Amend_0015_70Z04721RMYERDB_pg2-5.pdf

PDF 557 KB Posted

Attached to
Design/Build Facilities and Waterfront at USCG Station Fort Myers Beach, Fort Myers, FL
Solicitation number
70Z04721RMYERDB
Issued by

View the file

Other files

File Type Posted
Amend_0016_70Z04721RMYERDB_pg2-3.pdf PDF
Amendment 0016_Page 1.pdf PDF
Amendment 0015_Page 1.pdf PDF
201202 - 10878160 Appendix F SCS - Boat Work Bay Rev03.pdf PDF
201202 - 10878160 Appendix F SCS - Boat WASH Bay Rev01.pdf PDF
Amend_0014_70Z04721RMYERDB_pg2-14.pdf PDF
Amendment 0014 Page 1.pdf PDF
70Z04721RMYERDB_Amend_0013.pdf PDF
70Z04721RMYERDB_Amend_0012.pdf PDF
0049-0105 Amendment 0012_Attach_001.pdf PDF
Amendment 0011 Page 1.pdf PDF
Amend_0011_70Z04721RMYERDB_pg2-9.pdf PDF
Visitor Access List 70Z04720RTYBEDB_FtMyers_1100 - FINAL.pdf PDF
Visitors Access List 70Z04720RTYBEDB_FtMyers_0900 - Final.pdf PDF
Amendment 0010 Page 1.pdf PDF
70Z04721MYERDB_Amendment 0009.pdf PDF
Amendment_0008_70Z04721RMYERDB.pdf PDF
Amendment 0007 Page 1.pdf PDF
Amendment 0007_page 2.pdf PDF
DRAFT NEPA EA - Fort Myers (Oct Draft).pdf PDF
Attachment D - Field Surveys (Shore and Waterfront).pdf PDF
Amendment_0006_70Z04721MYERDB.pdf PDF
Attachment F - Building 1 and 2 ACM and Lead.pdf PDF
Attachment B - Survey Field Notes and Data Drawings.pdf PDF
Attachment C- Waterfront Structures Field Investigation Report.pdf PDF
10878160_USCG STA-FMB Site Survey-DWGs 335000017.AB.1.zip ZIP file
Amendment 0005 Page 1.pdf PDF
_USCG 1977 STA-FMB - Compiled Fort Myers Beach USCG Misson Building 1977.pdf PDF
10878160_USCG STA-FMB Site Survey DWGs 335000017.AB.2.zip ZIP file
Amend_0005_70Z04721RMYERDB_pg2-4.pdf PDF
Transmittal - 00025_11-02-20.pdf PDF
Amendment 0004_70Z04721FMYERDB.pdf PDF
Amendment 0003_70Z04721RMYERDB.pdf PDF
Amend_0002_70Z04721RMYERDB_pg2.pdf PDF
Amendment 0002 Page 1.pdf PDF
USCG 2005 STA FMB - Boat Basin Dredge 07-M05032-2005.pdf PDF
USCG_87_WBP (Cutter Boat) ILSP LOGISTICS SUPPORT INFO.pdf PDF
TOA_Fort Myers_10-14-2020.pdf PDF
USCG 2017 STA-FMB - FIRE ALARM DWGS 440P-215403-May15 2017.pdf PDF
70Z04721RMYERDB_Amendment 0001.pdf PDF
USCG 1994 STA -FMB - TOPO survey 1994.pdf PDF
10878160_ USCG STA-FMB Site Survey 335000017.AB 200723cbg-SnS.pdf PDF
Wage_Determination_FL20200211_9-4-2020.pdf PDF
Transmittal - 00025.pdf PDF
USCG 1984 STA-FMB - PIER REPLACEMENT Jan 24 1984.pdf PDF
USCG 2008 STA FMB - 87 foot boat MOORING PIER EXTENSION - 611975-Oct 23 2008.pdf PDF
USCG 1988 STA-FMB - REBUILD BULKHEAD Jun 8 1988.pdf PDF
USCG 1996 STA-FMB - DWG_M0317-S_SH2_ASBESTOS ABATEMENT PLAN July 31 1996.pdf PDF
10878160_USCG STA-FMB Site Survey 335000017.AB.pdf PDF
USCG 2014 STA-FMB - Replace HVAC System USCG Station-6115266-Sept 4 2014.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0015

70Z04721RMYERDB

SOLICITATION 70Z04721RMYERDB IS AMENDED AS FOLLOWS:

1. RFP Section 01800 Space Criteria List – Work Bay (Boat Wash Bay)

Add: Insert new Space Criteria Sheet including Item List and RO Plan (attached).

Revision

2. RFP Section 01800 Space Criteria List –Work Bay (Boat Work Bay)

Remove: Existing Space Criteria Sheet including Item List and RO Plan.

Add: Insert revised Space Criteria Sheet Item List and RO Plan (attached). Revisions include:

- Modify: (2) “S-4 Mobile Workcenter” to (3) “S-4 Mobile Utility Cart”

- Add: (1) “S-1A Eye Level Height Cabinet”

- Add: (1) “S-1C Eye Level Height Cabinet”

- Add: (1) “S-1D Eye Level Height Cabinet”

- Add: (1) “S-1E Eye Level Height Cabinet”

- Add: (1) “S-1F Eye Level Height Cabinet”

- Modify: (3) “S-3A Compartment Drawer” to (1) “S-3A Bench Level Height Cabinet”

- Modify: (3) “S-3B Compartment Drawer” to (1) “S-3A Bench Level Height Cabinet”

- Modify: (3) “S-3C Compartment Drawer” to (1) “S-3A Bench Level Height Cabinet”

- Add: (1) “S-3D Bench Level Height Cabinet”

- Add: (1) “S-3E Bench Level Height Cabinet”

- Modify: (9) “S-5 Shop Workbench Top” to (1) “S-5 Shop Workbench Top”

- Modify: (2) “S-8 Shop Stool” to (3) “S-8 Shop Stool”

- Add: (1) “S-27 Flammable Storage Cabinet”

- Add: (1) “S-28 Corrosive Storage Cabinet”

- Add: (1) “S-29 Hazmat Storage Cabinet”

- Add: (1) “S-31 Solvent Cleaner”

- Add: (2) “F-8 Recycling Bins”

- Modify: Remove existing description for Finishes|Walls and replace with the following: “Shall be CMU or concrete, sealed or painted.”

- Modify: Remove existing description for Finishes|Doors and replace with the following:

“16’H x 16’W clear opening roll-up exterior door. Provide (2) 3’W x 7’H egress doors with vision panels. Provide (1) door located near/adjacent to roll-up door and other at the opposite end of bay. Doors/frames to be FRP. Doors to have SS kickplates extending from bottom to

24"AFF (min.).”

- Modify: Remove last sentence “Dehumidification?” from existing description for Utility

Services|Mech. There is no dehumidification requirement in the Boat Work Bays.

- Modify: Remove existing description for Utility Services | Plumbing and replace with the following:

“Provide four compressed air tool drops in bays, two drops on the exterior of the boat bays adjacent hose bibbs including valve, filter, and accessories, two compressed air hose reels, two hose bibbs on exterior walls, and one hose bibb within the boat bay”.

REMOVE Utility Services | Plumbing note that states: “…two floor drains with trap primer per bay, two hose bibbs on exterior walls, one hose bibb within boat bays for boat engine test and one oil/water separator downstream of the drains”.

An oil/water separator is not desired and the above text is inconsistent with the sump text under

Finishes | Floor on this SCS.

3. RFP Section 01800 Plumbing, Paragraph 1.10.6

Remove: “Provide compressed air piping routed underground to the pier. Underground piping material shall be Type BCS-PS black carbon steel with polyethylene sheath.

Compressed air piping shall run in an access space within the pier structure. Provide at least one drop at each berth.”

Compressed Air is not required at the piers.

THE FOLLOWING REQUESTS FOR INFORMATION/CLARIFICATIONS WERE RECEIVED:

Clarifications to Previous RFIs.

1. We know that the RFI deadline has passed, but we are hoping for some clarification on conflicting answers to the Progressive Collapse question. It is important because of the potential for significant cost impacts if it is required. Amendment 11 states that “Progressive

Collapse Resistance is applicable…” and Amendment 12, in response to a similar question states that “Progressive collapse is not one of them” referring to the required elements of

UFC 4-10-01. Can you clarify?

RESPONSE: From amendment 12, the response to RFI #98 is incorrect. Progressive collapse per UFC 4-010-01 is required.

2. Regarding the response to RFI #61 in Amendment #12, along the existing bulkhead the mudline varies from approximately -4 to -9. The response to this RFI states that "the design dredge elevation shall not be less than 5' below existing bathymetry". Will the future dredge depth elevation vary from -9 to -14 along the new bulkhead or will the future dredge depth be a uniform depth along the new bulkhead? If so, please provide the desired uniform depth.

RESPONSE: As no dredging is planned for this project, then future dredge depth elevation will vary.

2. RFP specification section 01800, 1.11.16 states that infrared heat is required in the Boat

Bay. Based on the response to RFI #93 in amendment #12, it appears this would not be required. Please verify.

RESPONSE: Infrared heat is required in the boat bay. RFI#93 addressed dehumidification, not heating.

3. Please clarify if there are any requirements for special salt/corrosion coatings at rooftop equipment.

RESPONSE: See response to RFI #139 via amendment.

4. The RFP plumbing section 1.10.6 says the following “Provide compressed air piping routed underground to the pier. Underground piping material shall be Type BCS-PS black carbon steel with polyethylene sheath. Compressed air piping shall run in an access space within the pier structure. Provide at least one drop at each berth.” Please confirm if these drops are required. If required, please provide the PSI and manifold required at each berth.

RESPONSE: Compressed air drops along the pier are not required. See amendment.

5. RFP specification section 01800, 1.11.1 states that Grease duct shall be insulated stainless steel double-wall factory built type for use with Type-1 kitchen hoods. Please verify if single wall welded stainless steel ductwork with (2) layers of fire rated insulation will be acceptable.

RESPONSE: For purposes of bidding, provide what is specified.

6. RFP specification section 01800, 1.11.7 requires “Berthing toilet rooms shall be exhausted via roof-mounted exhaust fans. These fans shall be sized to exhaust the rooms at a minimum 15 air changes per hour, and shall be interlocked with the room lights (controlled by occupancy sensors).” Please confirm that in lieu of individual fans and occupancy sensors, the berthing toilet rooms could be exhausted by a Dedicated Outdoor Air System

(DOAS) at constant rate and therefor lower rate and be routed through an energy recovery unit.

RESPONSE: Confirmed. The RFP is not prescriptive on the exact type of exhaust. Therefore, this proposal utilizing roof mounted Dedicated Outdoor Air System (DOAS) at a constant rate is acceptable. The base exhaust requirements listed in detail in the RFP are the minimums.

7. There were questions on the exact requirements for the Boat Work Bay and the Boat Wash

Bay.

RESPONSE: Updates to the Boat Work Bay and the Boat Wash Bay Requirements below.

See Amendment.

8. Section 01800 paragraph 1.4.8.1 allows both asphaltic concrete and rigid concrete paving.

However there is a statement that “Pavement areas frequently utilized by trucks or heavy equipment requiring loading, unloading, maneuvering and parking shall be constructed using reinforced (rigid) concrete.” Does the USCG utilize trucks or heavy equipment frequently in any area of the site that would require the need for rigid concrete? If so, please identify where such vehicles are utilized.

RESPONSE: Depending on the locations of the fuel tanks, refueling trucks will need to access the Station on regular intervals. This is an item that needs to be coordinated in the final design / location of the fuel tanks.

Note

Failure to acknowledge amendments may be cause for rejection of your offer.