This document package includes construction drawings and specifications for the Emergency Department Observation Unit Renovation project at the Jesse Brown VA Medical Center in Chicago, Illinois. The project scope involves demolishing an unused office area and expanding and upgrading the emergency department to include additional observational exam and treatment rooms. Improvements to the existing emergency department are also specified. The construction drawings provide architectural, mechanical, electrical, plumbing and fire protection plans and details for the renovation work.

The related federal contract opportunity seeks bids for providing all labor, materials, tools and supervision to complete the construction and renovation work detailed in the project specifications and drawings. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Great Lakes Acquisition Center for Project No. 537-15-160. Bids are due by the date specified in the solicitation for awarding a contract to renovate the emergency department observation unit at the Jesse Brown VA Medical Center located at 820 S. Damen Ave. in Chicago, Illinois 60612.

View the file

Other files

File Type Posted
AE Responses 537-15-160 Consolidated RFI Amendment 6.xlsx XLSX spreadsheet
36C25220B0023 0006.docx DOCX document
537-15-160 SOW - Mod2.docx DOCX document
IFB Bid opening invitation changed to 10SEP.pdf PDF
36C25220B0023 0005.docx DOCX document
AE Responses 537-15-160 Consolidated RFI Amendment 4.pdf PDF
085113 - Psychiatric windows.docx DOCX document
081710 - Integrated Door Assemblies.docx DOCX document
36C25220B0023 0004.docx DOCX document
087100 - Door Hardware.docx DOCX document
Basement sketch Question 64.png PNG image
024100 - Demolition.pdf PDF
SIGNED Brand Name J and A.pdf PDF
36C25220B0023 0003.docx DOCX document
262416 - Panels.pdf PDF
264313 - Surge Protective Devices.pdf PDF
537-15-160 Consolidated RFI-ADD1.pdf PDF
Bid opening change to 10 AUG Meeting Invitation.pdf PDF
260573 - OCP Device Coordination Study.pdf PDF
C03 36C25220B0023 0002.docx DOCX document
EJ200 - Addendum 1 Elec - 07.23.20.pdf PDF
RFI-001_Guidon Addendum 1.pdf PDF
000100 - Specification Table of Contents.pdf PDF
537-15-160 SOW - Mod1.pdf PDF
ED201 - Addendum 1 Elec - 07.23.20.pdf PDF
36C25220B0023 A0001.docx DOCX document
ATCH 2 537-15-160 sign in sheets 8-9 jul 2020.pdf PDF
ATCH 1 537-15-160 Construction Bid Opening Meeting.pdf PDF
537-15-160 Construction Drawings 3 of 4.pdf PDF
537-15-160 Construction Drawings 2 of 4.pdf PDF
S02 36C25220B0023_2_7-1-2020.docx DOCX document
537-15-160 Construction Drawings 4 of 4.pdf PDF
537-15-160 Project Manual Vol2.pdf PDF
537-15-160 Project Manual Vol1.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

