This file is a detailed specification document for the VA Illiana Healthcare System Electronic Health Records Modernization (EHRM) Infrastructure Upgrades project located in Danville, Illinois. The project involves comprehensive infrastructure improvements across multiple buildings (Buildings 14, 19, 22, 58, 60, 64, 98, 101, 102, 103, 104, 125, 128, 129, 130, 131, 132, 133, 140) with a total scope encompassing electrical upgrades, HVAC reconfiguration, data center renovation, communication infrastructure enhancement, physical security upgrades, and hazardous material abatement.

The specification document provides extensive technical details for the project, including comprehensive requirements for demolition, asbestos abatement, site surveys, construction procedures, safety protocols, and environmental controls. The project will be solicited as a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside with a NAICS code of 236220, a size standard of $45 million, and an anticipated solicitation in April 2025. The period of performance is estimated at approximately 730 calendar days from the Notice to Proceed, with the total project value falling between $20 million and $50 million. The project will follow a Design-Bid-Build contract approach and will be managed by the Department of Veterans Affairs Technology Acquisition Center Austin.

View the file

Other files

File Type Posted
36C77625B0011 0006.pdf PDF
Abstract of Bids OF 1419 - CONSTRUCTION - Signed 8.11.25.pdf PDF
Attachment 21 - Technical Questions - Danville IL 8-5-2025.pdf PDF
36C77625B0011 0005.docx DOCX document
36C77625B0011 0004.pdf PDF
Attachment 21 - Technical Questions - Danville IL 7-30-2025.pdf PDF
Attachment 23 - A-903.pdf PDF
Attachment 3 Construction Wage Rates Vermilion 7.25.25.pdf PDF
Solicitation 36C77625B0011 Amendment 0003 - Danville IL EHRM Construction.pdf PDF
Attachment 21 - Technical Questions - Danville IL 7-28-2025.pdf PDF
Attachment 20 - Stamped Civil Drawings.pdf PDF
Attachment 22 - Electrical Single Line.pdf PDF
Attachment 11 - 02 82 11_Appendix_Asbestos Containing Materials Report Crosswalk.pdf PDF
Attachment 23 - Construction Wage Rates - Vermilion 7-11-25.pdf PDF
Attachment 12 - 58.AE301.pdf PDF
Attachment 14 -101.AE301.pdf PDF
Attachment 13 - 58.AE401.pdf PDF
Amendment - 0002 36C77625B0011.pdf PDF
Attachment 17 - FloorHeightTable.xlsx XLSX spreadsheet
Attachment 16 - FloorHeightTable.pdf PDF
Attachment 15 - 013324 - Electronic Submittals.pdf PDF
Attachment 18 - RFI Log_EHRM Upgrades Danville IL.xls XLS spreadsheet
Attachment 21 - Technical Questions - Danville IL 7-15-2025.docx DOCX document
Attachment 19 - Soil Report Danville IL - 7-15-25.pdf PDF
Amendment - 0001 36C77625B0011.pdf PDF
Attachment 10 Limitations on Subcontracting Construction.pdf PDF
Attachment 8 Drawings Danville IL EHRM IU Construction Volume 3 of 3.pdf PDF
Attachment 6 Drawings Danville IL EHRM IU Construction Volume 1 of 3.pdf PDF
Attachment 4 Site Visit Instructions EHRM IU 550 21 700.docx DOCX document
Attachment 5 Pre Construction Risk Assessment Danville IL EHRM IU.docx DOCX document
Attachment 9 Brand Name Justification Danville IL EHRM IU Construction.pdf PDF
Attachment 3 Construction Wage Rates Vermilion 4 18 25.pdf PDF
Attachment 2 Specifications Danville IL EHRM IU Construction Volume 2 of 2.pdf PDF
36C77625B0011_1.docx DOCX document
Attachment 7 Drawings Danville IL EHRM IU Construction Volume 2 of 3.pdf PDF
36C77625B0011.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS

VETERANS HEALTHCARE ADMINISTRATION

DESIGN AND CONSTRUCTION SERVICE

WASHINGTON, D.C.

BID DOCUMENTS

VOLUME 1 OF 2

VA ILLIANA HEALTHCARE SYSTEM (VAIHCS)

EHRM INFRASTRUCTURE UPGRADES

DANVILLE, IL

IFB NUMBER VA-XXXXXXXX

PROJECT NO. 550-21-700

BID DOCUMENTS

SIGNATURE PAGE

Architect:

ALESIA ARCHITECTURE

Sections covered by these seals include:

DIVISION 04, 06, 07, 08, 09, and 10 sections

SECTION 05 50 00

ARCHITECT: Richard J. Onken

Electrical Engineer:

DAV Energy Solutions Sections covered by these seals include:

DIVISION 26 section

ELECTRICAL: Hugo Flores

Mechanical Engineer:

VALI COOPER INTERNATIONAL

DIVISION 22 and 23 sections

MECHANICAL: Brendan Scanlon

12/31/24

Technology Designer:

IMEG Corp.

DIVISION 27 and 28 sections

TECHNOLOGY: Joe Kowols

Fire Protection Engineer:

SPECIALIZED ENGINEERNIG

SOLUTIONS

Sections covered by these seals include:

DIVISION 21 sections

SECTION 28 31 00

FIRE PROTECTION: Nate Timm

Civil Engineering:

DIVISION 31, and 32 sections.

CIVIL: Linnea Shaw

5/28/24

Fire Protection Engineer:

SPECIALIZED ENGINEERNIG

SOLUTIONS

Sections covered by these seals include:

DIVISION 21 sections

SECTION 28 31 00

FIRE PROTECTION: Nate Timm

Kristopher Burnham

05/28/2024

Structural Engineering:

SECTION 05 40 00

STRUCTURAL: Katie Goldberg

Hazardous Materials Abatement:

VCI

DIVISIONS 01 and 02 sections.

HAZARDOUS MATERIALS ABATEMENT: Sean Fitzpatrick

BID Submittal Project No. 550-21-700

VA Illiana Healthcare System 28 May 2024

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS Volume 1 of 2

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 05-21

01 01 10 IC Infection Control 01-25

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20

01 33 23 Shop Drawings, Product Data, and Samples 06-21

01 35 26 Safety Requirements 05-24

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 06-21

01 57 19 Temporary Environmental Controls 01-21

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 01-21

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 01-21

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 01-21

02 82 13.13 Glovebag Asbestos Abatement 01-21

02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21

02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE [NOT USED]

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 01-21

04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

05 40 00 Cold-Formed Metal Framing 01-21

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

00 01 10-2

06 10 00 Rough Carpentry 10-17

06 20 00 Finish Carpentry 01-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 01-21

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 10-17

07 95 13 Expansion Joint Cover Assemblies 01-21

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 01-21

08 17 10 Integrated Door Assemblies 01-21

08 31 13 Access Doors and Frames 01-21

08 71 00 Door Hardware 01-24

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21

09 06 00 Schedule for Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 23 00 Gypsum Plastering 01-21

09 29 00 Gypsum Board 04-20

09 30 13 Ceramic/Porcelain Tiling 01-21

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 01-21

09 65 16 Resilient Sheet Flooring 05-18

09 65 19 Resilient Tile Flooring 05-18

09 65 19.01 Static Dissipative Resilient Tile Flooring

09 68 00 Carpeting 01-21

09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21

10 26 00 Wall and Door Protection 01-21

10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT [NOT USED]

DIVISION 12 – FURNISHINGS [NOT USED]

DIVISION 13 - SPECIAL CONSTRUCTION

DIVISION 14– CONVEYING EQUIPEMENT [NOT USED]

DIVISION 21- FIRE SUPPRESSION

00 01 10-3

21 08 00 Commissioning of Fire Suppression System 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

21 13 16 Dry-Pipe Sprinkler Systems

21 22 00 Clean Agent Fire Suppression Systems 05-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-20

22 05 23 General-Duty Valves for Plumbing Piping 09-20

22 07 11 Plumbing Insulation 09-19

22 11 00 Facility Water Distribution 05-21

22 13 00 Facility Sanitary and Vent Piping 09-20

22 14 00 Facility Storm Drainage 09-15

22 61 13.74 Dental Compressed-Air Piping 09-20

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL INFORMATION

GI001.1 COVERSHEET – VOLUME 1 OF 3

GI001.2 COVERSHEET – VOLUME 2 OF 3

GI001.3 COVERSHEET – VOLUME 3 OF 3

GI002 SHEET INDEX – VOLUME 1 OF 3

GI003 SHEET INDEX – VOLUME 2 OF 3

GI004 SHEET INDEX – VOLUME 3 OF 3

GI005 GENERAL NOTES

GI006 GENERAL NOTES

GI007 INFECTION CONTROL & LIFE SAFETY MEASURES

GI008 GENERAL RECORD KEEPING AND COVID SAFETY NOTES

GI009 MAP OF VA ILLIANA FHCS

104.GC101 BLDG. 104 PHASING PLAN – PHASE 1

104.GC102 BLDG. 104 PHASING PLAN – PHASE 2

104.GC103 BLDG. 104 PHASING PLAN – PHASE 3

104.GC104 BLDG. 104 PHASING PLAN – PHASE 4

104.GT101 BLDG. 104 TECHNOLOGY PHASING PLAN – PHASE 1

104.GT102 BLDG. 104 TECHNOLOGY PHASING PLAN – PHASE 2

104.GT103 BLDG. 104 TECHNOLOGY PHASING PLAN – PHASE 3

104.GT104 BLDG. 104 TECHNOLOGY PHASING PLAN – PHASE 4

ARCHITECTURAL

AG001 ARCHITECTURAL ABBREVIATIONS, LEGENDS AND NOTES

14.AD101 BASEMENT FLOOR - DEMOLITION FLOOR PLAN

14.AD102 FIRST FLOOR - DEMOLITION FLOOR PLAN

14.AD103 SECOND FLOOR - DEMOLITION FLOOR PLAN

14.AE101 BASEMENT FLOOR - FLOOR PLAN

00 01 15 - 2

14.AE102 FIRST FLOOR - FLOOR PLAN

14.AE103 SECOND FLOOR - FLOOR PLAN

14.AC101 BASEMENT - REFLECTED CEILING PLAN

14.AC102 FIRST FLOOR - REFLECTED CEILING PLAN

14.AC103 SECOND FLOOR - REFLECTED CEILING PLAN

19.AD101 BASEMENT FLOOR - DEMOLITION FLOOR PLAN

19.AD102 FIRST FLOOR - DEMOLITION FLOOR PLAN

19.AE101 BASEMENT FLOOR - FLOOR PLAN

19.AE102 FIRST FLOOR - FLOOR PLAN

19.AC101 BASEMENT - REFLECTED CEILING PLAN

19.AC102 FIRST FLOOR - REFLECTED CEILING PLAN

22-69.AD101 BASEMENT FLOOR - DEMOLITION FLOOR PLAN

22-69.AD102 FIRST FLOOR - DEMOLITION FLOOR PLAN

22-69.AE101 BASEMENT FLOOR - FLOOR PLAN

22-69.AE102 FIRST FLOOR - FLOOR PLAN

22-69.AC101 BASEMENT - REFLECTED CEILING PLAN

22-69.AC102 FIRST FLOOR - REFLECTED CEILING PLAN

58.AD101 BASEMENT FLOOR - DEMOLITION FLOOR PLAN

58.AD102 FIRST FLOOR - DEMOLITION FLOOR PLAN

58.AD103 SECOND FLOOR - DEMOLITION FLOOR PLAN

58.AD104 THIRD FLOOR - DEMOLITION FLOOR PLAN

58.AD105 FOURTH FLOOR - DEMOLITION FLOOR PLAN

58.AD106 FIFTH FLOOR - DEMOLITION FLOOR PLAN

58.AD301 LARGE SCAL PLANS - DEMOLITION

58.AE101 BASEMENT FLOOR - FLOOR PLAN

58.AE102 FIRST FLOOR - FLOOR PLAN

58.AE103 SECOND FLOOR - FLOOR PLAN

58.AE104 THIRD FLOOR - FLOOR PLAN

58.AE105 FOURTH FLOOR - FLOOR PLAN

58.AE106 FIFTH FLOOR - FLOOR PLAN

58.AE301 LARGE SCALE PLANS

58.AE401 PARTIAL BUILDING SECTIONS

58.AC101 BASEMENT - REFLECTED CEILING PLAN

58.AC102 FIRST FLOOR - REFLECTED CEILING PLAN

58.AC103 SECOND FLOOR - REFLECTED CEILING PLAN

58.AC104 THIRD FLOOR - REFLECTED CEILING PLAN

00 01 15 - 3

58.AC105 FOURTH FLOOR - REFLECTED CEILING PLAN

58.AC106 FIFTH FLOOR - REFLECTED CEILING PLAN

60.AD101 FIRST & SECOND FLOOR - DEMOLITION FLOOR PLANS

60.AE101 FIRST & SECOND FLOOR - FLOOR PLANS

60.AC101 FIRST & SECOND FLOOR – REFLECTED CEILING PLAN

64-72.AD101 FIRST FLOOR - DEMOLITION FLOOR PLAN

64-72.AE101 FIRST FLOOR - FLOOR PLAN

64-72.AC101 FIRST FLOOR - REFLECTED CEILING PLAN

98.AD101 BASEMENT FLOOR - DEMOLITION FLOOR PLAN

98.AD102 BASEMENT FLOOR - DEMOLITION FLOOR PLAN AREA A

98.AD103 BASEMENT FLOOR - DEMOLITION FLOOR PLAN AREA B

98.AD104 FIRST FLOOR - DEMOLITION FLOOR PLAN

98.AD105 FIRST FLOOR - DEMOLITION FLOOR PLAN AREA A

98.AD106 FIRST FLOOR - DEMOLITION FLOOR PLAN AREA B

98.AD107 SECOND FLOOR - DEMOLITION FLOOR PLAN

98.AD108 SECOND FLOOR - DEMOLITION FLOOR PLAN AREA A

98.AD109 SECOND FLOOR – DEMOLITION FLOOR PLAN AREA B

98.AD110 THIRD FLOOR - DEMOLITION FLOOR PLAN

98.AD111 THIRD FLOOR - DEMOLITION FLOOR PLAN AREA A

98.AD112 THIRD FLOOR - DEMOLITION FLOOR PLAN AREA B

98.AD301 LARGE SCALE PLANS – DEMOLITION

98.AD302 LARGE SCALE PLANS - DEMOLITION

98.AE101 BASEMENT FLOOR - FLOOR PLAN

98.AE102 BASEMENT FLOOR, AREA A - FLOOR PLAN

98.AE103 BASEMENT FLOOR, AREA B - FLOOR PLAN

98.AE104 FIRST FLOOR - FLOOR PLAN

98.AE105 FIRST FLOOR, AREA A - FLOOR PLAN

98.AE106 FIRST FLOOR, AREA B - FLOOR PLAN

98.AE107 SECOND FLOOR - FLOOR PLAN

98.AE108 SECOND FLOOR, AREA A - FLOOR PLAN

98.AE109 SECOND FLOOR, AREA B - FLOOR PLAN

98.AE110 THIRD FLOOR - FLOOR PLAN

98.AE111 THIRD FLOOR, AREA A - FLOOR PLAN

98.AE112 THIRD FLOOR, AREA B - FLOOR PLAN

98.AE301 LARGE SCALE PLANS

98.AE401 PARTIAL BUILDING SECTION

00 01 15 - 4

98.AC101 BASEMENT - REFLECTED CEILING PLAN

98.AC102 FIRST FLOOR - REFLECTED CEILING PLAN

98.AC103 SECOND FLOOR - REFLECTED CEILING PLAN

98.AC104 THIRD FLOOR - REFLECTED CEILING PLAN

101.AD101 FIRST FLOOR - DEMOLITION FLOOR PLAN

101.AD102 FIRST FLOOR, AREA A - DEMOLITION FLOOR PLAN

101.AD103 FIRST FLOOR, AREA B - DEMOLITION FLOOR PLAN

101.AD104 FIRST FLOOR, AREA C - DEMOLITION FLOOR PLAN

101.AD105 FIRST FLOOR, AREA D - DEMOLITION FLOOR PLAN

101.AD301 LARGE SCALE PLANS – DEMOLITION

101.AE101 FIRST FLOOR - FLOOR PLAN

101.AE102 FIRST FLOOR, AREA A - FLOOR PLAN

101.AE103 FIRST FLOOR, AREA B - FLOOR PLAN

101.AE104 FIRST FLOOR, AREA C - FLOOR PLAN

101.AE105 FIRST FLOOR, AREA D - FLOOR PLAN

101.AE301 LARGE SCALE PLANS & PARTIAL BUILDING SECTIONS

101.AC101 FIRST FLOOR - REFLECTED CEILING PLAN

102.AD101 FIRST FLOOR - DEMOLITION FLOOR PLAN

102.AD102 FIRST FLOOR, AREA A - DEMOLITION FLOOR PLAN

102.AD103 FIRST FLOOR, AREA B - DEMOLITION FLOOR PLAN

102.AD104 FIRST FLOOR, AREA C - DEMOLITION FLOOR PLAN

102.AD105 FIRST FLOOR, AREA D - DEMOLITION FLOOR PLAN

102.AD301 LARGE SCALE PLANS & SECTIONS – DEMOLITION

102.AE101 FIRST FLOOR - FLOOR PLAN

102.AE102 FIRST FLOOR, AREA A - FLOOR PLAN

102.AE103 FIRST FLOOR, AREA B - FLOOR PLAN

102.AE104 FIRST FLOOR, AREA C - FLOOR PLAN

102.AE105 FIRST FLOOR, AREA D - FLOOR PLAN

102.AE301 LARGE SCALE PLANS & PARTIAL BUILDING SECTIONS

102.AC101 FIRST FLOOR - REFLECTED CEILING PLAN

103.AD101 FIRST FLOOR, - DEMOLITION FLOOR PLAN

103.AD102 FIRST FLOOR, AREA A - DEMOLITION FLOOR PLAN

103.AD103 FIRST FLOOR, AREA B - DEMOLITION FLOOR PLAN

103.AD104 FIRST FLOOR, AREA C - DEMOLITION FLOOR PLAN

103.AD105 FIRST FLOOR, AREA D - DEMOLITION FLOOR PLAN

103.AD301 LARGE SCALE PLANS & SECTIONS - DEMOLITION

00 01 15 - 5

103.AE101 FIRST FLOOR - FLOOR PLAN

103.AE102 FIRST FLOOR, AREA A - FLOOR PLAN

103.AE103 FIRST FLOOR, AREA B - FLOOR PLAN

103.AE104 FIRST FLOOR, AREA C - FLOOR PLAN

103.AE105 FIRST FLOOR, AREA D - FLOOR PLAN

103.AE301 LARGE SCALE PLANS & PARTIAL BUILDING SECTONS

103.AC101 FIRST FLOOR - REFLECTED CEILING PLAN

104.AD101 FIRST FLOOR - DEMOLITION FLOOR PLAN

104.AD102 FIRST FLOOR, AREA A - DEMOLITION FLOOR PLAN

104.AD103 FIRST FLOOR, AREA B - DEMOLITION FLOOR PLAN

104.AD301 LARGE SCALE PLANS - DEMOLITION

104.AE101 FIRST FLOOR - FLOOR PLAN

104.AE102 FIRST FLOOR, AREA A - RENOVATION FLOOR PLAN

104.AE103 FIRST FLOOR, AREA B - RENOVATION FLOOR PLAN

104.AE301 LARGE SCALE PLANS

104.AE401 PARTIAL BUILDING SECTIONS

104.AE402 PARTIAL BUILDING SECTIONS

104.AC101 FIRST FLOOR - REFLECTED CEILING PLAN

104.AC102 FIRST FLOOR, AREA B – REFLECTED CEILING PLAN

125.AD101 FIRST FLOOR - DEMOLITION FLOOR PLAN

125.AE101 FIRST FLOOR - FLOOR PLAN

125.AC101 FIRST FLOOR - REFLECTED CEILING PLAN

128.AD101 FREEDOM HOUSE - FIRST FLOOR - DEMOLITION FLOOR PLAN

128.AE101 FREEDOM HOUSE - FIRST FLOOR - FLOOR PLAN

128.AC101 FREEDOM HOUSE - FIRST FLOOR - REFLECTED CEILING PLAN

129.AD101 LIBERTY HOUSE - FIRST FLOOR - DEMOLITION FLOOR PLAN

129.AE101 LIBERTY HOUSE - FIRST FLOOR - FLOOR PLAN

129.AC101 LIBERTY HOUSE - FIRST FLOOR - REFLECTED CEILING PLAN

130.AD101 HONOR HOUSE - DEMOLITION FLOOR PLAN

130.AE101 HONOR HOUSE - BASEMENT & FIRST FLOOR - FLOOR PLANS

130.AC101 HONOR HOUSE - FIRST FLOOR - REFLECTED CEILING PLANS

131.AD101 VALOR HOUSE - BASEMENT & FIRST FLOOR - DEMOLITION FLOOR

PLAN

131.AE101 VALOR HOUSE - BASEMENT & FIRST FLOOR - FLOOR PLANS

131.AC101 VALOR HOUSE - BASEMENT & FIRST FLOOR - REFLECTED CEILING

PLANS

00 01 15 - 6

132.AD101 INDEPENDENCE HOUSE - FIRST FLOOR - DEMOLITION FLOOR PLAN

132.AE101 INDEPENDENCE HOUSE - FIRST FLOOR - FLOOR PLAN

132.AC101 INDEPENDENCE HOUSE - FIRST FLOOR - REFLECTED CEILING

PLAN

133.AD101 COURAGE HOUSE - FIRST FLOOR – DEMOLITION FLOOR PLAN

133.AE101 COURAGE HOUSE - FIRST FLOOR - FLOOR PLAN

133.AC101 COURAGE HOUSE - FIRST FLOOR - REFLECTED CEILING PLAN

A-501 MISCELLANEOUS ARCHITECTURAL & CEILING DETAILS

A-601 ROOM FINISH SCHEDULE

A-602 SIGNAGE SCHEDULE AND DETAILS

A-701 DOOR AND FRAME TYPES, SCHEDULE AND DETAILS

A-801 PARTITION TYPES & PENETRATION DETAILS

A-802 PARTITION & INTERIOR DETAILS

A-901 TR ROOM ELEVATIONS & DETAILS

A-902 INTERIOR ELEVATIONS & DETAILS

TECHNOLOGY

TN001 TECHNOLOGY COVERSHEET

TN002 SITE PLAN – TECHNOLOGY

TD101 TRAMWAY DEMOLITION PLANS – TECHNOLOGY

TD101 TRAMWAY DEMOLITION PLANS – TECHNOLOGY

TN101 TRAMWAY PLANS - TECHNOLOGY

14.TD101 BASEMENT – DEMOLITION FLOOR PLAN – TECHNOLOGY

14.TD102 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

14.TD103 SECOND FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

14.TN101 BASEMENT – FLOOR PLAN - TECHNOLOGY

14.TN102 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY

14.TN103 SECOND FLOOR – FLOOR PLAN - TECHNOLOGY

14.TN401 TECHNOLOGY ROOM ENLARGEMENTS

14.TN601 TECHNOLOGY RISER DIAGRAMS

14.TN602 TECHNOLOGY RISER DIAGRAMS

14.TN701 TECHNOLOGY SCHEDULES

19.TD101 BASEMENT – DEMOLITION FLOOR PLAN - TECHNOLOGY

19.TD102 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

00 01 15 - 7

19.TD103 SECOND FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

19.TN101 BASEMENT – FLOOR PLAN - TECHNOLOGY

19.TN102 FIRST FLOOR – FLOOR PLAN – TECHNOLOGY

19.TN103 SECOND FLOOR – FLOOR PLAN - TECHNOLOGY

19.TN401 TECHNOLOGY ROOM ENLARGEMENTS

19.TN601 TECHNOLOGY RISER DIAGRAMS

19.TN602 TECHNOLOGY RISER DIAGRAMS

19.TN701 TECHNOLOGY SCHEDULES

22-69.TD101 BASEMENT – DEMOLITION FLOOR PLAN - TECHNOLOGY

22-69.TD102 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

22-69.TN101 BASEMENT – FLOOR PLAN - TECHNOLOGY

22-69.TN102 FIRST FLOOR – FLOOR PLAN – TECHNOLOGY

22-69.TN401 TECHNOLOGY ROOM ENLARGEMENTS

22-69.TN601 TECHNOLOGY RISER DIAGRAMS

22-69.TN701 TECHNOLOGY SCHEDULES

58.TD101 BASEMENT FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

58.TD102 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

58.TD103 SECOND FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

58.TD104 THIRD FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

58.TD105 FOURTH FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

58.TD106 FIFTH FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

58.TN101 BASEMENT FLOOR – FLOOR PLAN - TECHNOLOGY

58.TN102 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY

58.TN103 SECOND FLOOR – FLOOR PLAN - TECHNOLOGY

58.TN104 THIRD FLOOR – FLOOR PLAN - TECHNOLOGY

58.TN105 FOUTH FLOOR – FLOOR PLAN - TECHNOLOGY

58.TN106 FIFTH FLOOR – FLOOR PLAN - TECHNOLOGY

58.TN401 TECHNOLOGY ROOM ENLARGEMENTS

58.TN402 TECHNOLOGY ROOM ENLARGEMENTS

58.TN403 TECHNOLOGY ROOM ENLARGEMENTS

58.TN601 TECHNOLOGY RISER DIAGRAMS

58.TN602 TECHNOLOGY RISER DIAGRAMS

58.TN701 TECHNOLOGY SCHEDULES

60.TD101 FIRST AND SECOND FLOORS – DEMOLITION FLOOR PLAN -

TECHNOLOGY

60.TN101 FIRST AND SECOND FLOORS – FLOOR PLANS – TECHNOLOGY

60.TN401 TECHNOLOGY ROOM ENLARGEMENTS

00 01 15 - 8

60.TN601 TECHNOLOGY RISER DIAGRAMS

60.TN602 TECHNOLOGY RISER DIAGRAMS

60.TN701 TECHNOLOGY SCHEDULES

64-72.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

64-72.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY

64-72.TN401 TECHNOLOGY ROOM ENLARGEMENTS

64-72.TN601 TECHNOLOGY RISER DIAGRAMS

64-72.TN701 TECHNOLOGY SCHEDULES

98.TD101 BASEMENT FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

98.TD102 BASEMENT FLOOR, AREA A – DEMOLITION FLOOR PLAN –

TECHNOLOGY

98.TD103 BASEMENT FLOOR, AREA B – DEMOLITION FLOOR PLAN –

TECHNOLOGY

98.TD104 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

98.TD105 FIRST FLOOR, AREA A – DEMOLITION FLOOR PLAN - TECHNOLOGY

98.TD106 FIRST FLOOR, AREA B – DEMOLITION FLOOR PLAN - TECHNOLOGY

98.TD107 SECOND FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

98.TD108 SECOND FLOOR, AREA A – DEMOLITION FLOOR PLAN -

TECHNOLOGY

98.TD109 SECOND FLOOR, AREA B – DEMOLITION FLOOR PLAN -

TECHNOLOGY

98.TD110 THIRD FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

98.TD111 THIRD FLOOR, AREA A – DEMOLITION FLOOR PLAN - TECHNOLOGY

98.TD112 THIRD FLOOR, AREA B – DEMOLITION FLOOR PLAN - TECHNOLOGY

98.TD113 FOURTH FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

98.TD114 FOURTH FLOOR, AREA A – DEMOLITION FLOOR PLAN –

TECHNOLOGY

98.TD115 FOURTH FLOOR, AREA B – DEMOLITION FLOOR PLAN -

TECHNOLOGY

98.TN101 BASEMENT FLOOR – FLOOR PLAN - TECHNOLOGY

98.TN102 BASEMENT FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY

98.TN103 BASEMENT FLOOR, AREA B – FLOOR PLAN - TECHNOLOGY

98.TN104 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY

98.TN105 FIRST FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY

98.TN106 FIRST FLOOR, AREA B – FLOOR PLAN - TECHNOLOGY

98.TN107 SECOND FLOOR – FLOOR PLAN – TECHNOLOGY

98.TN108 SECOND FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY

98.TN109 SECOND FLOOR, AREA B – FLOOR PLAN - TECHNOLOGY

00 01 15 - 9

98.TN110 THIRD FLOOR – FLOOR PLAN – TECHNOLOGY

98.TN111 THIRD FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY

98.TN112 THIRD FLOOR, AREA B – FLOOR PLAN - TECHNOLOGY

98.TN113 FOURTH FLOOR – FLOOR PLAN - TECHNOLOGY

98.TN114 FOURTH FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY

98.TN115 FOURTH FLOOR, AREA B – FLOOR PLAN - TECHNOLOGY

98.TN401 TECHNOLOGY ROOM ENLARGEMENTS

98.TN402 TECHNOLOGY ROOM ENLARGEMENTS

98.TN403 TECHNOLOGY ROOM ENLARGEMENTS

98.TN601 TECHNOLOGY RISER DIAGRAMS

98.TN602 TECHNOLOGY RISER DIAGRAMS

98.TN701 TECHNOLOGY SCHEDULES

101.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

101.TD102 FIRST FLOOR, AREA A – DEMOLITION FLOOR PLAN – TECHNOLOGY

101.TD103 FIRST FLOOR, AREA B – DEMOLITION FLOOR PLAN - TECHNOLOGY

101.TD104 FIRST FLOOR, AREA C – DEMOLITION FLOOR PLAN – TECHNOLOGY

101.TD105 FIRST FLOOR, AREA D – DEMOLITION FLOOR PLAN - TECHNOLOGY

101.TN101 FIRST FLOOR – FLOOR PLAN – TECHNOLOGY

101.TN102 FIRST FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY

101.TN103 FIRST FLOOR, AREA B – FLOOR PLAN – TECHNOLOGY

101.TN104 FIRST FLOOR, AREA C – FLOOR PLAN - TECHNOLOGY

101.TN105 FIRST FLOOR, AREA D – FLOOR PLAN - TECHNOLOGY

101.TN401 TECHNOLOGY ROOM ENLARGEMENTS

101.TN601 TECHNOLOGY RISER DIAGRAMS

101.TN701 TECHNOLOGY SCHEDULES

102.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

102.TD102 FIRST FLOOR, AREA A – DEMOLITION FLOOR PLAN - TECHNOLOGY

102.TD103 FIRST FLOOR, AREA B – DEMOLITION FLOOR PLAN - TECHNOLOGY

102.TD104 FIRST FLOOR, AREA C – DEMOLITION FLOOR PLAN - TECHNOLOGY

102.TD105 FIRST FLOOR, AREA D – DEMOLITION FLOOR PLAN - TECHNOLOGY

102.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY

102.TN102 FIRST FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY

102.TN103 FIRST FLOOR, AREA B – FLOOR PLAN - TECHNOLOGY

102.TN104 FIRST FLOOR, AREA C – FLOOR PLAN – TECHNOLOGY

102.TN105 FIRST FLOOR, AREA D – FLOOR PLAN – TECHNOLOGY

102.TN401 TECHNOLOGY ROOM ENLARGEMENTS

00 01 15 - 10

102.TN402 TECHNOLOGY ROOM ENLARGEMENTS

102.TN601 TECHNOLOGY RISER DIAGRAMS

102.TN602 TECHNOLOGY RISER DIAGRAMS

102.TN701 TECHNOLOGY SCHEDULES

103.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

103.TD102 FIRST FLOOR, AREA A – DEMOLITION FLOOR PLAN – TECHNOLOGY

103.TD103 FIRST FLOOR, AREA B – DEMOLITION FLOOR PLAN – TECHNOLOGY

103.TD104 FIRST FLOOR, AREA C – DEMOLITION FLOOR PLAN – TECHNOLOGY

103.TD105 FIRST FLOOR, AREA D – DEMOLITION FLOOR PLAN – TECHNOLOGY

103.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY

103.TN102 FIRST FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY

103.TN103 FIRST FLOOR, AREA B – FLOOR PLAN – TECHNOLOGY

103.TN104 FIRST FLOOR, AREA C – FLOOR PLAN – TECHNOLOGY

103.TN105 FIRST FLOOR, AREA D – FLOOR PLAN – TECHNOLOGY

103.TN401 TECHNOLOGY ROOM ENLARGEMENTS

103.TN601 TECHNOLOGY RISER DIAGRAMS

103.TN701 TECHNOLOGY SCHEDULES

104.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

104.TD102 FIRST FLOOR, AREA A – DEMOLITION FLOOR PLAN - TECHNOLOGY

104.TD103 FIRST FLOOR, AREA B – DEMOLITION FLOOR PLAN - TECHNOLOGY

104.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY

104.TN102 FIRST FLOOR, AREA A – FLOOR PLAN – TECHNOLOGY

104.TN103 FIRST FLOOR, AREA B – FLOOR PLAN – TECHNOLOGY

104.TN401 TECHNOLOGY ROOM ENLARGEMENTS

104.TN402 TECHNOLOGY ROOM ENLARGEMENTS

104.TN403 TECHNOLOGY ROOM ENLARGEMENTS

104.TN404 TECHNOLOGY ROOM ENLARGEMENTS

104.TN601 TECHNOLOGY RISER DIAGRAMS

104.TN602 TECHNOLOGY RISER DIAGRAMS

104.TN603 TECHNOLOGY RISER DIAGRAMS

104.TN701 TECHNOLOGY SCHEDULES

125.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

125.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY

125.TN401 TECHNOLOGY ROOM ENLARGEMENTS

125.TN601 TECHNOLOGY RISER DIAGRAMS

125.TN701 TECHNOLOGY SCHEDULES

00 01 15 - 11

128.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

128.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY

128.TN401 TECHNOLOGY ROOM ENLARGEMENTS

128.TN601 TECHNOLOGY RISER DIAGRAMS

128.TN701 TECHNOLOGY SCHEDULES

129.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

129.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY

129.TN401 TECHNOLOGY ROOM ENLARGEMENTS

129.TN601 TECHNOLOGY RISER DIAGRAMS

129.TN701 TECHNOLOGY SCHEDULES

130.TD101 BASEMENT & FIRST FLOOR – DEMOLITION FLOOR PLAN -

TECHNOLOGY

130.TN101 BASEMENT & FIRST FLOOR – FLOOR PLAN – TECHNOLOGY

130.TN401 TECHNOLOGY ROOM ENLARGEMENTS

130.TN601 TECHNOLOGY RISER DIAGRAMS

130.TN701 TECHNOLOGY SCHEDULES

131.TD101 BASEMENT & FIRST FLOOR – DEMOLITION FLOOR PLAN –

TECHNOLOGY

131.TN101 BASEMENT & FIRST FLOOR – FLOOR PLAN – TECHNOLOGY

131.TN401 TECHNOLOGY ROOM ENLARGEMENTS

131.TN601 TECHNOLOGY RISER DIAGRAMS

131.TN701 TECHNOLOGY SCHEDULES

132.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

132.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY

132.TN401 TECHNOLOGY ROOM ENLARGEMENTS

132.TN601 TECHNOLOGY RISER DIAGRAMS

132.TN701 TECHNOLOGY SCHEDULES

133.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

133.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY

133.TN401 TECHNOLOGY ROOM ENLARGEMENTS

133.TN601 TECHNOLOGY RISER DIAGRAMS

133.TN701 TECHNOLOGY SCHEDULES

140.TD101 FIRST FLOOR – DEMOLITION FLOOR PLAN - TECHNOLOGY

140.TN101 FIRST FLOOR – FLOOR PLAN - TECHNOLOGY

140.TN401 TECHNOLOGY ROOM ENLARGEMENTS

140.TN601 TECHNOLOGY RISER DIAGRAMS

140.TN701 TECHNOLOGY SCHEDULES

00 01 15 - 12

TN501 TECHNOLOGY DETAILS

TN502 TECHNOLOGY DETAILS

TN503 TECHNOLOGY DETAILS

TN601 TECHNOLOGY RISER DIAGRAMS

TN701 TECHNOLOGY SCHEDULES

ELECTRICAL

EG001 GENERAL NOTES & LEGENDS

14.ED101 ELECTRICAL ENLARGED PLANS – BASEMENT DEMO PLAN

14.ED102 ELECTRICAL ENLARGED PLANS – LEVEL 1 & 2 DEMO PLAN

14.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 & 2 LIGHTING PLAN

14.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

14.E-601 ELECTRICAL ONE-LINE DIAGRAM

14.E-701 ELECTRICAL SCHEDULES

19.ED101 ELECTRICAL ENLARGED PLAN – BASEMENT & LEVEL 1 DEMO PLAN

19.EP101 ELECTRICAL ENLARGED PLAN – BASEMENT & LEVEL 1 POWER PLAN

19.E-601 ELECTRICAL ONE-LINE DIAGRAM

19.E-701 ELECTRICAL SCHEDULES

22-69.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

22-69.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

22-69.E-601 ELECTRICAL ONE-LINE DIAGRAM

22-69.E-701 ELECTRICAL SCHEDULES

58.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

58.ED102 ELECTRICAL ENLARGED PLANS – LEVEL 2 DEMO PLAN

58.ED103 ELECTRICAL ENLARGED PLANS – LEVEL 3 DEMO PLAN

58.ED104 ELECTRICAL ENLARGED PLANS – LEVEL 4 DEMO PLAN

58.ED105 ELECTRICAL ENLARGED PLANS – LEVEL 5 DEMO PLAN

58.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN

58.EL102 ELECTRICAL ENLARGED PLANS – LEVEL 2 LIGHTING PLAN

58.EL103 ELECTRICAL ENLARGED PLANS – LEVEL 3 LIGHTING PLAN

58.EL104 ELECTRICAL ENLARGED PLANS – LEVEL 4 LIGHTING PLAN

58.EL105 ELECTRICAL ENLARGED PLANS – LEVEL 5 LIGHTING PLAN

58.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

58.EP102 ELECTRICAL ENLARGED PLANS – LEVEL 2 POWER PLAN

00 01 15 - 13

58.EP103 ELECTRICAL ENLARGED PLANS – LEVEL 3 POWER PLAN

58.EP104 ELECTRICAL ENLARGED PLANS – LEVEL 4 POWER PLAN

58.EP105 ELECTRICAL ENLARGED PLANS – LEVEL 5 POWER PLAN

58.E-601 ELECTRICAL ONE-LINE DIAGRAM

58.E-701 ELECTRICAL SCHEDULES

58.E-702 ELECTRICAL SCHEDULES

60.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

60.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN

60.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

60.E-601 ELECTRICAL ONE-LINE DIAGRAMS

60.E-701 ELECTRICAL SCHEDULES

64-72.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

64-72.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

64-72.E-601 ELECTRICAL ONE-LINE DIAGRAMS

64-72.E-701 ELECTRICAL SCHEDULES

98.ED101 ELECTRICAL ENLARGED PLANS – BASEMENT DEMO PLAN

98.ED102 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

98.ED103 ELECTRICAL ENLARGED PLANS – LEVEL 2 DEMO PLAN

98.ED104 ELECTRICAL ENLARGED PLANS – LEVEL 3 DEMO PLAN

98.EL101 ELECTRICAL ENLARGED PLANS – BASEMENT LIGHTING PLAN

98.EL102 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN

98.EL103 ELECTRICAL ENLARGED PLANS – LEVEL 2 LIGHTING PLAN

98.EL104 ELECTRICAL ENLARGED PLANS – LEVEL 3 LIGHTING PLAN

98.EP101 ELECTRICAL ENLARGED PLANS – BASEMENT POWER PLAN

98.EP102 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

98.EP103 ELECTRICAL ENLARGED PLANS – LEVEL 2 POWER PLAN

98.EP104 ELECTRICAL ENLARGED PLANS – LEVEL 3 POWER PLAN

98.E-601 ELECTRICAL ONE-LINE DIAGRAM

98.E-701 ELECTRICAL SCHEDULES

98.E-702 ELECTRICAL SCHEDULES

101.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

101.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN

101.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

101.E-601 ELECTRICAL ONE-LINE DIAGRAM

101.E-701 ELECTRICAL SCHEDULES

102.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

00 01 15 - 14

102.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN

102.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

102.E-601 ELECTRICAL ONE-LINE DIAGRAM

102.E-701 ELECTRICAL SCHEDULES

103.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

103.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN

103.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

103.E-601 ELECTRICAL ONE-LINE DIAGRAM

103.E-701 ELECTRICAL SCHEDULES

104.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

104.ED102 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

104.ED103 ELECTRICAL ENLARGED PLANS – ATTIC LEVEL DEMO PLAN

104.ED601 ELECTRICAL ONE-LINE DIAGRAM DEMO

104.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN

104.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

104.EP102 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

104.E-601 ELECTRICAL ONE-LINE DIAGRAM

104.E-701 ELECTRICAL SCHEDULES

125.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

125.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN

125.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

125.E-601 ELECTRICAL ONE-LINE DIAGRAM

125.E-701 ELECTRICAL SCHEDULES

128.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

128.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

128.E-601 ELECTRICAL ONE-LINE DIAGRAM

128.E-701 ELECTRICAL SCHEDULES

129.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

129.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

129.E-601 ELECTRICAL ONE-LINE DIAGRAM

129.E-701 ELECTRICAL SCHEDULES

130.ED101 ELECTRICAL ENLARGED PLANS – BASEMENT DEMO PLAN

130.EL101 ELECTRICAL ENLARGED PLANS – BASEMENT LIGHTING PLAN

130.EP101 ELECTRICAL ENLARGED PLANS – BASEMENT POWER PLAN

130.E-601 ELECTRICAL ONE-LINE DIAGRAM

130.E-701 ELECTRICAL SCHEDULES

00 01 15 - 15

131.ED101 ELECTRICAL ENLARGED PLANS – BASEMENT DEMO PLAN

131.EL101 ELECTRICAL ENLARGED PLANS – BASEMENT LIGHTING PLAN

131.EP101 ELECTRICAL ENLARGED PLANS – BASEMENT POWER PLAN

131.E-601 ELECTRICAL ONE-LINE DIAGRAM

131.E-701 ELECTRICAL SCHEDULES

132.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

132.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN

132.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

132.E-601 ELECTRICAL ONE-LINE DIAGRAM

132.E-701 ELECTRICAL SCHEDULES

133.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

133.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN

133.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

133.E-601 ELECTRICAL ONE-LINE DIAGRAM

133.E-701 ELECTRICAL SCHEDULES

140.ED101 ELECTRICAL ENLARGED PLANS – LEVEL 1 DEMO PLAN

140.EL101 ELECTRICAL ENLARGED PLANS – LEVEL 1 LIGHTING PLAN

140.EP101 ELECTRICAL ENLARGED PLANS – LEVEL 1 POWER PLAN

140.E-601 ELECTRICAL ONE-LINE DIAGRAM

140.E-701 ELECTRICAL SCHEDULES

E-501 ELECTRICAL DETAILS

E-701 ELECTRICAL SCHEDULES

MECHANICAL

MG001 MECHANICAL - LEGENDS AND NOTES

14.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01

14.MH101 MECHANICAL VENTILATION – LARGE SCALE PLANS

19.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – BASEMENT & LEVEL

19.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01

22-69.MH101 MECHANICAL VENTILATION - FIRST FLOOR PLAN

58.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01 & 02

58.MD102 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 03 & 04

58.MD103 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 05

58.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01 & 02

00 01 15 - 16

58.MH102 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVELS 03 & 04

58.MH103 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 05

60.MD101 MECHANICAL VENTILATION – FIRST FLOOR DEMOLITION PLAN

60.MH101 MECHANICAL VENTILATION – FIRST FLOOR PLAN

98.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN

98.MD102 MECHANICAL ENLARGED DEMO FLOOR PLAN

98.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN

98.MH102 MECHANICAL ENLARGED NEW FLOOR PLAN

98.MH103 MECHANICAL ENLARGED NEW FLOOR PLAN

98.MH104 MECHANICAL ENLARGED NEW FLOOR PLAN

101.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01

101.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01

101.MH102 MECHANICAL SECTIONS

102.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01

102.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01

102.MH102 MECHANICAL SECTIONS

103.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01

103.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01

103.MH102 MECHANICAL SECTIONS

104.MD101 PHASE 1 DATA CENTER MECHANICAL DEMO

104.MD102 PHASE 3 DATA CENTER MECHANICAL DEMO

104.MH101 PHASE 2 DATA CENTER MECHANICAL ATTIC

104.MH102 PHASE 2 DATA CENTER MECHANICAL FIRST FLOOR

104.MH103 PHASE 2 DATA CENTER MECHANICAL OVERALL

104.MH104 PHASE 4 DATA CENTER MECHANICAL ATTIC

104.MH105 PHASE 4 DATA CENTER MECHANICAL FIRST FLOOR

125.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01

125.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01

128.MD101 MECHANICAL DEMO FLOOR PLAN – LEVEL 1

128.MH101 MECHANICAL NEW FLOOR PLAN – LEVEL 1

129.MD101 MECHANICAL DEMO FLOOR PLAN – LEVEL 1

129.MH101 MECHANICAL NEW FLOOR PLAN – LEVEL 1

130.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – BASEMENT

130.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – BASEMENT

131.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – BASEMENT

131.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – BASEMENT

00 01 15 - 17

132.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01

132.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01

133.MD101 MECHANICAL ENLARGED DEMO FLOOR PLAN – LEVEL 01

133.MH101 MECHANICAL ENLARGED NEW FLOOR PLAN – LEVEL 01

MH501 MECHANICAL DETAILS

MH502 MECHANICAL DETAILS

MH503 MECHANICAL DETAILS

MH504 MECHANICAL DETAILS

MH601 MECHANICAL SCHEDULES

MH602 MECHANICAL SCHEDULES & DETAILS

MI701 MECHANICAL CONTROLS

MI702 TEMPERATURE CONTROLS

MI703 MECHANICAL CONTROLS

MI704 MECHANICAL CONTROLS

FIRE PROTECTION

F-001 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS

14.FP101 FIRST FLOOR PLAN – FIRE PROTECTION

58.FP101 FIRST FLOOR PLAN – FIRE PROTECTION

58.FP102 SECOND FLOOR PLAN – FIRE PROTECTION

58.FP103 THIRD FLOOR PLAN – FIRE PROTECTION

58.FP104 FOURTH FLOOR PLAN – FIRE PROTECTION

58.FP105 FIFTH FLOOR PLAN – FIRE PROTECTION

60.FP101 FIRST FLOOR PLAN – FIRE PROTECTION

98.FP101 BASEMENT AREA B – FLOOR PLAN – FIRE PROTECTION

98.FP102 FIRST FLOOR AREA B – FLOOR PLAN – FIRE PROTECTION

98.FP103 SECOND FLOOR AREA B – FLOOR PLAN – FIRE PROTECTION

98.FP104 THIRD FLOOR AREA A – FLOOR PLAN – FIRE PROTECTION

98.FP105 THIRD FLOOR AREA B – FLOOR PLAN – FIRE PROTECTION

101.FP101 FIRST FLOOR PLAN – AREA A – FIRE PROTECTION

101.FP102 FIRST FLOOR PLAN – AREA D – FIRE PROTECTION

102.FP101 FIRST FLOOR PLAN – AREA C – FIRE PROTECTION

102.FP102 FIRST FLOOR PLAN – AREA D – FIRE PROTECTION

103.FP101 FIRST FLOOR PLAN – AREA A – FIRE PROTECTION

103.FP102 FIRST FLOOR PLAN – AREA D – FIRE PROTECTION

00 01 15 - 18

104.FP101 FIRST FLOOR PLAN – FIRE PROTECTION

104.FP102 DATA CENTER – FIRE PROTECTION

125.FP101 FIRST FLOOR PLAN – FIRE PROTECTION

CIVIL

C-001 NOTES, LEGEND AND SITE LOCATIONS

CD101 OVERALL EXISTING AND DEMOLITION

CD102 DETAILED EXISTING AND DMOLITION PLAN

CD103 DETAILED EXISTING AND DMOLITION PLAN

CD104 DETAILED EXISTING AND DMOLITION PLAN

CD105 DETAILED EXISTING AND DMOLITION PLAN

CD106 DETAILED EXISTING AND DMOLITION PLAN

CD107 DETAILED EXISTING AND DMOLITION PLAN

CD108 DETAILED EXISTING AND DMOLITION PLAN

CS101 OVERALL SITE PLAN

CS102 DETAILED SITE PLAN

CS103 DETAILED SITE PLAN

CS104 DETAILED SITE PLAN

CS105 DETAILED SITE PLAN

CS106 DETAILED SITE PLAN

CS107 DETAILED SITE PLAN

CS108 DETAILED SITE PLAN

CS109 MECHANICAL SECURITY

CS110 MECHANICAL SECURITY

CG101 OVERALL EROSION CONTROL PLAN

CG102 DETAILED EROSION CONTROL PLAN

CG103 DETAILED EROSION CONTROL PLAN

CG104 DETAILED EROSION CONTROL PLAN

CG105 DETAILED EROSION CONTROL PLAN

CG106 DETAILED EROSION CONTROL PLAN

CG107 DETAILED EROSION CONTROL PLAN

CG108 DETAILED EROSION CONTROL PLAN

CU101 FIBER PLAN AND PROFILE 1

CU102 FIBER PLAN AND PROFILE 2

CU103 FIBER PLAN AND PROFILE 3

00 01 15 - 19

CU104 FIBER PLAN AND PROFILE 4

CU105 FIBER PLAN AND PROFILE 5

CU106 FIBER PLAN AND PROFILE 6

CU107 FIBER PLAN AND PROFILE 7

CU108 FIBER PLAN AND PROFILE 8

CU109 FIBER PLAN AND PROFILE 9

CU110 FIBER PLAN AND PROFILE 10, 11, 12 & 13

CU111 FIBER PLAN AND PROFILE 14 & 15

CU112 FIBER PLAN AND PROFILE 16, 17 & 18

CU113 FIBER PLAN AND PROFILE 19, 20 & 21

CU114 FIBER PLAN AND PROFILE 22, 23 & 24

CU115 FIBER PLAN AND PROFILE 25, 26, 27 & 28

CK501 CIVIL DETAILS

HAZARDOUS ABATEMENT

HG001 HAZARDOUS ABATEMENT – GENERAL NOTES

14.HD101 FIRST & SECOND FLOORS - HAZARDOUS MATERIALS ABATEMENT

19.HD101 FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT

22-69.HD101 BASEMENT - HAZARDOUS MATERIALS ABATEMENT

22-69.HD102 FIRST FLOOR - HAZARDOUS MATERIALS ABATMENT

58.HD101 BASEMENT – HAZARDOUS MATERIALS ABATEMENT

58.HD102 FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT

58.HD103 SECOND FLOOR - HAZARDOUS MATERIALS ABATEMENT

58.HD104 THIRD FLOOR - HAZARDOUS MATERIALS ABATEMENT

58.HD105 FOURTH FLOOR HAZARDOUS MATERIALS ABASTEMENT

58.HD106 FIFTH FLOOR - HAZARDOUS MATERIALS ABATEMENT

60.HD101 FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT

64-72.HD101 FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT

98.HD101 BASEMENT & FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT

98.HD102 SECOND & THIRD FLOORS FLOOR - HAZARDOUS MATERIALS

ABATEMENT

101.HD101 FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT

102.HD101 FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT

103.HD101 FIRST FLOOR - HAZARDOUS MATERIALS ABATEMENT

104.HD101 ATTIC - HAZARDOUS MATERIALS ABATEMENT

00 01 15 - 20

104.HD102 FIRST FLOOR – HAZARDOUS MATERIALS ABATEMENT

STRUCTURAL

S-001 GENERAL NOTES, TESTING, INSPECTIONS AND OBSERVATIONS

104.S-101 CEILING FRAMING PLAN AND DETAILS

- - - E N D - - -

00 01 15 - 21

(This page intentionally left blank)

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, asbestos and lead abatement as necessary, and furnish labor and materials and perform work for multiple

Electronic Health Record Management (EHRM) upgrades to existing campus facilities by means of renovation and new construction as required by drawings and specifications.

B. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the Contracting Officer.

C. Offices of Vali Cooper International (VCI), as

Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by a testing laboratory retained by the General Contractor, the Contractor shall notify the COR in sufficient time to be present at the site, in time for proper taking and testing of specimens and field inspection. Such prior

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades

01 00 00 -2 notice shall be not less than three workdays unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. Any reference throughout this Project Manual / Specifications document to the VA “Resident Engineer”, “Project Engineer”, or “COR” shall be considered synonymous with the VA

“Contracting Officers Representative” and used interchangeably.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, (Base Bid) VA Project #550-21-700, EHRM

Infrastructure Upgrades, VAMC Illiana Health Care System, Danville, IL: Work includes all labor, material, equipment and supervision to perform general new construction, renovation, selective demolition, interior fit-up, structural, mechanical, fire protection, plumbing, electrical, technology system work, asbestos and lead abatement and any other necessary work as described in the

Construction Documents. All work, including final cleanup and completion of any punch list items, shall be performed within a period of performance designated by the VA starting after date of receipt of Notice to Proceed.

1. The Project Scope includes, but is not limited to, the following:

a. ARCHITECTURAL / STRUCTURAL / MECHANICAL / ELECTRICAL /

PLUMBING / FIRE PROTECTION / CIVIL / PHYSICAL SECURITY

/ TECHNOLOGY / HAZARDOUS MATERIALS ABATEMENT

B. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, asbestos and lead abatement as necessary, and

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades

01 00 00 -3 furnish labor and materials to perform work for multiple

Electronic Health Record Management (EHRM) upgrades to existing campus facilities by means of renovation and new construction as required by the drawings and specifications.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge to be designated by the VA. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades

01 00 00 -4

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The

General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall install all permanent cores at completion of the work. See Section 08 71 00, DOOR

HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub

Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or

“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades

01 00 00 -5

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of

“sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an

Engineering Document Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 5-days hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of (2 to 5) permits shall be issued for

General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA

Medical Center COR.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer’s

Representative. Offsite storage shall be at the

Contractor’s risk and financial responsibility. The

Contractor shall hold and save the Government, its officers

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades

01 00 00 -6 and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer’s Representative and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the

Contracting Officer’s Representative, use only established roadways. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage.

The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of the VA Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades

01 00 00 -7 operations of utility services, fire protection systems and any existing equipment, and with work being done by others.

Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of

Contractor's materials and equipment will be permitted subject to fire and safety requirements.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades

01 00 00 -8 the responsibility of the Government and not the

Contractor.

I. Working Hours:

1. Normal working hours for this contract will be from

7:00AM to 4:30PM (local time) Monday through Friday except for weekends and established Federal Holidays.

2. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the

COR. Requests shall be submitted via email at least 72 hours prior to the requested date and time at no additional cost to the Government. Approvals are subject to the availability of on-site staff.

J. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

The work to be outlined shall include, but not be limited to:

2. To ensure such executions, Contractor shall furnish the

COR with a detailed schedule of dates, including phasing based on the phasing plan in the contract drawings, on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR 120, 90, 30, 15, and 7 days in advance of the proposed date of starting work in each specific area of site, building or

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades

01 00 00 -9 portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, and COR and

Contractor, as follows:

a. Main Computer Room Side-B must be operation before TR cut-overs and re-racking.

b. All TR construction must be complete before WAO cut-over.

c. OSP must be installed and tested prior to TR cut-overs.

d. See phasing sheets in drawing set for detailed phasing process.

K. Building(s) No. (s) 14, 19, 22-69, 58, 60, 64-72, 98, 101, 102, 103, 104, 125, 128, 129, 130, 131, 132, 133, and 140 will be occupied during performance of work; but immediate areas of alterations will be vacated.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access.

Coordinate alteration work in areas occupied by

Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades

01 00 00 -10

L. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction areas, and construction staging areas designated by the COR or shown on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches).