Other files
| File |
Type |
Posted |
| 36C77625B0011 0006.pdf |
PDF |
|
| Abstract of Bids OF 1419 - CONSTRUCTION - Signed 8.11.25.pdf |
PDF |
|
| Attachment 21 - Technical Questions - Danville IL 8-5-2025.pdf |
PDF |
|
| 36C77625B0011 0005.docx |
DOCX document |
|
| Attachment 21 - Technical Questions - Danville IL 7-30-2025.pdf |
PDF |
|
| 36C77625B0011 0004.pdf |
PDF |
|
| Attachment 23 - A-903.pdf |
PDF |
|
| Attachment 21 - Technical Questions - Danville IL 7-28-2025.pdf |
PDF |
|
| Solicitation 36C77625B0011 Amendment 0003 - Danville IL EHRM Construction.pdf |
PDF |
|
| Attachment 3 Construction Wage Rates Vermilion 7.25.25.pdf |
PDF |
|
| Attachment 20 - Stamped Civil Drawings.pdf |
PDF |
|
| Attachment 17 - FloorHeightTable.xlsx |
XLSX spreadsheet |
|
| Attachment 16 - FloorHeightTable.pdf |
PDF |
|
| Attachment 15 - 013324 - Electronic Submittals.pdf |
PDF |
|
| Attachment 14 -101.AE301.pdf |
PDF |
|
| Attachment 12 - 58.AE301.pdf |
PDF |
|
| Amendment - 0002 36C77625B0011.pdf |
PDF |
|
| Attachment 21 - Technical Questions - Danville IL 7-15-2025.docx |
DOCX document |
|
| Attachment 19 - Soil Report Danville IL - 7-15-25.pdf |
PDF |
|
| Attachment 18 - RFI Log_EHRM Upgrades Danville IL.xls |
XLS spreadsheet |
|
| Attachment 22 - Electrical Single Line.pdf |
PDF |
|
| Attachment 13 - 58.AE401.pdf |
PDF |
|
| Attachment 23 - Construction Wage Rates - Vermilion 7-11-25.pdf |
PDF |
|
| Amendment - 0001 36C77625B0011.pdf |
PDF |
|
| Attachment 6 Drawings Danville IL EHRM IU Construction Volume 1 of 3.pdf |
PDF |
|
| Attachment 5 Pre Construction Risk Assessment Danville IL EHRM IU.docx |
DOCX document |
|
| Attachment 10 Limitations on Subcontracting Construction.pdf |
PDF |
|
| Attachment 7 Drawings Danville IL EHRM IU Construction Volume 2 of 3.pdf |
PDF |
|
| Attachment 1 Specifications Danville IL EHRM IU Construction Volume 1 of 2.pdf |
PDF |
|
| Attachment 9 Brand Name Justification Danville IL EHRM IU Construction.pdf |
PDF |
|
| Attachment 8 Drawings Danville IL EHRM IU Construction Volume 3 of 3.pdf |
PDF |
|
| Attachment 4 Site Visit Instructions EHRM IU 550 21 700.docx |
DOCX document |
|
| Attachment 3 Construction Wage Rates Vermilion 4 18 25.pdf |
PDF |
|
| Attachment 2 Specifications Danville IL EHRM IU Construction Volume 2 of 2.pdf |
PDF |
|
| 36C77625B0011_1.docx |
DOCX document |
|
| 36C77625B0011.docx |
DOCX document |
|
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .