Amend_0016_70Z04721RMYERDB_pg2-3.pdf

PDF 450 KB Posted

Attached to
Design/Build Facilities and Waterfront at USCG Station Fort Myers Beach, Fort Myers, FL
Solicitation number
70Z04721RMYERDB
Issued by

View the file

Other files

File Type Posted
Amendment 0016_Page 1.pdf PDF
Amendment 0015_Page 1.pdf PDF
201202 - 10878160 Appendix F SCS - Boat Work Bay Rev03.pdf PDF
Amend_0015_70Z04721RMYERDB_pg2-5.pdf PDF
201202 - 10878160 Appendix F SCS - Boat WASH Bay Rev01.pdf PDF
Amend_0014_70Z04721RMYERDB_pg2-14.pdf PDF
Amendment 0014 Page 1.pdf PDF
70Z04721RMYERDB_Amend_0013.pdf PDF
70Z04721RMYERDB_Amend_0012.pdf PDF
0049-0105 Amendment 0012_Attach_001.pdf PDF
Amendment 0011 Page 1.pdf PDF
Amend_0011_70Z04721RMYERDB_pg2-9.pdf PDF
Visitor Access List 70Z04720RTYBEDB_FtMyers_1100 - FINAL.pdf PDF
Visitors Access List 70Z04720RTYBEDB_FtMyers_0900 - Final.pdf PDF
Amendment 0010 Page 1.pdf PDF
70Z04721MYERDB_Amendment 0009.pdf PDF
Amendment_0008_70Z04721RMYERDB.pdf PDF
Amendment 0007 Page 1.pdf PDF
Amendment 0007_page 2.pdf PDF
DRAFT NEPA EA - Fort Myers (Oct Draft).pdf PDF
Attachment D - Field Surveys (Shore and Waterfront).pdf PDF
Amendment_0006_70Z04721MYERDB.pdf PDF
Attachment F - Building 1 and 2 ACM and Lead.pdf PDF
Attachment B - Survey Field Notes and Data Drawings.pdf PDF
Attachment C- Waterfront Structures Field Investigation Report.pdf PDF
10878160_USCG STA-FMB Site Survey-DWGs 335000017.AB.1.zip ZIP file
Amendment 0005 Page 1.pdf PDF
_USCG 1977 STA-FMB - Compiled Fort Myers Beach USCG Misson Building 1977.pdf PDF
10878160_USCG STA-FMB Site Survey DWGs 335000017.AB.2.zip ZIP file
Amend_0005_70Z04721RMYERDB_pg2-4.pdf PDF
Transmittal - 00025_11-02-20.pdf PDF
Amendment 0004_70Z04721FMYERDB.pdf PDF
Amendment 0003_70Z04721RMYERDB.pdf PDF
Amend_0002_70Z04721RMYERDB_pg2.pdf PDF
Amendment 0002 Page 1.pdf PDF
USCG 2005 STA FMB - Boat Basin Dredge 07-M05032-2005.pdf PDF
USCG_87_WBP (Cutter Boat) ILSP LOGISTICS SUPPORT INFO.pdf PDF
TOA_Fort Myers_10-14-2020.pdf PDF
USCG 2017 STA-FMB - FIRE ALARM DWGS 440P-215403-May15 2017.pdf PDF
70Z04721RMYERDB_Amendment 0001.pdf PDF
USCG 1994 STA -FMB - TOPO survey 1994.pdf PDF
10878160_ USCG STA-FMB Site Survey 335000017.AB 200723cbg-SnS.pdf PDF
Wage_Determination_FL20200211_9-4-2020.pdf PDF
Transmittal - 00025.pdf PDF
USCG 1984 STA-FMB - PIER REPLACEMENT Jan 24 1984.pdf PDF
USCG 2008 STA FMB - 87 foot boat MOORING PIER EXTENSION - 611975-Oct 23 2008.pdf PDF
USCG 1988 STA-FMB - REBUILD BULKHEAD Jun 8 1988.pdf PDF
USCG 1996 STA-FMB - DWG_M0317-S_SH2_ASBESTOS ABATEMENT PLAN July 31 1996.pdf PDF
10878160_USCG STA-FMB Site Survey 335000017.AB.pdf PDF
USCG 2014 STA-FMB - Replace HVAC System USCG Station-6115266-Sept 4 2014.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0016

70Z04721RMYERDB

THE FOLLOWING REQUESTS FOR INFORMATION/CLARIFICATIONS WERE RECEIVED:

1. The response to RFI 128 was as follows: "No changes to site grading are expected, therefore match existing elevations along the full length of the bulkhead. At this location, provide a step as currently shown or a tapered transition."

However, the RFP Attachment E, Draft EA page 2-10 states (bold emphasis added) “The existing 415-foot-long bulkhead, which extends along the entire boundary with Matanzas Pass, would be replaced with a steel sheet pile bulkhead. The proposed bulkhead would have a uniform height approximately 1 foot taller than the existing bulkhead to account for long-term sea level rise projections. Additionally, the bulkhead would be approximately 6 inches taller than the existing pavement to create a 6-inch curb that precludes runoff from the Station directly entering into Matanzas Pass."

Please clarify the desired height of the top of bulkhead.

ANSWER: “Interpret the intended design height of the bulkhead to be at least one foot higher than the current bulkhead at all locations. The specific elevation will be as deemed appropriate by the DOR/EOR, but should account for items such as (but maybe not limited to): weather-event induced wave overtopping and/or storm surge; upland site grading and drainage requirements; waterside structure and/or utility connectivity & access; and projected sea level rise elevations. The bulkhead may not be a consistent elevation over its entire length, but the top of cap should generally be higher than the existing elevation to account for the above factors (for the location in question in RFI 128, provide a step or tapered transition to connect the differential elevation). Additionally, final top of cap elevation must comply with local and national water quality standards, and thus, will likely need to incorporate at least a 6-8” height difference (as dictated by the environmental permits) above adjacent upland grades to prevent unwanted surface water runoff.“

2. Response to RFI 109 make it mandatory to extend the concrete bulkhead cap to below low waterline whereas response to RFI 157 leaves it to discretion of DOR. Which is it?

Responses pasted below:

RFI 109 Response: "In order to meet the required design service life, the concrete cap shall extend below the low waterline (to an elevation as deemed appropriate by the design engineer) to protect the steel sheet pile within the splash zone similar to that which is commonly employed at other government (i.e. Navy) and industrial port facilities."

RFI 157 Response: "It is preferred to have the concrete cap extend below the low waterline to put the sheet pile below the splash zone and provide a uniform visual profile from the water. However, the cap design and geometry ultimately is at the discretion of the Designer of Record."

Amendment 0016

70Z04721RMYERDB

ANSWER: “Extend the cap/fascia below the waterline. The final dimensions, geometry, and specific elevations shall be determined by the DOR/EOR, as deemed appropriate, and shall take into consideration various factors such as (but potentially not limited to): bulkhead sheet pile section dimensions; lateral support/anchorage system (if required); cathodic protection system(s); typical tidal elevation range (i.e. protection within the splash zone); and the required structure design/service life.

However, as a general guide, typical industry standards for bulkhead designs of industrial port/government facilities require the bulkhead cap (fascia) to extend at least 1-2ft below the MLWL in order to achieve the required service life.“

Note

Failure to acknowledge amendments may be cause for rejection of your offer.

File details come from the government source that posted it. Updated .