SHEET LIST

SHEET

NUMBER SHEET NAME

GI000 COVER SHEET

GI101 LIFE SAFETY PLAN

GC100 INFECTION CONTROL/PHASING PLAN

GC101 FIRST FLOOR - PHASE 1 AND 2

GC102 FIRST FLOOR - PHASE 3 AND 4

GC103 FIRST FLOOR - PHASE 5 AND 6

AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS

AE002 WALL TYPES

AE003 PROJECT ALTERNATES

AD100 FIRST FLOOR EXISTING PLAN

AD101 DEMOLITION PLANS

AE101 FIRST FLOOR OVERALL ARCHITECTURAL PLAN

AE102 FIRST FLOOR ARCHITECTURAL PLAN - A

AE103 FIRST FLOOR ARCHITECTURAL PLAN - B

AE201 SECOND FLOOR PLAN AND BUILDING SECTION

AE202 ROOF PLAN

AC111 FIRST FLOOR OVERALL REFLECTED CEILING PLAN

AC112 FIRST FLOOR REFLECTED CEILING PLAN - A

AC113 FIRST FLOOR REFLECTED CEILING PLAN - B

AC201 SECOND FLOOR REFLECTED CEILING PLAN

AE501 BUILDING DETAILS

AE502 BUILDING DETAILS

AE601 DOOR SCHEDULE AND DETAILS

AI101 FIRST FLOOR FINISH PLAN

AI201 INTERIOR ELEVATIONS

AI202 INTERIOR ELEVATIONS

AI401 ENLARGED FINISH PLANS AND ELEVATIONS

AI402 ENLARGED RESTROOM FINISH PLANS AND ELEVATIONS

AI501 INTERIOR SECTIONS AND DETAILS

AI601 FINISHES SCHEDULE

QH101 FIRST FLOOR OVERALL EQUIPMENT FLOOR PLAN

QH102 FIRST FLOOR EQUIPMENT PLAN - A

QH103 FIRST FLOOR EQUIPMENT PLAN - B

QH201 TYPICAL EQUIPMENT PLANS AND ELEVATIONS

MH001 MECHANICAL LEGEND, GENERAL NOTES AND SCHEDULES

MH002 MECHANICAL DETAILS

MH003 MECHANICAL DETAILS

MH004 MECHANICAL DETAILS

MH005 MECHANICAL DETAILS

MD101 FIRST FLOOR AIR DISTRIBUTION PLAN - OVERALL DEMOLITION

MD201 FIRST FLOOR HYDRONICS PLAN - OVERALL DEMOLITION

MH101 FIRST FLOOR AIR DISTRIBUTION PLAN - OVERALL NEW WORK

MH102 SECOND FLOOR AIR DISTRIBUTION PLAN - OVERALL NEW WORK

MH103 ROOF AIR DISTRIBUTION PLAN - OVERALL NEW WORK

MH201 ENLARGED MECHANICAL ROOM PLANS

MP101 FIRST FLOOR HYDRONICS PLAN - OVERALL NEW WORK

FP100 FIRST FLOOR FIRE PROTECTION PLAN

PL001 PLUMBING LEGEND,SCHEDULES AND GENERAL NOTES

PL002 PLUMBING DETAILS

PD101 UNDERSLAB PLUMBING PLAN - OVERALL DEMOLITION

PD201 FIRST FLOOR PLUMBING PLAN - OVERALL DEMOLITION

PD301 FIRST FLOOR MEDICAL GAS PLAN - OVERALL DEMOLITION

PL101 UNDERSLAB PLUMBING PLAN - OVERALL NEW WORK

PL201 FIRST FLOOR PLUMBING PLAN - OVERALL NEW WORK

PG101 FIRST FLOOR MEDICAL GAS PLAN - OVERALL NEW WORK

PL301 DOMESTIC WATER RISER

PG201 MEDICAL GAS RISER

PW101 PLUMBING WASTE AND VENT RISER

EJ001 ELECTRICAL LEGEND

EJ100 LIGHT FIXTURES SCHEDULE AND DETAILS

EJ101 ELECTRICAL DETAILS

EJ200 POWER RISER DIAGRAM

EJ201 PANEL SCHEDULES

ED101 PARTIAL FIRST FLOOR PLAN - LIGHTING DEMOLITION

ED201 PARTIAL FIRST FLOOR PLAN - POWER DEMOLITION

ED301 PARTIAL FIRST FLOOR PLAN - SYSTEMS DEMOLITION

EL101 PARTIAL FIRST FLOOR PLAN - LIGHTING

EL101A PARTIAL FIRST FLOOR PLAN - LIGHTING ALTERNATE

EL200 PARTIAL FIRST FLOOR PLAN - PHOTOMETRIC

EP101 PARTIAL FIRST FLOOR PLAN - POWER

EP301 PARTIAL ROOF FLOOR PLAN - POWER

ET101 PARTIAL FIRST FLOOR PLAN - SYSTEMS

FA100 FIRE ALARM RISER DIAGRAM AND DETAILS

FA101 PARTIAL FIRST FLOOR PLAN - FIRE ALARM

CMTA CONSULTING ENGINEERS

MECHANICAL,

PLUMBING, &

FIRE PROTECTION

JESSE BROWN VA MEDICAL CENTER

Jesse Brown VA Medical Center 820 S. Damen Ave.

Chicago, IL 60612 Building 11B

OWNER

GUIDON DESIGN INC.

