United States Coast Guard FDCC Norfolk, VA
REQUEST FOR PROPOSALS –
REBUILD STA FORT MYERS BEACH and WATERFRONT
USCG FORT MYERS BEACH, FLORIDA
ATTACHMENT C
ATTACHMENT C – FIEILD SURVEY WATERFRONT STRUCTURES
Task order No. 70Z04720FMYERAE00 Project No. 10878169
REBUILD STATION FORT MYERS BEACH AND WATERFRONT
FORT MYERS BEACH, FLORIDA
USCG PROJECT 10878160
FINAL
ENVIRONMENTAL SOIL SAMPLING REPORT
Contract Number 70Z05018DAMFWHD02 Task Order Number 70Z04720RMYRCAN00
Prepared For
United States Coast Guard Facilities Design & Construction Center
Norfolk, Virginia
Prepared By
Wood HDR Joint Venture 8601 Six Forks Road, Suite 400 Raleigh, North Carolina 27615
JV Project Number 335000017
May 2020
FINAL
WATERFRONT STRUCTURES INSPECTION REPORT
600 State Street, Suite E | Portsmouth New Hampshire 03801
Ph: 603-766-1870 | www.appledoremarine.com
April 2, 2020
Mr. Brendan Ellis Mr. Josiah M. Berg HDR Architecture, Inc. HDR Architecture, Inc.
4830 W. Kennedy Blvd Suite 400 154450 New Barn Rd. Suite 304 Tampa, FL 33609 Miami Lakes, FL 33014
Email: Brendan.Ellis@hdrinc.com Josiah.Berg@hdrinc.com
Re: Waterfront Structural Inspection Services United States Coast Guard Station Fort Myers Fort Myers Beach, FL 33931
Dear Mr. Ellis & Mr. Berg:
On March 9th and 10th, 2020 Appledore Marine Engineering, LLC (AME) completed a waterfront structural inspection of the waterfront structures at USCG Station Fort Myers, in Fort Myers Beach, Florida. This work was completed to support HDR Architecture, Inc. in the execution of the Task Order 70Z04720FMYERAE00 – Rebuild Station Fort Myers Beach and Waterfront.
Summary of Work
AME completed a cursory inspection of the waterfront structures at USCG Station Fort Myers. The inspection included a visual inspection of the existing structure to validate existing quantities/possible obstructions for demolition planning.
Findings
Several of the structures that make up the waterfront at the Station utilize timber piles for fender elements and support piles. The piles that remain have severe marine borer deterioration with approximately 100 percent section loss localized to low water. The contractor should be aware of this condition as the piles will be difficult to pull during demolition. It is recommended where the timber piles cannot be pulled, the piles should be cut below the mudline.
Remnant stub piles were identified below water and present a potential obstruction for pile driving operations at the 41 Pier Floating dock, Travel Lift Pier, and the WPB Pier.
Failed utility and concrete debris were identified along the Bulkhead at Sta. 2+25. It is recommended to remove the debris prior to the repair or reconstruction of the Bulkhead.
mailto:Brendan.Ellis@hdrinc.com
AME Project Number: 8022A Rebuild Station Fort Myers Beach and Waterfront April 02, 2020
The following structures have been identified for demolition or removal and replacement, a detailed asset inventory and drawings are attached.
RPUID Structure Demolition or Removal/Replacement 10694 41 Pier Floating Dock Removal/Replacement 10708 Bulkhead Removal/Replacement 10709 Travel Lift Pier Demolition 10711 Visiting Ship Pier Removal/Replacement 10712 WPB Pier Removal/Replacement 10713 41 UTB Pier Removal/Replacement 10714 Travel Lift Pier Floating Dock Demolition 811064 Whip Antenna T01 Pier Demolition
If you have questions or comments on the above findings or the photographs and field notes provided, please do not hesitate to contact me.
Regards, Kirk Riden, P.E.
Vice-President
Kyle Vandemoer, P.E.
Engineer- Diver
Attached: Photographs, Field Notes, & Drawings
41 Pier Floating Dock (RPUID 10694) and 41 UTB Pier (RPUID 10713)
Photo 1: Floating dock overall, looking south
Photo 2: Pier overall, looking south
Photo 3: Typical Pier under deck bent with concrete support piles and timber fender piles
Photo 4: Floating dock overall, looking east
Asset Inventory
SITE NAME: USCG Station Fort Myers INSPECTION DATE: 03/09/2020 STRUCTURE: 41 UTB Pier
RPUID: 10713
Depth (in.) Width (in.) Length (in.)
Depth
(in.) Area (sf)
P1 Concrete Plumb Pile 6 1 EA Concrete 14 Square - - - - - PC1 Concrete Pile Cap 3 1 EA Concrete - Rectangular 18 28 100 - -
STR1 Timber Stringers 2 34 LF Timber 6x12 Rectangular - - - - - D1 Timber Decking 1 170 SF Timber 3x12 Rectangular - - - 3 170 FP1 Timber Fender Pile 6 1 EA Timber 12 Round - - - - -
PWL1 Potable Water Line 1 34 LF Rubber 1 Round - - - - - EL1 Electrical Conduit 3 34 LF Plastic 0.75/2 Round - - - - -
Asset Type Asset Type Description
Quantity of Units Material
Deck
Comments
No. of Assets
(Count) Unit Type Size (in.) Shape
Caps, Beams, & Girders
STRUCTURE: 41 Pier Floating Dock
RPUID: 10694
Depth (in.) Width (in.) Length (in.)
p
(in.) Area (sf)
GP1 Steel Guide Pile 4 1 EA Steel 14 Round - - - - -
GPA1 Guid Pile Assembly 4 1 EA Steel 24 Square - - - - -
FM1 Concrete Float Module 6 1 EA Concrete - Rectangular 48 84 120 - -
WL1 Floating Dock Wale 2 120 LF Timber 4x12 Rectangular - - - - -
RS1 Floating Dock Rubstrip 1 136 LF Timber 2x12 Rectangular - - - - -
FND1 D Fender 2 60 LF Rubber 3 D-Shape - - - - -
GW1 Steel Gangway 1 23 LF Steel - Rectangular 4 48 276 - -
LGT1 Light Pedestal 1 1 EA Steel - Rectangular - - - - -
UMD1 Utility Pedestal 2 1 EA Plastic - Rectangular - - - - - Shore Power and Water Hose Connection
PWL1 Potable Water Line 1 60 LF Rubber 1 Round - - - - -
EL1 Electrical Conduit 2 60 LF Plastic 2 Round - - - - -
Asset Type Asset Type Description
Quantity of Units Material
Deck
Comments
No. of Assets
Defect List
USCG Station Fort Myers INSPECTION DATE: 03/09/2020
41 Pier Floating Dock
Depth
Bent Row L (in.) W (in.) L (ft) W (in.) D (in.)
1 Pile 1.25 A Debris 8 36 12
SITE NAME:
STRUCTURE:
RPUID: 10694
Defect
ID No. Defect Type
Defect Size
CommentsP (ft)
Exp Bars
N (#)
Area (sf) or % Loss
Location
Asset Type
Crack
Bulkhead (RPUID 10708)
Photo 1: Bulkhead overall, looking north
Photo 2: Bulkhead transition to adjacent property at Sta. 0+00
Photo 3: Bulkhead transition to adjacent property at Sta. 4+11
Photo 4: Typical concrete pile cap and sheet pile
STRUCTURE: Bulkhead
RPUID: 10708
Depth (in.) Width (in.) Length (in.)
p
(in.) Area (sf)
SP1 Concrete Sheet Pile 1 210 LF Concrete - Rectangular - 30 - - - Sta. 0+00 to Sta. 2+10
SP2 Concrete Sheet Pile 1 101 LF Concrete - Rectangular - 36 - - - Sta. 2+10 to Sta. 3+11
SP3 Concrete Sheet Pile 1 62 LF Concrete - Rectangular - 48 - - - Sta. 3+11 to Sta. 3+73
SP4 Concrete Sheet Pile 1 38 LF Concrete - Rectangular - 72 - - - Sta. 3+73 to Sta. 4+11
PC1 Pile Cap 0+00 to 2+10 1 210 LF Concrete - Round 18 20 - - -
PC2 Pile Cap 2+10 to 2+37 1 27 LF Concrete - Rectangular 29 32 - - -
PC3 Pile Cap 2+37 to 3+11 1 101 LF Concrete - Rectangular 12 20 - - -
PC4 Pile Cap 3+11 to 4+11 1 100 LF Concrete - Rectangular 12 12 - - -
EL1 3" Dia. Electrical Line 1 185 LF Plastic 3 Round - - - - -
EL2 0.75" Electrical Line 1 56 LF Plastic 0.75 Round - - - - -
EP1 Electrical Box 0+23 1 1 EA Plastic - Rectangular - - - - -
PWC2 Sprinkler Bay 1 1 EA Steel - Round - - - - -
PWC1 Hose Connection 2 1 EA Steel 0.75 Round - - - - - Sta. 1+30 & Sta. 1+98
FSO1 Gas & Diesel Shutoff 1 1 EA Steel - Rectangular - - - - -
FSD1 Gas & Diesel Dispensers 1 1 EA Steel - Rectangular - - - - -
Asset Type Asset Type Description
Quantity of Units Material
Deck
Comments
No. of Assets
Bulkhead
10708
Location Depth
Station L (in.) W (in.) L (ft) W (in.) D (in.)
