This file is a detailed specification document for the VA Illiana Healthcare System Electronic Health Records Modernization (EHRM) Infrastructure Upgrades project located in Danville, Illinois. The project involves comprehensive infrastructure improvements across multiple buildings (Buildings 14, 19, 22, 58, 60, 64, 98, 101, 102, 103, 104, 125, 128, 129, 130, 131, 132, 133, 140) with a total scope encompassing electrical upgrades, HVAC reconfiguration, data center renovation, communication infrastructure enhancement, physical security upgrades, and hazardous material abatement.
The specification document provides extensive technical details for the project, including comprehensive requirements for demolition, asbestos abatement, site surveys, construction procedures, safety protocols, and environmental controls. The project will be solicited as a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside with a NAICS code of 236220, a size standard of $45 million, and an anticipated solicitation in April 2025. The period of performance is estimated at approximately 730 calendar days from the Notice to Proceed, with the total project value falling between $20 million and $50 million. The project will follow a Design-Bid-Build contract approach and will be managed by the Department of Veterans Affairs Technology Acquisition Center Austin.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS
VETERANS HEALTHCARE ADMINISTRATION
DESIGN AND CONSTRUCTION SERVICE
WASHINGTON, D.C.
BID DOCUMENTS
VOLUME 1 OF 2
VA ILLIANA HEALTHCARE SYSTEM (VAIHCS)
EHRM INFRASTRUCTURE UPGRADES
DANVILLE, IL
IFB NUMBER VA-XXXXXXXX
PROJECT NO. 550-21-700
BID DOCUMENTS
SIGNATURE PAGE
Architect:
ALESIA ARCHITECTURE
Sections covered by these seals include:
DIVISION 04, 06, 07, 08, 09, and 10 sections
SECTION 05 50 00
ARCHITECT: Richard J. Onken
Electrical Engineer:
DAV Energy Solutions Sections covered by these seals include:
DIVISION 26 section
ELECTRICAL: Hugo Flores
Mechanical Engineer:
VALI COOPER INTERNATIONAL
DIVISION 22 and 23 sections
MECHANICAL: Brendan Scanlon
12/31/24
Technology Designer:
IMEG Corp.
DIVISION 27 and 28 sections
TECHNOLOGY: Joe Kowols
Fire Protection Engineer:
SPECIALIZED ENGINEERNIG
SOLUTIONS
Sections covered by these seals include:
DIVISION 21 sections
SECTION 28 31 00
FIRE PROTECTION: Nate Timm
Civil Engineering:
DIVISION 31, and 32 sections.
CIVIL: Linnea Shaw
5/28/24
Fire Protection Engineer:
SPECIALIZED ENGINEERNIG
SOLUTIONS
Sections covered by these seals include:
DIVISION 21 sections
SECTION 28 31 00
FIRE PROTECTION: Nate Timm
Kristopher Burnham
05/28/2024
Structural Engineering:
SECTION 05 40 00
STRUCTURAL: Katie Goldberg
Hazardous Materials Abatement:
VCI
DIVISIONS 01 and 02 sections.
HAZARDOUS MATERIALS ABATEMENT: Sean Fitzpatrick
BID Submittal Project No. 550-21-700
VA Illiana Healthcare System 28 May 2024
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS Volume 1 of 2
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 05-21
01 01 10 IC Infection Control 01-25
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20
01 33 23 Shop Drawings, Product Data, and Samples 06-21
01 35 26 Safety Requirements 05-24
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 45 29 Testing Laboratory Services 11-18
01 45 35 Special Inspections 06-21
01 57 19 Temporary Environmental Controls 01-21
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 01-21
01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 01-21
02 41 00 Demolition 08-17
02 82 11 Traditional Asbestos Abatement 01-21
02 82 13.13 Glovebag Asbestos Abatement 01-21
02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21
02 83 33.13 Lead-Based Paint Removal and Disposal 01-21
DIVISION 03 – CONCRETE [NOT USED]
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 01-21
04 20 00 Unit Masonry 08-17
DIVISION 05 – METALS
05 40 00 Cold-Formed Metal Framing 01-21
05 50 00 Metal Fabrications 08-18
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
00 01 10-2
06 10 00 Rough Carpentry 10-17
06 20 00 Finish Carpentry 01-21
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 01-21
07 84 00 Firestopping 01-21
07 92 00 Joint Sealants 10-17
07 95 13 Expansion Joint Cover Assemblies 01-21
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
08 14 00 Interior Wood Doors 01-21
08 17 10 Integrated Door Assemblies 01-21
08 31 13 Access Doors and Frames 01-21
08 71 00 Door Hardware 01-24
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21
09 06 00 Schedule for Finishes 01-21
09 22 16 Non-Structural Metal Framing 06-18
09 23 00 Gypsum Plastering 01-21
09 29 00 Gypsum Board 04-20
09 30 13 Ceramic/Porcelain Tiling 01-21
09 51 00 Acoustical Ceilings 12-18
09 65 13 Resilient Base and Accessories 01-21
09 65 16 Resilient Sheet Flooring 05-18
09 65 19 Resilient Tile Flooring 05-18
09 65 19.01 Static Dissipative Resilient Tile Flooring
09 68 00 Carpeting 01-21
09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21
10 26 00 Wall and Door Protection 01-21
10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 11 – EQUIPMENT [NOT USED]
DIVISION 12 – FURNISHINGS [NOT USED]
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14– CONVEYING EQUIPEMENT [NOT USED]
DIVISION 21- FIRE SUPPRESSION
00 01 10-3
21 08 00 Commissioning of Fire Suppression System 11-16
21 13 13 Wet-Pipe Sprinkler Systems 06-15
21 13 16 Dry-Pipe Sprinkler Systems
21 22 00 Clean Agent Fire Suppression Systems 05-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-20
22 05 23 General-Duty Valves for Plumbing Piping 09-20
22 07 11 Plumbing Insulation 09-19
22 11 00 Facility Water Distribution 05-21
22 13 00 Facility Sanitary and Vent Piping 09-20
22 14 00 Facility Storm Drainage 09-15
22 61 13.74 Dental Compressed-Air Piping 09-20
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL INFORMATION
GI001.1 COVERSHEET – VOLUME 1 OF 3
GI001.2 COVERSHEET – VOLUME 2 OF 3
GI001.3 COVERSHEET – VOLUME 3 OF 3
GI002 SHEET INDEX – VOLUME 1 OF 3
GI003 SHEET INDEX – VOLUME 2 OF 3
GI004 SHEET INDEX – VOLUME 3 OF 3
GI005 GENERAL NOTES
GI006 GENERAL NOTES
GI007 INFECTION CONTROL & LIFE SAFETY MEASURES
GI008 GENERAL RECORD KEEPING AND COVID SAFETY NOTES
GI009 MAP OF VA ILLIANA FHCS
104.GC101 BLDG. 104 PHASING PLAN – PHASE 1
104.GC102 BLDG. 104 PHASING PLAN – PHASE 2
104.GC103 BLDG. 104 PHASING PLAN – PHASE 3
104.GC104 BLDG. 104 PHASING PLAN – PHASE 4
104.GT101 BLDG. 104 TECHNOLOGY PHASING PLAN – PHASE 1
104.GT102 BLDG. 104 TECHNOLOGY PHASING PLAN – PHASE 2
104.GT103 BLDG. 104 TECHNOLOGY PHASING PLAN – PHASE 3
104.GT104 BLDG. 104 TECHNOLOGY PHASING PLAN – PHASE 4
ARCHITECTURAL
AG001 ARCHITECTURAL ABBREVIATIONS, LEGENDS AND NOTES
14.AD101 BASEMENT FLOOR - DEMOLITION FLOOR PLAN
14.AD102 FIRST FLOOR - DEMOLITION FLOOR PLAN
14.AD103 SECOND FLOOR - DEMOLITION FLOOR PLAN
14.AE101 BASEMENT FLOOR - FLOOR PLAN
00 01 15 - 2
14.AE102 FIRST FLOOR - FLOOR PLAN
14.AE103 SECOND FLOOR - FLOOR PLAN
14.AC101 BASEMENT - REFLECTED CEILING PLAN
14.AC102 FIRST FLOOR - REFLECTED CEILING PLAN
14.AC103 SECOND FLOOR - REFLECTED CEILING PLAN
19.AD101 BASEMENT FLOOR - DEMOLITION FLOOR PLAN
19.AD102 FIRST FLOOR - DEMOLITION FLOOR PLAN
19.AE101 BASEMENT FLOOR - FLOOR PLAN
19.AE102 FIRST FLOOR - FLOOR PLAN
19.AC101 BASEMENT - REFLECTED CEILING PLAN
19.AC102 FIRST FLOOR - REFLECTED CEILING PLAN
22-69.AD101 BASEMENT FLOOR - DEMOLITION FLOOR PLAN
22-69.AD102 FIRST FLOOR - DEMOLITION FLOOR PLAN
22-69.AE101 BASEMENT FLOOR - FLOOR PLAN
22-69.AE102 FIRST FLOOR - FLOOR PLAN
22-69.AC101 BASEMENT - REFLECTED CEILING PLAN
22-69.AC102 FIRST FLOOR - REFLECTED CEILING PLAN
58.AD101 BASEMENT FLOOR - DEMOLITION FLOOR PLAN
58.AD102 FIRST FLOOR - DEMOLITION FLOOR PLAN
58.AD103 SECOND FLOOR - DEMOLITION FLOOR PLAN
58.AD104 THIRD FLOOR - DEMOLITION FLOOR PLAN
58.AD105 FOURTH FLOOR - DEMOLITION FLOOR PLAN
58.AD106 FIFTH FLOOR - DEMOLITION FLOOR PLAN
58.AD301 LARGE SCAL PLANS - DEMOLITION
58.AE101 BASEMENT FLOOR - FLOOR PLAN
58.AE102 FIRST FLOOR - FLOOR PLAN
58.AE103 SECOND FLOOR - FLOOR PLAN
58.AE104 THIRD FLOOR - FLOOR PLAN
58.AE105 FOURTH FLOOR - FLOOR PLAN
58.AE106 FIFTH FLOOR - FLOOR PLAN
58.AE301 LARGE SCALE PLANS
58.AE401 PARTIAL BUILDING SECTIONS
58.AC101 BASEMENT - REFLECTED CEILING PLAN
58.AC102 FIRST FLOOR - REFLECTED CEILING PLAN
58.AC103 SECOND FLOOR - REFLECTED CEILING PLAN
58.AC104 THIRD FLOOR - REFLECTED CEILING PLAN
00 01 15 - 3
58.AC105 FOURTH FLOOR - REFLECTED CEILING PLAN
58.AC106 FIFTH FLOOR - REFLECTED CEILING PLAN
60.AD101 FIRST & SECOND FLOOR - DEMOLITION FLOOR PLANS
60.AE101 FIRST & SECOND FLOOR - FLOOR PLANS
60.AC101 FIRST & SECOND FLOOR – REFLECTED CEILING PLAN
64-72.AD101 FIRST FLOOR - DEMOLITION FLOOR PLAN
64-72.AE101 FIRST FLOOR - FLOOR PLAN
64-72.AC101 FIRST FLOOR - REFLECTED CEILING PLAN
98.AD101 BASEMENT FLOOR - DEMOLITION FLOOR PLAN
98.AD102 BASEMENT FLOOR - DEMOLITION FLOOR PLAN AREA A
98.AD103 BASEMENT FLOOR - DEMOLITION FLOOR PLAN AREA B
98.AD104 FIRST FLOOR - DEMOLITION FLOOR PLAN
98.AD105 FIRST FLOOR - DEMOLITION FLOOR PLAN AREA A
98.AD106 FIRST FLOOR - DEMOLITION FLOOR PLAN AREA B
98.AD107 SECOND FLOOR - DEMOLITION FLOOR PLAN
98.AD108 SECOND FLOOR - DEMOLITION FLOOR PLAN AREA A
98.AD109 SECOND FLOOR – DEMOLITION FLOOR PLAN AREA B
98.AD110 THIRD FLOOR - DEMOLITION FLOOR PLAN
98.AD111 THIRD FLOOR - DEMOLITION FLOOR PLAN AREA A
98.AD112 THIRD FLOOR - DEMOLITION FLOOR PLAN AREA B
98.AD301 LARGE SCALE PLANS – DEMOLITION
98.AD302 LARGE SCALE PLANS - DEMOLITION
98.AE101 BASEMENT FLOOR - FLOOR PLAN
98.AE102 BASEMENT FLOOR, AREA A - FLOOR PLAN
98.AE103 BASEMENT FLOOR, AREA B - FLOOR PLAN
98.AE104 FIRST FLOOR - FLOOR PLAN
98.AE105 FIRST FLOOR, AREA A - FLOOR PLAN
98.AE106 FIRST FLOOR, AREA B - FLOOR PLAN
98.AE107 SECOND FLOOR - FLOOR PLAN
98.AE108 SECOND FLOOR, AREA A - FLOOR PLAN
98.AE109 SECOND FLOOR, AREA B - FLOOR PLAN
98.AE110 THIRD FLOOR - FLOOR PLAN
98.AE111 THIRD FLOOR, AREA A - FLOOR PLAN
98.AE112 THIRD FLOOR, AREA B - FLOOR PLAN
98.AE301 LARGE SCALE PLANS
98.AE401 PARTIAL BUILDING SECTION
00 01 15 - 4
98.AC101 BASEMENT - REFLECTED CEILING PLAN
98.AC102 FIRST FLOOR - REFLECTED CEILING PLAN
98.AC103 SECOND FLOOR - REFLECTED CEILING PLAN
98.AC104 THIRD FLOOR - REFLECTED CEILING PLAN
101.AD101 FIRST FLOOR - DEMOLITION FLOOR PLAN
101.AD102 FIRST FLOOR, AREA A - DEMOLITION FLOOR PLAN
101.AD103 FIRST FLOOR, AREA B - DEMOLITION FLOOR PLAN
101.AD104 FIRST FLOOR, AREA C - DEMOLITION FLOOR PLAN
101.AD105 FIRST FLOOR, AREA D - DEMOLITION FLOOR PLAN
101.AD301 LARGE SCALE PLANS – DEMOLITION
101.AE101 FIRST FLOOR - FLOOR PLAN
101.AE102 FIRST FLOOR, AREA A - FLOOR PLAN
101.AE103 FIRST FLOOR, AREA B - FLOOR PLAN
101.AE104 FIRST FLOOR, AREA C - FLOOR PLAN
101.AE105 FIRST FLOOR, AREA D - FLOOR PLAN
101.AE301 LARGE SCALE PLANS & PARTIAL BUILDING SECTIONS
101.AC101 FIRST FLOOR - REFLECTED CEILING PLAN
102.AD101 FIRST FLOOR - DEMOLITION FLOOR PLAN
102.AD102 FIRST FLOOR, AREA A - DEMOLITION FLOOR PLAN
102.AD103 FIRST FLOOR, AREA B - DEMOLITION FLOOR PLAN
102.AD104 FIRST FLOOR, AREA C - DEMOLITION FLOOR PLAN
102.AD105 FIRST FLOOR, AREA D - DEMOLITION FLOOR PLAN
102.AD301 LARGE SCALE PLANS & SECTIONS – DEMOLITION
102.AE101 FIRST FLOOR - FLOOR PLAN
102.AE102 FIRST FLOOR, AREA A - FLOOR PLAN
102.AE103 FIRST FLOOR, AREA B - FLOOR PLAN
102.AE104 FIRST FLOOR, AREA C - FLOOR PLAN
102.AE105 FIRST FLOOR, AREA D - FLOOR PLAN
102.AE301 LARGE SCALE PLANS & PARTIAL BUILDING SECTIONS
102.AC101 FIRST FLOOR - REFLECTED CEILING PLAN
103.AD101 FIRST FLOOR, - DEMOLITION FLOOR PLAN
103.AD102 FIRST FLOOR, AREA A - DEMOLITION FLOOR PLAN
103.AD103 FIRST FLOOR, AREA B - DEMOLITION FLOOR PLAN
103.AD104 FIRST FLOOR, AREA C - DEMOLITION FLOOR PLAN
103.AD105 FIRST FLOOR, AREA D - DEMOLITION FLOOR PLAN
103.AD301 LARGE SCALE PLANS & SECTIONS - DEMOLITION
00 01 15 - 5
103.AE101 FIRST FLOOR - FLOOR PLAN
103.AE102 FIRST FLOOR, AREA A - FLOOR PLAN
103.AE103 FIRST FLOOR, AREA B - FLOOR PLAN
103.AE104 FIRST FLOOR, AREA C - FLOOR PLAN
103.AE105 FIRST FLOOR, AREA D - FLOOR PLAN
103.AE301 LARGE SCALE PLANS & PARTIAL BUILDING SECTONS
103.AC101 FIRST FLOOR - REFLECTED CEILING PLAN
104.AD101 FIRST FLOOR - DEMOLITION FLOOR PLAN
104.AD102 FIRST FLOOR, AREA A - DEMOLITION FLOOR PLAN
104.AD103 FIRST FLOOR, AREA B - DEMOLITION FLOOR PLAN
104.AD301 LARGE SCALE PLANS - DEMOLITION
104.AE101 FIRST FLOOR - FLOOR PLAN
104.AE102 FIRST FLOOR, AREA A - RENOVATION FLOOR PLAN
104.AE103 FIRST FLOOR, AREA B - RENOVATION FLOOR PLAN
104.AE301 LARGE SCALE PLANS
104.AE401 PARTIAL BUILDING SECTIONS
104.AE402 PARTIAL BUILDING SECTIONS
104.AC101 FIRST FLOOR - REFLECTED CEILING PLAN
104.AC102 FIRST FLOOR, AREA B – REFLECTED CEILING PLAN
125.AD101 FIRST FLOOR - DEMOLITION FLOOR PLAN
125.AE101 FIRST FLOOR - FLOOR PLAN
125.AC101 FIRST FLOOR - REFLECTED CEILING PLAN
128.AD101 FREEDOM HOUSE - FIRST FLOOR - DEMOLITION FLOOR PLAN
128.AE101 FREEDOM HOUSE - FIRST FLOOR - FLOOR PLAN
128.AC101 FREEDOM HOUSE - FIRST FLOOR - REFLECTED CEILING PLAN
129.AD101 LIBERTY HOUSE - FIRST FLOOR - DEMOLITION FLOOR PLAN
129.AE101 LIBERTY HOUSE - FIRST FLOOR - FLOOR PLAN
129.AC101 LIBERTY HOUSE - FIRST FLOOR - REFLECTED CEILING PLAN
130.AD101 HONOR HOUSE - DEMOLITION FLOOR PLAN
130.AE101 HONOR HOUSE - BASEMENT & FIRST FLOOR - FLOOR PLANS
130.AC101 HONOR HOUSE - FIRST FLOOR - REFLECTED CEILING PLANS
131.AD101 VALOR HOUSE - BASEMENT & FIRST FLOOR - DEMOLITION FLOOR
PLAN
131.AE101 VALOR HOUSE - BASEMENT & FIRST FLOOR - FLOOR PLANS
131.AC101 VALOR HOUSE - BASEMENT & FIRST FLOOR - REFLECTED CEILING
PLANS
00 01 15 - 6
132.AD101 INDEPENDENCE HOUSE - FIRST FLOOR - DEMOLITION FLOOR PLAN
132.AE101 INDEPENDENCE HOUSE - FIRST FLOOR - FLOOR PLAN
132.AC101 INDEPENDENCE HOUSE - FIRST FLOOR - REFLECTED CEILING
PLAN
133.AD101 COURAGE HOUSE - FIRST FLOOR – DEMOLITION FLOOR PLAN
133.AE101 COURAGE HOUSE - FIRST FLOOR - FLOOR PLAN
133.AC101 COURAGE HOUSE - FIRST FLOOR - REFLECTED CEILING PLAN
A-501 MISCELLANEOUS ARCHITECTURAL & CEILING DETAILS
A-601 ROOM FINISH SCHEDULE
A-602 SIGNAGE SCHEDULE AND DETAILS
A-701 DOOR AND FRAME TYPES, SCHEDULE AND DETAILS
A-801 PARTITION TYPES & PENETRATION DETAILS
A-802 PARTITION & INTERIOR DETAILS
A-901 TR ROOM ELEVATIONS & DETAILS
A-902 INTERIOR ELEVATIONS & DETAILS
TECHNOLOGY
TN001 TECHNOLOGY COVERSHEET
TN002 SITE PLAN – TECHNOLOGY
TD101 TRAMWAY DEMOLITION PLANS – TECHNOLOGY
TD101 TRAMWAY DEMOLITION PLANS – TECHNOLOGY
TN101 TRAMWAY PLANS - TECHNOLOGY
14.TD101 BASEMENT – DEMOLITION FLOOR PLAN – TECHNOLOGY
14.TD102 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
14.TD103 SECOND FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
14.TN101 BASEMENT – FLOOR PLAN - TECHNOLOGY
14.TN102 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY
14.TN103 SECOND FLOOR – FLOOR PLAN - TECHNOLOGY
14.TN401 TECHNOLOGY ROOM ENLARGEMENTS
14.TN601 TECHNOLOGY RISER DIAGRAMS
14.TN602 TECHNOLOGY RISER DIAGRAMS
14.TN701 TECHNOLOGY SCHEDULES
19.TD101 BASEMENT – DEMOLITION FLOOR PLAN - TECHNOLOGY
19.TD102 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
00 01 15 - 7
19.TD103 SECOND FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
19.TN101 BASEMENT – FLOOR PLAN - TECHNOLOGY
19.TN102 FIRST FLOOR – FLOOR PLAN – TECHNOLOGY
19.TN103 SECOND FLOOR – FLOOR PLAN - TECHNOLOGY
19.TN401 TECHNOLOGY ROOM ENLARGEMENTS
19.TN601 TECHNOLOGY RISER DIAGRAMS
19.TN602 TECHNOLOGY RISER DIAGRAMS
19.TN701 TECHNOLOGY SCHEDULES
22-69.TD101 BASEMENT – DEMOLITION FLOOR PLAN - TECHNOLOGY
22-69.TD102 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
22-69.TN101 BASEMENT – FLOOR PLAN - TECHNOLOGY
22-69.TN102 FIRST FLOOR – FLOOR PLAN – TECHNOLOGY
22-69.TN401 TECHNOLOGY ROOM ENLARGEMENTS
22-69.TN601 TECHNOLOGY RISER DIAGRAMS
22-69.TN701 TECHNOLOGY SCHEDULES
58.TD101 BASEMENT FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
58.TD102 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
58.TD103 SECOND FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
58.TD104 THIRD FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
58.TD105 FOURTH FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
58.TD106 FIFTH FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
58.TN101 BASEMENT FLOOR – FLOOR PLAN - TECHNOLOGY
58.TN102 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY
58.TN103 SECOND FLOOR – FLOOR PLAN - TECHNOLOGY
58.TN104 THIRD FLOOR – FLOOR PLAN - TECHNOLOGY
58.TN105 FOUTH FLOOR – FLOOR PLAN - TECHNOLOGY
58.TN106 FIFTH FLOOR – FLOOR PLAN - TECHNOLOGY
58.TN401 TECHNOLOGY ROOM ENLARGEMENTS
58.TN402 TECHNOLOGY ROOM ENLARGEMENTS
58.TN403 TECHNOLOGY ROOM ENLARGEMENTS
58.TN601 TECHNOLOGY RISER DIAGRAMS
58.TN602 TECHNOLOGY RISER DIAGRAMS
58.TN701 TECHNOLOGY SCHEDULES
60.TD101 FIRST AND SECOND FLOORS – DEMOLITION FLOOR PLAN -
TECHNOLOGY
60.TN101 FIRST AND SECOND FLOORS – FLOOR PLANS – TECHNOLOGY
60.TN401 TECHNOLOGY ROOM ENLARGEMENTS
00 01 15 - 8
60.TN601 TECHNOLOGY RISER DIAGRAMS
60.TN602 TECHNOLOGY RISER DIAGRAMS
60.TN701 TECHNOLOGY SCHEDULES
64-72.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
64-72.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY
64-72.TN401 TECHNOLOGY ROOM ENLARGEMENTS
64-72.TN601 TECHNOLOGY RISER DIAGRAMS
64-72.TN701 TECHNOLOGY SCHEDULES
98.TD101 BASEMENT FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
98.TD102 BASEMENT FLOOR, AREA A – DEMOLITION FLOOR PLAN –
TECHNOLOGY
98.TD103 BASEMENT FLOOR, AREA B – DEMOLITION FLOOR PLAN –
TECHNOLOGY
98.TD104 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
98.TD105 FIRST FLOOR, AREA A – DEMOLITION FLOOR PLAN - TECHNOLOGY
98.TD106 FIRST FLOOR, AREA B – DEMOLITION FLOOR PLAN - TECHNOLOGY
98.TD107 SECOND FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
98.TD108 SECOND FLOOR, AREA A – DEMOLITION FLOOR PLAN -
TECHNOLOGY
98.TD109 SECOND FLOOR, AREA B – DEMOLITION FLOOR PLAN -
TECHNOLOGY
98.TD110 THIRD FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
98.TD111 THIRD FLOOR, AREA A – DEMOLITION FLOOR PLAN - TECHNOLOGY
98.TD112 THIRD FLOOR, AREA B – DEMOLITION FLOOR PLAN - TECHNOLOGY
98.TD113 FOURTH FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
98.TD114 FOURTH FLOOR, AREA A – DEMOLITION FLOOR PLAN –
TECHNOLOGY
98.TD115 FOURTH FLOOR, AREA B – DEMOLITION FLOOR PLAN -
TECHNOLOGY
98.TN101 BASEMENT FLOOR – FLOOR PLAN - TECHNOLOGY
98.TN102 BASEMENT FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY
98.TN103 BASEMENT FLOOR, AREA B – FLOOR PLAN - TECHNOLOGY
98.TN104 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY
98.TN105 FIRST FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY
98.TN106 FIRST FLOOR, AREA B – FLOOR PLAN - TECHNOLOGY
98.TN107 SECOND FLOOR – FLOOR PLAN – TECHNOLOGY
98.TN108 SECOND FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY
98.TN109 SECOND FLOOR, AREA B – FLOOR PLAN - TECHNOLOGY
00 01 15 - 9
98.TN110 THIRD FLOOR – FLOOR PLAN – TECHNOLOGY
98.TN111 THIRD FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY
98.TN112 THIRD FLOOR, AREA B – FLOOR PLAN - TECHNOLOGY
98.TN113 FOURTH FLOOR – FLOOR PLAN - TECHNOLOGY
98.TN114 FOURTH FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY
98.TN115 FOURTH FLOOR, AREA B – FLOOR PLAN - TECHNOLOGY
98.TN401 TECHNOLOGY ROOM ENLARGEMENTS
98.TN402 TECHNOLOGY ROOM ENLARGEMENTS
98.TN403 TECHNOLOGY ROOM ENLARGEMENTS
98.TN601 TECHNOLOGY RISER DIAGRAMS
98.TN602 TECHNOLOGY RISER DIAGRAMS
98.TN701 TECHNOLOGY SCHEDULES
101.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
101.TD102 FIRST FLOOR, AREA A – DEMOLITION FLOOR PLAN – TECHNOLOGY
101.TD103 FIRST FLOOR, AREA B – DEMOLITION FLOOR PLAN - TECHNOLOGY
101.TD104 FIRST FLOOR, AREA C – DEMOLITION FLOOR PLAN – TECHNOLOGY
101.TD105 FIRST FLOOR, AREA D – DEMOLITION FLOOR PLAN - TECHNOLOGY
101.TN101 FIRST FLOOR – FLOOR PLAN – TECHNOLOGY
101.TN102 FIRST FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY
101.TN103 FIRST FLOOR, AREA B – FLOOR PLAN – TECHNOLOGY
101.TN104 FIRST FLOOR, AREA C – FLOOR PLAN - TECHNOLOGY
101.TN105 FIRST FLOOR, AREA D – FLOOR PLAN - TECHNOLOGY
101.TN401 TECHNOLOGY ROOM ENLARGEMENTS
101.TN601 TECHNOLOGY RISER DIAGRAMS
101.TN701 TECHNOLOGY SCHEDULES
102.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
102.TD102 FIRST FLOOR, AREA A – DEMOLITION FLOOR PLAN - TECHNOLOGY
102.TD103 FIRST FLOOR, AREA B – DEMOLITION FLOOR PLAN - TECHNOLOGY
102.TD104 FIRST FLOOR, AREA C – DEMOLITION FLOOR PLAN - TECHNOLOGY
102.TD105 FIRST FLOOR, AREA D – DEMOLITION FLOOR PLAN - TECHNOLOGY
102.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY
102.TN102 FIRST FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY
102.TN103 FIRST FLOOR, AREA B – FLOOR PLAN - TECHNOLOGY
102.TN104 FIRST FLOOR, AREA C – FLOOR PLAN – TECHNOLOGY
102.TN105 FIRST FLOOR, AREA D – FLOOR PLAN – TECHNOLOGY
102.TN401 TECHNOLOGY ROOM ENLARGEMENTS
00 01 15 - 10
102.TN402 TECHNOLOGY ROOM ENLARGEMENTS
102.TN601 TECHNOLOGY RISER DIAGRAMS
102.TN602 TECHNOLOGY RISER DIAGRAMS
102.TN701 TECHNOLOGY SCHEDULES
103.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
103.TD102 FIRST FLOOR, AREA A – DEMOLITION FLOOR PLAN – TECHNOLOGY
103.TD103 FIRST FLOOR, AREA B – DEMOLITION FLOOR PLAN – TECHNOLOGY
103.TD104 FIRST FLOOR, AREA C – DEMOLITION FLOOR PLAN – TECHNOLOGY
103.TD105 FIRST FLOOR, AREA D – DEMOLITION FLOOR PLAN – TECHNOLOGY
103.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY
103.TN102 FIRST FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY
103.TN103 FIRST FLOOR, AREA B – FLOOR PLAN – TECHNOLOGY
103.TN104 FIRST FLOOR, AREA C – FLOOR PLAN – TECHNOLOGY
103.TN105 FIRST FLOOR, AREA D – FLOOR PLAN – TECHNOLOGY
103.TN401 TECHNOLOGY ROOM ENLARGEMENTS
103.TN601 TECHNOLOGY RISER DIAGRAMS
103.TN701 TECHNOLOGY SCHEDULES
104.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
104.TD102 FIRST FLOOR, AREA A – DEMOLITION FLOOR PLAN - TECHNOLOGY
104.TD103 FIRST FLOOR, AREA B – DEMOLITION FLOOR PLAN - TECHNOLOGY
104.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY
104.TN102 FIRST FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY
104.TN103 FIRST FLOOR, AREA B – FLOOR PLAN – TECHNOLOGY
104.TN401 TECHNOLOGY ROOM ENLARGEMENTS
104.TN402 TECHNOLOGY ROOM ENLARGEMENTS
104.TN403 TECHNOLOGY ROOM ENLARGEMENTS
104.TN404 TECHNOLOGY ROOM ENLARGEMENTS
104.TN601 TECHNOLOGY RISER DIAGRAMS
104.TN602 TECHNOLOGY RISER DIAGRAMS
104.TN603 TECHNOLOGY RISER DIAGRAMS
104.TN701 TECHNOLOGY SCHEDULES
125.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
125.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY
125.TN401 TECHNOLOGY ROOM ENLARGEMENTS
125.TN601 TECHNOLOGY RISER DIAGRAMS
125.TN701 TECHNOLOGY SCHEDULES
00 01 15 - 11
128.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
128.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY
128.TN401 TECHNOLOGY ROOM ENLARGEMENTS
128.TN601 TECHNOLOGY RISER DIAGRAMS
128.TN701 TECHNOLOGY SCHEDULES
129.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
129.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY
129.TN401 TECHNOLOGY ROOM ENLARGEMENTS
129.TN601 TECHNOLOGY RISER DIAGRAMS
129.TN701 TECHNOLOGY SCHEDULES
130.TD101 BASEMENT & FIRST FLOOR – DEMOLITION FLOOR PLAN -
TECHNOLOGY
130.TN101 BASEMENT & FIRST FLOOR – FLOOR PLAN – TECHNOLOGY
130.TN401 TECHNOLOGY ROOM ENLARGEMENTS
130.TN601 TECHNOLOGY RISER DIAGRAMS
130.TN701 TECHNOLOGY SCHEDULES
131.TD101 BASEMENT & FIRST FLOOR – DEMOLITION FLOOR PLAN –
TECHNOLOGY
131.TN101 BASEMENT & FIRST FLOOR – FLOOR PLAN – TECHNOLOGY
131.TN401 TECHNOLOGY ROOM ENLARGEMENTS
131.TN601 TECHNOLOGY RISER DIAGRAMS
131.TN701 TECHNOLOGY SCHEDULES
132.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
132.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY
132.TN401 TECHNOLOGY ROOM ENLARGEMENTS
132.TN601 TECHNOLOGY RISER DIAGRAMS
132.TN701 TECHNOLOGY SCHEDULES
133.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
133.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY
133.TN401 TECHNOLOGY ROOM ENLARGEMENTS
133.TN601 TECHNOLOGY RISER DIAGRAMS
133.TN701 TECHNOLOGY SCHEDULES
140.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY
140.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY
140.TN401 TECHNOLOGY ROOM ENLARGEMENTS
140.TN601 TECHNOLOGY RISER DIAGRAMS
140.TN701 TECHNOLOGY SCHEDULES
00 01 15 - 12
TN501 TECHNOLOGY DETAILS
TN502 TECHNOLOGY DETAILS
TN503 TECHNOLOGY DETAILS
TN601 TECHNOLOGY RISER DIAGRAMS
TN701 TECHNOLOGY SCHEDULES
ELECTRICAL
EG001 GENERAL NOTES & LEGENDS
14.ED101 ELECTRICAL ENLARGED PLANS – BASEMENT DEMO PLAN
14.ED102 ELECTRICAL ENLARGED PLANS – LEVEL 1 & 2 DEMO PLAN
14.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 & 2 LIGHTING PLAN
14.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
14.E-601 ELECTRICAL ONE-LINE DIAGRAM
14.E-701 ELECTRICAL SCHEDULES
19.ED101 ELECTRICAL ENLARGED PLAN – BASEMENT & LEVEL 1 DEMO PLAN
19.EP101 ELECTRICAL ENLARGED PLAN – BASEMENT & LEVEL 1 POWER PLAN
19.E-601 ELECTRICAL ONE-LINE DIAGRAM
19.E-701 ELECTRICAL SCHEDULES
22-69.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
22-69.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
22-69.E-601 ELECTRICAL ONE-LINE DIAGRAM
22-69.E-701 ELECTRICAL SCHEDULES
58.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
58.ED102 ELECTRICAL ENLARGED PLANS – LEVEL 2 DEMO PLAN
58.ED103 ELECTRICAL ENLARGED PLANS – LEVEL 3 DEMO PLAN
58.ED104 ELECTRICAL ENLARGED PLANS – LEVEL 4 DEMO PLAN
58.ED105 ELECTRICAL ENLARGED PLANS – LEVEL 5 DEMO PLAN
58.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN
58.EL102 ELECTRICAL ENLARGED PLANS – LEVEL 2 LIGHTING PLAN
58.EL103 ELECTRICAL ENLARGED PLANS – LEVEL 3 LIGHTING PLAN
58.EL104 ELECTRICAL ENLARGED PLANS – LEVEL 4 LIGHTING PLAN
58.EL105 ELECTRICAL ENLARGED PLANS – LEVEL 5 LIGHTING PLAN
58.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
58.EP102 ELECTRICAL ENLARGED PLANS – LEVEL 2 POWER PLAN
00 01 15 - 13
58.EP103 ELECTRICAL ENLARGED PLANS – LEVEL 3 POWER PLAN
58.EP104 ELECTRICAL ENLARGED PLANS – LEVEL 4 POWER PLAN
58.EP105 ELECTRICAL ENLARGED PLANS – LEVEL 5 POWER PLAN
58.E-601 ELECTRICAL ONE-LINE DIAGRAM
58.E-701 ELECTRICAL SCHEDULES
58.E-702 ELECTRICAL SCHEDULES
60.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
60.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN
60.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
60.E-601 ELECTRICAL ONE-LINE DIAGRAMS
60.E-701 ELECTRICAL SCHEDULES
64-72.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
64-72.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
64-72.E-601 ELECTRICAL ONE-LINE DIAGRAMS
64-72.E-701 ELECTRICAL SCHEDULES
98.ED101 ELECTRICAL ENLARGED PLANS – BASEMENT DEMO PLAN
98.ED102 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
98.ED103 ELECTRICAL ENLARGED PLANS – LEVEL 2 DEMO PLAN
98.ED104 ELECTRICAL ENLARGED PLANS – LEVEL 3 DEMO PLAN
98.EL101 ELECTRICAL ENLARGED PLANS – BASEMENT LIGHTING PLAN
98.EL102 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN
98.EL103 ELECTRICAL ENLARGED PLANS – LEVEL 2 LIGHTING PLAN
98.EL104 ELECTRICAL ENLARGED PLANS – LEVEL 3 LIGHTING PLAN
98.EP101 ELECTRICAL ENLARGED PLANS – BASEMENT POWER PLAN
98.EP102 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
98.EP103 ELECTRICAL ENLARGED PLANS – LEVEL 2 POWER PLAN
98.EP104 ELECTRICAL ENLARGED PLANS – LEVEL 3 POWER PLAN
98.E-601 ELECTRICAL ONE-LINE DIAGRAM
98.E-701 ELECTRICAL SCHEDULES
98.E-702 ELECTRICAL SCHEDULES
101.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
101.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN
101.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
101.E-601 ELECTRICAL ONE-LINE DIAGRAM
101.E-701 ELECTRICAL SCHEDULES
102.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
00 01 15 - 14
102.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN
102.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
102.E-601 ELECTRICAL ONE-LINE DIAGRAM
102.E-701 ELECTRICAL SCHEDULES
103.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
103.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN
103.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
103.E-601 ELECTRICAL ONE-LINE DIAGRAM
103.E-701 ELECTRICAL SCHEDULES
104.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
104.ED102 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
104.ED103 ELECTRICAL ENLARGED PLANS – ATTIC LEVEL DEMO PLAN
104.ED601 ELECTRICAL ONE-LINE DIAGRAM DEMO
104.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN
104.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
104.EP102 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
104.E-601 ELECTRICAL ONE-LINE DIAGRAM
104.E-701 ELECTRICAL SCHEDULES
125.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
125.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN
125.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
125.E-601 ELECTRICAL ONE-LINE DIAGRAM
125.E-701 ELECTRICAL SCHEDULES
128.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
128.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
128.E-601 ELECTRICAL ONE-LINE DIAGRAM
128.E-701 ELECTRICAL SCHEDULES
129.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
129.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
129.E-601 ELECTRICAL ONE-LINE DIAGRAM
129.E-701 ELECTRICAL SCHEDULES
130.ED101 ELECTRICAL ENLARGED PLANS – BASEMENT DEMO PLAN
130.EL101 ELECTRICAL ENLARGED PLANS – BASEMENT LIGHTING PLAN
130.EP101 ELECTRICAL ENLARGED PLANS – BASEMENT POWER PLAN
130.E-601 ELECTRICAL ONE-LINE DIAGRAM
130.E-701 ELECTRICAL SCHEDULES
00 01 15 - 15
131.ED101 ELECTRICAL ENLARGED PLANS – BASEMENT DEMO PLAN
131.EL101 ELECTRICAL ENLARGED PLANS – BASEMENT LIGHTING PLAN
131.EP101 ELECTRICAL ENLARGED PLANS – BASEMENT POWER PLAN
131.E-601 ELECTRICAL ONE-LINE DIAGRAM
131.E-701 ELECTRICAL SCHEDULES
132.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
132.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN
132.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
132.E-601 ELECTRICAL ONE-LINE DIAGRAM
132.E-701 ELECTRICAL SCHEDULES
133.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
133.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN
133.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
133.E-601 ELECTRICAL ONE-LINE DIAGRAM
133.E-701 ELECTRICAL SCHEDULES
140.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN
140.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN
140.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN
140.E-601 ELECTRICAL ONE-LINE DIAGRAM
140.E-701 ELECTRICAL SCHEDULES
E-501 ELECTRICAL DETAILS
E-701 ELECTRICAL SCHEDULES
MECHANICAL
MG001 MECHANICAL - LEGENDS AND NOTES
14.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01
14.MH101 MECHANICAL VENTILATION – LARGE SCALE PLANS
19.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – BASEMENT & LEVEL
19.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01
22-69.MH101 MECHANICAL VENTILATION - FIRST FLOOR PLAN
58.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01 & 02
58.MD102 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 03 & 04
58.MD103 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 05
58.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01 & 02
00 01 15 - 16
58.MH102 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVELS 03 & 04
58.MH103 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 05
60.MD101 MECHANICAL VENTILATION – FIRST FLOOR DEMOLITION PLAN
60.MH101 MECHANICAL VENTILATION – FIRST FLOOR PLAN
98.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN
98.MD102 MECHANICAL ENLARGED DEMO FLOOR PLAN
98.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN
98.MH102 MECHANICAL ENLARGED NEW FLOOR PLAN
98.MH103 MECHANICAL ENLARGED NEW FLOOR PLAN
98.MH104 MECHANICAL ENLARGED NEW FLOOR PLAN
101.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01
101.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01
101.MH102 MECHANICAL SECTIONS
102.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01
102.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01
102.MH102 MECHANICAL SECTIONS
103.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01
103.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01
103.MH102 MECHANICAL SECTIONS
104.MD101 PHASE 1 DATA CENTER MECHANICAL DEMO
104.MD102 PHASE 3 DATA CENTER MECHANICAL DEMO
104.MH101 PHASE 2 DATA CENTER MECHANICAL ATTIC
104.MH102 PHASE 2 DATA CENTER MECHANICAL FIRST FLOOR
104.MH103 PHASE 2 DATA CENTER MECHANICAL OVERALL
104.MH104 PHASE 4 DATA CENTER MECHANICAL ATTIC
104.MH105 PHASE 4 DATA CENTER MECHANICAL FIRST FLOOR
125.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01
125.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01
128.MD101 MECHANICAL DEMO FLOOR PLAN – LEVEL 1
128.MH101 MECHANICAL NEW FLOOR PLAN – LEVEL 1
129.MD101 MECHANICAL DEMO FLOOR PLAN – LEVEL 1
129.MH101 MECHANICAL NEW FLOOR PLAN – LEVEL 1
130.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – BASEMENT
130.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – BASEMENT
131.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – BASEMENT
131.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – BASEMENT
00 01 15 - 17
132.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01
132.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01
133.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01
133.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01
MH501 MECHANICAL DETAILS
MH502 MECHANICAL DETAILS
MH503 MECHANICAL DETAILS
MH504 MECHANICAL DETAILS
MH601 MECHANICAL SCHEDULES
MH602 MECHANICAL SCHEDULES & DETAILS
MI701 MECHANICAL CONTROLS
MI702 TEMPERATURE CONTROLS
MI703 MECHANICAL CONTROLS
MI704 MECHANICAL CONTROLS
FIRE PROTECTION
F-001 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS
14.FP101 FIRST FLOOR PLAN – FIRE PROTECTION
58.FP101 FIRST FLOOR PLAN – FIRE PROTECTION
58.FP102 SECOND FLOOR PLAN – FIRE PROTECTION
58.FP103 THIRD FLOOR PLAN – FIRE PROTECTION
58.FP104 FOURTH FLOOR PLAN – FIRE PROTECTION
58.FP105 FIFTH FLOOR PLAN – FIRE PROTECTION
60.FP101 FIRST FLOOR PLAN – FIRE PROTECTION
98.FP101 BASEMENT AREA B – FLOOR PLAN – FIRE PROTECTION
98.FP102 FIRST FLOOR AREA B – FLOOR PLAN – FIRE PROTECTION
98.FP103 SECOND FLOOR AREA B – FLOOR PLAN – FIRE PROTECTION
98.FP104 THIRD FLOOR AREA A – FLOOR PLAN – FIRE PROTECTION
98.FP105 THIRD FLOOR AREA B – FLOOR PLAN – FIRE PROTECTION
101.FP101 FIRST FLOOR PLAN – AREA A – FIRE PROTECTION
101.FP102 FIRST FLOOR PLAN – AREA D – FIRE PROTECTION
102.FP101 FIRST FLOOR PLAN – AREA C – FIRE PROTECTION
102.FP102 FIRST FLOOR PLAN – AREA D – FIRE PROTECTION
103.FP101 FIRST FLOOR PLAN – AREA A – FIRE PROTECTION
103.FP102 FIRST FLOOR PLAN – AREA D – FIRE PROTECTION
00 01 15 - 18
104.FP101 FIRST FLOOR PLAN – FIRE PROTECTION
104.FP102 DATA CENTER – FIRE PROTECTION
125.FP101 FIRST FLOOR PLAN – FIRE PROTECTION
CIVIL
C-001 NOTES, LEGEND AND SITE LOCATIONS
CD101 OVERALL EXISTING AND DEMOLITION
CD102 DETAILED EXISTING AND DMOLITION PLAN
CD103 DETAILED EXISTING AND DMOLITION PLAN
CD104 DETAILED EXISTING AND DMOLITION PLAN
CD105 DETAILED EXISTING AND DMOLITION PLAN
CD106 DETAILED EXISTING AND DMOLITION PLAN
CD107 DETAILED EXISTING AND DMOLITION PLAN
CD108 DETAILED EXISTING AND DMOLITION PLAN
CS101 OVERALL SITE PLAN
CS102 DETAILED SITE PLAN
CS103 DETAILED SITE PLAN
CS104 DETAILED SITE PLAN
CS105 DETAILED SITE PLAN
CS106 DETAILED SITE PLAN
CS107 DETAILED SITE PLAN
CS108 DETAILED SITE PLAN
CS109 MECHANICAL SECURITY
CS110 MECHANICAL SECURITY
CG101 OVERALL EROSION CONTROL PLAN
CG102 DETAILED EROSION CONTROL PLAN
CG103 DETAILED EROSION CONTROL PLAN
CG104 DETAILED EROSION CONTROL PLAN
CG105 DETAILED EROSION CONTROL PLAN
CG106 DETAILED EROSION CONTROL PLAN
CG107 DETAILED EROSION CONTROL PLAN
CG108 DETAILED EROSION CONTROL PLAN
CU101 FIBER PLAN AND PROFILE 1
CU102 FIBER PLAN AND PROFILE 2
CU103 FIBER PLAN AND PROFILE 3
00 01 15 - 19
CU104 FIBER PLAN AND PROFILE 4
CU105 FIBER PLAN AND PROFILE 5
CU106 FIBER PLAN AND PROFILE 6
CU107 FIBER PLAN AND PROFILE 7
CU108 FIBER PLAN AND PROFILE 8
CU109 FIBER PLAN AND PROFILE 9
CU110 FIBER PLAN AND PROFILE 10, 11, 12 & 13
CU111 FIBER PLAN AND PROFILE 14 & 15
CU112 FIBER PLAN AND PROFILE 16, 17 & 18
CU113 FIBER PLAN AND PROFILE 19, 20 & 21
CU114 FIBER PLAN AND PROFILE 22, 23 & 24
CU115 FIBER PLAN AND PROFILE 25, 26, 27 & 28
CK501 CIVIL DETAILS
HAZARDOUS ABATEMENT
HG001 HAZARDOUS ABATEMENT – GENERAL NOTES
14.HD101 FIRST & SECOND FLOORS - HAZARDOUS MATERIALS ABATEMENT
19.HD101 FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT
22-69.HD101 BASEMENT - HAZARDOUS MATERIALS ABATEMENT
22-69.HD102 FIRST FLOOR - HAZARDOUS MATERIALS ABATMENT
58.HD101 BASEMENT – HAZARDOUS MATERIALS ABATEMENT
58.HD102 FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT
58.HD103 SECOND FLOOR - HAZARDOUS MATERIALS ABATEMENT
58.HD104 THIRD FLOOR - HAZARDOUS MATERIALS ABATEMENT
58.HD105 FOURTH FLOOR HAZARDOUS MATERIALS ABASTEMENT
58.HD106 FIFTH FLOOR - HAZARDOUS MATERIALS ABATEMENT
60.HD101 FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT
64-72.HD101 FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT
98.HD101 BASEMENT & FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT
98.HD102 SECOND & THIRD FLOORS FLOOR - HAZARDOUS MATERIALS
ABATEMENT
101.HD101 FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT
102.HD101 FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT
103.HD101 FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT
104.HD101 ATTIC - HAZARDOUS MATERIALS ABATEMENT
00 01 15 - 20
104.HD102 FIRST FLOOR – HAZARDOUS MATERIALS ABATEMENT
STRUCTURAL
S-001 GENERAL NOTES, TESTING, INSPECTIONS AND OBSERVATIONS
104.S-101 CEILING FRAMING PLAN AND DETAILS
- - - E N D - - -
00 01 15 - 21
(This page intentionally left blank)
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, asbestos and lead abatement as necessary, and furnish labor and materials and perform work for multiple
Electronic Health Record Management (EHRM) upgrades to existing campus facilities by means of renovation and new construction as required by drawings and specifications.
B. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the Contracting Officer.
C. Offices of Vali Cooper International (VCI), as
Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by a testing laboratory retained by the General Contractor, the Contractor shall notify the COR in sufficient time to be present at the site, in time for proper taking and testing of specimens and field inspection. Such prior
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades
01 00 00 -2 notice shall be not less than three workdays unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. Any reference throughout this Project Manual / Specifications document to the VA “Resident Engineer”, “Project Engineer”, or “COR” shall be considered synonymous with the VA
“Contracting Officers Representative” and used interchangeably.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, (Base Bid) VA Project #550-21-700, EHRM
Infrastructure Upgrades, VAMC Illiana Health Care System, Danville, IL: Work includes all labor, material, equipment and supervision to perform general new construction, renovation, selective demolition, interior fit-up, structural, mechanical, fire protection, plumbing, electrical, technology system work, asbestos and lead abatement and any other necessary work as described in the
Construction Documents. All work, including final cleanup and completion of any punch list items, shall be performed within a period of performance designated by the VA starting after date of receipt of Notice to Proceed.
1. The Project Scope includes, but is not limited to, the following:
a. ARCHITECTURAL / STRUCTURAL / MECHANICAL / ELECTRICAL /
PLUMBING / FIRE PROTECTION / CIVIL / PHYSICAL SECURITY
/ TECHNOLOGY / HAZARDOUS MATERIALS ABATEMENT
B. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, asbestos and lead abatement as necessary, and
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades
01 00 00 -3 furnish labor and materials to perform work for multiple
Electronic Health Record Management (EHRM) upgrades to existing campus facilities by means of renovation and new construction as required by the drawings and specifications.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge to be designated by the VA. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades
01 00 00 -4
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The
General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall install all permanent cores at completion of the work. See Section 08 71 00, DOOR
HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub
Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or
“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades
01 00 00 -5
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of
“sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an
Engineering Document Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 5-days hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of (2 to 5) permits shall be issued for
General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA
Medical Center COR.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer’s
Representative. Offsite storage shall be at the
Contractor’s risk and financial responsibility. The
Contractor shall hold and save the Government, its officers
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades
01 00 00 -6 and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer’s Representative and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the
Contracting Officer’s Representative, use only established roadways. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage.
The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the COR.
E. Workers are subject to rules of the VA Medical Center applicable to their conduct.
F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades
01 00 00 -7 operations of utility services, fire protection systems and any existing equipment, and with work being done by others.
Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of
Contractor's materials and equipment will be permitted subject to fire and safety requirements.
H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades
01 00 00 -8 the responsibility of the Government and not the
Contractor.
I. Working Hours:
1. Normal working hours for this contract will be from
7:00AM to 4:30PM (local time) Monday through Friday except for weekends and established Federal Holidays.
2. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the
COR. Requests shall be submitted via email at least 72 hours prior to the requested date and time at no additional cost to the Government. Approvals are subject to the availability of on-site staff.
J. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
The work to be outlined shall include, but not be limited to:
2. To ensure such executions, Contractor shall furnish the
COR with a detailed schedule of dates, including phasing based on the phasing plan in the contract drawings, on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR 120, 90, 30, 15, and 7 days in advance of the proposed date of starting work in each specific area of site, building or
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades
01 00 00 -9 portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, and COR and
Contractor, as follows:
a. Main Computer Room Side-B must be operation before TR cut-overs and re-racking.
b. All TR construction must be complete before WAO cut-over.
c. OSP must be installed and tested prior to TR cut-overs.
d. See phasing sheets in drawing set for detailed phasing process.
K. Building(s) No. (s) 14, 19, 22-69, 58, 60, 64-72, 98, 101, 102, 103, 104, 125, 128, 129, 130, 131, 132, 133, and 140 will be occupied during performance of work; but immediate areas of alterations will be vacated.
1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of
Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access.
Coordinate alteration work in areas occupied by
Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades
01 00 00 -10
L. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction areas, and construction staging areas designated by the COR or shown on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches).