Amend_0014_70Z04721RMYERDB_pg2-14.pdf
PDF 835 KB Posted
- Solicitation number
- 70Z04721RMYERDB
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0014
70Z04721RMYERDB
SOLICITATION 70Z04721RMYERDB IS AMENDED AS FOLLOWS:
1. RFI #126 - RFP Specification Section 01800 – 1.8.7.3.2 specifies a 500 PSF dead load capacity; This is a typo in the specification. Please treat the design dead load as the self-weight of all gangway materials and fixtures plus 5 pounds per square foot of walking surface.
Remove: Under dead load capacity, remove “500 PSF”
Add: “Self –weight of all gangway materials and fixtures plus 5 pounds per square foot of walking surface.”
2. RFI #138 – Under Telecommunication Drawings, RFP 01800 Paragraph 3.18.6 lists to provide (2) shore tie locations. This is incorrect. Only (1) is required for the WPB 87’. The visiting WPB 87’ cutter berth shore tie is not required.
Remove: “Anticipate two (2) shore tie locations, one for current 87’ patrol boat and one for the visiting cutter” Add: “Anticipate one (1) shore tie location for current WPB 87’.”
3. RFI #139 – Section 01800 - Page 1 1.11-HVAC 1.11.1 GENERAL DESCRIPTION states “All exterior equipment shall include a corrosion-resistant coating. “ After this sentence….
Add: “ Applicable standard is 6,000 hours salt spray test in accordance with ASTM International (ASTM) B117. Requirement applies to equipment enclosures and coils exposed to ambient air.”
RFI #155 - RFP 1801 1.1.1
4. Section 1.1.1 - General
a. Remove: “The Contractor shall provide a 36’ ft x 60 ft modular building.
Replace / Add: “USCG Third Party Inspector Trailer Dimensions are located in Section 01500.1.3.
b. Remove Section 1.1.4
c. Remove Section 1.1.10
RFI #165
5. Space Criteria Sheet - Weapons Storage (Ready Service Locker, Above Ground Magazine)
a. Under Item list, update quantity of F-34 Armory Workbench from “1” to “2” for a total armory workbench length of 6’.
b. From the Weapons Storage Outfitting Plan.
i. Update Qty: 2 -F-34
ii. Remove: F-20
RFI #170
6. S-14 Section 15.0 FF&E
a. Under Model…
i. Add: Dake B-10 972200 or approved equal
RFI #172
7. RFP Section: Section 01800 3.5.2 and 01800 3.10.5
a. Under 3.5 Architectural Requirements
i. Remove: Section 3.5.2.
b. Under 3.10 Grounding and Bonding
i. Remove: Section 3.10.5.
THE FOLLOWING REQUESTS FOR INFORMATION/CLARIFICATIONS WERE RECEIVED:
Fort Myers Beach RFI 126
RFP Specification Section 01800 – 1.8.7.3.2 specifies a 500 PSF dead load capacity; are small utility vehicles expected on the gangways? If so, could USCG provide vehicle specifications?
RESPONSE: This is a typo in the specification. Please treat the design dead load as the self-weight of all gangway materials and fixtures plus 5 pounds per square foot of walking surface. See
Amendment.
Fort Myers Beach RFI 127
Bid Option A on M-01A of RFP Appendix F shows a 45’ RB-M vessel moored under the pile supported boat canopy, and an 87’ WPB vessel moored seaward/outside of the boat canopy. The RB-M will not be able to berth or depart when the WPB is present. There is not enough clearance between the boat canopy’s outer piles and the WPB vessel’s stern to moor the RB-M. Is this USCG’s intention?
RESPONSE: The RFP figure is a diagrammatic solution. The design based solution needs to ensure all assets (RB-S, RB-M, WPB) will be able to enter or leave independently of each other at ALL times.
Fort Myers Beach RFI 128
At approx. sta. 2+10 of the bulkhead, there is approx. a 3-ft elevation difference at this location. Was the intent of the new bulkhead in Option 5 to match the two different existing bulkhead elevation or should the new bulkhead to have a continuous elevation that matches the higher bulkhead existing elevation?
RESPONSE: No changes to site grading are expected, therefore match existing elevations along the full length of the bulkhead. At this location, provide a step as currently shown or a tapered transition between the two elevations, while complying with environmental permitting requirements regarding surface water quality and storm runoff standards.
Fort Myers Beach RFI 129
At sta. 2+25 at the bulkhead, there are existing utilities. Please identify all existing utilities, there appears to be more utilities here than are identified in the RFP. Are any of the utiltiies abandoned in place?
RESPONSE: Based on the historical documents provided by CG, all known utilities have been provided/shown in the RFP drawings and record drawings of the site. Design-Build team will be responsible for identifying and coordinating existing utilities into final construction plans and programming.
Fort Myers Beach RFI 130
Does the project have a controlled perimeter as defined in UFC 4 010 01?
FDCC RESPONSE: Project does not have a controlled perimeter as defined by UFC 4 010 01.
Fort Myers Beach RFI 131
Please clarify if UFC 4 010 01, Standard 2 for Unobstructed Space is applicable to this project.
RESPONSE: Unobstructed Space is not applicable to this project.
Fort Myers Beach RFI 132
Please clarify if UFC 4 010 01, Standard 10 for Glazing and Standard 12 for Exterior Doors are applicable to this project.
RESPONSE: Confirmed.
Fort Myers Beach RFI 133
Section 01800 paragraph 1.4.4.2 states that monumentation with historical significance around the site is to be protected and reused where plausible including but not limited to signage, flag poles, and commemorative monuments. Please identify the specific elements on the site that have historic significance and the location on the site that these items should be placed (reused).
RESPONSE: There are no specific elements on the site that have historic significance.
Fort Myers Beach RFI 134
RFP 01800 1.1.2.2: States that a Guard House in not required. Section 01800 3.11.2.3 states to provide a 12 pair PE89/CAT 3 cable to Gate Guard Shack. Please confirm that cable in 3.11.2.3 is not required based on
1.1.2.2.
RESPONSE: The “Guard shack” is not required but requirements of Section 01800 3.11.2.3 are required for access control, camera, and remote opening for the Main Gate.
Fort Myers Beach RFI 135
RFP 01800 1.12: During the site survey it was observed that there are existing electrical on existing pier, shore ties/lighting, that would remain. The electrical section of the RFP does not address these system, please provide direction on what is required to be reconnected.
RESPONSE: If the Base Option only is selected, all systems are required to be reconnected to the new Mission Building.
Fort Myers Beach RFI 136
RFP 01800 1.12.2.3; States that new exterior poles are required to be concrete or aluminum. During the site visit is was observed that there are existing exterior lights on poles. Please provide direction on existing exterior lights located on poles around the site.
RESPONSE: The site shall receive new lighting as defined in the section noted. If the contractor wants to utilized the existing lighting on site, during the construction period, that is acceptable.
Fort Myers Beach RFI 137
RFP 01800 1.12.7: States to provide electrical service as defined at each Berth Station. Please define quantities and locations of berth stations as well as slips up to 28 feet long and slips greater than 28 feet long.
RESPONSE: Required electrical service is dependent on the chosen bid option as the mooring/berthing arrangement changes for each. The electrical service for each option shall be based on the ability to service the indicated vessels at the locations shown on the drawings; i.e. where the
87’ WPB is shown on the drawings, provide electrical service that will meet the demands of that vessel at the prescribed location. Final location and position of shorepower equipment/services on the docks shall be determined in coordination with the dock manufacturer and final approval by the
USCG.
Fort Myers Beach RFI 138
RFP 01800 3.11.2.2; States to provide 50 pair cable/CAT 5e copper cable to each planned shore tie location. Section 3.18.6 states to anticipate two (2) shore tie locations, please provide quantities and location of each planned shore tie locations.
RESPONSE: Provide (1) shore tie location for the WPB at the location shown on the RFP drawing.
See Amendment.
Fort Myers Beach RFI 139
Section 01800 - Page 1 1.11-HVAC 1.11.1 GENERAL DESCRIPTION states, "All exterior equipment shall include a corrosion-resistant coating." Is the minimum defined as 1,000 hour salt-spray tested per
ASTM B117B meet the requirement? Please clarify if this applies to condensing coils only or applies to the entire equipment housing and the coils.
RESPONSE: Applicable standard is 6,000 hours salt spray test in accordance with
ASTM International (ASTM) B117. Requirement applies to equipment enclosures and coils exposed to ambient air.
Fort Myers Beach RFI 140
Section 01800 - Page 4 1.11-HVAC 1.11.5 VENTILATION states, "Mechanical ventilation of filtered and tempered outside air shall be provided to each occupied space (ducted directly to the room) to satisfy the minimum ventilation rates...". The phrase "ducted directly to the room" implies the use of Dedicated
Outside Air Unit (DOAU) that conditions filters and delivers ventilation air directly to rooms separate from the VAV RTU. Please clarify that DOAU is not required if the VAV RTU is selected to include modulating capacity control to assure that under all load conditions that return air mixed with ventilation air will be conditioned down to 52-58 F and therefore be properly dehumidified before being supplied to the rooms.
RESPONSE: VAV RTU (without DOAU) providing code required ventilation and maintain serviced spaces at defined temperature and humidity level is acceptable.
141 What FF+E will be left behind by the USCG for the contractor to remove / dispose?
RESPONSE: None is anticipated. The Station will be moved temporarily to another location.
142 What FF+E will be left behind by the USCG for the contractor to remove / store / reinstall?
RESPONSE: None is anticipated. The Station will be moved temporarily to another location.
143 Is there any dredging required to support the option scopes of work if the options are selected?
RESPONSE: Dredging is not required for any option items.
144 Please confirm that 757-day period of performance does not start until the base bid and all selected options have been awarded.
RESPONSE: Confirmed.
145 Please confirm the size of the underground storage tanks that are to be removed.
RESPONSE: All drawings have been provided to the contractors for use. The list below is not necessarily an all-inclusive list, but does reference the original major construction at this site. Reference Appendix A - file _USCG
1977 STA-FMB - Compiled Fort Myers Beach
USCG Mission Building 1977.pdf. Refer to
Sheet 2 of 68, Site Plan scaled at 1/16" = 1'-
0". Sheet 41 of 68 indicates two (2) 15,000 gallon water storage tanks that served the solar hot water system, that had panel previously installed on the roof. Sheet 56 of
68 indicates a 2,000 gallon fuel tank and a
1,000 gallon emergency generator fuel tank.
Page 54 of 68 indicates additional incidental underground systems noted on the site plan.
146 Please confirm that the underground storage tanks are empty and environmentally cleaned and ready for demolition.
RESPONSE RFI 146 (also refer to RFI 171): For
Bidding purposes, assume the 2 underground tanks will not be empty and the 55 gallon drums will be filled.
147 Please confirm that the hazardous materials stored in the hazardous material storage building #9 as well as any other stored hazardous material on site will be removed by the GVT prior to the site turnover to the contractor.
RESPONSE: The Government will move the hazardous materials as part of the Station moving temporarily to another location.
148 What are the weights of the safes in the armory room and communications room
(provide make and model if weight is unknown). Will the safes be the responsibility of the contractor to remove
/ dispose? Are the safes constructed with any hazardous material (lead, asbestos etc.)?
RESPONSE: Coast Guard will move safes to transient location prior to the notice to proceed. They will not be the responsibility of the contractor to remove. Safes are not constructed of any hazardous material.
149 Paragraph 1.1 indicates that “Temporary facilities will be provided for USCG personnel, equipment, and assets (i.e., vessels) during the construction period via separate contract.” Please confirm that the temporary facilities will be at another location and that the contractor will have full use of the site and waterfront for the full duration of construction.
RESPONSE: Confirmed.
150 Please confirm that the USCG will have completely vacated the project site ready for turnover to the contractor upon the
RESPONSE: Confirmed, USCG will be fully vacated upon notice to proceed.
notice to proceed.
151 Please define what activities the USCG and their other contractors will be carrying out during construction. Please define the duration of these activities. Please confirm that the contractor will be informed at least 1 month in advance of these activities so that the activities can be scheduled in a manner that will not delay the project.
RESPONSE: Confirmed, contractor will have full use of the site and waterfront for full duration of construction.
152 Relocated Equipment – states as shown on the drawings. There does not appear to be anything noted on the drawings. Please define what equipment must be relocated
/ re-installed.
RESPONSE: There is no equipment that is planned to be reinstalled by the Contractor and therefore no drawing to depict it.
153 The BFR on pg. 365 indicates (1) RBS Boat
Work Bay. The SOW description on pg. 6 indicates (2) RBS Boat Work Bays. Please indicate how many boat bays there should be.
RESPONSE: 1 RBS Boat Work Bay, and 1 RBS
Boat Wash Bay as indicated on Appendix F -
A100 STA-FMB Space Adjacency diagram.
154 Other than the 1988 USCG Dwg No 5132 showing a short section of the existing bulkhead are there any other available drawings for the bulkhead?
RESPONSE: All drawings have been provided to the contractors for use.
155 Section 01500.1.3 requires us to provide an 11’-6” x 35’ office trailer and Section
01801.1.1.1 requires us to provide a 36’ x
60’ trailer for USCG 3rd party inspectors.
Are both trailers required? If one or both required, are we able locate offsite due to the limited space at the project site?
One trailer (11’-6” x 35’) is required and needs to be located on site. See Amendment.
156 The 2008 Dwg M1461-D, 9 of 22 shows a
16” water main, a 12” water main, and a
18” forced sanitary main crossing the bulkhead into the waterway and crossing
Matanzas Pass. We did not see information for these utilities upland that could help us draw a line between the locations shown on Page 14 and the penetration through the bulkhead. Can
RESPONSE: 1) All the as-built / record drawing information has been forwarded, obtained by the AE team.
you provide any additional as-built information that would show the upland location of these utilities? Please also confirm who owns these utilities and if there are and offsets/easements that need to be maintained for proximity of pile driving for the floating dock support.
157 Bid Option 5 - On sheet M-02, Detail 1-M-
02. The cross section of the bulkhead in the RFP drawings shows the concrete cap extending below the water line. Is the intent to extend the concrete bulkhead cap below the water line? If so, how far below MLW?
RESPONSE: It is preferred to have the concrete cap extend below the low waterline to put the sheet pile below the splash zone and provide a uniform visual profile from the water. However, the cap design and geometry ultimately is at the discretion of the Designer of Record.
158 Bid Option 4 - Covered Boat Slip Canopy -
Can the canopy be constructed of materials other than concrete? Such as a combination of concrete and alternate materials? Or constructed of 100% materials suitable for marine construction other than concrete? Also, if 100% concrete construction is desired, does the structure need to be water tight (which would require a roof membrane in addition to the concrete roof deck)?
RESPONSE: The piers / columns supporting the canopy shall be either precast, prestressed concrete (DOT-approved) or steel pipe pile sleeved in UHMWPE. The pier
/ column locations can be independent or shared by the floating dock system and shall not preclude the design vessel (45' RB-M) from the maneuvering or departing quickly in the case of an emergency. The canopy structure is primarily intended to provide shelter/shade for CG personnel from the blistering FL sun, and itself, shall be a structural, non-combustible material, resistant to corrosion, sun damage, and high-wind (storm) conditions typical for this location, while also providing a waterproof cover over the boats. The roof material shall be light colored and/or reflective to reduce heat gain under the canopy, and like the structure itself, shall be resistant to sun and wind damage for the desired service life.
159 The North Travel pier that leads to the newer floating dock is listed as existing to remain. This existing travel pier appears structurally deficient and beyond its useful life. Please confirm if this travel pier should be demolished and a new pier built to connect from the upland end to the
RESPONSE: No. Provide the Base Bid and
Additive Options, as noted on overall on drawings C-101 and in detail on drawing M-
01A.
floating dock.
160 There are two Temporary Facility specifications covering the requirements of the Government trailer, 01500 and 01801. 1801 calls out for 2 showers in the Government temporary trailer.
Please clarify which spec to follow and if showers are required?
RESPONSE: See RFI 155 response on direction of Government trailer.
161 Specification 01110, section 1.10 mentions construction and parking within the indicated contractor staging area and site. Please designate where this is located.
RESPONSE: Since the Contractor will have complete control over the construction site, the Coast Guard has not dictated where the trailers will be located.
162 The provided topographical survey within the
RFP notes the existing gravity sewer line within
San Carlos Drive. Please provide invert data for the manhole located south east of the southern entrance of the site.
Appendix B documents the 2020 As-Built
Topographic Survey and Bathymetric Survey.
This is the most current site information.
Based on the review of the APPENDIX A, 87'
CPB MOORING PIER EXTENSION drawing set, and DISCIPLINE / SHT NO. S-11 (sheet 14 of
22), assume the Sanitary Sewer invert at the
Manhole is at elevation: (10.0 feet NGVD). In the Design After Award phase, Contractor will verify invert elevation to complete the engineering design.
163 Please provide any electrical load requirements for the boat bays for GFGI equipment for pricing. The assumed loads in the boat bays used were: Two 50amp welding outlets, One
5HP air compressor, and General outlets.
Please confirm no additional equipment or loads are required in the boat bays beyond this.
RESPONSE: See RFI 59 RESPONSE via amendment 12.
164 The RFP/BFR/Space Criteria Worksheets state that there are to be (1) Male/Female
Separation Birthing Rooms and (9) Watch
Stander/Transient Single Occupancy Rooms.
Please confirm if this is a misprint and those numbers should be flipped per type? Also, in the Space Criteria Worksheet the Male/Female
Separation Birthing Rooms show (4) beds. Is this correct or should it be (2)?
RESPONSE: Correct: (1) Male / Female
Berthing - 4 beds, (9) Watchstander/Transient
Single Occupancy - 2 beds each. Therefore, total beds is 22 (4 + 18 ).
165 Section 01800 - Page 5 1.11 HVAC 1.11.17
EXHAUST states, "Provide dedicated exhaust fan for weapons cleaning bench hood in the
Armory." How large or long is this bench?
RESPONSE: Provide two (2) 6' wide x 30"deep armory workbenches. Please refer to F-34 in
FFE spec (SCS should be revised to identify a quantity of (2) for a 6' width). See
Amendment.
166 Section 01800 - Page 6 1.11 HVAC 1.11.17
EXHAUST states, "Berthing toilet rooms shall be exhausted via roof-mounted exhaust fans."
This implies that ERV (energy recovery ventilator) is not used on the toilet exhaust.
Please clarify that an acceptable alternative is to duct the exhaust to an ERV or heat wheel
(stand alone or integral to the RTU) is acceptable so that energy may be recovered from the exhaust air stream.
RESPONSE: In section 1.11.7, EXHAUST, the first sentence states "heat recovery on exhaust systems shall be considered to maximize energy savings." Therefore, it is the Offerors option, to choose to employ a system of this type as one item to satisfy other Sustainability
Requirements. The base exhaust requirement listed in detail in the RFP are minimums.
167 Due to the conceptual diagram provided, would the Government like to include a one day charette or Design review session of the winning proposal floor plan prior to the 35% submittal? This will allow the USCG building occupants to review the floor plan and provide occupant input.
RESPONSE: Negative. Contractor will provide proposed concept design as part of bid.
168 Please confirm that USCG 2008 Mooring
Extension drawing (as-built) and site civil plans, C101 and C102 provided in the solicitation, are still accurate for electrical, telecommunication, sanitary sewer, and domestic water. The RFP drawings indicate that Option 2 includes the demolition and construction of a new launch dock and option 3 includes the demolition and construction of a new dock. In the case that the applicable option is not picked up, it is assumed that the domestic water, sanitary, and electrical for the docks are fed from San
Carlos drive and thus would remain active throughout construction. No rework of these utilities would be required for this contract unless the applicable option is accepted.
RESPONSE: Agreed. Keep in mind, even if the water front options are not accepted, the docks on the waterfront will not be operational during construction, but the utilities would have may remain connected and must protected from damage. The
Contractor is responsible for site safety, so therefore must evaluate if the utilities may remain connected, or not, during construction.
Appendix B documents the As-Built 2020
Topographic Survey and Bathymetric Survey.
This is the most current site information.
169 Can the Government provide an allowance or tonnage for debris found in the water near the existing bulkhead that will need to be removed as part of Option 5 New Bulkhead and
RESPONSE: Negative, However, for more information regarding tonnage for debris, see
APPENDIX C - April 2, 2020 Summary and
Findings letter by Appledore Marine
Concrete Cap. There is not any way for the contractor to estimate what the quality of debris there is to be removed.
Engineering (on RFP.PDF page 470 of 2111).
For Bid Option 05, Detail 1/M-02 (on RFP .PDF page 358 of 2111) conveys the scope of work, which indicates that the existing bulkhead remains in place, with exception of modifying the existing concrete cap.
170 Please provide the model number of item #S-
14 Hydraulic Press shown in specification section 01800 1.15.
RESPONSE: Dake B-10 972200 or approved equal See Amendment.
171 Regarding the existing on-site items to be demolished: 1) Will the 6000gal dual fuel tank be empty? 2) Will the 500gal tank for the generator be empty? 3) Will the 55gal drums in the hazmat building fill with used oil and fluids be empty?
RESPONSE: For Bidding purposes, assume the
2 underground tanks will not be empty and the 55 galloon drums will be filled.
172 Specification section 01800 3.5.2 and 3.10.5 notes to provide raised access flooring (if possible) for the Communications Center, R-21
Electronics Equipment Room, the Base
Computer Server Room ad the Command
Center Equipment Room. These rooms are not listed on the Station BFR and there is no raised access flooring noted in any of the Space
Criteria Sheets. Please confirm raised access flooring is not required in any room in this building.
RESPONSE: Raised access flooring is not a requirement. See Amendment.
173 Two rooms in the Space Criteria Sheets
(Housing and Elevator Machine Room) have
STC ratings denoted for the ceiling, floor, and walls, but do not have an STC rating noted for the door. Please confirm if the doors, frames, and hardware in these rooms need to be STC rated assemblies with the same STC rating as the ceiling, floor, and walls.
RESPONSE: Door/Frame combination needs to have the same corresponding rating to maintain the required rating. These should be a system.
174 Please confirm that the large missile impact test per TAS 201 is required to be tested to a speed of 80 ft/s for exterior finishes and glazing in accordance with Section 1626.2.4 of the
Florida Building Code or if the speed of 50 ft/s is acceptable.
RESPONSE: Use 80 feet per second (24.38 m/s) for Risk Category IV–Essential Facility buildings or structures. Per Table FBC 1604.5, Fire, rescue, ambulance and police stations and emergency vehicle garages is listed under Risk
Category IV. The CG Mission Building is a combination fire / police station on the water, housing rescue and law enforcement functions. Review Section 1800 1.8 Structural
Requirements and
1800 1.7.5.1 Architectural – Exterior Walls
(Envelope).
175 The structure will not be located in a High
Velocity Hurricane Zone. Florida Building Code requires TAS 201, 202, and 203 for structures within High Velocity Hurricane Zone; please confirm that TAS 201, 202, and 203 must be applied for the exterior façade and finishes for this structure.
RESPONSE: TAS 201, 202, and 203 must be applied for the exterior façade and finishes for this structure. Section 1800 1.7.5.1 that explicitly states that these are applicable to the exterior envelope and openings. Review also Section 1800 1.8 Structural Requirements.
That is correct that the building is not in an
High Velocity Hurricane Zone (Miami-Dade or
Broward Counties), however it is in a Wind
Borne Debris region and the same standards apply, per the FBC and the Coast Guard’s concurrence with how this DB-RFP criteria has been defined.
Note
Failure to acknowledge amendments may be cause for rejection of your offer.
File details come from the government source that posted it. Updated .