1 Sheet Pile 2+25 Debris 96 48 Abandoned Utilities
SITE NAME:
STRUCTURE:
RPUID:
Defect
ID No. Defect Type
Defect Size
CommentsP (ft)
Exp Bars
N (#)
Area (sf) or % LossAsset Type
Crack
Travel Lift Pier (RPUID 10709) and Travel Lift Floating Dock (RPUID 10714)
Photo 1: Travel Lift Pier overall, looking west
Photo 2: Travel Lift Pier Floating Dock Overall
Photo 3: Typical Travel Lift Pier finger, north finger shown
Photo 4: Typical Travel Lift Pier bent and underdeck.
STRUCTURE: Travel Lift Pier
RPUID: 10709
Depth (in.) Width (in.) Length (in.)
p
(in.) Area (sf)
P1 Concrete Pile 1 16 EA Concrete 14 Square - - - - - PC1 Concrete Pile Cap 1 8 EA Concrete - Rectangular 18 28 86 - -
STR1 Timber Stringers 4 50 LF Timber 6x12 Rectangular - - - - - D1 Concrete Travel Lift Deck 2 134 SF Concrete - Rectangular - - - 28 268 D2 Timber Decking 2 200 SF Timber 3x12 Rectangular - - - 2 400
RS1 Timber Rubstrip 4 47 LF Timber 2x5 Rectangular - - - - - FND1 UHMW Rubrail 1 8 EA Rubber 3 D-Shape - - - - - FP1 Timber Fender Pile 1 10 EA Timber 12 Round - - - - -
MHC1 Steel Cleat 1 9 EA Steel 12 Cleat - - - - - SGB1 Steel Guide Bracing 1 84 EA Steel ˂4x4x1/2 Angle - - - - - 32" Long SG1 Steel Guides 4 50 LF Steel ˂3x8x1/2 Angle - - - - -
SPC1 100A/120V Shore Power 1 1 EA Steel - Rectangular - - - - - SPC2 15A/120V Outlet 1 1 EA Plastic - Rectangular - - - - - EL1 1" Electrical Line 1 100 LF Plastic 1 Round - - - - - EL2 2.5" Electrical Line 1 50 LF Plastic 3 Round - - - - -
LGT1 Flood Light 1 1 EA Plastic - Rectangular - - - - - PWC1 Hose Connection 1 1 EA Steel 0.75 Round - - - - - PWL1 Water Line 1 50 LF Plastic 1 Round - - - - -
Asset Type Asset Type Description
Quantity of Units Material
Deck
Comments
No. of Assets
Travel Lift Pier 10709
Depth
Bent Row L (in.) W (in.) L (ft) W (in.) D (in.)
1 Pile 4 B Debris 14 36 12 Abandon stub pile
Crack Exp Bars
N (#) Comments
LocationDefect
ID No. Asset Type Defect Type P (ft)
Defect Size Area (sf) or % Loss
SITE NAME:
STRUCTURE:
RPUID:
STRUCTURE: Travel Lift Pier Floating Dock
RPUID: 10714
Depth (in.) Width (in.) Length (in.)
p
(in.) Area (sf)
FM1 Plastic Floats 4 1 EA Plastic - Rectangular 12 120 78 - -
GP1 Guide Piles 4 1 EA Timber 12 Round - - - - -
BR1 Gangway 1 15 LF Aluminium - Rectangular 6 36 80 - -
MHC1 Cleat 4 1 EA Plastic 8 Cleat - - - - -
GPA1 Hoop Assembly 4 1 EA Steel 18 Rectangular - - - - - 2" Diameter Pipe
Asset Type Asset Type Description
Quantity of Units Material
Deck
Comments
No. of Assets
Visiting Ship Pier (RPUID 10711)
Photo 1: Visiting Ship Pier overall, looking west.
Photo 2: Visiting Ship Pier timber access trestle, looking west
Photo 3: Typical timber pile with severe marine borer damage and 100 percent section loss
Photo 4: Typical main pier bent with concrete piles and pile cap
STRUCTURE: Visiting Ship Pier
RPUID: 10711
Depth (in.) Width (in.) Length (in.)
p
(in.) Area (sf)
P1 Concrete Plumb Pile 12 1 EA Concrete 10 Rectangular - - - - -
P2 Timber Pile 14 1 EA Timber 12 Round - - - - -
PB1 Concrete Batter Pile 12 1 EA Concrete 10 Rectangular - - - - -
FP1 Timber Fender Pile 11 1 EA Timber 12 Round
PC1 Concrete Pile Cap 12 1 EA Concrete - Rectangular 24 30 120 - - Bents 1-3,5-8,10-11 (L=120in), 4&9 (L=132")
PC2 Timber Pile Cap 7 1 EA Timber 3x12 Rectangular 12 3 84 - - Timber Split Cap
STR1 Timber Stringers 1 635 LF Timber 3x12 Rectangular - - - - -
D1 Timber Decking 1 1343 SF Timber 3x12 Rectangular - - - 3 1343
FBL1 Fender Blocking 11 1 EA Rubber - Rectangular - - - - -
RS1 Fender Rub Strip 11 1 EA Rubber - Rectangular - - - - -
LD1 Safety Ladder 1 1 EA Steel - Rectangular - - - - -
LGT1 Light Pole 2 1 EA Steel - Rectangular - - - - -
PWC1 Potable Water Connection 2 1 EA Steel 2/6 Round - - - - -
PWL1 Water Line 1 50 LF Plastic 3 Round - - - - -
SPC1 Shore Power Connection 1 1 EA Steel - Rectangular - - - - -
EL1 Electrical Line 1 35 LF Plastic 1 Rectangular - - - - - Multiple Conduits Below Deck
Asset Type Asset Type Description
Quantity of Units Material
Deck
Comments
No. of Assets
WPB Pier (RPUID 10712)
Photo 1: WPB Pier overall, looking south
Photo 2: WPB Pier overall, looking east
Photo 3: Typical main pier bent with concrete piles and pile cap
Photo 4: Typical timber fender pile with severe marine borer damage and 100 percent section loss
STRUCTURE: WPB Pier
RPUID: 10712
Depth (in.) Width (in.) Length (in.)
p
(in.) Area (sf)
P1 Concrete Pile 1 14 EA Concrete 10 Square - - - - -
PB1 Concrete Batter Pile 1 34 EA Concrete 10 Square - - - - -
FP1 Timber Fender Pile 1 14 EA Timber - Round - - - - -
PC1 Concrete Pile Cap 1 34 EA Concrete - Rectangular 12 18
96 - -
Varies in Dimension
12x18x96 Bents M-C,8,9
12x18x120 Bent 7
18x22x96 Bents 10-14
STR1 Timber Stringer 1 725 LF Timber 3x12 Rectangular - - - - -
D1 Timber Decking 1 1904 SF Timber 3x12 Rectangular - - - 3 1904
FPL1 Timber Fender Panel 1 40 LF Timber 3x12 Rectangular - - 120 - -
SPC1 Shore Power 1 1 EA Plastic - Rectangular - - - - -
LGT1 Light Pole 1 1 LF Steel - Round - - - - -
PWC1 Potable Water Connection 1 1 LF Plastic 6 Round - - - - -
PWL1 Potable Water Line 1 200 LF Plastic 6 Round - - - - -
Asset Type Asset Type Description
Quantity of Units Material
Deck
Comments
No. of Assets
WPB Pier
Depth
Bent Row L (in.) W (in.) L (ft) W (in.) D (in.)
1 Pile 3 A Debris 14 36 12 Abandoned Fender Pile
Defect
ID No. Defect Type
Defect Size
CommentsP (ft)
Exp Bars
N (#)
Area (sf) or % Loss
Location
Asset Type
Crack
SITE NAME:
STRUCTURE:
RPUID: 10712
Whip Antenna T01 Pier (RPUID 811064)
Photo 1: Whip Antenna T01 Pier overall, looking north
Photo 2: Steel monopile with moderate corrosion scale and section loss localized to the splash zone
Photo 3: Typical timber pier underdeck, stringers, pile cap, bracing, and piles
Photo 4: Steel platform and support framing
STRUCTURE: Whip Antenna T01 Pier
RPUID: 811064
Depth (in.) Width (in.) Length (in.)
p
(in.) Area (sf)
P1 Timber Pile 2 1 EA Timber 10 Round - - - - - P2 Steel Monopile 1 1 EA Steel 18 Round - - - - -
ABT1 Concrete Abutment 1 1 EA Concrete - Rectangular 12 22 100 - - PC1 Timber Split Cap 1 1 EA Timber 2x9 Rectangular - - - - - BR1 Timber Brace 2 XX LF Timber 2x7 Rectangular - - - - -
STR1 Timber Stringer 5 15 LF Timber 2x9 Rectangular - - - - - B1 Steel Angle Beam 1 36 LF Steel ˂3x3x1/4 Angle - - - - - B2 Steel Channel Beam 1 16 LF Steel C8x2 Channel - - - - - D1 Timber Decking 1 87.5 SF Timber 2x5 Rectangular - - - 2 88 D2 Concrete Step 1 1 EA Concrete - Rectangular 4 16 80 - - D3 Steel Grate Decking 1 36 SF Steel - Rectangular 1.5 72 72 1.5 36
EB1 Electrical Box 1 1 EA Plastic - Rectangular 18 36 48 - - EBS1 Electrical Box Support 1 1 EA Steel - Rectangular 33 36 38 - - 2" Unistrut Frame EL1 Electrical Conduit 1 13.5 LF Steel 3 Round - - - - - EP1 Electrical Panel 1 1 EA Plastic - Rectangular 32 36 36 - - ES1 Timber Support 1 3 EA Timber 4x12 Rectangular - - - - -
HDR1 Timber Handrails 1 30 LF Timber - Rectangular - - - - - 3.5 Sq. Posts/2x5 Railing TP1 Steel Grate Transition 1 1 EA Steel - Rectangular 1.5 12 42 - -
Asset Type Asset Type Description
Quantity of Units Material
Deck
Comments
No. of Assets
Level II
STRUCTURE: Whip Antenna T01 Pier
RPUID: 811064
UT Reading
Bent Row Flange or Wall (in.)
Splash Zone 0.470 Mid Water 0.540
Hight Water 0.560 Plumb Pile 2 A.5
Asset
Elevation (ft.
water depth) Comments
Location
| _10878160 USCG FINAL DB-RFP STA-FMB REBUILD & WATERFRONT (06 October FINAL R3) (28 July 2020 R1) |
| 10878160 - DB RFP Cover STA-FMB |
| 10887160 - Table of Contents STA-FMB |
| 10887160 - Design Build Criteria - Specfications |
| 10878160_SECTION 01110 Design Build General Paragraphs |
| 10878160_SECTION 01115 Dedication Plaque |
| 10878160_SECTION 01200 Design Build Prog Paymts |
| 10878160_SECTION 01320 Design Build Prog Schd Complex Projects |
| 10878160_SECTION 01330 Submittal Procedures |
| 10878160_SECTION 01450 Quality Control |
| 10878160_SECTION 01500 Temp COR Facilities and Equp |
| 10878160_SECTION 01505 Project Meetings |
| 10878160_SECTION 01781 O and M Documentation |
| 01781 APPENDIX O and M - Part 1 |
| 01781 APPENDIX O and M - Part 2 |
| 01781 APPENDIX O and M - Part 3 |
| 10878160 Section 01800 1 01 Design Build Criteria (ECH & HDR) |
| 10878160 Section 01800 1 02 Role of RFP - Specs Dwgs (ECH) |
| 10878160 Section 01800 1 03 Design Related Permits & Certs (ECH) |
| 10878160 Section 01800 1 04 Civil and Site Work |
| 10878160 Section 01800 1 05 Geotechinical Design |
| 10878160 Section 01800 1 06 Landscape Design (ECH) |
| 10878160 Section 01800 1 07 Architectural Design (ECH) |
| 10878160 Section 01800 1 08 Structural |
| 10878160 Section 01800 1 09 Fire |
| 10878160 Section 01800 1 10 Plumbing |
| 10878160 Section 01800 1 11 HVAC |
| 10878160 Section 01800 1 12-1 Electrical |
| 10878160 Section 01800 1 12-2 Electrical-Estimated Load |
| 10878160 Section 01800 1 12-3 Electical One Line Diagram |
| 10878160 Section 01800 1 13-1 Telecommunications Preface |
| 10878160 Section 01800 1 13-2 Telecommunicaitons |
| 10878160 Section 01800 1 14 Security |
| 10878160 Section 01800 1 15 FF&E (ECH) |
| 10878160 Section 01800 1.18 Environmental |
| 10878160 Section 01801_Temporary Facilities |
| 10878160 Section 01802_Construction Design Docs |
| 10878160 Section 01803_Record Documents and Drawings |
| 10878160 Section 01900_List of Drawings |
| APPENDIX SECTIONS - A, B, C, D & E |
| Appendix A-ComputerGenDrwgs-Sept2019 |
| Appendix B -ElectDeliv-Sept2019 |
| Appendix C -FDCC File Naming-SEP 2019 |
| Appendix D - Design Narrative-Sept2012 |
| Appendix E - Industry Standards for Const Docs-Sept2012 |
| APPENDIX SECTIONS - F & G |
| APPENDIX F - 10878160 - A100 STA-FMB SPACE ADJACENCY DIAGRAM |
| APPENDIX F - 10878160 - C-101 STA-FMB -Base Bid Layout with Options (2020-07-22) |
| APPENDIX F - 10878160 - C-102 STA-FMB - Site Criteria Plan (2020-07-22) |
| APPENDIX F - 10878160 - M-SERIES STA-FMB (2020-07-22) |
| M-01 PLAN-M-01 OVERALL SITE PLAN |
| M-01A PLAN-M-01 OVERALL SITE PLAN |
| M-02 SECTIONS-M-02 TYPICAL SECTIONS |
| M-03 UTILITIES-M-03 UTILITIES |
| M-05 UTILITIES-M-04 UTILITIES |
| APPENDIX G 10878160 BFR & SPACE CRITERIA SHEETS |
| BFR - STA-Fort Myers Beach - 3 pages |
| SPACE CRITERIA SHEETS - 97 pages |
| BID OPTION 1 - MSD OFFICE SUITE (pages 94-97) |
| ATTACHMENT SECTIONS - A, B, C, D & E |
| ATTACHMENT A - (ELECTRONIC ON DVD ONLY) - NO CONTENT IN THIS DOCUMENT |
| ATTACHMENT B - 10878160 - USCG - Ft Myers_10878160_Survey_FINAL 20 May2020 |
| V001 Survey As-Built - Shore Work (p.1) |
| V001 Survey As-Built - Waterfront Workf (p.2) |
| V002 |
| V003 |
| ATTACHMENT C - 10878160 - USCG-Ft Myers Beach_10878160_Waterfront Inspection FINAL Report 04-02-2020 |
| COVER |
| Summary of Work |
| Findings |
| 41 Pier Floating Dock (RPUID 10694) and 41 UTB Pier (RPUID 10713) |
| Bulkhead (RPUID 10708) |
| Travel Lift Pier (RPUID 10709) and Travel Lift Floating Dock (RPUID 10714) |
| Visiting Ship Pier (RPUID 10711) |
| WPB Pier (RPUID 10712) |
| Whip Antenna T01 Pier (RPUID 811064) |
| ATTACHMENTS D - 10878160 -FIIELD SURVEYS - SHORE AND WATERFRONT |
| ATTACHMENT D.1 10878160 - USCG - Ft_Myers_10878160_Geotechnical_Report_FINAL 17May2020 |
| 1.0 INTRODUCTION |
| 1.1 Project Information |
| 1.2 Scope of Work |
| 2.0 DATA GATHERING |
| 2.1 Data Review |
| 2.2 Site Description |
| 2.3 Field Exploration |
| 2.4 Test Pits |
| 2.5 Laboratory Testing |
| 3.0 SUBSURFACE CONDITIONS |
| 3.1 Site and Area Geology |
| 3.2 Soil Survey Information |
| 3.3 Interpreted Stratigraphy |
| 3.3.1 Strata 1 – Reworked/Densified Sands |
| 3.3.2 Strata 2 – Very Loose Sand |
| 3.3.3 Strata 3 – Loose to Medium Dense Sand |
| 3.3.4 Strata 4 – Silty or Clayey Sand and Sandy Silt |
| 3.4 Groundwater |
| 4.0 CONCLUSIONS AND RECOMMENDATIONS |
| 4.1 Demolition |
| 4.2 Site Preparation |
| 4.2.1 Excavation |
| 4.2.2 Fill Placement |
| 4.2.3 Surface and Groundwater Control |
| 4.3 Building Foundations (Driven Piles) |
| 4.3.1 Pile Capacity |
| 4.3.2 Pile Interaction |
| 4.3.3 Pile Splicing |
| 4.3.4 Pile Testing Program |
| 4.4 Minor Structure Foundations |
| 4.5 Bulkhead Design |
| 4.5.1 Design Parameters |
| 4.5.2 Deadman Anchors |
| 4.5.3 Grouted Soil Anchors |
| 4.5.4 Environmental Corrosion Classification |
| 4.6 Pavement Design |
| 4.7 Construction Inspection and Testing |
| 5.0 REPORT LIMITATIONS |
| 6.0 CLOSURE |
| ATTACHMENT D.2 10878160 - USCG -Ft_Myers_10878160_Env_Soils_Report_FINAL 17May2020 |
| Report Cover |
| Letter |
| 1.0 INTRODUCTION |
| 2.0 ENVIRONMENTAL SOIL SAMPLING |
| 3.0 CONCLUSIONS |
| 4.0 LIMITATIONS |
| FIGURES |
| TABLES |
| APPENDICES |
| ATTACHMENT D.3 10878160 - USCG_Ft_Myers_10878160_Hydrant_Flow_Report_FINAL 17May2020 |
| Letter Report |
| Hydrant Flow Testing Cover Sheet |
| Hydrant Flow Test Field Sketch |
| Test #1 – One Outlet |
| Test #2 – Two Outlets |
| Test #3 – One Outlet |
| Test #4 – Two Outlets |
| ATTACHMENT D.4 10878160 -USCG_Ft_Myers_10878160_Hazmat_Report_FINAL 17May2020 |
| HAZARDOUS MATERIALS REPORT |
| Attachment A - CERTIFICATIONS |
| Attachment B - XRF UNIT CALIBRATION DATA AND RESULTS |
| Attachment C - ASBESTOS SAMPLE ANALYSIS RESULTS |
| Attachment D - PHOTOGRAPHIC DOCUMENTATION |
| Attachment E (1) - HAZARDOUS MATERIALS OBSERVATIONS |
| Attachment E (2) - HAZARDOUS MATERIALS OBSERVATIONS |
| Attachment F - BUILDINGS 1 & 2 DRAWINGS/ROOM NUMBERS//ACM-LEAD LOCATIONS |
| ATTACHMENT D.5 10878160 -USCG_Ft_Myers_10878160_Benthic_Survey_Report |
| Cover |
| Table of Contents |
| 1.0 Introduction |
| 2.0 Existing Conditions |
| 3.0 Methods |
| 4.0 Results |
| 5.0 Conclusion |
| 6.0 References |
| Tables |
| Figures |
| Appendix A |
| Appendix B |
| ATTACHMENT E - Draft National Environmental Policy Act (NEPA) Document |
| _10878160 ATTACHMENT E - STA-FMB_Compiled Draft EA & Appendices_100120 |
| Fort Myers Beach_Draft EA_091020 |
| CONTENTS |
| APPENDICES |
| ACRONYMS AND ABBREVIATIONS |
| SECTION 1 PURPOSE AND NEED FOR ACTION |
| 1.1 Introduction |
| 1.2 Background |
| 1.3 Overview |
| 1.3.1 USCG Mission |
| 1.3.2 Sector St. Petersburg |
| 1.3.3 Station Fort Myers Beach |
| 1.3.3.1 Existing Facilities |
| 1.3.3.2 Existing Vessels |
| 1.4 Surrounding Land Uses |
| 1.5 Purpose of the Proposed Action |
| 1.6 Need for the Proposed Action |
| 1.7 Agency and Public Involvement Process |
| 1.8 Summary of Environmental Study Requirements |
| 1.8.1 National Environmental Policy Act |
| 1.8.2 Endangered Species Act |
| 1.8.3 Magnuson-Stevens Fishery Conservation and Management Act |
| 1.8.4 Marine Mammal Protection Act |
| 1.8.5 Clean Air Act and Conformity Requirements |
| 1.8.6 Wetland and Water Resources Regulatory Requirements |
| 1.8.7 National Pollutant Discharge Elimination System Program |
| 1.8.8 Coastal Zone Consistency Determination |
| 1.8.9 Cultural Resources Regulatory Requirements |
| 1.8.10 Invasive Species |
1.9 Scope of the Environmental Assessment
| SECTION 2 DESCRIPTION OF THE PROPOSED ACTION AND ALTERNATIVES |
| 2.1 Proposed Action |
| 2.1.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| 2.1.1.1 Temporary Relocation |
| 2.1.1.2 Landside Demolition Activities |
| 2.1.1.3 Construction of a Single Consolidated Multi-Mission Building |
| 2.1.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 2.1.2.1 Landside and In-Water Demolition Activities |
| 2.1.2.2 Landside and In-Water Construction Activities |
| Landside Facilities |
| In-Water Facilities |
| Single Floating Finger Pier |
| Boat Ramp / Launch Dock |
| Bulkhead |
2.1.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
| 2.2 No-Action Alternative |
| 2.3 Alternatives Identified but not Carried Forward for Detailed Analysis |
| 2.3.1 Permanent Relocation to Another Location |
| 2.3.2 Demolition and Reconstruction of the In-Water Facilities |
| 2.3.3 Construction of Two Floating Finger Piers |
| 2.4 Construction Requirements |
| 2.4.1 Memorandum of Agreement between Coast Guard Atlantic Area and the National Marine Fisheries Service |
| 2.4.2 USCG Operational Guidance Related to Marine Resources |
| 2.4.3 Sea Turtle and Smalltooth Sawfish Construction Conditions (2006) |
| 2.4.4 Standard Manatee Conditions for In-Water Work (2011) |
| 2.4.5 Soil Management Plan |
| 2.4.6 Additional Construction Best Management Practices |
| SECTION 3 AFFECTED ENVIRONMENT |
| 3.1 Air Quality |
| 3.1.1 Definition of Resources |
| 3.1.1.1 Criteria Pollutants |
| 3.1.1.2 Clean Air Act Amendments |
| 3.1.1.3 Florida Administrative Code |
| 3.1.2 Existing Conditions |
| Regional Air Quality |
| Emissions at Station Fort Myers Beach |
| 3.2 Biological Resources |
| 3.2.1 Definition of Resource |
| 3.2.2 Existing Conditions |
| 3.2.2.1 Terrestrial Biological Resources |
| Vegetation |
| Terrestrial Habitats |
| Terrestrial Wildlife |
| Special Status Species |
| 3.2.2.2 Nesting Birds |
| 3.2.2.3 Aquatic Biological Resources |
| Existing Marine Conditions |
| Benthic Resources |
| Seagrasses |
| Invertebrates |
| Algal Communities |
| Critical Habitat |
| Essential Fish Habitat |
| Essential Fish Habitat |
| Aquatic Species |
| Special Status Aquatic Species |
3.2.2.4 Invasive Species
| 3.3 Geological Resources |
| 3.3.1 Definition of Resource |
| 3.3.2 Existing Conditions |
| Geology |
| Topography |
| Soils |
| Geologic Hazards |
| Sinkholes |
| Flooding and Erosion |
| Problem Soils |
| Geochemical Hazards |
| Tsunami |
| 3.4 Hazardous Materials and Wastes |
| 3.4.1 Definition of Resource |
| 3.4.2 Existing Conditions |
| 3.4.2.1 Hazardous Materials and Wastes in the Vicinity of Station Fort Myers Beach |
| 3.4.2.2 Hazardous Materials and Wastes at Station Fort Myers Beach |
| Soil Contamination at Station Fort Myers Beach |
| Asbestos-Containing Material at Station Fort Myers Beach |
| Lead-Based Paint at Station Fort Myers Beach |
| 3.5 Land Use and Recreation |
| 3.5.1 Definition of Resource |
| 3.5.2 Existing Conditions |
| 3.5.2.1 Land Use |
| Coastal Zone |
3.5.2.2 Recreation
| 3.6 Water Resources |
| 3.6.1 Definition of Resource |
| 3.6.1.1 Upland Surface Water |
| 3.6.1.2 Groundwater |
| 3.6.1.3 Wetlands |
| 3.6.1.4 Floodplains |
| 3.6.1.5 Marine Waters |
| 3.6.1.6 Shorelines |
| 3.6.1.7 Stormwater Management |
| 3.6.2 Existing Conditions |
| Upland Surface Waters |
| Marine Waters and Shorelines |
| Groundwater |
| Wetlands |
| Floodplains and Flood Hazards |
| Sea Level Rise |
| 3.7 Visual Resources |
| 3.7.1 Definition of Resource |
| 3.7.2 Existing Conditions |
| San Carlos Island |
| Station Fort Myers Beach |
| Historic Structures |
| SECTION 4 ENVIRONMENTAL CONSEQUENCES |
| 4.1 Air Quality |
| 4.1.1 Approach to Analysis |
| 4.1.2 Impacts from the Action Alternatives |
| 4.1.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Short-term Construction Emissions |
| Fugitive Dust Emissions |
| Combustion Emissions |
| Long-term Operational Emissions |
| General Conformity |
| 4.1.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.1.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.1.3 Impacts from the No-Action Alternative |
| 4.1.4 Special Procedures |
| 4.2 Biological Resources |
| 4.2.1 Approach to Analysis |
| 4.2.2 Impacts from the Action Alternatives |
| 4.2.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Terrestrial Biological Resources |
| Vegetation |
| Special Status Species |
| Migratory Birds |
Aquatic Biological Resources
| 4.2.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| Terrestrial Biological Resources |
| Aquatic Biological Resources |
| Turbidity |
| Underwater Noise |
| Essential Fish Habitat and Benthic Resources |
| Special Status Species |
Invasive Species
| 4.2.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| Terrestrial Biological Resources |
| Aquatic Biological Resources |
| 4.2.3 Impacts from the No-Action Alternative |
| 4.2.4 Special Procedures |
| Bats |
| Nesting Birds |
| Water Quality |
| Noise and Turbidity |
| Invasive Species |
| 4.3 Geological Resources |
| 4.3.1 Approach to Analysis |
| 4.3.2 Impacts from the Action Alternatives |
| 4.3.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Geology and Topography |
| Soils |
| Geologic Hazards |
| 4.3.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.3.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.3.3 Impacts from the No-Action Alternative |
| 4.3.4 Special Procedures |
| 4.4 Hazardous Materials and Wastes |
| 4.4.1 Approach to Analysis |
| 4.4.2 Impacts from the Action Alternatives |
| 4.4.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Hazardous Materials and Waste Storage and Generation |
| Soil Contamination |
| Asbestos and Lead |
| 4.4.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.4.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.4.3 Impacts from the No-Action Alternative |
| 4.4.4 Special Procedures |
| 4.5 Land Use and Recreation |
| 4.5.1 Approach to Analysis |
| 4.5.2 Impacts from the Action Alternatives |
| 4.5.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| 4.5.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.5.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.5.3 Impacts from the No-Action Alternative |
| 4.5.4 Special Procedures |
| 4.6 Water Resources |
| 4.6.1 Approach to Analysis |
| 4.6.2 Impacts from the Action Alternatives |
| 4.6.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Surface Waters and Marine Waters |
| Short-term Construction Impacts |
| Long-term Operational Impacts |
| Groundwater |
| Wetlands |
| Floodplains and Sea Level Rise |
| 4.6.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| Surface Waters and Marine Waters |
| Short-term Construction Impacts |
| Long-term Operational Impacts |
| Groundwater |
| Wetlands |
| Floodplains and Sea Level Rise |
4.6.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
| 4.6.3 Impacts from the No-Action Alternative |
| 4.6.4 Special Procedures |
| Water Quality |
| Hazardous Materials and Wastes |
| 4.7 Visual Resources |
| 4.7.1 Approach to Analysis |
| 4.7.2 Impacts from the Action Alternatives |
| 4.7.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Construction-Related Impacts |
| Operations-Related Impacts |
| 4.7.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| Construction-Related Impacts |
| Operations-Related Impacts |
4.7.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
| 4.7.3 Impacts from No-Action Alternative |
| 4.7.4 Special Procedures |
| SECTION 5 CUMULATIVE IMPACTS |
| 5.1 Projects Considered |
| 5.2 Evaluation of Cumulative Effects |
| Air Quality |
| Biological Resources |
| Geological Resources |
| Hazardous Materials and Wastes |
| Land Use and Recreation |
| Water Resources |
| Visual Resources |
| SECTION 6 SUMMARY OF FINDINGS |
| SECTION 7 SPECIAL PROCEDURES |
| Air Quality |
| Biological Resources |
| Bats |
| Nesting Birds |
| Noise and Turbidity |
| Invasive Species |
| Hazardous Materials and Wastes |
| Water Resources |
| Water Quality |
| SECTION 8 REFERENCES |
| SECTION 9 LIST OF PREPARERS |
| Appendix A_Compiled |
| A2_NOA_082020 |
| A3_Intergovernmental Review Letter_091020 |
| A4_Fort Myers NMFS (Signed)_v2 |
| A5_NMFS Letter Enclosures |
| A6_NMFS Summary of Potential Effects |
| A7_Fort Myers USFWS (Signed) |
| A8_USFWS Letter Enclosures |
| A9_USFWS Summary of Potential Effects |
| A10_Fort Myers SHPO (Signed) |
| A12_Fort Myers THPO Letters (Signed) |
| A13_THPO Letter Enclosures |
| A14_USCG_Ft_Myers_CZ Signed Consultation Package (9-17-2020) |
| Appendix B_Compiled |
| B1_Appendix B Table of Contents |
| Appendix B |
| Table of Contents |
| B2_Combined Appendix B |
| FNAI_Unofficial_Grid_Result.pdf |
| Official IPAC Species List.pdf |
| United States Department of the Interior |
| FISH AND WILDLIFE SERVICE |
| Official Species List |
| Project summary |
| Endangered Species Act species |
| Mammals |
| Birds |
| Reptiles |
| Fishes |
| Insects |
| Flowering Plants |
| Critical habitats |
| T&E photopages.pdf |
| 20130425_gd_Appendix B_2011_Standard Manatee Construction Conditions |
| SeaTurtleAndSawfishConstructionConditions23mar2006.pdf |
| national marine fisheries service |
| B3_USCG_Ft_Myers_10878160_Benthic_Survey_Report |
| B4_USCG_Ft_Myers_10878160_Wetland_Report |
| 19950124 Permit 362151115.pdf |
| 19950726 Permit and Drawings.pdf |
| 19970421 Survey Drawing.pdf |
| 19980825 Pier Extension Permit.pdf |
| 20080818 Permit 0128497006EG Permit and drawings.pdf |
| 20080918 Lee County Dock Reconfiguration permits and drawings.pdf |
| 20120906 Permit Info 0128497006EG permits and drawings.pdf |
| B5_Biological Opinion-2017 |
| B6_Florida_Manatee_Key_Programmatic_Biological_Opinion |
| Appendix C_Compiled |
| C1_Appendix C Table of Contents |
| Appendix C |
| Table of Contents |
| C2_USCG_Ft_Myers_10878160_Cultural_Resources_Report - Copy |
| 1.0 PROJECT AREA |
| 2.0 SCOPE OF WORK REVIEW |
| 3.0 CULTURAL CONTEXT |
| 4.0 HISTORIC MAP/PHOTOGRAPHY AND BACKGROUND RESEARCH |
| 4.1 Historic Maps/Photography |
| 4.2 Archaeological Background Research |
| 4.3 Historic Architectural Background Research |
| 4.4 Site Inspection |
| 5.0 PROJECT AREA SOILS |
| 6.0 CULTURAL RESOURCE SENSITIVITY AND RECOMMENDATIONS |
| 7.0 REFERENCES |
| ATTACHMENT A |
| Appendix D & E_Compiled |
| D1_Appendix D Table of Contents |
| Appendix D |
| Table of Contents |
| D2_USCG_Ft_Myers_10878160_Environmental_Soils_Report |
| Report Cover |
| Letter |
| 1.0 INTRODUCTION |
| 2.0 ENVIRONMENTAL SOIL SAMPLING |
| 2.1 Soil Assessment |
| 2.2 Soil Analytical Results |
| 3.0 CONCLUSIONS |
| 4.0 LIMITATIONS |
| FIGURES |
| TABLES |
| APPENDICES |
| APPENDIX A - SOIL BORING LOGS |
| APPENDIX B - LABORATORY ANALYTICAL REPORT |
| Cover Page |
| Table of Contents |
| Section 1: Sample Summary |
| Section 2: Summary of Hits |
| Section 3: Sample Results |
| 3.1: FA73669-1: B-3 (0-3) |
| 3.2: FA73669-2: B-3 (4-5) |
| 3.3: FA73669-3: B-3 (5-6) |
| 3.4: FA73669-4: B-2 (0-3) |
| 3.5: FA73669-5: B-2 (4-5) |
| 3.6: FA73669-6: B-2 (5-6) |
| 3.7: FA73669-7: B-4 (0-3) |
| 3.8: FA73669-8: B-4 (4-5) |
| 3.9: FA73669-9: B-4 (5-6) |
| 3.10: FA73669-10: B-1 (0-3) |
| 3.11: FA73669-11: B-1 (4-5) |
| 3.12: FA73669-12: B-1 (5-6) |
| Section 4: Misc. Forms |
| 4.1: Chain of Custody |
| Section 5: MS Volatiles - QC Data Summaries |
| 5.1: Method Blank Summary |
| 5.1.1: V3C392-MB 3C9328.D Method Blank Summary |
| 5.2: Blank Spike Summary |
| 5.2.1: V3C392-BS 3C9327.D Blank Spike Summary |
| 5.3: Matrix Spike/Matrix Spike Duplicate Summary |
| 5.3.1: FA73669-8MS 3C9349.D Matrix Spike/Matrix Spike Duplicate Summary |
| Section 6: MS Semi-volatiles - QC Data Summaries |
| 6.1: Method Blank Summary |
| 6.1.1: OP79527-MB X069692.D Method Blank Summary |
| 6.2: Blank Spike Summary |
| 6.2.1: OP79527-BS X069691.D Blank Spike Summary |
| 6.3: Matrix Spike/Matrix Spike Duplicate Summary |
| 6.3.1: OP79527-MS X069694.D Matrix Spike/Matrix Spike Duplicate Summary |
| Section 7: GC Volatiles - QC Data Summaries |
| 7.1: Method Blank Summary |
| 7.1.1: G1U55-MB 1U1084.D Method Blank Summary |
| 7.1.2: G1U56-MB 1U1117.D Method Blank Summary |
| 7.2: Blank Spike Summary |
| 7.2.1: G1U55-BS 1U1083.D Blank Spike Summary |
| 7.2.2: G1U56-BS 1U1116.D Blank Spike Summary |
| 7.3: Matrix Spike/Matrix Spike Duplicate Summary |
| 7.3.1: FA73616-12MS 1U1106.D Matrix Spike/Matrix Spike Duplicate Summary |
| 7.3.2: FA73669-12MS 1U1129.D Matrix Spike/Matrix Spike Duplicate Summary |
| Section 8: GC/LC Semi-volatiles - QC Data Summaries |
| 8.1: Method Blank Summary |
| 8.1.1: OP79505-MB YR37745.D Method Blank Summary |
| 8.1.2: OP79506-MB TT399283.D Method Blank Summary |
| 8.1.3: OP79523-MB ST146580.D Method Blank Summary |
| 8.1.4: OP79523-MB TT399469.D Method Blank Summary |
| 8.1.5: OP79507-MB MM61917.D Method Blank Summary |
| 8.1.6: OP79524-MB MM61952.D Method Blank Summary |
| 8.1.7: OP79504-MB WW23969.D Method Blank Summary |
| 8.1.8: OP79586-MB WW24089.D Method Blank Summary |
| 8.2: Blank Spike Summary |
| 8.2.1: OP79505-BS YR37704.D Blank Spike Summary |
| 8.2.2: OP79506-BS TT399281.D Blank Spike Summary |
| 8.2.3: OP79506-BS2 TT399282.D Blank Spike Summary |
| 8.2.4: OP79523-BS ST146578.D Blank Spike Summary |
| 8.2.5: OP79523-BS2 ST146579.D Blank Spike Summary |
| 8.2.6: OP79523-BS ST146644.D Blank Spike Summary |
| 8.2.7: OP79523-BS2 TT399468.D Blank Spike Summary |
| 8.2.8: OP79507-BS MM61916.D Blank Spike Summary |
| 8.2.9: OP79524-BS MM61951.D Blank Spike Summary |
| 8.2.10: OP79504-BS WW23968.D Blank Spike Summary |
| 8.2.11: OP79586-BS WW24088.D Blank Spike Summary |
| 8.3: Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.1: OP79505-MS YR37725.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.2: OP79506-MS TT399288.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.3: OP79523-MS ST146582.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.4: OP79507-MS MM61921.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.5: OP79524-MS MM61954.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.6: OP79504-MS WW23973.D Matrix Spike/Matrix Spike Duplicate Summary |
| 8.3.7: OP79586-MS WW24106.D Matrix Spike/Matrix Spike Duplicate Summary |
| Section 9: Metals Analysis - QC Data Summaries |
| 9.1: Prep QC MP36999: Hg |
| 9.1.1: Method Blanks |
| 9.1.2: Matrix Spike and Duplicate Results Summary |
| 9.1.3: Spike Blank and LCS Summary |
| 9.1.4: Serial Dilution Results Summary |
| 9.2: Prep QC MP37014: As,Ba,Cd,Cr,Pb,Se,Ag |
| 9.2.1: Method Blanks |
| 9.2.2: Matrix Spike and Duplicate Results Summary |
| 9.2.3: Spike Blank and LCS Summary |
| 9.2.4: Serial Dilution Results Summary |
| 9.2.5: Post Digestate Spike Summary |
| 9.3: Prep QC MP37015: As,Ba,Cd,Cr,Pb,Se,Ag |
| 9.3.1: Method Blanks |
| 9.3.2: Matrix Spike and Duplicate Results Summary |
| 9.3.3: Spike Blank and LCS Summary |
| 9.3.4: Serial Dilution Results Summary |
| 9.3.5: Post Digestate Spike Summary |
APPENDIX C - CHAIN OF CUSTODY
| Appendix E_Compiled HAZARDOUS MATERIALS REPORT |
| E2_USCG_Ft_Myers_10878160_Hazmat_Report |
| INTRO LETTER |
| BACKGROUND INFORMATION |
| TESTING/SAMPLING FOR LEAD COATINGS AND ASBESTOS |
| TESTING RESULTS |
| CONCLUSIONS |
| RECOMMENDATIONS |
| Attachment A - CERTIFICATIONS |
| Attachment B - XRF UNIT CALIBRATION DATA AND RESULTS |
| Attachment C - ASBESTOS SAMPLE ANALYSIS RESULTS |
| Attachment D - PHOTOGRAPHIC DOCUMENTATION |
| Attachment E (1) - HAZARDOUS MATERIALS OBSERVATIONS |
| Attachment E (2) - HAZARDOUS MATERIALS OBSERVATIONS |
| Attachment F - BUILDINGS 1 & 2 DRAWINGS/ROOM NUMBERS//ACM-LEAD LOCATIONS |
| 10878160 DB RFP BackCover STA-FMB |
| DRAFT NEPA EA - Fort Myers (Oct Draft).pdf |
| _10878160 USCG FINAL DB-RFP STA-FMB REBUILD & WATERFRONT (06 October FINAL R3) (28 July 2020 R1) |
| 10878160 - DB RFP Cover STA-FMB |
| 10887160 - Table of Contents STA-FMB |
| 10887160 - Design Build Criteria - Specfications |
| 10878160_SECTION 01110 Design Build General Paragraphs |
| 10878160_SECTION 01115 Dedication Plaque |
| 10878160_SECTION 01200 Design Build Prog Paymts |
| 10878160_SECTION 01320 Design Build Prog Schd Complex Projects |
| 10878160_SECTION 01330 Submittal Procedures |
| 10878160_SECTION 01450 Quality Control |
| 10878160_SECTION 01500 Temp COR Facilities and Equp |
| 10878160_SECTION 01505 Project Meetings |
| 10878160_SECTION 01781 O and M Documentation |
| 01781 APPENDIX O and M - Part 1 |
| 01781 APPENDIX O and M - Part 2 |
| 01781 APPENDIX O and M - Part 3 |
| 10878160 Section 01800 1 01 Design Build Criteria (ECH & HDR) |
| 10878160 Section 01800 1 02 Role of RFP - Specs Dwgs (ECH) |
| 10878160 Section 01800 1 03 Design Related Permits & Certs (ECH) |
| 10878160 Section 01800 1 04 Civil and Site Work |
| 10878160 Section 01800 1 05 Geotechinical Design |
| 10878160 Section 01800 1 06 Landscape Design (ECH) |
