Attachment F - Building 1 and 2 ACM and Lead.pdf

PDF 896 KB Posted

Attached to
Design/Build Facilities and Waterfront at USCG Station Fort Myers Beach, Fort Myers, FL
Solicitation number
70Z04721RMYERDB
Issued by

View the file

Other files

File Type Posted
Amend_0016_70Z04721RMYERDB_pg2-3.pdf PDF
Amendment 0016_Page 1.pdf PDF
Amendment 0015_Page 1.pdf PDF
201202 - 10878160 Appendix F SCS - Boat Work Bay Rev03.pdf PDF
Amend_0015_70Z04721RMYERDB_pg2-5.pdf PDF
201202 - 10878160 Appendix F SCS - Boat WASH Bay Rev01.pdf PDF
Amend_0014_70Z04721RMYERDB_pg2-14.pdf PDF
Amendment 0014 Page 1.pdf PDF
70Z04721RMYERDB_Amend_0013.pdf PDF
70Z04721RMYERDB_Amend_0012.pdf PDF
0049-0105 Amendment 0012_Attach_001.pdf PDF
Amendment 0011 Page 1.pdf PDF
Amend_0011_70Z04721RMYERDB_pg2-9.pdf PDF
Visitor Access List 70Z04720RTYBEDB_FtMyers_1100 - FINAL.pdf PDF
Visitors Access List 70Z04720RTYBEDB_FtMyers_0900 - Final.pdf PDF
Amendment 0010 Page 1.pdf PDF
70Z04721MYERDB_Amendment 0009.pdf PDF
Amendment_0008_70Z04721RMYERDB.pdf PDF
Amendment 0007 Page 1.pdf PDF
Amendment 0007_page 2.pdf PDF
DRAFT NEPA EA - Fort Myers (Oct Draft).pdf PDF
Attachment D - Field Surveys (Shore and Waterfront).pdf PDF
Amendment_0006_70Z04721MYERDB.pdf PDF
Attachment B - Survey Field Notes and Data Drawings.pdf PDF
Attachment C- Waterfront Structures Field Investigation Report.pdf PDF
10878160_USCG STA-FMB Site Survey-DWGs 335000017.AB.1.zip ZIP file
Amendment 0005 Page 1.pdf PDF
_USCG 1977 STA-FMB - Compiled Fort Myers Beach USCG Misson Building 1977.pdf PDF
10878160_USCG STA-FMB Site Survey DWGs 335000017.AB.2.zip ZIP file
Amend_0005_70Z04721RMYERDB_pg2-4.pdf PDF
Transmittal - 00025_11-02-20.pdf PDF
Amendment 0004_70Z04721FMYERDB.pdf PDF
Amendment 0003_70Z04721RMYERDB.pdf PDF
Amend_0002_70Z04721RMYERDB_pg2.pdf PDF
Amendment 0002 Page 1.pdf PDF
USCG 2005 STA FMB - Boat Basin Dredge 07-M05032-2005.pdf PDF
USCG_87_WBP (Cutter Boat) ILSP LOGISTICS SUPPORT INFO.pdf PDF
TOA_Fort Myers_10-14-2020.pdf PDF
USCG 2017 STA-FMB - FIRE ALARM DWGS 440P-215403-May15 2017.pdf PDF
70Z04721RMYERDB_Amendment 0001.pdf PDF
USCG 1994 STA -FMB - TOPO survey 1994.pdf PDF
10878160_ USCG STA-FMB Site Survey 335000017.AB 200723cbg-SnS.pdf PDF
Wage_Determination_FL20200211_9-4-2020.pdf PDF
Transmittal - 00025.pdf PDF
USCG 1984 STA-FMB - PIER REPLACEMENT Jan 24 1984.pdf PDF
USCG 2008 STA FMB - 87 foot boat MOORING PIER EXTENSION - 611975-Oct 23 2008.pdf PDF
USCG 1988 STA-FMB - REBUILD BULKHEAD Jun 8 1988.pdf PDF
USCG 1996 STA-FMB - DWG_M0317-S_SH2_ASBESTOS ABATEMENT PLAN July 31 1996.pdf PDF
10878160_USCG STA-FMB Site Survey 335000017.AB.pdf PDF
USCG 2014 STA-FMB - Replace HVAC System USCG Station-6115266-Sept 4 2014.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT F

BUILDINGS 1 & 2 DRAWINGS/ROOM NUMBERS//ACM-LEAD LOCATIONS

E-55

E-56

E-57

E-58

_10878160 USCG FINAL DB-RFP STA-FMB REBUILD & WATERFRONT (06 October FINAL R3) (28 July 2020 R1)
10878160 - DB RFP Cover STA-FMB
10887160 - Table of Contents STA-FMB
10887160 - Design Build Criteria - Specfications
10878160_SECTION 01110 Design Build General Paragraphs
10878160_SECTION 01115 Dedication Plaque
10878160_SECTION 01200 Design Build Prog Paymts
10878160_SECTION 01320 Design Build Prog Schd Complex Projects
10878160_SECTION 01330 Submittal Procedures
10878160_SECTION 01450 Quality Control
10878160_SECTION 01500 Temp COR Facilities and Equp
10878160_SECTION 01505 Project Meetings
10878160_SECTION 01781 O and M Documentation
01781 APPENDIX O and M - Part 1
01781 APPENDIX O and M - Part 2
01781 APPENDIX O and M - Part 3
10878160 Section 01800 1 01 Design Build Criteria (ECH & HDR)
10878160 Section 01800 1 02 Role of RFP - Specs Dwgs (ECH)
10878160 Section 01800 1 03 Design Related Permits & Certs (ECH)
10878160 Section 01800 1 04 Civil and Site Work
10878160 Section 01800 1 05 Geotechinical Design
10878160 Section 01800 1 06 Landscape Design (ECH)
10878160 Section 01800 1 07 Architectural Design (ECH)
10878160 Section 01800 1 08 Structural
10878160 Section 01800 1 09 Fire
10878160 Section 01800 1 10 Plumbing
10878160 Section 01800 1 11 HVAC
10878160 Section 01800 1 12-1 Electrical
10878160 Section 01800 1 12-2 Electrical-Estimated Load
10878160 Section 01800 1 12-3 Electical One Line Diagram
10878160 Section 01800 1 13-1 Telecommunications Preface
10878160 Section 01800 1 13-2 Telecommunicaitons
10878160 Section 01800 1 14 Security
10878160 Section 01800 1 15 FF&E (ECH)
10878160 Section 01800 1.18 Environmental
10878160 Section 01801_Temporary Facilities
10878160 Section 01802_Construction Design Docs
10878160 Section 01803_Record Documents and Drawings
10878160 Section 01900_List of Drawings
APPENDIX SECTIONS - A, B, C, D & E
Appendix A-ComputerGenDrwgs-Sept2019
Appendix B -ElectDeliv-Sept2019
Appendix C -FDCC File Naming-SEP 2019
Appendix D - Design Narrative-Sept2012
Appendix E - Industry Standards for Const Docs-Sept2012
APPENDIX SECTIONS - F & G
APPENDIX F - 10878160 - A100 STA-FMB SPACE ADJACENCY DIAGRAM
APPENDIX F - 10878160 - C-101 STA-FMB -Base Bid Layout with Options (2020-07-22)
APPENDIX F - 10878160 - C-102 STA-FMB - Site Criteria Plan (2020-07-22)
APPENDIX F - 10878160 - M-SERIES STA-FMB (2020-07-22)
M-01 PLAN-M-01 OVERALL SITE PLAN
M-01A PLAN-M-01 OVERALL SITE PLAN
M-02 SECTIONS-M-02 TYPICAL SECTIONS
M-03 UTILITIES-M-03 UTILITIES
M-05 UTILITIES-M-04 UTILITIES
APPENDIX G 10878160 BFR & SPACE CRITERIA SHEETS
BFR - STA-Fort Myers Beach - 3 pages
SPACE CRITERIA SHEETS - 97 pages
BID OPTION 1 - MSD OFFICE SUITE (pages 94-97)
ATTACHMENT SECTIONS - A, B, C, D & E
ATTACHMENT A - (ELECTRONIC ON DVD ONLY) - NO CONTENT IN THIS DOCUMENT
ATTACHMENT B - 10878160 - USCG - Ft Myers_10878160_Survey_FINAL 20 May2020
V001 Survey As-Built - Shore Work (p.1)
V001 Survey As-Built - Waterfront Workf (p.2)
V002
V003
ATTACHMENT C - 10878160 - USCG-Ft Myers Beach_10878160_Waterfront Inspection FINAL Report 04-02-2020
COVER
Summary of Work
Findings
41 Pier Floating Dock (RPUID 10694) and 41 UTB Pier (RPUID 10713)
Bulkhead (RPUID 10708)
Travel Lift Pier (RPUID 10709) and Travel Lift Floating Dock (RPUID 10714)
Visiting Ship Pier (RPUID 10711)
WPB Pier (RPUID 10712)
Whip Antenna T01 Pier (RPUID 811064)
ATTACHMENTS D - 10878160 -FIIELD SURVEYS - SHORE AND WATERFRONT
ATTACHMENT D.1 10878160 - USCG - Ft_Myers_10878160_Geotechnical_Report_FINAL 17May2020
1.0 INTRODUCTION
1.1 Project Information
1.2 Scope of Work
2.0 DATA GATHERING
2.1 Data Review
2.2 Site Description
2.3 Field Exploration
2.4 Test Pits
2.5 Laboratory Testing
3.0 SUBSURFACE CONDITIONS
3.1 Site and Area Geology
3.2 Soil Survey Information
3.3 Interpreted Stratigraphy
3.3.1 Strata 1 – Reworked/Densified Sands
3.3.2 Strata 2 – Very Loose Sand
3.3.3 Strata 3 – Loose to Medium Dense Sand
3.3.4 Strata 4 – Silty or Clayey Sand and Sandy Silt
3.4 Groundwater
4.0 CONCLUSIONS AND RECOMMENDATIONS
4.1 Demolition
4.2 Site Preparation
4.2.1 Excavation
4.2.2 Fill Placement
4.2.3 Surface and Groundwater Control
4.3 Building Foundations (Driven Piles)
4.3.1 Pile Capacity
4.3.2 Pile Interaction
4.3.3 Pile Splicing
4.3.4 Pile Testing Program
4.4 Minor Structure Foundations
4.5 Bulkhead Design
4.5.1 Design Parameters
4.5.2 Deadman Anchors
4.5.3 Grouted Soil Anchors
4.5.4 Environmental Corrosion Classification
4.6 Pavement Design
4.7 Construction Inspection and Testing
5.0 REPORT LIMITATIONS
6.0 CLOSURE
ATTACHMENT D.2 10878160 - USCG -Ft_Myers_10878160_Env_Soils_Report_FINAL 17May2020
Report Cover
Letter
1.0 INTRODUCTION
2.0 ENVIRONMENTAL SOIL SAMPLING
3.0 CONCLUSIONS
4.0 LIMITATIONS
FIGURES
TABLES
APPENDICES
ATTACHMENT D.3 10878160 - USCG_Ft_Myers_10878160_Hydrant_Flow_Report_FINAL 17May2020
Letter Report
Hydrant Flow Testing Cover Sheet
Hydrant Flow Test Field Sketch
Test #1 – One Outlet
Test #2 – Two Outlets
Test #3 – One Outlet
Test #4 – Two Outlets
ATTACHMENT D.4 10878160 -USCG_Ft_Myers_10878160_Hazmat_Report_FINAL 17May2020
HAZARDOUS MATERIALS REPORT
Attachment A - CERTIFICATIONS
Attachment B - XRF UNIT CALIBRATION DATA AND RESULTS
Attachment C - ASBESTOS SAMPLE ANALYSIS RESULTS
Attachment D - PHOTOGRAPHIC DOCUMENTATION
Attachment E (1) - HAZARDOUS MATERIALS OBSERVATIONS
Attachment E (2) - HAZARDOUS MATERIALS OBSERVATIONS
Attachment F - BUILDINGS 1 & 2 DRAWINGS/ROOM NUMBERS//ACM-LEAD LOCATIONS
ATTACHMENT D.5 10878160 -USCG_Ft_Myers_10878160_Benthic_Survey_Report
Cover
Table of Contents
1.0 Introduction
2.0 Existing Conditions
3.0 Methods
4.0 Results
5.0 Conclusion
6.0 References
Tables
Figures
Appendix A
Appendix B
ATTACHMENT E - Draft National Environmental Policy Act (NEPA) Document
_10878160 ATTACHMENT E - STA-FMB_Compiled Draft EA & Appendices_100120
Fort Myers Beach_Draft EA_091020
CONTENTS
APPENDICES
ACRONYMS AND ABBREVIATIONS
SECTION 1 PURPOSE AND NEED FOR ACTION
1.1 Introduction
1.2 Background
1.3 Overview
1.3.1 USCG Mission
1.3.2 Sector St. Petersburg
1.3.3 Station Fort Myers Beach
1.3.3.1 Existing Facilities
1.3.3.2 Existing Vessels
1.4 Surrounding Land Uses
1.5 Purpose of the Proposed Action
1.6 Need for the Proposed Action
1.7 Agency and Public Involvement Process
1.8 Summary of Environmental Study Requirements
1.8.1 National Environmental Policy Act
1.8.2 Endangered Species Act
1.8.3 Magnuson-Stevens Fishery Conservation and Management Act
1.8.4 Marine Mammal Protection Act
1.8.5 Clean Air Act and Conformity Requirements
1.8.6 Wetland and Water Resources Regulatory Requirements
1.8.7 National Pollutant Discharge Elimination System Program
1.8.8 Coastal Zone Consistency Determination
1.8.9 Cultural Resources Regulatory Requirements
1.8.10 Invasive Species

1.9 Scope of the Environmental Assessment

SECTION 2 DESCRIPTION OF THE PROPOSED ACTION AND ALTERNATIVES
2.1 Proposed Action
2.1.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
2.1.1.1 Temporary Relocation
2.1.1.2 Landside Demolition Activities
2.1.1.3 Construction of a Single Consolidated Multi-Mission Building
2.1.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
2.1.2.1 Landside and In-Water Demolition Activities
2.1.2.2 Landside and In-Water Construction Activities
Landside Facilities
In-Water Facilities
Single Floating Finger Pier
Boat Ramp / Launch Dock
Bulkhead

2.1.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock

2.2 No-Action Alternative
2.3 Alternatives Identified but not Carried Forward for Detailed Analysis
2.3.1 Permanent Relocation to Another Location
2.3.2 Demolition and Reconstruction of the In-Water Facilities
2.3.3 Construction of Two Floating Finger Piers
2.4 Construction Requirements
2.4.1 Memorandum of Agreement between Coast Guard Atlantic Area and the National Marine Fisheries Service
2.4.2 USCG Operational Guidance Related to Marine Resources
2.4.3 Sea Turtle and Smalltooth Sawfish Construction Conditions (2006)
2.4.4 Standard Manatee Conditions for In-Water Work (2011)
2.4.5 Soil Management Plan
2.4.6 Additional Construction Best Management Practices
SECTION 3 AFFECTED ENVIRONMENT
3.1 Air Quality
3.1.1 Definition of Resources
3.1.1.1 Criteria Pollutants
3.1.1.2 Clean Air Act Amendments
3.1.1.3 Florida Administrative Code
3.1.2 Existing Conditions
Regional Air Quality
Emissions at Station Fort Myers Beach
3.2 Biological Resources
3.2.1 Definition of Resource
3.2.2 Existing Conditions
3.2.2.1 Terrestrial Biological Resources
Vegetation
Terrestrial Habitats
Terrestrial Wildlife
Special Status Species
3.2.2.2 Nesting Birds
3.2.2.3 Aquatic Biological Resources
Existing Marine Conditions
Benthic Resources
Seagrasses
Invertebrates
Algal Communities
Critical Habitat
Essential Fish Habitat
Essential Fish Habitat
Aquatic Species
Special Status Aquatic Species

3.2.2.4 Invasive Species

3.3 Geological Resources
3.3.1 Definition of Resource
3.3.2 Existing Conditions
Geology
Topography
Soils
Geologic Hazards
Sinkholes
Flooding and Erosion
Problem Soils
Geochemical Hazards
Tsunami
3.4 Hazardous Materials and Wastes
3.4.1 Definition of Resource
3.4.2 Existing Conditions
3.4.2.1 Hazardous Materials and Wastes in the Vicinity of Station Fort Myers Beach
3.4.2.2 Hazardous Materials and Wastes at Station Fort Myers Beach
Soil Contamination at Station Fort Myers Beach
Asbestos-Containing Material at Station Fort Myers Beach
Lead-Based Paint at Station Fort Myers Beach
3.5 Land Use and Recreation
3.5.1 Definition of Resource
3.5.2 Existing Conditions
3.5.2.1 Land Use
Coastal Zone

3.5.2.2 Recreation

3.6 Water Resources
3.6.1 Definition of Resource
3.6.1.1 Upland Surface Water
3.6.1.2 Groundwater
3.6.1.3 Wetlands
3.6.1.4 Floodplains
3.6.1.5 Marine Waters
3.6.1.6 Shorelines
3.6.1.7 Stormwater Management
3.6.2 Existing Conditions
Upland Surface Waters
Marine Waters and Shorelines
Groundwater
Wetlands
Floodplains and Flood Hazards
Sea Level Rise
3.7 Visual Resources
3.7.1 Definition of Resource
3.7.2 Existing Conditions
San Carlos Island
Station Fort Myers Beach
Historic Structures
SECTION 4 ENVIRONMENTAL CONSEQUENCES
4.1 Air Quality
4.1.1 Approach to Analysis
4.1.2 Impacts from the Action Alternatives
4.1.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
Short-term Construction Emissions
Fugitive Dust Emissions
Combustion Emissions
Long-term Operational Emissions
General Conformity
4.1.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
4.1.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
4.1.3 Impacts from the No-Action Alternative
4.1.4 Special Procedures
4.2 Biological Resources
4.2.1 Approach to Analysis
4.2.2 Impacts from the Action Alternatives
4.2.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
Terrestrial Biological Resources
Vegetation
Special Status Species
Migratory Birds

Aquatic Biological Resources

4.2.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
Terrestrial Biological Resources
Aquatic Biological Resources
Turbidity
Underwater Noise
Essential Fish Habitat and Benthic Resources
Special Status Species

Invasive Species

4.2.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
Terrestrial Biological Resources
Aquatic Biological Resources
4.2.3 Impacts from the No-Action Alternative
4.2.4 Special Procedures
Bats
Nesting Birds
Water Quality
Noise and Turbidity
Invasive Species
4.3 Geological Resources
4.3.1 Approach to Analysis
4.3.2 Impacts from the Action Alternatives
4.3.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
Geology and Topography
Soils
Geologic Hazards
4.3.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
4.3.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
4.3.3 Impacts from the No-Action Alternative
4.3.4 Special Procedures
4.4 Hazardous Materials and Wastes
4.4.1 Approach to Analysis
4.4.2 Impacts from the Action Alternatives
4.4.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
Hazardous Materials and Waste Storage and Generation
Soil Contamination
Asbestos and Lead
4.4.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
4.4.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
4.4.3 Impacts from the No-Action Alternative
4.4.4 Special Procedures
4.5 Land Use and Recreation
4.5.1 Approach to Analysis
4.5.2 Impacts from the Action Alternatives
4.5.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
4.5.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
4.5.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
4.5.3 Impacts from the No-Action Alternative
4.5.4 Special Procedures
4.6 Water Resources
4.6.1 Approach to Analysis
4.6.2 Impacts from the Action Alternatives
4.6.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
Surface Waters and Marine Waters
Short-term Construction Impacts
Long-term Operational Impacts
Groundwater
Wetlands
Floodplains and Sea Level Rise
4.6.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
Surface Waters and Marine Waters
Short-term Construction Impacts
Long-term Operational Impacts
Groundwater
Wetlands
Floodplains and Sea Level Rise

4.6.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock

4.6.3 Impacts from the No-Action Alternative
4.6.4 Special Procedures
Water Quality
Hazardous Materials and Wastes
4.7 Visual Resources
4.7.1 Approach to Analysis
4.7.2 Impacts from the Action Alternatives
4.7.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
Construction-Related Impacts
Operations-Related Impacts
4.7.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
Construction-Related Impacts
Operations-Related Impacts

4.7.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock

4.7.3 Impacts from No-Action Alternative
4.7.4 Special Procedures
SECTION 5 CUMULATIVE IMPACTS
5.1 Projects Considered
5.2 Evaluation of Cumulative Effects
Air Quality
Biological Resources
Geological Resources
Hazardous Materials and Wastes
Land Use and Recreation
Water Resources
Visual Resources
SECTION 6 SUMMARY OF FINDINGS
SECTION 7 SPECIAL PROCEDURES
Air Quality
Biological Resources
Bats
Nesting Birds
Noise and Turbidity
Invasive Species
Hazardous Materials and Wastes
Water Resources
Water Quality
SECTION 8 REFERENCES
SECTION 9 LIST OF PREPARERS
Appendix A_Compiled
A2_NOA_082020
A3_Intergovernmental Review Letter_091020
A4_Fort Myers NMFS (Signed)_v2
A5_NMFS Letter Enclosures
A6_NMFS Summary of Potential Effects
A7_Fort Myers USFWS (Signed)
A8_USFWS Letter Enclosures
A9_USFWS Summary of Potential Effects
A10_Fort Myers SHPO (Signed)
A12_Fort Myers THPO Letters (Signed)
A13_THPO Letter Enclosures
A14_USCG_Ft_Myers_CZ Signed Consultation Package (9-17-2020)
Appendix B_Compiled
B1_Appendix B Table of Contents
Appendix B
Table of Contents
B2_Combined Appendix B
FNAI_Unofficial_Grid_Result.pdf
Official IPAC Species List.pdf
United States Department of the Interior
FISH AND WILDLIFE SERVICE
Official Species List
Project summary
Endangered Species Act species
Mammals
Birds
Reptiles
Fishes
Insects
Flowering Plants
Critical habitats
T&E photopages.pdf
20130425_gd_Appendix B_2011_Standard Manatee Construction Conditions
SeaTurtleAndSawfishConstructionConditions23mar2006.pdf
national marine fisheries service
B3_USCG_Ft_Myers_10878160_Benthic_Survey_Report
B4_USCG_Ft_Myers_10878160_Wetland_Report
19950124 Permit 362151115.pdf
19950726 Permit and Drawings.pdf
19970421 Survey Drawing.pdf
19980825 Pier Extension Permit.pdf
20080818 Permit 0128497006EG Permit and drawings.pdf
20080918 Lee County Dock Reconfiguration permits and drawings.pdf
20120906 Permit Info 0128497006EG permits and drawings.pdf
B5_Biological Opinion-2017
B6_Florida_Manatee_Key_Programmatic_Biological_Opinion
Appendix C_Compiled
C1_Appendix C Table of Contents
Appendix C
Table of Contents
C2_USCG_Ft_Myers_10878160_Cultural_Resources_Report - Copy
1.0 PROJECT AREA
2.0 SCOPE OF WORK REVIEW
3.0 CULTURAL CONTEXT
4.0 HISTORIC MAP/PHOTOGRAPHY AND BACKGROUND RESEARCH
4.1 Historic Maps/Photography
4.2 Archaeological Background Research
4.3 Historic Architectural Background Research
4.4 Site Inspection
5.0 PROJECT AREA SOILS
6.0 CULTURAL RESOURCE SENSITIVITY AND RECOMMENDATIONS
7.0 REFERENCES
ATTACHMENT A
Appendix D & E_Compiled
D1_Appendix D Table of Contents
Appendix D
Table of Contents
D2_USCG_Ft_Myers_10878160_Environmental_Soils_Report
Report Cover
Letter
1.0 INTRODUCTION
2.0 ENVIRONMENTAL SOIL SAMPLING
2.1 Soil Assessment
2.2 Soil Analytical Results
3.0 CONCLUSIONS
4.0 LIMITATIONS
FIGURES
TABLES
APPENDICES
APPENDIX A - SOIL BORING LOGS
APPENDIX B - LABORATORY ANALYTICAL REPORT
Cover Page
Table of Contents
Section 1: Sample Summary
Section 2: Summary of Hits
Section 3: Sample Results
3.1: FA73669-1: B-3 (0-3)
3.2: FA73669-2: B-3 (4-5)
3.3: FA73669-3: B-3 (5-6)
3.4: FA73669-4: B-2 (0-3)
3.5: FA73669-5: B-2 (4-5)
3.6: FA73669-6: B-2 (5-6)
3.7: FA73669-7: B-4 (0-3)
3.8: FA73669-8: B-4 (4-5)
3.9: FA73669-9: B-4 (5-6)
3.10: FA73669-10: B-1 (0-3)
3.11: FA73669-11: B-1 (4-5)
3.12: FA73669-12: B-1 (5-6)
Section 4: Misc. Forms
4.1: Chain of Custody
Section 5: MS Volatiles - QC Data Summaries
5.1: Method Blank Summary
5.1.1: V3C392-MB 3C9328.D Method Blank Summary
5.2: Blank Spike Summary
5.2.1: V3C392-BS 3C9327.D Blank Spike Summary
5.3: Matrix Spike/Matrix Spike Duplicate Summary
5.3.1: FA73669-8MS 3C9349.D Matrix Spike/Matrix Spike Duplicate Summary
Section 6: MS Semi-volatiles - QC Data Summaries
6.1: Method Blank Summary
6.1.1: OP79527-MB X069692.D Method Blank Summary
6.2: Blank Spike Summary
6.2.1: OP79527-BS X069691.D Blank Spike Summary
6.3: Matrix Spike/Matrix Spike Duplicate Summary
6.3.1: OP79527-MS X069694.D Matrix Spike/Matrix Spike Duplicate Summary
Section 7: GC Volatiles - QC Data Summaries
7.1: Method Blank Summary
7.1.1: G1U55-MB 1U1084.D Method Blank Summary
7.1.2: G1U56-MB 1U1117.D Method Blank Summary
7.2: Blank Spike Summary
7.2.1: G1U55-BS 1U1083.D Blank Spike Summary
7.2.2: G1U56-BS 1U1116.D Blank Spike Summary
7.3: Matrix Spike/Matrix Spike Duplicate Summary
7.3.1: FA73616-12MS 1U1106.D Matrix Spike/Matrix Spike Duplicate Summary
7.3.2: FA73669-12MS 1U1129.D Matrix Spike/Matrix Spike Duplicate Summary
Section 8: GC/LC Semi-volatiles - QC Data Summaries
8.1: Method Blank Summary
8.1.1: OP79505-MB YR37745.D Method Blank Summary
8.1.2: OP79506-MB TT399283.D Method Blank Summary
8.1.3: OP79523-MB ST146580.D Method Blank Summary
8.1.4: OP79523-MB TT399469.D Method Blank Summary
8.1.5: OP79507-MB MM61917.D Method Blank Summary
8.1.6: OP79524-MB MM61952.D Method Blank Summary
8.1.7: OP79504-MB WW23969.D Method Blank Summary
8.1.8: OP79586-MB WW24089.D Method Blank Summary
8.2: Blank Spike Summary
8.2.1: OP79505-BS YR37704.D Blank Spike Summary
8.2.2: OP79506-BS TT399281.D Blank Spike Summary
8.2.3: OP79506-BS2 TT399282.D Blank Spike Summary
8.2.4: OP79523-BS ST146578.D Blank Spike Summary
8.2.5: OP79523-BS2 ST146579.D Blank Spike Summary
8.2.6: OP79523-BS ST146644.D Blank Spike Summary
8.2.7: OP79523-BS2 TT399468.D Blank Spike Summary
8.2.8: OP79507-BS MM61916.D Blank Spike Summary
8.2.9: OP79524-BS MM61951.D Blank Spike Summary
8.2.10: OP79504-BS WW23968.D Blank Spike Summary
8.2.11: OP79586-BS WW24088.D Blank Spike Summary
8.3: Matrix Spike/Matrix Spike Duplicate Summary
8.3.1: OP79505-MS YR37725.D Matrix Spike/Matrix Spike Duplicate Summary
8.3.2: OP79506-MS TT399288.D Matrix Spike/Matrix Spike Duplicate Summary
8.3.3: OP79523-MS ST146582.D Matrix Spike/Matrix Spike Duplicate Summary
8.3.4: OP79507-MS MM61921.D Matrix Spike/Matrix Spike Duplicate Summary
8.3.5: OP79524-MS MM61954.D Matrix Spike/Matrix Spike Duplicate Summary
8.3.6: OP79504-MS WW23973.D Matrix Spike/Matrix Spike Duplicate Summary
8.3.7: OP79586-MS WW24106.D Matrix Spike/Matrix Spike Duplicate Summary
Section 9: Metals Analysis - QC Data Summaries
9.1: Prep QC MP36999: Hg
9.1.1: Method Blanks
9.1.2: Matrix Spike and Duplicate Results Summary
9.1.3: Spike Blank and LCS Summary
9.1.4: Serial Dilution Results Summary
9.2: Prep QC MP37014: As,Ba,Cd,Cr,Pb,Se,Ag
9.2.1: Method Blanks
9.2.2: Matrix Spike and Duplicate Results Summary
9.2.3: Spike Blank and LCS Summary
9.2.4: Serial Dilution Results Summary
9.2.5: Post Digestate Spike Summary
9.3: Prep QC MP37015: As,Ba,Cd,Cr,Pb,Se,Ag
9.3.1: Method Blanks
9.3.2: Matrix Spike and Duplicate Results Summary
9.3.3: Spike Blank and LCS Summary
9.3.4: Serial Dilution Results Summary
9.3.5: Post Digestate Spike Summary

APPENDIX C - CHAIN OF CUSTODY

Appendix E_Compiled HAZARDOUS MATERIALS REPORT
E2_USCG_Ft_Myers_10878160_Hazmat_Report
INTRO LETTER
BACKGROUND INFORMATION
TESTING/SAMPLING FOR LEAD COATINGS AND ASBESTOS
TESTING RESULTS
CONCLUSIONS
RECOMMENDATIONS
Attachment A - CERTIFICATIONS
Attachment B - XRF UNIT CALIBRATION DATA AND RESULTS
Attachment C - ASBESTOS SAMPLE ANALYSIS RESULTS
Attachment D - PHOTOGRAPHIC DOCUMENTATION
Attachment E (1) - HAZARDOUS MATERIALS OBSERVATIONS
Attachment E (2) - HAZARDOUS MATERIALS OBSERVATIONS
Attachment F - BUILDINGS 1 & 2 DRAWINGS/ROOM NUMBERS//ACM-LEAD LOCATIONS
10878160 DB RFP BackCover STA-FMB
DRAFT NEPA EA - Fort Myers (Oct Draft).pdf
_10878160 USCG FINAL DB-RFP STA-FMB REBUILD & WATERFRONT (06 October FINAL R3) (28 July 2020 R1)
10878160 - DB RFP Cover STA-FMB
10887160 - Table of Contents STA-FMB
10887160 - Design Build Criteria - Specfications
10878160_SECTION 01110 Design Build General Paragraphs
10878160_SECTION 01115 Dedication Plaque
10878160_SECTION 01200 Design Build Prog Paymts
10878160_SECTION 01320 Design Build Prog Schd Complex Projects
10878160_SECTION 01330 Submittal Procedures
10878160_SECTION 01450 Quality Control
10878160_SECTION 01500 Temp COR Facilities and Equp
10878160_SECTION 01505 Project Meetings
10878160_SECTION 01781 O and M Documentation
01781 APPENDIX O and M - Part 1
01781 APPENDIX O and M - Part 2
01781 APPENDIX O and M - Part 3
10878160 Section 01800 1 01 Design Build Criteria (ECH & HDR)
10878160 Section 01800 1 02 Role of RFP - Specs Dwgs (ECH)
10878160 Section 01800 1 03 Design Related Permits & Certs (ECH)
10878160 Section 01800 1 04 Civil and Site Work
10878160 Section 01800 1 05 Geotechinical Design
10878160 Section 01800 1 06 Landscape Design (ECH)
10878160 Section 01800 1 07 Architectural Design (ECH)
10878160 Section 01800 1 08 Structural
10878160 Section 01800 1 09 Fire
10878160 Section 01800 1 10 Plumbing
10878160 Section 01800 1 11 HVAC
10878160 Section 01800 1 12-1 Electrical
10878160 Section 01800 1 12-2 Electrical-Estimated Load
10878160 Section 01800 1 12-3 Electical One Line Diagram
10878160 Section 01800 1 13-1 Telecommunications Preface
10878160 Section 01800 1 13-2 Telecommunicaitons
10878160 Section 01800 1 14 Security
10878160 Section 01800 1 15 FF&E (ECH)
10878160 Section 01800 1.18 Environmental
10878160 Section 01801_Temporary Facilities
10878160 Section 01802_Construction Design Docs
10878160 Section 01803_Record Documents and Drawings
10878160 Section 01900_List of Drawings
APPENDIX SECTIONS - A, B, C, D & E
Appendix A-ComputerGenDrwgs-Sept2019
Appendix B -ElectDeliv-Sept2019
Appendix C -FDCC File Naming-SEP 2019
Appendix D - Design Narrative-Sept2012
Appendix E - Industry Standards for Const Docs-Sept2012
APPENDIX SECTIONS - F & G
APPENDIX F - 10878160 - A100 STA-FMB SPACE ADJACENCY DIAGRAM
APPENDIX F - 10878160 - C-101 STA-FMB -Base Bid Layout with Options (2020-07-22)
APPENDIX F - 10878160 - C-102 STA-FMB - Site Criteria Plan (2020-07-22)
APPENDIX F - 10878160 - M-SERIES STA-FMB (2020-07-22)
M-01 PLAN-M-01 OVERALL SITE PLAN
M-01A PLAN-M-01 OVERALL SITE PLAN
M-02 SECTIONS-M-02 TYPICAL SECTIONS
M-03 UTILITIES-M-03 UTILITIES
M-05 UTILITIES-M-04 UTILITIES
APPENDIX G 10878160 BFR & SPACE CRITERIA SHEETS
BFR - STA-Fort Myers Beach - 3 pages
SPACE CRITERIA SHEETS - 97 pages
BID OPTION 1 - MSD OFFICE SUITE (pages 94-97)
ATTACHMENT SECTIONS - A, B, C, D & E
ATTACHMENT A - (ELECTRONIC ON DVD ONLY) - NO CONTENT IN THIS DOCUMENT
ATTACHMENT B - 10878160 - USCG - Ft Myers_10878160_Survey_FINAL 20 May2020
V001 Survey As-Built - Shore Work (p.1)
V001 Survey As-Built - Waterfront Workf (p.2)
V002
V003
ATTACHMENT C - 10878160 - USCG-Ft Myers Beach_10878160_Waterfront Inspection FINAL Report 04-02-2020
COVER
Summary of Work
Findings
41 Pier Floating Dock (RPUID 10694) and 41 UTB Pier (RPUID 10713)
Bulkhead (RPUID 10708)
Travel Lift Pier (RPUID 10709) and Travel Lift Floating Dock (RPUID 10714)
Visiting Ship Pier (RPUID 10711)
WPB Pier (RPUID 10712)
Whip Antenna T01 Pier (RPUID 811064)
ATTACHMENTS D - 10878160 -FIIELD SURVEYS - SHORE AND WATERFRONT
ATTACHMENT D.1 10878160 - USCG - Ft_Myers_10878160_Geotechnical_Report_FINAL 17May2020
1.0 INTRODUCTION
1.1 Project Information
1.2 Scope of Work
2.0 DATA GATHERING
2.1 Data Review
2.2 Site Description
2.3 Field Exploration
2.4 Test Pits
2.5 Laboratory Testing
3.0 SUBSURFACE CONDITIONS
3.1 Site and Area Geology
3.2 Soil Survey Information
3.3 Interpreted Stratigraphy
3.3.1 Strata 1 – Reworked/Densified Sands
3.3.2 Strata 2 – Very Loose Sand
3.3.3 Strata 3 – Loose to Medium Dense Sand
3.3.4 Strata 4 – Silty or Clayey Sand and Sandy Silt
3.4 Groundwater
4.0 CONCLUSIONS AND RECOMMENDATIONS
4.1 Demolition
4.2 Site Preparation
4.2.1 Excavation
4.2.2 Fill Placement
4.2.3 Surface and Groundwater Control
4.3 Building Foundations (Driven Piles)
4.3.1 Pile Capacity
4.3.2 Pile Interaction
4.3.3 Pile Splicing
4.3.4 Pile Testing Program
4.4 Minor Structure Foundations
4.5 Bulkhead Design
4.5.1 Design Parameters
4.5.2 Deadman Anchors
4.5.3 Grouted Soil Anchors
4.5.4 Environmental Corrosion Classification
4.6 Pavement Design
4.7 Construction Inspection and Testing
5.0 REPORT LIMITATIONS
6.0 CLOSURE
ATTACHMENT D.2 10878160 - USCG -Ft_Myers_10878160_Env_Soils_Report_FINAL 17May2020
Report Cover
Letter
1.0 INTRODUCTION
2.0 ENVIRONMENTAL SOIL SAMPLING
3.0 CONCLUSIONS
4.0 LIMITATIONS
FIGURES
TABLES
APPENDICES
ATTACHMENT D.3 10878160 - USCG_Ft_Myers_10878160_Hydrant_Flow_Report_FINAL 17May2020
Letter Report
Hydrant Flow Testing Cover Sheet
Hydrant Flow Test Field Sketch
Test #1 – One Outlet
Test #2 – Two Outlets
Test #3 – One Outlet
Test #4 – Two Outlets
ATTACHMENT D.4 10878160 -USCG_Ft_Myers_10878160_Hazmat_Report_FINAL 17May2020
HAZARDOUS MATERIALS REPORT
Attachment A - CERTIFICATIONS
Attachment B - XRF UNIT CALIBRATION DATA AND RESULTS
Attachment C - ASBESTOS SAMPLE ANALYSIS RESULTS
Attachment D - PHOTOGRAPHIC DOCUMENTATION
Attachment E (1) - HAZARDOUS MATERIALS OBSERVATIONS
Attachment E (2) - HAZARDOUS MATERIALS OBSERVATIONS
Attachment F - BUILDINGS 1 & 2 DRAWINGS/ROOM NUMBERS//ACM-LEAD LOCATIONS
ATTACHMENT D.5 10878160 -USCG_Ft_Myers_10878160_Benthic_Survey_Report
Cover
Table of Contents
1.0 Introduction
2.0 Existing Conditions
3.0 Methods
4.0 Results
5.0 Conclusion
6.0 References
Tables
Figures
Appendix A
Appendix B
ATTACHMENT E - Draft National Environmental Policy Act (NEPA) Document
_10878160 ATTACHMENT E - STA-FMB_Compiled Draft EA & Appendices_100120
Fort Myers Beach_Draft EA_091020
CONTENTS
APPENDICES
ACRONYMS AND ABBREVIATIONS
SECTION 1 PURPOSE AND NEED FOR ACTION
1.1 Introduction
1.2 Background
1.3 Overview
1.3.1 USCG Mission
1.3.2 Sector St. Petersburg
1.3.3 Station Fort Myers Beach
1.3.3.1 Existing Facilities
1.3.3.2 Existing Vessels
1.4 Surrounding Land Uses
1.5 Purpose of the Proposed Action
1.6 Need for the Proposed Action
1.7 Agency and Public Involvement Process
1.8 Summary of Environmental Study Requirements
1.8.1 National Environmental Policy Act
1.8.2 Endangered Species Act
1.8.3 Magnuson-Stevens Fishery Conservation and Management Act
1.8.4 Marine Mammal Protection Act
1.8.5 Clean Air Act and Conformity Requirements
1.8.6 Wetland and Water Resources Regulatory Requirements
1.8.7 National Pollutant Discharge Elimination System Program
1.8.8 Coastal Zone Consistency Determination
1.8.9 Cultural Resources Regulatory Requirements
1.8.10 Invasive Species

1.9 Scope of the Environmental Assessment

SECTION 2 DESCRIPTION OF THE PROPOSED ACTION AND ALTERNATIVES
2.1 Proposed Action
2.1.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
2.1.1.1 Temporary Relocation
2.1.1.2 Landside Demolition Activities
2.1.1.3 Construction of a Single Consolidated Multi-Mission Building
2.1.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
2.1.2.1 Landside and In-Water Demolition Activities
2.1.2.2 Landside and In-Water Construction Activities
Landside Facilities
In-Water Facilities
Single Floating Finger Pier
Boat Ramp / Launch Dock
Bulkhead

2.1.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock

2.2 No-Action Alternative
2.3 Alternatives Identified but not Carried Forward for Detailed Analysis
2.3.1 Permanent Relocation to Another Location
2.3.2 Demolition and Reconstruction of the In-Water Facilities
2.3.3 Construction of Two Floating Finger Piers
2.4 Construction Requirements
2.4.1 Memorandum of Agreement between Coast Guard Atlantic Area and the National Marine Fisheries Service
2.4.2 USCG Operational Guidance Related to Marine Resources
2.4.3 Sea Turtle and Smalltooth Sawfish Construction Conditions (2006)
2.4.4 Standard Manatee Conditions for In-Water Work (2011)
2.4.5 Soil Management Plan
2.4.6 Additional Construction Best Management Practices
SECTION 3 AFFECTED ENVIRONMENT
3.1 Air Quality
3.1.1 Definition of Resources
3.1.1.1 Criteria Pollutants
3.1.1.2 Clean Air Act Amendments
3.1.1.3 Florida Administrative Code
3.1.2 Existing Conditions
Regional Air Quality
Emissions at Station Fort Myers Beach
3.2 Biological Resources
3.2.1 Definition of Resource
3.2.2 Existing Conditions
3.2.2.1 Terrestrial Biological Resources
Vegetation
Terrestrial Habitats
Terrestrial Wildlife
Special Status Species
3.2.2.2 Nesting Birds
3.2.2.3 Aquatic Biological Resources
Existing Marine Conditions
Benthic Resources
Seagrasses
Invertebrates
Algal Communities
Critical Habitat
Essential Fish Habitat
Essential Fish Habitat
Aquatic Species
Special Status Aquatic Species

3.2.2.4 Invasive Species

3.3 Geological Resources
3.3.1 Definition of Resource
3.3.2 Existing Conditions
Geology
Topography
Soils
Geologic Hazards
Sinkholes
Flooding and Erosion
Problem Soils
Geochemical Hazards
Tsunami
3.4 Hazardous Materials and Wastes
3.4.1 Definition of Resource
3.4.2 Existing Conditions
3.4.2.1 Hazardous Materials and Wastes in the Vicinity of Station Fort Myers Beach
3.4.2.2 Hazardous Materials and Wastes at Station Fort Myers Beach
Soil Contamination at Station Fort Myers Beach
Asbestos-Containing Material at Station Fort Myers Beach
Lead-Based Paint at Station Fort Myers Beach
3.5 Land Use and Recreation
3.5.1 Definition of Resource
3.5.2 Existing Conditions
3.5.2.1 Land Use
Coastal Zone

3.5.2.2 Recreation

3.6 Water Resources
3.6.1 Definition of Resource
3.6.1.1 Upland Surface Water
3.6.1.2 Groundwater
3.6.1.3 Wetlands
3.6.1.4 Floodplains
3.6.1.5 Marine Waters
3.6.1.6 Shorelines
3.6.1.7 Stormwater Management
3.6.2 Existing Conditions
Upland Surface Waters
Marine Waters and Shorelines
Groundwater
Wetlands
Floodplains and Flood Hazards
Sea Level Rise
3.7 Visual Resources
3.7.1 Definition of Resource
3.7.2 Existing Conditions
San Carlos Island
Station Fort Myers Beach
Historic Structures
SECTION 4 ENVIRONMENTAL CONSEQUENCES
4.1 Air Quality
4.1.1 Approach to Analysis
4.1.2 Impacts from the Action Alternatives
4.1.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
Short-term Construction Emissions
Fugitive Dust Emissions
Combustion Emissions
Long-term Operational Emissions
General Conformity
4.1.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
4.1.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
4.1.3 Impacts from the No-Action Alternative
4.1.4 Special Procedures
4.2 Biological Resources
4.2.1 Approach to Analysis
4.2.2 Impacts from the Action Alternatives
4.2.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
Terrestrial Biological Resources
Vegetation
Special Status Species
Migratory Birds

Aquatic Biological Resources

4.2.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
Terrestrial Biological Resources
Aquatic Biological Resources
Turbidity
Underwater Noise
Essential Fish Habitat and Benthic Resources
Special Status Species

Invasive Species

4.2.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
Terrestrial Biological Resources
Aquatic Biological Resources
4.2.3 Impacts from the No-Action Alternative
4.2.4 Special Procedures
Bats
Nesting Birds
Water Quality
Noise and Turbidity
Invasive Species
4.3 Geological Resources
4.3.1 Approach to Analysis
4.3.2 Impacts from the Action Alternatives
4.3.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
Geology and Topography
Soils
Geologic Hazards
4.3.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
4.3.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
4.3.3 Impacts from the No-Action Alternative
4.3.4 Special Procedures
4.4 Hazardous Materials and Wastes
4.4.1 Approach to Analysis
4.4.2 Impacts from the Action Alternatives
4.4.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
Hazardous Materials and Waste Storage and Generation
Soil Contamination
Asbestos and Lead
4.4.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
4.4.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
4.4.3 Impacts from the No-Action Alternative
4.4.4 Special Procedures
4.5 Land Use and Recreation
4.5.1 Approach to Analysis
4.5.2 Impacts from the Action Alternatives
4.5.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
4.5.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
4.5.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
4.5.3 Impacts from the No-Action Alternative
4.5.4 Special Procedures
4.6 Water Resources
4.6.1 Approach to Analysis
4.6.2 Impacts from the Action Alternatives
4.6.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
Surface Waters and Marine Waters
Short-term Construction Impacts
Long-term Operational Impacts
Groundwater
Wetlands
Floodplains and Sea Level Rise
4.6.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
Surface Waters and Marine Waters
Short-term Construction Impacts
Long-term Operational Impacts
Groundwater
Wetlands
Floodplains and Sea Level Rise

4.6.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock

4.6.3 Impacts from the No-Action Alternative
4.6.4 Special Procedures
Water Quality
Hazardous Materials and Wastes
4.7 Visual Resources
4.7.1 Approach to Analysis
4.7.2 Impacts from the Action Alternatives
4.7.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building
Construction-Related Impacts
Operations-Related Impacts
4.7.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities
Construction-Related Impacts
Operations-Related Impacts

4.7.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock

4.7.3 Impacts from No-Action Alternative
4.7.4 Special Procedures
SECTION 5 CUMULATIVE IMPACTS
5.1 Projects Considered
5.2 Evaluation of Cumulative Effects
Air Quality
Biological Resources
Geological Resources
Hazardous Materials and Wastes
Land Use and Recreation
Water Resources
Visual Resources
SECTION 6 SUMMARY OF FINDINGS
SECTION 7 SPECIAL PROCEDURES
Air Quality
Biological Resources
Bats
Nesting Birds
Noise and Turbidity
Invasive Species
Hazardous Materials and Wastes
Water Resources
Water Quality
SECTION 8 REFERENCES
SECTION 9 LIST OF PREPARERS
Appendix A_Compiled
A2_NOA_082020
A3_Intergovernmental Review Letter_091020
A4_Fort Myers NMFS (Signed)_v2
A5_NMFS Letter Enclosures
A6_NMFS Summary of Potential Effects
A7_Fort Myers USFWS (Signed)
A8_USFWS Letter Enclosures
A9_USFWS Summary of Potential Effects
A10_Fort Myers SHPO (Signed)
A12_Fort Myers THPO Letters (Signed)
A13_THPO Letter Enclosures
A14_USCG_Ft_Myers_CZ Signed Consultation Package (9-17-2020)
Appendix B_Compiled
B1_Appendix B Table of Contents
Appendix B
Table of Contents
B2_Combined Appendix B
FNAI_Unofficial_Grid_Result.pdf
Official IPAC Species List.pdf
United States Department of the Interior
FISH AND WILDLIFE SERVICE
Official Species List
Project summary
Endangered Species Act species
Mammals
Birds
Reptiles
Fishes
Insects
Flowering Plants
Critical habitats
T&E photopages.pdf
20130425_gd_Appendix B_2011_Standard Manatee Construction Conditions
SeaTurtleAndSawfishConstructionConditions23mar2006.pdf
national marine fisheries service
B3_USCG_Ft_Myers_10878160_Benthic_Survey_Report
B4_USCG_Ft_Myers_10878160_Wetland_Report
19950124 Permit 362151115.pdf
19950726 Permit and Drawings.pdf
19970421 Survey Drawing.pdf
19980825 Pier Extension Permit.pdf
20080818 Permit 0128497006EG Permit and drawings.pdf
20080918 Lee County Dock Reconfiguration permits and drawings.pdf
20120906 Permit Info 0128497006EG permits and drawings.pdf
B5_Biological Opinion-2017
B6_Florida_Manatee_Key_Programmatic_Biological_Opinion
Appendix C_Compiled
C1_Appendix C Table of Contents
Appendix C
Table of Contents
C2_USCG_Ft_Myers_10878160_Cultural_Resources_Report - Copy
1.0 PROJECT AREA
2.0 SCOPE OF WORK REVIEW
3.0 CULTURAL CONTEXT
4.0 HISTORIC MAP/PHOTOGRAPHY AND BACKGROUND RESEARCH
4.1 Historic Maps/Photography
4.2 Archaeological Background Research
4.3 Historic Architectural Background Research
4.4 Site Inspection
5.0 PROJECT AREA SOILS
6.0 CULTURAL RESOURCE SENSITIVITY AND RECOMMENDATIONS
7.0 REFERENCES
ATTACHMENT A
Appendix D & E_Compiled
D1_Appendix D Table of Contents
Appendix D
Table of Contents
D2_USCG_Ft_Myers_10878160_Environmental_Soils_Report
Report Cover
Letter
1.0 INTRODUCTION
2.0 ENVIRONMENTAL SOIL SAMPLING
2.1 Soil Assessment
2.2 Soil Analytical Results
3.0 CONCLUSIONS
4.0 LIMITATIONS
FIGURES
TABLES
APPENDICES
APPENDIX A - SOIL BORING LOGS
APPENDIX B - LABORATORY ANALYTICAL REPORT
Cover Page
Table of Contents
Section 1: Sample Summary
Section 2: Summary of Hits
Section 3: Sample Results
3.1: FA73669-1: B-3 (0-3)
3.2: FA73669-2: B-3 (4-5)
3.3: FA73669-3: B-3 (5-6)
3.4: FA73669-4: B-2 (0-3)
3.5: FA73669-5: B-2 (4-5)
3.6: FA73669-6: B-2 (5-6)
3.7: FA73669-7: B-4 (0-3)
3.8: FA73669-8: B-4 (4-5)
3.9: FA73669-9: B-4 (5-6)
3.10: FA73669-10: B-1 (0-3)
3.11: FA73669-11: B-1 (4-5)
3.12: FA73669-12: B-1 (5-6)
Section 4: Misc. Forms
4.1: Chain of Custody
Section 5: MS Volatiles - QC Data Summaries
5.1: Method Blank Summary
5.1.1: V3C392-MB 3C9328.D Method Blank Summary
5.2: Blank Spike Summary
5.2.1: V3C392-BS 3C9327.D Blank Spike Summary
5.3: Matrix Spike/Matrix Spike Duplicate Summary
5.3.1: FA73669-8MS 3C9349.D Matrix Spike/Matrix Spike Duplicate Summary
Section 6: MS Semi-volatiles - QC Data Summaries
6.1: Method Blank Summary
6.1.1: OP79527-MB X069692.D Method Blank Summary
6.2: Blank Spike Summary
6.2.1: OP79527-BS X069691.D Blank Spike Summary
6.3: Matrix Spike/Matrix Spike Duplicate Summary
6.3.1: OP79527-MS X069694.D Matrix Spike/Matrix Spike Duplicate Summary
Section 7: GC Volatiles - QC Data Summaries
7.1: Method Blank Summary
7.1.1: G1U55-MB 1U1084.D Method Blank Summary
7.1.2: G1U56-MB 1U1117.D Method Blank Summary
7.2: Blank Spike Summary
7.2.1: G1U55-BS 1U1083.D Blank Spike Summary
7.2.2: G1U56-BS 1U1116.D Blank Spike Summary
7.3: Matrix Spike/Matrix Spike Duplicate Summary
7.3.1: FA73616-12MS 1U1106.D Matrix Spike/Matrix Spike Duplicate Summary
7.3.2: FA73669-12MS 1U1129.D Matrix Spike/Matrix Spike Duplicate Summary
Section 8: GC/LC Semi-volatiles - QC Data Summaries
8.1: Method Blank Summary
8.1.1: OP79505-MB YR37745.D Method Blank Summary
8.1.2: OP79506-MB TT399283.D Method Blank Summary
8.1.3: OP79523-MB ST146580.D Method Blank Summary
8.1.4: OP79523-MB TT399469.D Method Blank Summary
8.1.5: OP79507-MB MM61917.D Method Blank Summary
8.1.6: OP79524-MB MM61952.D Method Blank Summary
8.1.7: OP79504-MB WW23969.D Method Blank Summary
8.1.8: OP79586-MB WW24089.D Method Blank Summary
8.2: Blank Spike Summary
8.2.1: OP79505-BS YR37704.D Blank Spike Summary
8.2.2: OP79506-BS TT399281.D Blank Spike Summary
8.2.3: OP79506-BS2 TT399282.D Blank Spike Summary
8.2.4: OP79523-BS ST146578.D Blank Spike Summary
8.2.5: OP79523-BS2 ST146579.D Blank Spike Summary
8.2.6: OP79523-BS ST146644.D Blank Spike Summary
8.2.7: OP79523-BS2 TT399468.D Blank Spike Summary
8.2.8: OP79507-BS MM61916.D Blank Spike Summary
8.2.9: OP79524-BS MM61951.D Blank Spike Summary
8.2.10: OP79504-BS WW23968.D Blank Spike Summary
8.2.11: OP79586-BS WW24088.D Blank Spike Summary
8.3: Matrix Spike/Matrix Spike Duplicate Summary
8.3.1: OP79505-MS YR37725.D Matrix Spike/Matrix Spike Duplicate Summary
8.3.2: OP79506-MS TT399288.D Matrix Spike/Matrix Spike Duplicate Summary
8.3.3: OP79523-MS ST146582.D Matrix Spike/Matrix Spike Duplicate Summary
8.3.4: OP79507-MS MM61921.D Matrix Spike/Matrix Spike Duplicate Summary
8.3.5: OP79524-MS MM61954.D Matrix Spike/Matrix Spike Duplicate Summary
8.3.6: OP79504-MS WW23973.D Matrix Spike/Matrix Spike Duplicate Summary
8.3.7: OP79586-MS WW24106.D Matrix Spike/Matrix Spike Duplicate Summary
Section 9: Metals Analysis - QC Data Summaries
9.1: Prep QC MP36999: Hg
9.1.1: Method Blanks
9.1.2: Matrix Spike and Duplicate Results Summary
9.1.3: Spike Blank and LCS Summary
9.1.4: Serial Dilution Results Summary
9.2: Prep QC MP37014: As,Ba,Cd,Cr,Pb,Se,Ag
9.2.1: Method Blanks
9.2.2: Matrix Spike and Duplicate Results Summary
9.2.3: Spike Blank and LCS Summary
9.2.4: Serial Dilution Results Summary
9.2.5: Post Digestate Spike Summary
9.3: Prep QC MP37015: As,Ba,Cd,Cr,Pb,Se,Ag
9.3.1: Method Blanks
9.3.2: Matrix Spike and Duplicate Results Summary
9.3.3: Spike Blank and LCS Summary
9.3.4: Serial Dilution Results Summary
9.3.5: Post Digestate Spike Summary

APPENDIX C - CHAIN OF CUSTODY

Appendix E_Compiled HAZARDOUS MATERIALS REPORT
E2_USCG_Ft_Myers_10878160_Hazmat_Report
INTRO LETTER
BACKGROUND INFORMATION
TESTING/SAMPLING FOR LEAD COATINGS AND ASBESTOS
TESTING RESULTS
CONCLUSIONS
RECOMMENDATIONS
Attachment A - CERTIFICATIONS
Attachment B - XRF UNIT CALIBRATION DATA AND RESULTS
Attachment C - ASBESTOS SAMPLE ANALYSIS RESULTS
Attachment D - PHOTOGRAPHIC DOCUMENTATION
Attachment E (1) - HAZARDOUS MATERIALS OBSERVATIONS
Attachment E (2) - HAZARDOUS MATERIALS OBSERVATIONS
Attachment F - BUILDINGS 1 & 2 DRAWINGS/ROOM NUMBERS//ACM-LEAD LOCATIONS

10878160 DB RFP BackCover STA-FMB