ARCHITECT

CMTA CONSULTING ENGINEERS

ELECTRICAL

AREA MAP

VICINITY MAP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \s w h it c o m b

.G U

ID

O

N D

E S

IG

N

\D o c u m e n ts \1

.5

.0

E

D P h a s e d R e n o v s w h it c o m b g u id o n d e s ig n .c o m

.r v t

/2

/2

:4

:0

P

M

GI000

COVER SHEET

GUIDON-CMTA SDVOSB JV, LLC

EMERGENCY DEPARTMENT

RENOVATION

JESSE BROWN VAMC, CHICAGO

537-15-160

1A

06/12/2020 JDF LNS

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

GREAT LAKES ACQUISITION CENTER

JESSE BROWN VAMC, CHICAGO

100% CONSTRUCTION DOCUMENTS

EMERGENCY DEPARTMENT RENOVATION

537-15-160

100% CONSTRUCTION DOCUMENTS

CAMPUS MAP

N

N

N

Revisions: Date:

100% RE-SUBMIT 2020/06/29

FD

CODE ANALYSIS LEGEND

TOTAL OCCUPANCY

FEC

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND

REGULATIONS.

ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)

PCI MNL 120-17, 8th EDITION DESIGN HANDBOOK WITH ERRATA

NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018 EDITION

NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION

NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2019

EDITION

NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE

PROTECTION, 2019 EDITION

NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND

THEIR APPURTENANCE, 2019 EDITION.

NFPA 70, NATIONAL ELECTRIC CODE, 2020 EDITION

NFPA 72, NATIONAL FIRE ALARM CODE, 2019 EDITION

NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA

PROCESSING EQUIPMENT, 2020 EDITION

NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2019 EDITION

NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2019 EDITION

NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2018 EDITION

NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2018 EDITION

NFPA 101, LIFE SAFETY CODE, 2018 EDITION

NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS

MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA

5000 AND NFPA 900

ANSI A117.1-2017 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES

ABAAS ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS FOR ACCESSIBLE

DESIGN

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD

STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

VA MENTAL HEALTH FACILITIES DESIGN GUIDE, CURRENT VERSION

VA BARRIER FREE DESIGN GUIDE PG-18-13, CURRENT VERSION

ARCHITECTURAL, CURRENT VERSION

ELECTRICAL, CURRENT VERSION

ENERGY SUSTAINABILITY, CURRENT VERSION

EQUIPMENT, CURRENT VERSION

FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015

INTERIOR DESIGN, CURRENT VERSION

PLUMBING, CURRENT VERSION

VA DESIGN MANUALS PG-18-10:

GOVERNING CODES:

CODE CRITERIA

GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

CODE REVIEW

THE 2018 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS.

FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2018 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN

USED.

PROJECT SCOPE

THE PROJECT SCOPE INCLUDES DEMOLITION AND REMODELING OF AN EXISTING UNUSED OFFICE AREA OF THE FACILITY RESULTING IN EXPANSION TO THE EMERGENCY DEPARTMENT FOR OBSERVATIONAL EXAM AND TREATMENT ROOMS OF FULLY FUNCTIONAL AND UPGRADED SPACE. IMPROVEMENTS TO THE EXISTING EMERGENCY

DEPARTMENT ARE ALSO INCLUDED.

CODE ANALYSIS

THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2018 IBC. CONSTRUCTION TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE 1A CONSTRUCTION AND LSC (NFPA 101-2018) CONSTRUCTION AS FOLLOWS:

1. OCCUPANCY TYPE: I-2 INSTITUTIONAL, IBC CHAPTER 3/LSC CHAPTER 18 HEALTHCARE

2. CONSTRUCTION TYPE: 1A (IBC CHAPTER 5)

3. FIRE RESISTIVE RATINGS TYPE 1A CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:

STRUCTURAL FRAME: NONCOMBUSTIBLE, 3-HOUR FIRE RESISTIVE

BEARING WALLS

EXTERIOR: NONCOMBUSTIBLE, 3 - HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 3 - HOUR FIRE RESISTIVE

NON-BEARING WALLS AND PARTITIONS

EXTERIOR: NONCOMBUSTIBLE, 0 - HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 0 - HOUR FIRE-RESISTIVE

FLOOR: NONCOMBUSTIBLE, 2 - HOUR FIRE RESISTIVE

ROOF: NONCOMBUSTIBLE, 1 1/2-HOUR FIRE RESISTIVE

SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 12.3.6)

SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 12.3.6)

4. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.

5. ALLOWABLE HEIGHT: EXISTING (IBC, TABLE 504.3)

6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: EXISTING

7. ALLOWABLE AREA: EXISTING FLOOR PLATE TO REMAIN

8. BUILDING SEPARATION: BASED ON A FIRE SEPARATION A 1 -HOUR FIRE RESISTANCE WALL RATING IS REQUIRED. (IBC, TABLE 602)

9. OCCUPANCY SEPARATION: A TWO HOUR OCCUPANCY SEPARATION IS REQUIRED BETWEEN THE CLINIC SUITE B OCCUPANCY (LCS CHAPTER 18) AND HEALTHCARE I-2

OCCUPANCY (LSC 18.1.3.4)

SECTIONS OF HEALTH CARE FACILITIES SHALL BE PERMITTED TO BE CLASSIFIED AS OTHER OCCUPANCIES, PROVIDED THAT THEY MEET BOTH OF THE FOLLOWING

CONDITIONS: (LSC 18.1.3.3)

(1) THEY ARE NOT INTENDED TO PROVIDE SERVICES SIMULTANEOUSLY FOR FOUR OR MORE INPATIENTS FOR PURPOSES OF HOUSING, TREATMENT, OR

CUSTOMARY ACCESS BY INPATIENTS INCAPABLE OF SELF-PRESERVATION.

CODE ANALYSIS - NFPA 101, INSTITUTIONAL HEALTHCARE CHAPTER 18

CODE CRITERIA (CONTINUED)

(2) THEY ARE SEPARATED FROM AREAS OF HEALTH CARE OCCUPANCIES BY CONSTRUCTION HAVING A MINIMUM 2-HOUR FIRE RESISTANCE RATING IN ACCORDANCE

WITH CHAPTER 8.18.1.3.4 CONTIGUOUS NON-HEALTH CARE OCCUPANCIES.

10. MEANS OF EGRESS

• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 8 FEET.

• AISLES, CORRIDORS, AND RAMPS IN ADJUNCT AREAS NOT INTENDED FOR THE HOUSING, TREATMENT, OR USE OF INPATIENTS SHALL BE NOT LESS THAN 44 IN. (1120

MM) IN CLEAR AND UNOBSTRUCTED WIDTH.

• CLEAR WIDTH OF DOORS SHALL BE CLEAR 42 INCHES FROM SLEEPING ROOMS; DIAGNOSTIC AND TREATMENT AREAS, SUCH AS X-RAY, SURGERY, OR PHYSICAL

THERAPY.

• CLEAR WIDTH OF DOORS SHALL BE CLEAR 32 INCHES

• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.

• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED (LSC 7.4.1)

• MAXIMUM TRAVEL DISTANCE, FULLY SPRINKLED: 200 FEET (LSC 18.2.6.2.1)

• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 18.2.5.3)

• DEAD END CORRIDORS SHALL NOT EXCEED 30 FEET. (LSC 18.2.5.2)

• MEANS OF EGRESS SHALL BE ILLUMINATED PER 7.9. (LSC 18.2.6.2.1)

• EMERGENCY LIGHTING SHALL BE PER 7.9. (LSC 18.2.9)

• EXIT SIGNAGE SHALL BE PROVIDED 7.10. (LSC 18.2.10)

11. WHERE GENERAL ANESTHESIA OR LIFE SUPPORT EQUIPMENT IS USED AND ESSENTIAL ELECTRICAL SYSTEM PER NFPA 99 SHALL BE PROVIDED.

12. HAZARDOUS AREAS. ANY HAZARDOUS AREAS SHALL BE PROTECTED IN ACCORDANCE WITH SECTION 8.7, AND THE AREAS DESCRIBED IN TABLE 18.3.2.1 SHALL BE

PROTECTED AS INDICATED. (LSC 18.3.2.2)

TABLE 18.3.2.1 HAZARDOUS AREA PROTECTION

HAZARDOUS AREA DESCRIPTION: PROTECTION / SEPARATION (MINIMUM FIRE RESISTANCE RATING)

• ROOMS WITH SOILED LINEN IN VOLUME EXCEEDING 64 GAL (242 L): 1 HOUR

• STORAGE ROOMS LARGER THAN 50 FT2(4.6 M2) BUT NOT EXCEEDING 100 FT2 (9.3 M2) AND STORING COMBUSTIBLE MATERIAL: SEE 18.3.6.3.11.

• STORAGE ROOMS LARGER THAN 100 FT2 (9.3 M2) AND STORING COMBUSTIBLE MATERIAL: 1 HOUR

• ROOMS WITH COLLECTED TRASH IN VOLUME EXCEEDING 64 GAL (242 L): 1 HOUR

13. INTERIOR FINISH

• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 10.2 OF THE NFPA 101 TO CLASS A MATERIALS. (LSC 18.4.3.6.2)

CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.

• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I.

• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS SERVING

AS FURNISHINGS OR DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE REQUIREMENTS OF NFPA 701, STANDARD METHODS OF

FIRE TESTS FOR FLAME-RESISTANT TEXTILES AND FILMS.

• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA 260, NFPA 261, NFPA 266, 16 CFR 1632, ASTME E1537, AND ASTME E1590

14. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA 10.

15. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.

• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA 72. (LSC 9.6.1)

• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 18.3.4.2.1)(LSC 9.6.2)

• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS PER 9.6.3. (LSC 18.3.4.3)

• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.

• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION SYSTEM PER 9.6.4. (LSC 18.3.4.3.2)

16. FIRE SUPPRESSION:

SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE WITH NFPA 13.

THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2019 EDITION OF NFPA 13 AND THE CURRENT EDITION OF THE DEPARTMENT OF

VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:

STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:

ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 250 GPM

ALL OTHER AREAS SHALL BE PROTECTED AS:

LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 100 GPM

ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE FM APPROVED QUICK RESPONSE SPRINKLERS.

17. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS SHALL BE CONSTRUCTED AND MAINTAINED PER NFPA 241.

MMLL

JJHHHGF

N O P QM

LJI

1.1

2.3

3.5

TRAVEL DISTANCE= 86'-0"

TRAVEL DISTANCE= 200'

4770 SF

15032

I

DIAGONAL DISTANCE= 163'-0"

TRAVEL DISTANCE= 188'-0"

EXIT SEPARATION= 130'-0"

D E

A D

E N

D C

O R

R

ID

O R

L E

N G

T H

/8

1678 SF

10017

B

3523 SF

15023

I

223 SF

A

NOT IN SCOPENOT IN SCOPE

NOT IN SCOPE

N O

T I N

S C

O P

E

NOT IN SCOPE

FEC

FEC

FEC

491 SF

I

701 SF

I

E X

IT

E X

IT

RESIDENT AND

STAFF LOUNGE

1499C

NURSE STATION -

M.H. (FLEX)

M.H. EXAM (FLEX)

RM-20

M.H. EXAM (FLEX)

RM-21

M.H. EXAM (FLEX)

RM-19

M.H. EXAM (FLEX)

RM-18

OB EXAM AND AII

RM-16

AII ANTEROOM

M.H. EXAM AND AII

(FLEX) RM-17

SUPPLY STORAGE

1452EQUIPMENT

STORAGE

SOILED UTILITY

TOILET

LOUNGE

TOILET

1462A

EQUIPMENT

ED MGR. (FUTURE

BEREAVEMENT)