| 10878160 Section 01800 1 07 Architectural Design (ECH) |
| 10878160 Section 01800 1 08 Structural |
| 10878160 Section 01800 1 09 Fire |
| 10878160 Section 01800 1 10 Plumbing |
| 10878160 Section 01800 1 11 HVAC |
| 10878160 Section 01800 1 12-1 Electrical |
| 10878160 Section 01800 1 12-2 Electrical-Estimated Load |
| 10878160 Section 01800 1 12-3 Electical One Line Diagram |
| 10878160 Section 01800 1 13-1 Telecommunications Preface |
| 10878160 Section 01800 1 13-2 Telecommunicaitons |
| 10878160 Section 01800 1 14 Security |
| 10878160 Section 01800 1 15 FF&E (ECH) |
| 10878160 Section 01800 1.18 Environmental |
| 10878160 Section 01801_Temporary Facilities |
| 10878160 Section 01802_Construction Design Docs |
| 10878160 Section 01803_Record Documents and Drawings |
| 10878160 Section 01900_List of Drawings |
| APPENDIX SECTIONS - A, B, C, D & E |
| Appendix A-ComputerGenDrwgs-Sept2019 |
| Appendix B -ElectDeliv-Sept2019 |
| Appendix C -FDCC File Naming-SEP 2019 |
| Appendix D - Design Narrative-Sept2012 |
| Appendix E - Industry Standards for Const Docs-Sept2012 |
| APPENDIX SECTIONS - F & G |
| APPENDIX F - 10878160 - A100 STA-FMB SPACE ADJACENCY DIAGRAM |
| APPENDIX F - 10878160 - C-101 STA-FMB -Base Bid Layout with Options (2020-07-22) |
| APPENDIX F - 10878160 - C-102 STA-FMB - Site Criteria Plan (2020-07-22) |
| APPENDIX F - 10878160 - M-SERIES STA-FMB (2020-07-22) |
| M-01 PLAN-M-01 OVERALL SITE PLAN |
| M-01A PLAN-M-01 OVERALL SITE PLAN |
| M-02 SECTIONS-M-02 TYPICAL SECTIONS |
| M-03 UTILITIES-M-03 UTILITIES |
| M-05 UTILITIES-M-04 UTILITIES |
| APPENDIX G 10878160 BFR & SPACE CRITERIA SHEETS |
| BFR - STA-Fort Myers Beach - 3 pages |
| SPACE CRITERIA SHEETS - 97 pages |
| BID OPTION 1 - MSD OFFICE SUITE (pages 94-97) |
| ATTACHMENT SECTIONS - A, B, C, D & E |
| ATTACHMENT A - (ELECTRONIC ON DVD ONLY) - NO CONTENT IN THIS DOCUMENT |
| ATTACHMENT B - 10878160 - USCG - Ft Myers_10878160_Survey_FINAL 20 May2020 |
| V001 Survey As-Built - Shore Work (p.1) |
| V001 Survey As-Built - Waterfront Workf (p.2) |
| V002 |
| V003 |
| ATTACHMENT C - 10878160 - USCG-Ft Myers Beach_10878160_Waterfront Inspection FINAL Report 04-02-2020 |
| COVER |
| Summary of Work |
| Findings |
| 41 Pier Floating Dock (RPUID 10694) and 41 UTB Pier (RPUID 10713) |
| Bulkhead (RPUID 10708) |
| Travel Lift Pier (RPUID 10709) and Travel Lift Floating Dock (RPUID 10714) |
| Visiting Ship Pier (RPUID 10711) |
| WPB Pier (RPUID 10712) |
| Whip Antenna T01 Pier (RPUID 811064) |
| ATTACHMENTS D - 10878160 -FIIELD SURVEYS - SHORE AND WATERFRONT |
| ATTACHMENT D.1 10878160 - USCG - Ft_Myers_10878160_Geotechnical_Report_FINAL 17May2020 |
| 1.0 INTRODUCTION |
| 1.1 Project Information |
| 1.2 Scope of Work |
| 2.0 DATA GATHERING |
| 2.1 Data Review |
| 2.2 Site Description |
| 2.3 Field Exploration |
| 2.4 Test Pits |
| 2.5 Laboratory Testing |
| 3.0 SUBSURFACE CONDITIONS |
| 3.1 Site and Area Geology |
| 3.2 Soil Survey Information |
| 3.3 Interpreted Stratigraphy |
| 3.3.1 Strata 1 – Reworked/Densified Sands |
| 3.3.2 Strata 2 – Very Loose Sand |
| 3.3.3 Strata 3 – Loose to Medium Dense Sand |
| 3.3.4 Strata 4 – Silty or Clayey Sand and Sandy Silt |
| 3.4 Groundwater |
| 4.0 CONCLUSIONS AND RECOMMENDATIONS |
| 4.1 Demolition |
| 4.2 Site Preparation |
| 4.2.1 Excavation |
| 4.2.2 Fill Placement |
| 4.2.3 Surface and Groundwater Control |
| 4.3 Building Foundations (Driven Piles) |
| 4.3.1 Pile Capacity |
| 4.3.2 Pile Interaction |
| 4.3.3 Pile Splicing |
| 4.3.4 Pile Testing Program |
| 4.4 Minor Structure Foundations |
| 4.5 Bulkhead Design |
| 4.5.1 Design Parameters |
| 4.5.2 Deadman Anchors |
| 4.5.3 Grouted Soil Anchors |
| 4.5.4 Environmental Corrosion Classification |
| 4.6 Pavement Design |
| 4.7 Construction Inspection and Testing |
| 5.0 REPORT LIMITATIONS |
| 6.0 CLOSURE |
| ATTACHMENT D.2 10878160 - USCG -Ft_Myers_10878160_Env_Soils_Report_FINAL 17May2020 |
| Report Cover |
| Letter |
| 1.0 INTRODUCTION |
| 2.0 ENVIRONMENTAL SOIL SAMPLING |
| 3.0 CONCLUSIONS |
| 4.0 LIMITATIONS |
| FIGURES |
| TABLES |
| APPENDICES |
| ATTACHMENT D.3 10878160 - USCG_Ft_Myers_10878160_Hydrant_Flow_Report_FINAL 17May2020 |
| Letter Report |
| Hydrant Flow Testing Cover Sheet |
| Hydrant Flow Test Field Sketch |
| Test #1 – One Outlet |
| Test #2 – Two Outlets |
| Test #3 – One Outlet |
| Test #4 – Two Outlets |
| ATTACHMENT D.4 10878160 -USCG_Ft_Myers_10878160_Hazmat_Report_FINAL 17May2020 |
| HAZARDOUS MATERIALS REPORT |
| Attachment A - CERTIFICATIONS |
| Attachment B - XRF UNIT CALIBRATION DATA AND RESULTS |
| Attachment C - ASBESTOS SAMPLE ANALYSIS RESULTS |
| Attachment D - PHOTOGRAPHIC DOCUMENTATION |
| Attachment E (1) - HAZARDOUS MATERIALS OBSERVATIONS |
| Attachment E (2) - HAZARDOUS MATERIALS OBSERVATIONS |
| Attachment F - BUILDINGS 1 & 2 DRAWINGS/ROOM NUMBERS//ACM-LEAD LOCATIONS |
| ATTACHMENT D.5 10878160 -USCG_Ft_Myers_10878160_Benthic_Survey_Report |
| Cover |
| Table of Contents |
| 1.0 Introduction |
| 2.0 Existing Conditions |
| 3.0 Methods |
| 4.0 Results |
| 5.0 Conclusion |
| 6.0 References |
| Tables |
| Figures |
| Appendix A |
| Appendix B |
| ATTACHMENT E - Draft National Environmental Policy Act (NEPA) Document |
| _10878160 ATTACHMENT E - STA-FMB_Compiled Draft EA & Appendices_100120 |
| Fort Myers Beach_Draft EA_091020 |
| CONTENTS |
| APPENDICES |
| ACRONYMS AND ABBREVIATIONS |
| SECTION 1 PURPOSE AND NEED FOR ACTION |
| 1.1 Introduction |
| 1.2 Background |
| 1.3 Overview |
| 1.3.1 USCG Mission |
| 1.3.2 Sector St. Petersburg |
| 1.3.3 Station Fort Myers Beach |
| 1.3.3.1 Existing Facilities |
| 1.3.3.2 Existing Vessels |
| 1.4 Surrounding Land Uses |
| 1.5 Purpose of the Proposed Action |
| 1.6 Need for the Proposed Action |
| 1.7 Agency and Public Involvement Process |
| 1.8 Summary of Environmental Study Requirements |
| 1.8.1 National Environmental Policy Act |
| 1.8.2 Endangered Species Act |
| 1.8.3 Magnuson-Stevens Fishery Conservation and Management Act |
| 1.8.4 Marine Mammal Protection Act |
| 1.8.5 Clean Air Act and Conformity Requirements |
| 1.8.6 Wetland and Water Resources Regulatory Requirements |
| 1.8.7 National Pollutant Discharge Elimination System Program |
| 1.8.8 Coastal Zone Consistency Determination |
| 1.8.9 Cultural Resources Regulatory Requirements |
| 1.8.10 Invasive Species |
1.9 Scope of the Environmental Assessment
| SECTION 2 DESCRIPTION OF THE PROPOSED ACTION AND ALTERNATIVES |
| 2.1 Proposed Action |
| 2.1.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| 2.1.1.1 Temporary Relocation |
| 2.1.1.2 Landside Demolition Activities |
| 2.1.1.3 Construction of a Single Consolidated Multi-Mission Building |
| 2.1.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 2.1.2.1 Landside and In-Water Demolition Activities |
| 2.1.2.2 Landside and In-Water Construction Activities |
| Landside Facilities |
| In-Water Facilities |
| Single Floating Finger Pier |
| Boat Ramp / Launch Dock |
| Bulkhead |
2.1.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock
| 2.2 No-Action Alternative |
| 2.3 Alternatives Identified but not Carried Forward for Detailed Analysis |
| 2.3.1 Permanent Relocation to Another Location |
| 2.3.2 Demolition and Reconstruction of the In-Water Facilities |
| 2.3.3 Construction of Two Floating Finger Piers |
| 2.4 Construction Requirements |
| 2.4.1 Memorandum of Agreement between Coast Guard Atlantic Area and the National Marine Fisheries Service |
| 2.4.2 USCG Operational Guidance Related to Marine Resources |
| 2.4.3 Sea Turtle and Smalltooth Sawfish Construction Conditions (2006) |
| 2.4.4 Standard Manatee Conditions for In-Water Work (2011) |
| 2.4.5 Soil Management Plan |
| 2.4.6 Additional Construction Best Management Practices |
| SECTION 3 AFFECTED ENVIRONMENT |
| 3.1 Air Quality |
| 3.1.1 Definition of Resources |
| 3.1.1.1 Criteria Pollutants |
| 3.1.1.2 Clean Air Act Amendments |
| 3.1.1.3 Florida Administrative Code |
| 3.1.2 Existing Conditions |
| Regional Air Quality |
| Emissions at Station Fort Myers Beach |
| 3.2 Biological Resources |
| 3.2.1 Definition of Resource |
| 3.2.2 Existing Conditions |
| 3.2.2.1 Terrestrial Biological Resources |
| Vegetation |
| Terrestrial Habitats |
| Terrestrial Wildlife |
| Special Status Species |
| 3.2.2.2 Nesting Birds |
| 3.2.2.3 Aquatic Biological Resources |
| Existing Marine Conditions |
| Benthic Resources |
| Seagrasses |
| Invertebrates |
| Algal Communities |
| Critical Habitat |
| Essential Fish Habitat |
| Essential Fish Habitat |
| Aquatic Species |
| Special Status Aquatic Species |
3.2.2.4 Invasive Species
| 3.3 Geological Resources |
| 3.3.1 Definition of Resource |
| 3.3.2 Existing Conditions |
| Geology |
| Topography |
| Soils |
| Geologic Hazards |
| Sinkholes |
| Flooding and Erosion |
| Problem Soils |
| Geochemical Hazards |
| Tsunami |
| 3.4 Hazardous Materials and Wastes |
| 3.4.1 Definition of Resource |
| 3.4.2 Existing Conditions |
| 3.4.2.1 Hazardous Materials and Wastes in the Vicinity of Station Fort Myers Beach |
| 3.4.2.2 Hazardous Materials and Wastes at Station Fort Myers Beach |
| Soil Contamination at Station Fort Myers Beach |
| Asbestos-Containing Material at Station Fort Myers Beach |
| Lead-Based Paint at Station Fort Myers Beach |
| 3.5 Land Use and Recreation |
| 3.5.1 Definition of Resource |
| 3.5.2 Existing Conditions |
| 3.5.2.1 Land Use |
| Coastal Zone |
3.5.2.2 Recreation
| 3.6 Water Resources |
| 3.6.1 Definition of Resource |
| 3.6.1.1 Upland Surface Water |
| 3.6.1.2 Groundwater |
| 3.6.1.3 Wetlands |
| 3.6.1.4 Floodplains |
| 3.6.1.5 Marine Waters |
| 3.6.1.6 Shorelines |
| 3.6.1.7 Stormwater Management |
| 3.6.2 Existing Conditions |
| Upland Surface Waters |
| Marine Waters and Shorelines |
| Groundwater |
| Wetlands |
| Floodplains and Flood Hazards |
| Sea Level Rise |
| 3.7 Visual Resources |
| 3.7.1 Definition of Resource |
| 3.7.2 Existing Conditions |
| San Carlos Island |
| Station Fort Myers Beach |
| Historic Structures |
| SECTION 4 ENVIRONMENTAL CONSEQUENCES |
| 4.1 Air Quality |
| 4.1.1 Approach to Analysis |
| 4.1.2 Impacts from the Action Alternatives |
| 4.1.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Short-term Construction Emissions |
| Fugitive Dust Emissions |
| Combustion Emissions |
| Long-term Operational Emissions |
| General Conformity |
| 4.1.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.1.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.1.3 Impacts from the No-Action Alternative |
| 4.1.4 Special Procedures |
| 4.2 Biological Resources |
| 4.2.1 Approach to Analysis |
| 4.2.2 Impacts from the Action Alternatives |
| 4.2.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Terrestrial Biological Resources |
| Vegetation |
| Special Status Species |
| Migratory Birds |
Aquatic Biological Resources
| 4.2.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| Terrestrial Biological Resources |
| Aquatic Biological Resources |
| Turbidity |
| Underwater Noise |
| Essential Fish Habitat and Benthic Resources |
| Special Status Species |
Invasive Species
| 4.2.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| Terrestrial Biological Resources |
| Aquatic Biological Resources |
| 4.2.3 Impacts from the No-Action Alternative |
| 4.2.4 Special Procedures |
| Bats |
| Nesting Birds |
| Water Quality |
| Noise and Turbidity |
| Invasive Species |
| 4.3 Geological Resources |
| 4.3.1 Approach to Analysis |
| 4.3.2 Impacts from the Action Alternatives |
| 4.3.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Geology and Topography |
| Soils |
| Geologic Hazards |
| 4.3.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.3.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.3.3 Impacts from the No-Action Alternative |
| 4.3.4 Special Procedures |
| 4.4 Hazardous Materials and Wastes |
| 4.4.1 Approach to Analysis |
| 4.4.2 Impacts from the Action Alternatives |
| 4.4.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Hazardous Materials and Waste Storage and Generation |
| Soil Contamination |
| Asbestos and Lead |
| 4.4.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.4.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.4.3 Impacts from the No-Action Alternative |
| 4.4.4 Special Procedures |
| 4.5 Land Use and Recreation |
| 4.5.1 Approach to Analysis |
| 4.5.2 Impacts from the Action Alternatives |
| 4.5.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| 4.5.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |
| 4.5.2.3 Alternative 3: Demolition and Redevelopment of Landside and In-Water Facilities, including the Realignment of the Multi-Mission Building and Boat Ramp/Launch Dock |
| 4.5.3 Impacts from the No-Action Alternative |
| 4.5.4 Special Procedures |
| 4.6 Water Resources |
| 4.6.1 Approach to Analysis |
| 4.6.2 Impacts from the Action Alternatives |
| 4.6.2.1 Alternative 1: Demolition of Landside Facilities and Construction of a Single Consolidated Multi-Mission Building |
| Surface Waters and Marine Waters |
| Short-term Construction Impacts |
| Long-term Operational Impacts |
| Groundwater |
| Wetlands |
| Floodplains and Sea Level Rise |
| 4.6.2.2 Alternative 2: Demolition and Redevelopment of Landside and In-Water Facilities |