Related Impacts |
| 4.7.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| Construction-Related Impacts |
| Operations-Related Impacts |
4.7.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
| 4.7.3 Impacts from No-Action Alternative |
| 4.7.4 Special Procedures |
| SECTION 5 CUMULATIVE IMPACTS |
| 5.1 Projects Considered |
| 5.2 Evaluation of Cumulative Effects |
| Air Quality |
| Biological Resources |
| Geological Resources |
| Hazardous Materials and Wastes |
| Land Use and Recreation |
| Water Resources |
| Visual Resources |
| SECTION 6 SUMMARY OF FINDINGS |
| SECTION 7 SPECIAL PROCEDURES |
| Air Quality |
| Biological Resources |
| Bats |
| Nesting Birds |
| Noise and Turbidity |
| Invasive Species |
| Hazardous Materials and Wastes |
| Water Resources |
| Water Quality |
| SECTION 8 REFERENCES |
| SECTION 9 LIST OF PREPARERS |
| Appendix A_Compiled |
| A2_NOA_082020 |
| A3_Intergovernmental Review Letter_091020 |
| A4_Fort Myers NMFS (Signed)_v2 |
| A5_NMFS Letter Enclosures |
| A6_NMFS Summary of Potential Effects |
| A7_Fort Myers USFWS (Signed) |
| A8_USFWS Letter Enclosures |
| A9_USFWS Summary of Potential Effects |
| A10_Fort Myers SHPO (Signed) |
| A12_Fort Myers THPO Letters (Signed) |
| A13_THPO Letter Enclosures |
| A14_USCG_Ft_Myers_CZ Signed Consultation Package (9-17-2020) |
| Appendix B_Compiled |
| B1_Appendix B Table of Contents |
| Appendix B |
| Table of Contents |
| B2_Combined Appendix B |
| FNAI_Unofficial_Grid_Result.pdf |
| Official IPAC Species List.pdf |
| United States Department of the Interior |
| FISH AND WILDLIFE SERVICE |
| Official Species List |
| Project summary |
| Endangered Species Act species |
| Mammals |
| Birds |
| Reptiles |
| Fishes |
| Insects |
| Flowering Plants |
| Critical habitats |
| T&E photopages.pdf |
| 20130425_gd_Appendix B_2011_Standard Manatee Construction Conditions |
| SeaTurtleAndSawfishConstructionConditions23mar2006.pdf |
| national marine fisheries service |
| B3_USCG_Ft_Myers_10878160_Benthic_Survey_Report |
| B4_USCG_Ft_Myers_10878160_Wetland_Report |
| 19950124 Permit 362151115.pdf |
| 19950726 Permit and Drawings.pdf |
| 19970421 Survey Drawing.pdf |
| 19980825 Pier Extension Permit.pdf |
| 20080818 Permit 0128497006EG Permit and drawings.pdf |
| 20080918 Lee County Dock Reconfiguration permits and drawings.pdf |
| 20120906 Permit Info 0128497006EG permits and drawings.pdf |
| B5_Biological Opinion-2017 |
| B6_Florida_Manatee_Key_Programmatic_Biological_Opinion |
| Appendix C_Compiled |
| C1_Appendix C Table of Contents |
| Appendix C |
| Table of Contents |
| C2_USCG_Ft_Myers_10878160_Cultural_Resources_Report - Copy |
| 1.0 PROJECT AREA |
| 2.0 SCOPE OF WORK REVIEW |
| 3.0 CULTURAL CONTEXT |
| 4.0 HISTORIC MAP/PHOTOGRAPHY AND BACKGROUND RESEARCH |
| 4.1 Historic Maps/Photography |
| 4.2 Archaeological Background Research |
| 4.3 Historic Architectural Background Research |
| 4.4 Site Inspection |
| 5.0 PROJECT AREA SOILS |
| 6.0 CULTURAL RESOURCE SENSITIVITY AND RECOMMENDATIONS |
| 7.0 REFERENCES |
| ATTACHMENT A |
| Appendix D & E_Compiled |
| D1_Appendix D Table of Contents |
| Appendix D |
| Table of Contents |
| D2_USCG_Ft_Myers_10878160_Environmental_Soils_Report |
| Report Cover |
| Letter |
| 1.0 INTRODUCTION |
| 2.0 ENVIRONMENTAL SOIL SAMPLING |
| 2.1 Soil Assessment |
| 2.2 Soil Analytical Results |
| 3.0 CONCLUSIONS |
| 4.0 LIMITATIONS |
| FIGURES |
| TABLES |
| APPENDICES |
| APPENDIX A - SOIL BORING LOGS |
| APPENDIX B - LABORATORY ANALYTICAL REPORT |
| Cover Page |
| Table of Contents |
| Section 1: Sample Summary |
| Section 2: Summary of Hits |
| Section 3: Sample Results |
| 3.1: FA73669-1: B-3 (0-3) |
| 3.2: FA73669-2: B-3 (4-5) |
| 3.3: FA73669-3: B-3 (5-6) |
| 3.4: FA73669-4: B-2 (0-3) |
| 3.5: FA73669-5: B-2 (4-5) |
| 3.6: FA73669-6: B-2 (5-6) |
| 3.7: FA73669-7: B-4 (0-3) |
| 3.8: FA73669-8: B-4 (4-5) |
| 3.9: FA73669-9: B-4 (5-6) |
| 3.10: FA73669-10: B-1 (0-3) |
| 3.11: FA73669-11: B-1 (4-5) |
| 3.12: FA73669-12: B-1 (5-6) |
| Section 4: Misc. Forms |
| 4.1: Chain of Custody |
| Section 5: MS Volatiles - QC Data Summaries |
| 5.1: Method Blank Summary |
| 5.1.1: V3C392-MB 3C9328.D Method Blank Summary |
| 5.2: Blank Spike Summary |
| 5.2.1: V3C392-BS 3C9327.D Blank Spike Summary |
| 5.3: Matrix Spike/Matrix Spike Duplicate Summary |
| 5.3.1: FA73669-8MS 3C9349.D Matrix Spike/Matrix Spike Duplicate Summary |
| Section 6: MS Semi-volatiles - QC Data Summaries |
| 6.1: Method Blank Summary |
| 6.1.1: OP79527-MB X069692.D Method Blank Summary |
| 6.2: Blank Spike Summary |
| 6.2.1: OP79527-BS X069691.D Blank Spike Summary |
| 6.3: Matrix Spike/Matrix Spike Duplicate Summary |
| 6.3.1: OP79527-MS X069694.D Matrix Spike/Matrix Spike Duplicate Summary |
| Section 7: GC Volatiles - QC Data Summaries |
| 7.1: Method Blank Summary |
| 7.1.1: G1U55-MB 1U1084.D Method Blank Summary |
| 7.1.2: G1U56-MB 1U1117.D Method Blank Summary |
| 7.2: Blank Spike Summary |
| 7.2.1: G1U55-BS 1U1083.D Blank Spike Summary |
| 7.2.2: G1U56-BS 1U1116.D Blank Spike Summary |
| 7.3: Matrix Spike/Matrix Spike Duplicate Summary |
| 7.3.1: FA73616-12MS 1U1106.D Matrix Spike/Matrix Spike Duplicate Summary |
| 7.3.2: FA73669-12MS 1U1129.D Matrix Spike/Matrix Spike Duplicate Summary |
| Section 8: GC/LC Semi-volatiles - QC Data Summaries |
| 8.1: Method Blank Summary |
| 8.1.1: OP79505-MB YR37745.D Method Blank Summary |
| 8.1.2: OP79506-MB TT399283.D Method Blank Summary |
| 8.1.3: OP79523-MB ST146580.D Method Blank Summary |
| 8.1.4: OP79523-MB TT399469.D Method Blank Summary |
| 8.1.5: OP79507-MB MM61917.D Method Blank Summary |
| 8.1.6: OP79524-MB MM61952.D Method Blank Summary |
| 8.1.7: OP79504-MB WW23969.D Method Blank Summary |
| 8.1.8: OP79586-MB WW24089.D Method Blank Summary |
| 8.2: Blank Spike Summary |
| 8.2.1: OP79505-BS YR37704.D Blank Spike Summary |
| 8.2.2: OP79506-BS TT399281.D Blank Spike Summary |
| 8.2.3: OP79506-BS2 TT399282.D Blank Spike Summary |
| 8.2.4: OP79523-BS ST146578.D Blank Spike Summary |
| 8.2.5: OP79523-BS2 ST146579.D Blank Spike Summary |
| 8.2.6: OP79523-BS ST146644.D Blank Spike Summary |
| 8.2.7: OP79523-BS2 TT399468.D Blank Spike Summary |
| 8.2.8: OP79507-BS MM61916.D Blank Spike Summary |
| 8.2.9: OP79524-BS MM61951.D Blank Spike Summary |
| 8.2.10: OP79504-BS WW23968.D Blank Spike Summary |
| 8.2.11: OP79586-BS WW24088.D Blank Spike Summary |
| 8.3: Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.1: OP79505-MS YR37725.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.2: OP79506-MS TT399288.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.3: OP79523-MS ST146582.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.4: OP79507-MS MM61921.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.5: OP79524-MS MM61954.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.6: OP79504-MS WW23973.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.7: OP79586-MS WW24106.D Matrix Spike/Matrix Spike Duplicate Summary |
| Section 9: Metals Analysis - QC Data Summaries |
| 9.1: Prep QC MP36999: Hg |
| 9.1.1: Method Blanks |
| 9.1.2: Matrix Spike and Duplicate Results Summary |
| 9.1.3: Spike Blank and LCS Summary |
| 9.1.4: Serial Dilution Results Summary |
| 9.2: Prep QC MP37014: As,Ba,Cd,Cr,Pb,Se,Ag |
| 9.2.1: Method Blanks |
| 9.2.2: Matrix Spike and Duplicate Results Summary |
| 9.2.3: Spike Blank and LCS Summary |
| 9.2.4: Serial Dilution Results Summary |
| 9.2.5: Post Digestate Spike Summary |
| 9.3: Prep QC MP37015: As,Ba,Cd,Cr,Pb,Se,Ag |
| 9.3.1: Method Blanks |
| 9.3.2: Matrix Spike and Duplicate Results Summary |
| 9.3.3: Spike Blank and LCS Summary |
| 9.3.4: Serial Dilution Results Summary |
| 9.3.5: Post Digestate Spike Summary |
APPENDIX C - CHAIN OF CUSTODY
| Appendix E_Compiled HAZARDOUS MATERIALS REPORT |
| E2_USCG_Ft_Myers_10878160_Hazmat_Report |
| INTRO LETTER |
| BACKGROUND INFORMATION |
| TESTING/SAMPLING FOR LEAD COATINGS AND ASBESTOS |
| TESTING RESULTS |
| CONCLUSIONS |
| RECOMMENDATIONS |
| Attachment A - CERTIFICATIONS |
| Attachment B - XRF UNIT CALIBRATION DATA AND RESULTS |
| Attachment C - ASBESTOS SAMPLE ANALYSIS RESULTS |
| Attachment D - PHOTOGRAPHIC DOCUMENTATION |
| Attachment E (1) - HAZARDOUS MATERIALS OBSERVATIONS |
| Attachment E (2) - HAZARDOUS MATERIALS OBSERVATIONS |
| Attachment F - BUILDINGS 1 & 2 DRAWINGS/ROOM NUMBERS//ACM-LEAD LOCATIONS |
| 10878160 DB RFP BackCover STA-FMB |
| DRAFT NEPA EA - Fort Myers (Oct Draft).pdf |
| _10878160 USCG FINAL DB-RFP STA-FMB REBUILD & WATERFRONT (06 October FINAL R3) (28 July 2020 R1) |
| 10878160 - DB RFP Cover STA-FMB |
| 10887160 - Table of Contents STA-FMB |
| 10887160 - Design Build Criteria - Specfications |
| 10878160_SECTION 01110 Design Build General Paragraphs |
| 10878160_SECTION 01115 Dedication Plaque |
| 10878160_SECTION 01200 Design Build Prog Paymts |
| 10878160_SECTION 01320 Design Build Prog Schd Complex Projects |
| 10878160_SECTION 01330 Submittal Procedures |
| 10878160_SECTION 01450 Quality Control |
| 10878160_SECTION 01500 Temp COR Facilities and Equp |
| 10878160_SECTION 01505 Project Meetings |
| 10878160_SECTION 01781 O and M Documentation |
| 01781 APPENDIX O and M - Part 1 |
| 01781 APPENDIX O and M - Part 2 |
| 01781 APPENDIX O and M - Part 3 |
| 10878160 Section 01800 1 01 Design Build Criteria (ECH & HDR) |
| 10878160 Section 01800 1 02 Role of RFP - Specs Dwgs (ECH) |
| 10878160 Section 01800 1 03 Design Related Permits & Certs (ECH) |
| 10878160 Section 01800 1 04 Civil and Site Work |
| 10878160 Section 01800 1 05 Geotechinical Design |
| 10878160 Section 01800 1 06 Landscape Design (ECH) |
| 10878160 Section 01800 1 07 Architectural Design (ECH) |
| 10878160 Section 01800 1 08 Structural |
| 10878160 Section 01800 1 09 Fire |
| 10878160 Section 01800 1 10 Plumbing |
| 10878160 Section 01800 1 11 HVAC |
| 10878160 Section 01800 1 12-1 Electrical |
| 10878160 Section 01800 1 12-2 Electrical-Estimated Load |
| 10878160 Section 01800 1 12-3 Electical One Line Diagram |
| 10878160 Section 01800 1 13-1 Telecommunications Preface |
| 10878160 Section 01800 1 13-2 Telecommunicaitons |
| 10878160 Section 01800 1 14 Security |
| 10878160 Section 01800 1 15 FF&E (ECH) |
| 10878160 Section 01800 1.18 Environmental |
| 10878160 Section 01801_Temporary Facilities |
| 10878160 Section 01802_Construction Design Docs |
| 10878160 Section 01803_Record Documents and Drawings |
| 10878160 Section 01900_List of Drawings |
| APPENDIX SECTIONS - A, B, C, D & E |
| Appendix A-ComputerGenDrwgs-Sept2019 |
| Appendix B -ElectDeliv-Sept2019 |
| Appendix C -FDCC File Naming-SEP 2019 |
| Appendix D - Design Narrative-Sept2012 |
| Appendix E - Industry Standards for Const Docs-Sept2012 |
| APPENDIX SECTIONS - F & G |
| APPENDIX F - 10878160 - A100 STA-FMB SPACE ADJACENCY DIAGRAM |
| APPENDIX F - 10878160 - C-101 STA-FMB -Base Bid Layout with Options (2020-07-22) |
| APPENDIX F - 10878160 - C-102 STA-FMB - Site Criteria Plan (2020-07-22) |
| APPENDIX F - 10878160 - M-SERIES STA-FMB (2020-07-22) |
| M-01 PLAN-M-01 OVERALL SITE PLAN |
| M-01A PLAN-M-01 OVERALL SITE PLAN |
| M-02 SECTIONS-M-02 TYPICAL SECTIONS |
| M-03 UTILITIES-M-03 UTILITIES |
| M-05 UTILITIES-M-04 UTILITIES |
| APPENDIX G 10878160 BFR & SPACE CRITERIA SHEETS |
| BFR - STA-Fort Myers Beach - 3 pages |
| SPACE CRITERIA SHEETS - 97 pages |
| BID OPTION 1 - MSD OFFICE SUITE (pages 94-97) |
| ATTACHMENT SECTIONS - A, B, C, D & E |
| ATTACHMENT A - (ELECTRONIC ON DVD ONLY) - NO CONTENT IN THIS DOCUMENT |
| ATTACHMENT B - 10878160 - USCG - Ft Myers_10878160_Survey_FINAL 20 May2020 |
| V001 Survey As-Built - Shore Work (p.1) |
| V001 Survey As-Built - Waterfront Workf (p.2) |
| V002 |
| V003 |
| ATTACHMENT C - 10878160 - USCG-Ft Myers Beach_10878160_Waterfront Inspection FINAL Report 04-02-2020 |
| COVER |
| Summary of Work |
| Findings |
| 41 Pier Floating Dock (RPUID 10694) and 41 UTB Pier (RPUID 10713) |
| Bulkhead (RPUID 10708) |
| Travel Lift Pier (RPUID 10709) and Travel Lift Floating Dock (RPUID 10714) |
| Visiting Ship Pier (RPUID 10711) |
| WPB Pier (RPUID 10712) |
| Whip Antenna T01 Pier (RPUID 811064) |
| ATTACHMENTS D - 10878160 -FIIELD SURVEYS - SHORE AND WATERFRONT |
| ATTACHMENT D.1 10878160 - USCG - Ft_Myers_10878160_Geotechnical_Report_FINAL 17May2020 |
| 1.0 INTRODUCTION |
| 1.1 Project Information |
| 1.2 Scope of Work |
| 2.0 DATA GATHERING |
| 2.1 Data Review |
| 2.2 Site Description |
| 2.3 Field Exploration |
| 2.4 Test Pits |
| 2.5 Laboratory Testing |
| 3.0 SUBSURFACE CONDITIONS |
| 3.1 Site and Area Geology |
| 3.2 Soil Survey Information |
| 3.3 Interpreted Stratigraphy |
| 3.3.1 Strata 1 – Reworked/Densified Sands |
| 3.3.2 Strata 2 – Very Loose Sand |
| 3.3.3 Strata 3 – Loose to Medium Dense Sand |
| 3.3.4 Strata 4 – Silty or Clayey Sand and Sandy Silt |
| 3.4 Groundwater |
| 4.0 CONCLUSIONS AND RECOMMENDATIONS |
| 4.1 Demolition |
| 4.2 Site Preparation |
| 4.2.1 Excavation |
| 4.2.2 Fill Placement |
| 4.2.3 Surface and Groundwater Control |
| 4.3 Building Foundations (Driven Piles) |
| 4.3.1 Pile Capacity |
| 4.3.2 Pile Interaction |
| 4.3.3 Pile Splicing |
| 4.3.4 Pile Testing Program |
| 4.4 Minor Structure Foundations |
| 4.5 Bulkhead Design |
| 4.5.1 Design Parameters |
| 4.5.2 Deadman Anchors |
| 4.5.3 Grouted Soil Anchors |
| 4.5.4 Environmental Corrosion Classification |
| 4.6 Pavement Design |
| 4.7 Construction Inspection and Testing |
| 5.0 REPORT LIMITATIONS |
| 6.0 CLOSURE |
| ATTACHMENT D.2 10878160 - USCG -Ft_Myers_10878160_Env_Soils_Report_FINAL 17May2020 |
| Report Cover |
| Letter |
| 1.0 INTRODUCTION |
| 2.0 ENVIRONMENTAL SOIL SAMPLING |
| 3.0 CONCLUSIONS |
| 4.0 LIMITATIONS |
| FIGURES |
| TABLES |
| APPENDICES |
| ATTACHMENT D.3 10878160 - USCG_Ft_Myers_10878160_Hydrant_Flow_Report_FINAL 17May2020 |
| Letter Report |
| Hydrant Flow Testing Cover Sheet |
| Hydrant Flow Test Field Sketch |
| Test #1 – One Outlet |
| Test #2 – Two Outlets |
| Test #3 – One Outlet |
| Test #4 – Two Outlets |
| ATTACHMENT D.4 10878160 -USCG_Ft_Myers_10878160_Hazmat_Report_FINAL 17May2020 |
| HAZARDOUS MATERIALS REPORT |
| Attachment A - CERTIFICATIONS |
| Attachment B - XRF UNIT CALIBRATION DATA AND RESULTS |
| Attachment C - ASBESTOS SAMPLE ANALYSIS RESULTS |
| Attachment D - PHOTOGRAPHIC DOCUMENTATION |
| Attachment E (1) - HAZARDOUS MATERIALS OBSERVATIONS |
| Attachment E (2) - HAZARDOUS MATERIALS OBSERVATIONS |
| Attachment F - BUILDINGS 1 & 2 DRAWINGS/ROOM NUMBERS//ACM-LEAD LOCATIONS |
| ATTACHMENT D.5 10878160 -USCG_Ft_Myers_10878160_Benthic_Survey_Report |
| Cover |
| Table of Contents |
| 1.0 Introduction |
| 2.0 Existing Conditions |
| 3.0 Methods |
| 4.0 Results |
| 5.0 Conclusion |
| 6.0 References |
| Tables |
| Figures |
| Appendix A |
| Appendix B |
| ATTACHMENT E - Draft National Environmental Policy Act (NEPA) Document |
| _10878160 ATTACHMENT E - STA-FMB_Compiled Draft EA & Appendices_100120 |
| Fort Myers Beach_Draft EA_091020 |
| CONTENTS |
| APPENDICES |
| ACRONYMS AND ABBREVIATIONS |
| SECTION 1 PURPOSE AND NEED FOR ACTION |
| 1.1 Introduction |
| 1.2 Background |
| 1.3 Overview |
| 1.3.1 USCG Mission |
| 1.3.2 Sector St. Petersburg |
| 1.3.3 Station Fort Myers Beach |
| 1.3.3.1 Existing Facilities |
| 1.3.3.2 Existing Vessels |
| 1.4 Surrounding Land Uses |
| 1.5 Purpose of the Proposed Action |
| 1.6 Need for the Proposed Action |
| 1.7 Agency and Public Involvement Process |
| 1.8 Summary of Environmental Study Requirements |
| 1.8.1 National Environmental Policy Act |
| 1.8.2 Endangered Species Act |
| 1.8.3 Magnuson-Stevens Fishery Conservation and Management Act |
| 1.8.4 Marine Mammal Protection Act |
| 1.8.5 Clean Air Act and Conformity Requirements |
| 1.8.6 Wetland and Water Resources Regulatory Requirements |
| 1.8.7 National Pollutant Discharge Elimination System Program |
| 1.8.8 Coastal Zone Consistency Determination |
| 1.8.9 Cultural Resources Regulatory Requirements |
| 1.8.10 Invasive Species |
1.9 Scope of the Environmental Assessment
| SECTION 2 DESCRIPTION OF THE PROPOSED ACTION AND ALTERNATIVES |
| 2.1 Proposed Action |
| 2.1.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| 2.1.1.1 Temporary Relocation |
| 2.1.1.2 Landside Demolition Activities |
| 2.1.1.3 Construction of a Single Consolidated Multi-Mission Building |
| 2.1.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 2.1.2.1 Landside and In-Water Demolition Activities |
| 2.1.2.2 Landside and In-Water Construction Activities |
| Landside Facilities |
| In-Water Facilities |
| Single Floating Finger Pier |
| Boat Ramp / Launch Dock |
| Bulkhead |
2.1.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
| 2.2 No-Action Alternative |
| 2.3 Alternatives Identified but not Carried Forward for Detailed Analysis |
| 2.3.1 Permanent Relocation to Another Location |
| 2.3.2 Demolition and Reconstruction of the In-Water Facilities |
| 2.3.3 Construction of Two Floating Finger Piers |
| 2.4 Construction Requirements |
| 2.4.1 Memorandum of Agreement between Coast Guard Atlantic Area and the National Marine Fisheries Service |
| 2.4.2 USCG Operational Guidance Related to Marine Resources |
| 2.4.3 Sea Turtle and Smalltooth Sawfish Construction Conditions (2006) |
| 2.4.4 Standard Manatee Conditions for In-Water Work (2011) |
| 2.4.5 Soil Management Plan |
| 2.4.6 Additional Construction Best Management Practices |
| SECTION 3 AFFECTED ENVIRONMENT |
| 3.1 Air Quality |
| 3.1.1 Definition of Resources |
| 3.1.1.1 Criteria Pollutants |
| 3.1.1.2 Clean Air Act Amendments |
| 3.1.1.3 Florida Administrative Code |
| 3.1.2 Existing Conditions |
| Regional Air Quality |
| Emissions at Station Fort Myers Beach |
| 3.2 Biological Resources |
| 3.2.1 Definition of Resource |
| 3.2.2 Existing Conditions |
| 3.2.2.1 Terrestrial Biological Resources |
| Vegetation |
| Terrestrial Habitats |
| Terrestrial Wildlife |
| Special Status Species |
| 3.2.2.2 Nesting Birds |
| 3.2.2.3 Aquatic Biological Resources |
| Existing Marine Conditions |
| Benthic Resources |
| Seagrasses |
| Invertebrates |
| Algal Communities |
| Critical Habitat |
| Essential Fish Habitat |
| Essential Fish Habitat |
| Aquatic Species |
| Special Status Aquatic Species |
3.2.2.4 Invasive Species
| 3.3 Geological Resources |
| 3.3.1 Definition of Resource |
| 3.3.2 Existing Conditions |
| Geology |
| Topography |
| Soils |
| Geologic Hazards |
| Sinkholes |
| Flooding and Erosion |
| Problem Soils |
| Geochemical Hazards |
| Tsunami |
| 3.4 Hazardous Materials and Wastes |
| 3.4.1 Definition of Resource |
| 3.4.2 Existing Conditions |
| 3.4.2.1 Hazardous Materials and Wastes in the Vicinity of Station Fort Myers Beach |
| 3.4.2.2 Hazardous Materials and Wastes at Station Fort Myers Beach |
| Soil Contamination at Station Fort Myers Beach |
| Asbestos-Containing Material at Station Fort Myers Beach |
| Lead-Based Paint at Station Fort Myers Beach |
| 3.5 Land Use and Recreation |
| 3.5.1 Definition of Resource |
| 3.5.2 Existing Conditions |
| 3.5.2.1 Land Use |
| Coastal Zone |
3.5.2.2 Recreation
| 3.6 Water Resources |
| 3.6.1 Definition of Resource |
| 3.6.1.1 Upland Surface Water |
| 3.6.1.2 Groundwater |
| 3.6.1.3 Wetlands |
| 3.6.1.4 Floodplains |
| 3.6.1.5 Marine Waters |
| 3.6.1.6 Shorelines |
| 3.6.1.7 Stormwater Management |
| 3.6.2 Existing Conditions |
| Upland Surface Waters |
| Marine Waters and Shorelines |
| Groundwater |
| Wetlands |
| Floodplains and Flood Hazards |
| Sea Level Rise |
| 3.7 Visual Resources |
| 3.7.1 Definition of Resource |
| 3.7.2 Existing Conditions |
| San Carlos Island |
| Station Fort Myers Beach |
| Historic Structures |
| SECTION 4 ENVIRONMENTAL CONSEQUENCES |
| 4.1 Air Quality |
| 4.1.1 Approach to Analysis |
| 4.1.2 Impacts from the Action Alternatives |
| 4.1.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Short-term Construction Emissions |
| Fugitive Dust Emissions |
| Combustion Emissions |
| Long-term Operational Emissions |
| General Conformity |
| 4.1.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.1.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.1.3 Impacts from the No-Action Alternative |
| 4.1.4 Special Procedures |
| 4.2 Biological Resources |
| 4.2.1 Approach to Analysis |
| 4.2.2 Impacts from the Action Alternatives |
| 4.2.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Terrestrial Biological Resources |
| Vegetation |
| Special Status Species |
| Migratory Birds |
Aquatic Biological Resources
| 4.2.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| Terrestrial Biological Resources |
| Aquatic Biological Resources |
| Turbidity |
| Underwater Noise |
| Essential Fish Habitat and Benthic Resources |
| Special Status Species |
Invasive Species
| 4.2.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| Terrestrial Biological Resources |
| Aquatic Biological Resources |
| 4.2.3 Impacts from the No-Action Alternative |
| 4.2.4 Special Procedures |
| Bats |
| Nesting Birds |
| Water Quality |
| Noise and Turbidity |
| Invasive Species |
| 4.3 Geological Resources |
| 4.3.1 Approach to Analysis |
| 4.3.2 Impacts from the Action Alternatives |
| 4.3.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Geology and Topography |
| Soils |
| Geologic Hazards |
| 4.3.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.3.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.3.3 Impacts from the No-Action Alternative |
| 4.3.4 Special Procedures |
| 4.4 Hazardous Materials and Wastes |
| 4.4.1 Approach to Analysis |
| 4.4.2 Impacts from the Action Alternatives |
| 4.4.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Hazardous Materials and Waste Storage and Generation |
| Soil Contamination |
| Asbestos and Lead |
| 4.4.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.4.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.4.3 Impacts from the No-Action Alternative |
| 4.4.4 Special Procedures |
| 4.5 Land Use and Recreation |
| 4.5.1 Approach to Analysis |
| 4.5.2 Impacts from the Action Alternatives |
| 4.5.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| 4.5.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.5.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.5.3 Impacts from the No-Action Alternative |
| 4.5.4 Special Procedures |
| 4.6 Water Resources |
| 4.6.1 Approach to Analysis |
| 4.6.2 Impacts from the Action Alternatives |
| 4.6.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Surface Waters and Marine Waters |
| Short-term Construction Impacts |
| Long-term Operational Impacts |
| Groundwater |
| Wetlands |
| Floodplains and Sea Level Rise |
| 4.6.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| Surface Waters and Marine Waters |
| Short-term Construction Impacts |
| Long-term Operational Impacts |
| Groundwater |
| Wetlands |
| Floodplains and Sea Level Rise |
4.6.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
| 4.6.3 Impacts from the No-Action Alternative |
| 4.6.4 Special Procedures |
| Water Quality |
| Hazardous Materials and Wastes |
| 4.7 Visual Resources |
| 4.7.1 Approach to Analysis |
| 4.7.2 Impacts from the Action Alternatives |
| 4.7.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Construction-Related Impacts |
| Operations-Related Impacts |
| 4.7.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| Construction-Related Impacts |
| Operations-Related Impacts |
4.7.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
| 4.7.3 Impacts from No-Action Alternative |
| 4.7.4 Special Procedures |
| SECTION 5 CUMULATIVE IMPACTS |
| 5.1 Projects Considered |
| 5.2 Evaluation of Cumulative Effects |
| Air Quality |
| Biological Resources |
| Geological Resources |
| Hazardous Materials and Wastes |
| Land Use and Recreation |
| Water Resources |
| Visual Resources |
| SECTION 6 SUMMARY OF FINDINGS |
| SECTION 7 SPECIAL PROCEDURES |
| Air Quality |
| Biological Resources |
| Bats |
| Nesting Birds |
| Noise and Turbidity |
| Invasive Species |
| Hazardous Materials and Wastes |
| Water Resources |
| Water Quality |
| SECTION 8 REFERENCES |
| SECTION 9 LIST OF PREPARERS |
| Appendix A_Compiled |
| A2_NOA_082020 |
| A3_Intergovernmental Review Letter_091020 |
| A4_Fort Myers NMFS (Signed)_v2 |
| A5_NMFS Letter Enclosures |
| A6_NMFS Summary of Potential Effects |
| A7_Fort Myers USFWS (Signed) |
| A8_USFWS Letter Enclosures |
| A9_USFWS Summary of Potential Effects |
| A10_Fort Myers SHPO (Signed) |
| A12_Fort Myers THPO Letters (Signed) |
| A13_THPO Letter Enclosures |
| A14_USCG_Ft_Myers_CZ Signed Consultation Package (9-17-2020) |
| Appendix B_Compiled |
| B1_Appendix B Table of Contents |
| Appendix B |
| Table of Contents |
| B2_Combined Appendix B |
| FNAI_Unofficial_Grid_Result.pdf |
| Official IPAC Species List.pdf |
| United States Department of the Interior |
| FISH AND WILDLIFE SERVICE |
| Official Species List |
| Project summary |
| Endangered Species Act species |
| Mammals |
| Birds |
| Reptiles |
| Fishes |
| Insects |
| Flowering Plants |
| Critical habitats |
| T&E photopages.pdf |
| 20130425_gd_Appendix B_2011_Standard Manatee Construction Conditions |
| SeaTurtleAndSawfishConstructionConditions23mar2006.pdf |
| national marine fisheries service |
| B3_USCG_Ft_Myers_10878160_Benthic_Survey_Report |
| B4_USCG_Ft_Myers_10878160_Wetland_Report |
| 19950124 Permit 362151115.pdf |
| 19950726 Permit and Drawings.pdf |
| 19970421 Survey Drawing.pdf |
| 19980825 Pier Extension Permit.pdf |
| 20080818 Permit 0128497006EG Permit and drawings.pdf |
| 20080918 Lee County Dock Reconfiguration permits and drawings.pdf |
| 20120906 Permit Info 0128497006EG permits and drawings.pdf |
| B5_Biological Opinion-2017 |
| B6_Florida_Manatee_Key_Programmatic_Biological_Opinion |
| Appendix C_Compiled |
| C1_Appendix C Table of Contents |
| Appendix C |
| Table of Contents |
| C2_USCG_Ft_Myers_10878160_Cultural_Resources_Report - Copy |
| 1.0 PROJECT AREA |
| 2.0 SCOPE OF WORK REVIEW |
| 3.0 CULTURAL CONTEXT |
| 4.0 HISTORIC MAP/PHOTOGRAPHY AND BACKGROUND RESEARCH |
| 4.1 Historic Maps/Photography |
| 4.2 Archaeological Background Research |
| 4.3 Historic Architectural Background Research |
| 4.4 Site Inspection |
| 5.0 PROJECT AREA SOILS |
| 6.0 CULTURAL RESOURCE SENSITIVITY AND RECOMMENDATIONS |
| 7.0 REFERENCES |
| ATTACHMENT A |
| Appendix D & E_Compiled |
| D1_Appendix D Table of Contents |
| Appendix D |
| Table of Contents |
| D2_USCG_Ft_Myers_10878160_Environmental_Soils_Report |
| Report Cover |
| Letter |
| 1.0 INTRODUCTION |
| 2.0 ENVIRONMENTAL SOIL SAMPLING |
| 2.1 Soil Assessment |
| 2.2 Soil Analytical Results |
| 3.0 CONCLUSIONS |
| 4.0 LIMITATIONS |
| FIGURES |
| TABLES |
| APPENDICES |
| APPENDIX A - SOIL BORING LOGS |
| APPENDIX B - LABORATORY ANALYTICAL REPORT |
| Cover Page |
| Table of Contents |
| Section 1: Sample Summary |
| Section 2: Summary of Hits |
| Section 3: Sample Results |
| 3.1: FA73669-1: B-3 (0-3) |
| 3.2: FA73669-2: B-3 (4-5) |
| 3.3: FA73669-3: B-3 (5-6) |
| 3.4: FA73669-4: B-2 (0-3) |
| 3.5: FA73669-5: B-2 (4-5) |
| 3.6: FA73669-6: B-2 (5-6) |
| 3.7: FA73669-7: B-4 (0-3) |
| 3.8: FA73669-8: B-4 (4-5) |
| 3.9: FA73669-9: B-4 (5-6) |
| 3.10: FA73669-10: B-1 (0-3) |
| 3.11: FA73669-11: B-1 (4-5) |
| 3.12: FA73669-12: B-1 (5-6) |
| Section 4: Misc. Forms |
| 4.1: Chain of Custody |
| Section 5: MS Volatiles - QC Data Summaries |
| 5.1: Method Blank Summary |
| 5.1.1: V3C392-MB 3C9328.D Method Blank Summary |
| 5.2: Blank Spike Summary |
| 5.2.1: V3C392-BS 3C9327.D Blank Spike Summary |
| 5.3: Matrix Spike/Matrix Spike Duplicate Summary |
| 5.3.1: FA73669-8MS 3C9349.D Matrix Spike/Matrix Spike Duplicate Summary |
| Section 6: MS Semi-volatiles - QC Data Summaries |
| 6.1: Method Blank Summary |
| 6.1.1: OP79527-MB X069692.D Method Blank Summary |
| 6.2: Blank Spike Summary |
| 6.2.1: OP79527-BS X069691.D Blank Spike Summary |
| 6.3: Matrix Spike/Matrix Spike Duplicate Summary |
| 6.3.1: OP79527-MS X069694.D Matrix Spike/Matrix Spike Duplicate Summary |
| Section 7: GC Volatiles - QC Data Summaries |
| 7.1: Method Blank Summary |
| 7.1.1: G1U55-MB 1U1084.D Method Blank Summary |
| 7.1.2: G1U56-MB 1U1117.D Method Blank Summary |
| 7.2: Blank Spike Summary |
| 7.2.1: G1U55-BS 1U1083.D Blank Spike Summary |
| 7.2.2: G1U56-BS 1U1116.D Blank Spike Summary |
| 7.3: Matrix Spike/Matrix Spike Duplicate Summary |
| 7.3.1: FA73616-12MS 1U1106.D Matrix Spike/Matrix Spike Duplicate Summary |
| 7.3.2: FA73669-12MS 1U1129.D Matrix Spike/Matrix Spike Duplicate Summary |
| Section 8: GC/LC Semi-volatiles - QC Data Summaries |
| 8.1: Method Blank Summary |
| 8.1.1: OP79505-MB YR37745.D Method Blank Summary |
| 8.1.2: OP79506-MB TT399283.D Method Blank Summary |
| 8.1.3: OP79523-MB ST146580.D Method Blank Summary |
| 8.1.4: OP79523-MB TT399469.D Method Blank Summary |
| 8.1.5: OP79507-MB MM61917.D Method Blank Summary |
| 8.1.6: OP79524-MB MM61952.D Method Blank Summary |
| 8.1.7: OP79504-MB WW23969.D Method Blank Summary |
| 8.1.8: OP79586-MB WW24089.D Method Blank Summary |
| 8.2: Blank Spike Summary |
| 8.2.1: OP79505-BS YR37704.D Blank Spike Summary |
| 8.2.2: OP79506-BS TT399281.D Blank Spike Summary |
| 8.2.3: OP79506-BS2 TT399282.D Blank Spike Summary |
| 8.2.4: OP79523-BS ST146578.D Blank Spike Summary |
| 8.2.5: OP79523-BS2 ST146579.D Blank Spike Summary |
| 8.2.6: OP79523-BS ST146644.D Blank Spike Summary |
| 8.2.7: OP79523-BS2 TT399468.D Blank Spike Summary |
| 8.2.8: OP79507-BS MM61916.D Blank Spike Summary |
| 8.2.9: OP79524-BS MM61951.D Blank Spike Summary |
| 8.2.10: OP79504-BS WW23968.D Blank Spike Summary |
| 8.2.11: OP79586-BS WW24088.D Blank Spike Summary |
| 8.3: Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.1: OP79505-MS YR37725.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.2: OP79506-MS TT399288.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.3: OP79523-MS ST146582.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.4: OP79507-MS MM61921.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.5: OP79524-MS MM61954.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.6: OP79504-MS WW23973.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.7: OP79586-MS WW24106.D Matrix Spike/Matrix Spike Duplicate Summary |
| Section 9: Metals Analysis - QC Data Summaries |
| 9.1: Prep QC MP36999: Hg |
| 9.1.1: Method Blanks |
| 9.1.2: Matrix Spike and Duplicate Results Summary |
| 9.1.3: Spike Blank and LCS Summary |
| 9.1.4: Serial Dilution Results Summary |
| 9.2: Prep QC MP37014: As,Ba,Cd,Cr,Pb,Se,Ag |
| 9.2.1: Method Blanks |
| 9.2.2: Matrix Spike and Duplicate Results Summary |
| 9.2.3: Spike Blank and LCS Summary |
| 9.2.4: Serial Dilution Results Summary |
| 9.2.5: Post Digestate Spike Summary |
| 9.3: Prep QC MP37015: As,Ba,Cd,Cr,Pb,Se,Ag |
| 9.3.1: Method Blanks |
| 9.3.2: Matrix Spike and Duplicate Results Summary |
| 9.3.3: Spike Blank and LCS Summary |
| 9.3.4: Serial Dilution Results Summary |
| 9.3.5: Post Digestate Spike Summary |
APPENDIX C - CHAIN OF CUSTODY
| Appendix E_Compiled HAZARDOUS MATERIALS REPORT |
| E2_USCG_Ft_Myers_10878160_Hazmat_Report |
| INTRO LETTER |
| BACKGROUND INFORMATION |
| TESTING/SAMPLING FOR LEAD COATINGS AND ASBESTOS |
| TESTING RESULTS |
| CONCLUSIONS |
| RECOMMENDATIONS |
| Attachment A - CERTIFICATIONS |
| Attachment B - XRF UNIT CALIBRATION DATA AND RESULTS |
| Attachment C - ASBESTOS SAMPLE ANALYSIS RESULTS |
| Attachment D - PHOTOGRAPHIC DOCUMENTATION |
| Attachment E (1) - HAZARDOUS MATERIALS OBSERVATIONS |
| Attachment E (2) - HAZARDOUS MATERIALS OBSERVATIONS |
| Attachment F - BUILDINGS 1 & 2 DRAWINGS/ROOM NUMBERS//ACM-LEAD LOCATIONS |
10878160 DB RFP BackCover STA-FMB