Amendment_0008_70Z04721RMYERDB.pdf
PDF 995 KB Posted
- Solicitation number
- 70Z04721RMYERDB
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment 0008
70Z04721RMYERDB
SOLICITATION 70Z04721RMYERDB IS AMENDED AS FOLLOWS:
1. In Appendix F, Drawing Sheet C-102, ADD general note to read the following:
“For temporary construction purposes, Contractor may relocate the existing 3 gates. The foundation of the gates should be removed and relocated, in-kind, or replaced to match existing. After construction is complete, provide new fence and gates per CG Security CSTO.”
2. In RFP Guide Specifications dated 06 October 2020, Section 1800, Part 1.8 Structural Design
Requirements, Paragraph 1.8.3.2, Under Sub Item Flood, ADD the following language:
“Flood Design Class – 4 per ASCE 24-14 Table 1-1 Flood Design Class of Buildings and Structures.”
THE FOLLOWING REQUEST FOR INFORMATION/CLARIFICATION WERE RECEIVED:
1. Appendix F drawing sheet C102 identifies 3 gates that are to remain. Is it acceptable for the Contractor to keep the 3 gates and their functions, but to relocate them to aid in traffic flow in the new site?
RESPONSE: The Contractor may relocate the existing 3 gates since it will only be for temporary construction purposes. The foundation of the gates should be removed and relocated, in-kind, or replaced to match existing. After construction is complete, provide new gates and fence per CG
Security CSTO. See Amendment.
2. RFP Section 01800, 1.8.3.2 indicates the building Risk Category is IV. Is the Flood Design Class also to be 4 (as defined in ASCE 24)?
RESPONSE: Flood Design Class – 4 per ASCE 24-14 Table 1-1 Flood Design Class of Buildings and
Structures. See Amendment.
Note
Failure to acknowledge amendments may be cause for rejection of your offer.
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0008 |
| Code[0]: |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: Rebuild Facilities and Waterfront, USCG Station Fort Myers Beach, Fort Myers, FL |
Description of Amendment 0008: Continued on Page 2.
| FacilityCode[0]: |
| Code[2]: NA |
| IssuedBy[0]: Contracting Division |
USCG, Facilities Design and Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513-2431
| NameandAddress[0]: |
| AdministeredBy[0]: |
| ContractIDCode[0]: |
| ReqNumber[0]: NA |
| AmendmentNo[1]: 70Z04721RMYERDB |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 2 |
| EffectiveDate[0]: 11/10/2020 |
| Dated9B[0]: 10/15/2020 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: Off |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: 1 |
| Extended[0]: Off |
| NotExtended[0]: 1 |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: |
| CopiesReturned[0]: 1 |
File details come from the government source that posted it. Updated .