Attachment 16 - FloorHeightTable.pdf

PDF 42 KB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction - Danville FHCS Project 550-21-700
Solicitation number
36C77625B0011
Issued by

About this file

Attachment 16 - FloorHeightTable.pdf is a detailed table documenting ceiling and floor heights for multiple buildings at the VA Illiana Healthcare System in Danville, IL. The table covers 14 different buildings (Buildings 14, 19, 22-69, 58, 60, 64-72, 98, 101-104, 125, 128-133, and 140), providing specific height measurements for various levels including basement (B), first floor (1), second floor (2), crawlspace, penthouse, and other specific areas like foyers and side rooms. Height measurements vary across buildings, with ceiling heights ranging from approximately 7.4 to 16.8 feet and floor heights from 3.3 to 26.3 feet, demonstrating the complex architectural variations across the facility that will be part of the EHRM Infrastructure Upgrades Construction project.

View the file

Other files

File Type Posted
36C77625B0011 0006.pdf PDF
Abstract of Bids OF 1419 - CONSTRUCTION - Signed 8.11.25.pdf PDF
Attachment 21 - Technical Questions - Danville IL 8-5-2025.pdf PDF
36C77625B0011 0005.docx DOCX document
Attachment 21 - Technical Questions - Danville IL 7-30-2025.pdf PDF
36C77625B0011 0004.pdf PDF
Attachment 23 - A-903.pdf PDF
Attachment 21 - Technical Questions - Danville IL 7-28-2025.pdf PDF
Solicitation 36C77625B0011 Amendment 0003 - Danville IL EHRM Construction.pdf PDF
Attachment 3 Construction Wage Rates Vermilion 7.25.25.pdf PDF
Attachment 20 - Stamped Civil Drawings.pdf PDF
Attachment 17 - FloorHeightTable.xlsx XLSX spreadsheet
Attachment 15 - 013324 - Electronic Submittals.pdf PDF
Attachment 14 -101.AE301.pdf PDF
Attachment 12 - 58.AE301.pdf PDF
Amendment - 0002 36C77625B0011.pdf PDF
Attachment 21 - Technical Questions - Danville IL 7-15-2025.docx DOCX document
Attachment 19 - Soil Report Danville IL - 7-15-25.pdf PDF
Attachment 18 - RFI Log_EHRM Upgrades Danville IL.xls XLS spreadsheet
Attachment 22 - Electrical Single Line.pdf PDF
Attachment 13 - 58.AE401.pdf PDF
Attachment 11 - 02 82 11_Appendix_Asbestos Containing Materials Report Crosswalk.pdf PDF
Attachment 23 - Construction Wage Rates - Vermilion 7-11-25.pdf PDF
Amendment - 0001 36C77625B0011.pdf PDF
Attachment 6 Drawings Danville IL EHRM IU Construction Volume 1 of 3.pdf PDF
Attachment 5 Pre Construction Risk Assessment Danville IL EHRM IU.docx DOCX document
Attachment 10 Limitations on Subcontracting Construction.pdf PDF
Attachment 7 Drawings Danville IL EHRM IU Construction Volume 2 of 3.pdf PDF
Attachment 1 Specifications Danville IL EHRM IU Construction Volume 1 of 2.pdf PDF
Attachment 9 Brand Name Justification Danville IL EHRM IU Construction.pdf PDF
Attachment 8 Drawings Danville IL EHRM IU Construction Volume 3 of 3.pdf PDF
Attachment 4 Site Visit Instructions EHRM IU 550 21 700.docx DOCX document
Attachment 3 Construction Wage Rates Vermilion 4 18 25.pdf PDF
Attachment 2 Specifications Danville IL EHRM IU Construction Volume 2 of 2.pdf PDF
36C77625B0011_1.docx DOCX document
36C77625B0011.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building Level Ceiling Height Floor Height 14 B N/A 13

1 7.8 or 8 or 10.6 13.5 2 8 or 9.3 13.5

19 B N/A 13 1 12.7 or 9 13 2 N/A 15.3

22-69 B (South) N/A 8.9 Crawlspace N/A 5.4

1 (South) 10.4 19.6 B (Center) N/A 8.4 1 (Center) 16.1 10.5 B (North) N/A 13.7 1 (North) 8 N/A

58 B N/A 8.2 1 9.1 12.7 2 9.1 12.7 3 9.1 12.7 4 9.1 12.7 5 9.1 12.7

1 (East) 9.1 12.3 1 (Northwest) N/A 12.3

B (North) 8 or 9 12.7 1 (North) 9.1 12.7 2 (North) 9.1 12.7 3 (North) N/A 12.7 or Roof

Stairs (North) N/A 26.3 1 East Foyer (North) 12.7 26.3

60 Crawlspace N/A 3.3 1 8 10.7

1 Foyer N/A 8 2 8 or 9 Roof

64-72 1 (South) 9 or 10.5 or 11 or N/A Roof 1 (North) 8 or 9 or 10.5 Roof

98 Crawlspace N/A 5.7 B N/A or 8 or 9 12.7 1 N/A or 8 or 9 12.7

2 N/A or 8 or 9 12.7 3 N/A or 8 or 9 13.7

Penthouse N/A or 9 12.7 1 Side Room (North) 9 or 12 12.7

101 1 N/A or 7.4 or 7.5 or 8.5 or 9.6 9.3 or 11.3

102 1 N/A or 7.7 or 8 Roof

103 1 N/A or 7.8 or 7.9 or 8 Roof

104 1 N/A or 8 or 9 or 10 Roof or 11.8

125 1 N/A or 7.3 or 8 or 8.5 or 10.8 or 16.8 or (8 to 11) or (8.5 to 11.2) Roof

128 1 8 or 9 or 14 Roof

129 1 8 or 9 or 14 Roof

130 B N/A 9.5 1 N/A or 8.5 or 8.8 or 9 or 10.5 or 13.4 Roof

131 B N/A 9.5 1 8.5 or 8.8 or 9 or 13.5 Roof

132 1 N/A or 8 Roof

133 1 N/A or 8 or 8.5 or 9 or 10 Roof

140 1 N/A or 8 or 9 or 9.5 or 9.6 or 10.6 14.3 2 9 Roof

File details come from the government source that posted it. Updated .