Attachment 17 - FloorHeightTable.xlsx

XLSX spreadsheet 20 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction - Danville FHCS Project 550-21-700
Solicitation number
36C77625B0011
Issued by

About this file

Attachment 17 - FloorHeightTable.xlsx is a detailed spreadsheet documenting floor and ceiling heights for multiple buildings (14, 19, 22-69, 58, 60, 64-72, 98, 101-104, 125, 128-133, and 140) associated with the VA Illiana Healthcare System infrastructure upgrade project. The spreadsheet provides precise measurements for various building levels, including basement (B), first floor, second floor, and roof levels, with heights ranging from 3.3 to 26.3 feet across different sections and rooms.

The comprehensive height data corresponds to the federal contract opportunity (Solicitation Number 36C77625B0011) for EHRM Infrastructure Upgrades Construction at the Danville FHCS Project. This spreadsheet will likely be used by contractors to plan precise infrastructure modifications, including electrical, HVAC, data center renovations, and spatial reconfigurations across multiple buildings. The project is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an anticipated solicitation in April 2025, a 730-day performance period, and a project value between $20-50 million under NAICS code 236220.

View the file

Other files

File Type Posted
Abstract of Bids OF 1419 - CONSTRUCTION - Signed 8.11.25.pdf PDF
36C77625B0011 0006.pdf PDF
Attachment 21 - Technical Questions - Danville IL 8-5-2025.pdf PDF
36C77625B0011 0005.docx DOCX document
Attachment 21 - Technical Questions - Danville IL 7-30-2025.pdf PDF
36C77625B0011 0004.pdf PDF
Attachment 23 - A-903.pdf PDF
Attachment 3 Construction Wage Rates Vermilion 7.25.25.pdf PDF
Attachment 21 - Technical Questions - Danville IL 7-28-2025.pdf PDF
Solicitation 36C77625B0011 Amendment 0003 - Danville IL EHRM Construction.pdf PDF
Attachment 22 - Electrical Single Line.pdf PDF
Attachment 13 - 58.AE401.pdf PDF
Attachment 11 - 02 82 11_Appendix_Asbestos Containing Materials Report Crosswalk.pdf PDF
Attachment 20 - Stamped Civil Drawings.pdf PDF
Attachment 16 - FloorHeightTable.pdf PDF
Attachment 15 - 013324 - Electronic Submittals.pdf PDF
Attachment 14 -101.AE301.pdf PDF
Attachment 12 - 58.AE301.pdf PDF
Amendment - 0002 36C77625B0011.pdf PDF
Attachment 21 - Technical Questions - Danville IL 7-15-2025.docx DOCX document
Attachment 19 - Soil Report Danville IL - 7-15-25.pdf PDF
Attachment 18 - RFI Log_EHRM Upgrades Danville IL.xls XLS spreadsheet
Attachment 23 - Construction Wage Rates - Vermilion 7-11-25.pdf PDF
Amendment - 0001 36C77625B0011.pdf PDF
Attachment 9 Brand Name Justification Danville IL EHRM IU Construction.pdf PDF
Attachment 8 Drawings Danville IL EHRM IU Construction Volume 3 of 3.pdf PDF
Attachment 6 Drawings Danville IL EHRM IU Construction Volume 1 of 3.pdf PDF
Attachment 5 Pre Construction Risk Assessment Danville IL EHRM IU.docx DOCX document
Attachment 10 Limitations on Subcontracting Construction.pdf PDF
Attachment 7 Drawings Danville IL EHRM IU Construction Volume 2 of 3.pdf PDF
Attachment 1 Specifications Danville IL EHRM IU Construction Volume 1 of 2.pdf PDF
Attachment 4 Site Visit Instructions EHRM IU 550 21 700.docx DOCX document
Attachment 3 Construction Wage Rates Vermilion 4 18 25.pdf PDF
Attachment 2 Specifications Danville IL EHRM IU Construction Volume 2 of 2.pdf PDF
36C77625B0011_1.docx DOCX document
36C77625B0011.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BuildingLevelCeiling HeightFloor Height
14BN/A13
17.8 or 8 or 10.613.5
28 or 9.313.5
19BN/A13
112.7 or 913
2N/A15.3
22-69B (South)N/A8.9
CrawlspaceN/A5.4
1 (South)10.419.6
B (Center)N/A8.4
1 (Center)16.110.5
B (North)N/A13.7
1 (North)8N/A
58BN/A8.2
19.112.7
29.112.7
39.112.7
49.112.7
59.112.7
1 (East)9.112.3
1 (Northwest)N/A12.3
B (North)8 or 912.7
1 (North)9.112.7
2 (North)9.112.7
3 (North)N/A12.7 or Roof
Stairs (North)N/A26.3
1 East Foyer (North)12.726.3
60CrawlspaceN/A3.3
1810.7
1 FoyerN/A8
28 or 9Roof
64-721 (South)9 or 10.5 or 11 or N/ARoof
1 (North)8 or 9 or 10.5Roof
98CrawlspaceN/A5.7
BN/A or 8 or 912.7
1N/A or 8 or 912.7
2N/A or 8 or 912.7
3N/A or 8 or 913.7
PenthouseN/A or 912.7
1 Side Room (North)9 or 1212.7

101 1 N/A or 7.4 or 7.5 or 8.5 or 9.6 9.3 or 11.3

102 1 N/A or 7.7 or 8 Roof

103 1 N/A or 7.8 or 7.9 or 8 Roof

104 1 N/A or 8 or 9 or 10 Roof or 11.8

1251N/A or 7.3 or 8 or 8.5 or 10.8 or 16.8
or (8 to 11) or (8.5 to 11.2)Roof

128 1 8 or 9 or 14 Roof

129 1 8 or 9 or 14 Roof

130BN/A9.5
1N/A or 8.5 or 8.8 or 9 or 10.5 or 13.4Roof
131BN/A9.5
18.5 or 8.8 or 9 or 13.5Roof

132 1 N/A or 8 Roof

133 1 N/A or 8 or 8.5 or 9 or 10 Roof

1401N/A or 8 or 9 or 9.5 or 9.6 or 10.614.3
29Roof

B140

B133

B132

B131

B130

B129

B128

B125

B104

B103

B102

B101

B98

B64-72

B58

B60

B22-69

B19

B14 image1.png image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.png image23.png image24.png image25.png image26.png image27.png image28.png image29.png image30.png image31.png image32.png image33.png image34.png image35.png image36.png image37.png image38.png image39.png image40.png image41.png image42.png

File details come from the government source that posted it. Updated .