Amend_0002_70Z04721RMYERDB_pg2.pdf

PDF 358 KB Posted

Attached to
Design/Build Facilities and Waterfront at USCG Station Fort Myers Beach, Fort Myers, FL
Solicitation number
70Z04721RMYERDB
Issued by

View the file

Other files

File Type Posted
Amend_0016_70Z04721RMYERDB_pg2-3.pdf PDF
Amendment 0016_Page 1.pdf PDF
Amendment 0015_Page 1.pdf PDF
201202 - 10878160 Appendix F SCS - Boat Work Bay Rev03.pdf PDF
Amend_0015_70Z04721RMYERDB_pg2-5.pdf PDF
201202 - 10878160 Appendix F SCS - Boat WASH Bay Rev01.pdf PDF
Amend_0014_70Z04721RMYERDB_pg2-14.pdf PDF
Amendment 0014 Page 1.pdf PDF
70Z04721RMYERDB_Amend_0013.pdf PDF
70Z04721RMYERDB_Amend_0012.pdf PDF
0049-0105 Amendment 0012_Attach_001.pdf PDF
Amendment 0011 Page 1.pdf PDF
Amend_0011_70Z04721RMYERDB_pg2-9.pdf PDF
Visitor Access List 70Z04720RTYBEDB_FtMyers_1100 - FINAL.pdf PDF
Visitors Access List 70Z04720RTYBEDB_FtMyers_0900 - Final.pdf PDF
Amendment 0010 Page 1.pdf PDF
70Z04721MYERDB_Amendment 0009.pdf PDF
Amendment_0008_70Z04721RMYERDB.pdf PDF
Amendment 0007 Page 1.pdf PDF
Amendment 0007_page 2.pdf PDF
DRAFT NEPA EA - Fort Myers (Oct Draft).pdf PDF
Attachment D - Field Surveys (Shore and Waterfront).pdf PDF
Amendment_0006_70Z04721MYERDB.pdf PDF
Attachment F - Building 1 and 2 ACM and Lead.pdf PDF
Attachment B - Survey Field Notes and Data Drawings.pdf PDF
Attachment C- Waterfront Structures Field Investigation Report.pdf PDF
10878160_USCG STA-FMB Site Survey-DWGs 335000017.AB.1.zip ZIP file
Amendment 0005 Page 1.pdf PDF
_USCG 1977 STA-FMB - Compiled Fort Myers Beach USCG Misson Building 1977.pdf PDF
10878160_USCG STA-FMB Site Survey DWGs 335000017.AB.2.zip ZIP file
Amend_0005_70Z04721RMYERDB_pg2-4.pdf PDF
Transmittal - 00025_11-02-20.pdf PDF
Amendment 0004_70Z04721FMYERDB.pdf PDF
Amendment 0003_70Z04721RMYERDB.pdf PDF
Amendment 0002 Page 1.pdf PDF
USCG 2005 STA FMB - Boat Basin Dredge 07-M05032-2005.pdf PDF
USCG_87_WBP (Cutter Boat) ILSP LOGISTICS SUPPORT INFO.pdf PDF
TOA_Fort Myers_10-14-2020.pdf PDF
USCG 2017 STA-FMB - FIRE ALARM DWGS 440P-215403-May15 2017.pdf PDF
70Z04721RMYERDB_Amendment 0001.pdf PDF
USCG 1994 STA -FMB - TOPO survey 1994.pdf PDF
10878160_ USCG STA-FMB Site Survey 335000017.AB 200723cbg-SnS.pdf PDF
Wage_Determination_FL20200211_9-4-2020.pdf PDF
Transmittal - 00025.pdf PDF
USCG 1984 STA-FMB - PIER REPLACEMENT Jan 24 1984.pdf PDF
USCG 2008 STA FMB - 87 foot boat MOORING PIER EXTENSION - 611975-Oct 23 2008.pdf PDF
USCG 1988 STA-FMB - REBUILD BULKHEAD Jun 8 1988.pdf PDF
USCG 1996 STA-FMB - DWG_M0317-S_SH2_ASBESTOS ABATEMENT PLAN July 31 1996.pdf PDF
10878160_USCG STA-FMB Site Survey 335000017.AB.pdf PDF
USCG 2014 STA-FMB - Replace HVAC System USCG Station-6115266-Sept 4 2014.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0002

70Z04721RMYERDB

SOLICITATION 70Z04721RMYERDB IS AMENDED AS FOLLOWS:

1. Section 01801, Paragraph 2.6.1 Temporary Facilities Description: Delete the words “and modular

Conex box storage units 8 feet wide and 40 feet long.”

2. Section 01800, Paragraph 1.6.2, third paragraph, first sentence is amended to read as follows: “Shrubs will form a single continuous hedge and will NOT have thorns, spiny stems, and/or toothed leaves.

THE FOLLOWING REQUESTS FOR INFORMATION/CLARIFICATION WERE RECEIVED:

1. Please confirm that all Temporary Facilities described in the RFP are to be provided under a separate contract per Task Order Announcement description of “Base Item” (pages 2-3 under “I. General

Requirements”) that states “Temporary facilities will be provided for USCG personnel, equipment, and assets (i.e., vessels) during the construction period via separate contract.”

RESPONSE: Confirmed. All temporary facilities for Station Fort Myers Beach personnel and vessels described in the RFP are to be provided by separate contract. The intent is remove all operational activities and give the DB contractor full access to the site. However, temporary facilities for construction activities (construction inspector) are still required and defined in front end specs.

2. Section 01801 – page 6 and 7, temporary facilities, page 297 of 2114. It is stated one time in the RFP about Conex box storage but is not specific if contractor is to supply and how many to the Government.

Please clarify if needed and how many we are to supply.

RESPONSE: Delete the requirement for the Conex storage box. See item 1 above with amended language.

3. Section 01800, Paragraph 1.6.2 third paragraph. Instead of the word “will have thorns…”, did they mean to say “will not?”

RESPONSE: Shrubs will NOT have thorns, spiny stems, and/ or tooted leaves. See item 2 above with amended language.

Note

Failure to acknowledge amendments may be cause for rejection of your offer.