201202 - 10878160 Appendix F SCS - Boat WASH Bay Rev01.pdf

PDF 189 KB Posted

Attached to
Design/Build Facilities and Waterfront at USCG Station Fort Myers Beach, Fort Myers, FL
Solicitation number
70Z04721RMYERDB
Issued by

View the file

Other files

File Type Posted
Amend_0016_70Z04721RMYERDB_pg2-3.pdf PDF
Amendment 0016_Page 1.pdf PDF
Amendment 0015_Page 1.pdf PDF
201202 - 10878160 Appendix F SCS - Boat Work Bay Rev03.pdf PDF
Amend_0015_70Z04721RMYERDB_pg2-5.pdf PDF
Amend_0014_70Z04721RMYERDB_pg2-14.pdf PDF
Amendment 0014 Page 1.pdf PDF
70Z04721RMYERDB_Amend_0013.pdf PDF
70Z04721RMYERDB_Amend_0012.pdf PDF
0049-0105 Amendment 0012_Attach_001.pdf PDF
Amendment 0011 Page 1.pdf PDF
Amend_0011_70Z04721RMYERDB_pg2-9.pdf PDF
Visitor Access List 70Z04720RTYBEDB_FtMyers_1100 - FINAL.pdf PDF
Visitors Access List 70Z04720RTYBEDB_FtMyers_0900 - Final.pdf PDF
Amendment 0010 Page 1.pdf PDF
70Z04721MYERDB_Amendment 0009.pdf PDF
Amendment_0008_70Z04721RMYERDB.pdf PDF
Amendment 0007 Page 1.pdf PDF
Amendment 0007_page 2.pdf PDF
DRAFT NEPA EA - Fort Myers (Oct Draft).pdf PDF
Attachment D - Field Surveys (Shore and Waterfront).pdf PDF
Amendment_0006_70Z04721MYERDB.pdf PDF
Attachment F - Building 1 and 2 ACM and Lead.pdf PDF
Attachment B - Survey Field Notes and Data Drawings.pdf PDF
Attachment C- Waterfront Structures Field Investigation Report.pdf PDF
10878160_USCG STA-FMB Site Survey-DWGs 335000017.AB.1.zip ZIP file
Amendment 0005 Page 1.pdf PDF
_USCG 1977 STA-FMB - Compiled Fort Myers Beach USCG Misson Building 1977.pdf PDF
10878160_USCG STA-FMB Site Survey DWGs 335000017.AB.2.zip ZIP file
Amend_0005_70Z04721RMYERDB_pg2-4.pdf PDF
Transmittal - 00025_11-02-20.pdf PDF
Amendment 0004_70Z04721FMYERDB.pdf PDF
Amendment 0003_70Z04721RMYERDB.pdf PDF
Amend_0002_70Z04721RMYERDB_pg2.pdf PDF
Amendment 0002 Page 1.pdf PDF
USCG 2005 STA FMB - Boat Basin Dredge 07-M05032-2005.pdf PDF
USCG_87_WBP (Cutter Boat) ILSP LOGISTICS SUPPORT INFO.pdf PDF
TOA_Fort Myers_10-14-2020.pdf PDF
USCG 2017 STA-FMB - FIRE ALARM DWGS 440P-215403-May15 2017.pdf PDF
70Z04721RMYERDB_Amendment 0001.pdf PDF
USCG 1994 STA -FMB - TOPO survey 1994.pdf PDF
10878160_ USCG STA-FMB Site Survey 335000017.AB 200723cbg-SnS.pdf PDF
Wage_Determination_FL20200211_9-4-2020.pdf PDF
Transmittal - 00025.pdf PDF
USCG 1984 STA-FMB - PIER REPLACEMENT Jan 24 1984.pdf PDF
USCG 2008 STA FMB - 87 foot boat MOORING PIER EXTENSION - 611975-Oct 23 2008.pdf PDF
USCG 1988 STA-FMB - REBUILD BULKHEAD Jun 8 1988.pdf PDF
USCG 1996 STA-FMB - DWG_M0317-S_SH2_ASBESTOS ABATEMENT PLAN July 31 1996.pdf PDF
10878160_USCG STA-FMB Site Survey 335000017.AB.pdf PDF
USCG 2014 STA-FMB - Replace HVAC System USCG Station-6115266-Sept 4 2014.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DB RFP – STATION FORT MYERS REBUILD

U S C G F o r t M y e r s , F l o r i d a |

SPACE CRITERIA SHEET

Multi-Mission Building - Station New pages 98, 99

& 100

Fort Myers, Florida Date: 12/02/2020

SPACE NAME Work Bay (Boat Wash Bay) (not listed in the BFR)

SPACE

TYPE

Marine Maintenance

ACTIVITY Boat Wash of Trailerable Boats

ADJACENCIES

ROOM NO.

Min Ceiling Ht. 15’-0” (clear)

Program Area 1,155

Contractor Qty Item Qty Item

Furnished;

Contractor Installed

Government Furnished;

Contractor Installed

Finishes Ceiling Open to Structure, painted. Ceiling height: 15’-0” clear to lowest portion of overhead elements (structure, lighting, fire sprinklers, whichever is lower). Boat Wash Bay to be designed with structural elements and systems whose finished surfaces or encased surfaces deter the roosting of birds. Bird netting not allowed.

Floor Provide high reflectance index epoxy coating at concrete floor slab.

Provide grit in floor to prevent slipping. Floor design load 250psf minimum. Slope floor as required to central trench drain (removable grating) that feeds to sump. Sump is to be cleared via electric sump pump discharging into holding tank located either within the bay or outside the bay. Tank shall be located such that it can be evacuated by pump-truck with max. hose length of 50’. There shall not be any connection to the sewer system.

Walls Shall be CMU or concrete, sealed or painted.

Door 16’H x 16’W clear opening roll-up exterior door. Provide (2) 3’W x 7’H egress doors with vision panels. Provide (1) door located near/adjacent to roll-up door and other at the opposite end of bay. Doors/frames to be FRP. Doors to have SS kickplates extending from bottom to 24"AFF (min.).

Sound Ceiling

Attenuation Floor

Walls

Security

Utility Mech. No refrigerant air conditioning in the Boat Wash Bay.

Services Plumb.

Provide two water hose reels in bay, adjacent to two hose bibbs on concrete posts at opposite ends of bay. Provide trench drain (35’ L approximate) with accessible strainer for debris. Trench drain shall discharge to pit where a 25 GPM 25 feet of head sump pump will convey the water to a 1,000 gallon tank. Include two 1.5 GPM maximum electric pressure washers with a minimum of 25’ of high pressure hose each.

Multi-Mission Building - Station New pages 98, 99

& 100

Fort Myers, Florida Date: 12/02/2020

SPACE NAME Work Bay (Boat Wash Bay) (not listed in the BFR)

SPACE

TYPE

Marine Maintenance

ACTIVITY Boat Wash of Trailerable Boats

ADJACENCIES

ROOM NO.

Min Ceiling Ht. 15’-0” (clear)

Program Area 1,155

Elect. Provide two weatherproof GFCI receptacles, UL listed on either side of open to structure boat wash perimeter at the floor line.

Provide two weatherproof GFCI receptacles for pressure washers (240v 20 amp) on either side of open to structure boat wash perimeter at the floor line. Provide dedicated circuits for equipment in special use room and spaces.

Lighting: Suspended weatherproof linear direct LED luminaire. Provide 50 foot-candles (fc) at 2’-6” AFF, UL listed for wet locations. Provide manual controls with bi-level dimming capabilities to independently control general lighting, manual on with step dimming capability with at least one step to between 30% and 70% of lighting power. General lighting in day lighted areas separately controlled through multilevel photo control, step dimming or continuous dimming to reduce light output when daylight is available, with at least two steps, one to 35% lighting power, and one between 50% and 70% of lighting power. Provide two portable drop down LED luminaires per maintenance bay.

Comm.

Fire Life Safety

Other

Notes:

1.

2.

Multi-Mission Building - Station Fort Myers, Florida Date: 7/22/2020

SPACE NAME Work Bay (Boat Wash Bay)

SPACE

TYPE

Marine Maintenance

Program Area 1,155

ROOM OUTFITTING PLAN:

Notes:

1. FF+E Indicator: Refer to space data sheet and section 01800.15.0.

2.

BRELLIS

Text Box

12/02/2020

BRELLIS

Line

File details come from the government source that posted it. Updated .