ON-CALL 1

ON-CALL

BATHROOM

1466C

ON-CALL 2

1466B

EXAM RM-1

1470A

EXAM RM-2

1470B

EXAM RM-3

1470C

EXAM RM-4

1470D

EXAM RM-5

1470E

EXAM RM-6

1470F

EXAM RM-15

1470R

EXAM RM-13

1470P

EXAM RM-14

1470Q EXAM RM-12

1470N

EXAM RM-11

1470M

EXAM RM-10

1470L

EXAM RM-9

1470J

MEDS

EXAM RM-8

1470H

EXAM RM-7

1470G

HAC

CORRIDOR

1474B

CORRIDOR

1474A

CORRIDOR

1474C

NURSE STATION - 1

EMERGENCY ROOM

PATIENT TLT

CORRIDOR

1404A

ELECTRICAL

14E6

COMM

14T3

CORRIDOR

C1407

CLEAN LINEN

CFD SUPPLY

TOILET

VA POLICE

CORRIDOR

C1404

STAIR

NO 5A

MECH ROOM

1499B

CORRIDOR

C1403

CORRIDOR

C1402

CORRIDOR

C1401

STORAGE

COMP AND PENS

STAFF

SECRET OFFICE

DOCTOR OFFICE

DOCTOR OFFICE

TOILET

1499A

WAITING ROOM

SUPV OFFICE

NURSE STATION

PROJECT

SITE

NKEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \s w h it c o m b

.G U

ID

O

N D

E S

IG

N

\D o c u m e n ts \1

.5

.0

E

D P h a s e d R e n o v s w h it c o m b g u id o n d e s ig n .c o m

.r v t

/2

/2

:4

:1

P

M

GI101

LIFE SAFETY PLAN

GUIDON-CMTA SDVOSB JV, LLC

EMERGENCY DEPARTMENT

RENOVATION

JESSE BROWN VAMC, CHICAGO

537-15-160

1A

06/12/2020 JDF STW

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

100% CONSTRUCTION DOCUMENTS

SCALE: 1/8" = 1'-0"GI101

1 FIRST FLOOR LIFE SAFETY PLAN

N

LIFE SAFETY OCCUPANCY COUNT

AREA SF OCC OCC FACTOR # OF OCC

Level 1

BREAK ROOM/LOUNGE 223 SF A 15 15

EAST SUPPORT 491 SF I 150 4

EAST SUPPORT 701 SF I 150 5

OFFICE (COMP AND PEN) 1678 SF B 100 17

NEW ED (OU) 3523 SF I 150 23

EXISTING ED 4770 SF I 150 32

11385 SF 96

UP

INFECTION CONTROL PLAN NOTES #

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C + D

PATIENT RISK GROUP: HIGH OR HIGHEST, PER SPEC.

CLASS OF PRECAUTION MATRIX: IV

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GC100.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 3/GC100.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 4/GC100. SYSTEM SHALL BE 1 HR RATED.

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING

INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED

CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR

PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES

A

B

PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

TEMPORARY IC BARRIER WALL

CONSTRUCTION (DUST WALL)

3 5/8" STEEL STUDS @ 16"

O.C.

COMPRESSIBLE FOAM OR RUBBER SILL

6-MIL FIRE RETARDANT POLY

INTERIOR SIDE

CEILING

2" DEEP LEG 3 5/8" STEEL SLIP TRACK

3 5/8" STEEL STUD TRACK

/4

M

IN

CONTINUOUSLY ADHERE 6-MIL. FIRE

RETARDANT POLY TO DECK WITH TAPE

CONTINUOUSLY ADHERE FIRE RETARDANT

POLY TO FLOOR WITH TAPE

EXISTING DECK

CONSTRUCTION

SIDE

OCCUPIED

SIDE

1/2" VINYL FACED BATT INSULATION

CONTINUOUS POLYETHYLENE HINGE.

ADJUSTABLE HYDRAULIC CLOSER

AVAILABLE.

SELF LATCHING, LOCKING HANDLE WITH

KEYED OUTSIDE AND THUMBTURN INSIDE.

4 DIGIT COMBINATION PUSHBUTTON LOCK

AVAILABLE.

1/4" x 2" SOLID ALUMINUM THRESHOLD

STRIP WITH NEOPRENE GASKET

MATERIAL SEAL TO THE FLOOR.

1" x 1" ANGLE MOUNTED TO GASKET AND

ADHERED TO FORM SEAL WITH FRAME.

GASKETED SWEEP TO PREVENT DUST AND

DEBRIS ESCAPE.

ADJUSTABLE UPPER PANEL. SLIDES TO

CEILING HEIGHT UP TO 10'-0".

PUBLIC SIDE SYSTEM MUST BE 1 HR RATED, PER NFPA 241.

(ALTERNATIVELY PROVIDE FULL FIRE-WATCH)

MMLLJJHHHGF N O P QMLJI

1.1

2.3

3.5

MECH RM

DOCTOR OFFICE

DOCTOR OFFICE

EXAM RM

EXAM RM

EXAM RM

EXAM RM

EXAM RM

ADMIN OFFICE

CONFERENCE RM

STORAGE

MENS TOILET

WOMENS TOILET

TOILET

ON CALL

TOILET

1491A

ON CALL

1491B

CORRIDOR

C1404

CORRIDOR

C1404

STAIR

NO 5A

SOILED UTILITY

BEREAVEMENT

1475A

ELECTRICAL

14E6

COMM

14T3

LOUNGE

EQUIP STORAGE

ED MGR

EXAM RM-7

1470G

EXAM RM-6

1470F

EXAM RM-5

1470E

EXAM RM-4

1470D

EXAM RM-3

1470C

EXAM RM-2

1470B

CFD SUPPLY

EXAM RM-1

1470A

TOILET

VA POLICE

EXAM RM-15

1470R

EXAM RM-14

1470Q

EXAM RM-13

1470P

EXAM RM-12

1470N

EXAM RM-11

1470M

PARAMEDIC RM

1470L

EXAM RM-9

1470K

EXAM RM-8

1470J

MEDS

1470H

NURSE STATION

EMERGENCY RM

CORRIDOR

C1407

CLEAN LINEN

PHASE 1

PHASE 2

PHASE 2

PHASE 3 B

PHASE 4

PHASE 4

PHASE 4

PHASE 5

PHASE 5PHASE 6

* REFER TO FOLLOWING SHEETS FOR PHASE

DRAWINGS WITH MORE CLARIFICATION ON

PHASING

NOT IN SCOPENOT IN SCOPE

NOT IN SCOPE

N O

T I N

S C

O P

E

NOT IN SCOPE

SUPV OFFICE

WAITING ROOM

CORRIDOR

C1403

COMP AND PENS

STAFF

SECRET OFFICE

DOCTOR OFFICE

1494 DOCTOR OFFICE

TOILET

1499A

MECHANICAL ROOM

PH

A

SE

PHASE 3 A

2 3

2 3

CORRIDOR

C1404

A

LL

P H

A

SE

S

AB

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

CONSTRUCTION PHASE 1

CONSTRUCTION PHASE 2

RENOVATE AREA OUTSIDE OF

EMERGENCY ROOM AS SHOWN. DEMO ONE

ON-CALL ROOM.

RENOVATE AREA SHOWN;

CONSTRUCT NEW EXAM ROOM, MED. ROOM.

CONSTRUCT 1 EXAM ROOM AS TEMP SOILED

UTILITY. THIS EXAM ROOM RENOVATED IN PHASE

4 FOR FULL EXAM FUNCTION.

BED COUNT: EX + 0 (ACCESS)

BED COUNT: EX + 2

CONSTRUCTION PHASE 3

CONSTRUCTION PHASE 4

CONSTRUCTION PHASE 6

RENOVATE AREA AS SHOWN FOR NEW CORRIDOR,

EQUIPMENT ROOM, AND REMAINDER OF EXAM

ROOMS CONNECTED TO PHASE 1.

RESTORE TEMP SOILED UTILITY TO EXAM ROOM

(AS STATED IN PHASE 2). DEMO OFFICE AND

EQUIPMENT STORAGE TO ON-CALL.

NEW I.C.U. DOORS AND FINISHES, AND PARTIAL

NEW FLOOR FINISH AND CEILING

NEW I.C.U. DOORS AND FINISHES, AND PARTIAL

NEW FLOOR FINISH AND CEILING.

COMPLETE FLOOR AND CEILING FINISH.

RENOVATE REMAINDER OF NURSE STATION AND

FINISH FLOORING AND CEILING.

BED COUNT: EX + 3

BED COUNT: EX + 1

BED COUNT: EX + 7

RENOVATE REMAINDER OF SPACE ALONG THE

PERIMETER CORRIDOR.

CONSTRUCTION PHASE 5

REFURBISH/RENOVATE PARTIAL NURSE STATION,

FLOOR AND CEILING.

BED COUNT: EX + 1

COMPLETE TEMPORARY/SWING ROOMS INTO

EXAM ROOMS

ADJUSTABLE HYDRAULIC CLOSER

AVAILABLE.

1/4" x 2" SOLID ALUMINUM THRESHOLD

STRIP WITH NEOPRENE GASKET

MATERIAL SEAL TO THE FLOOR.

1" x 1" ANGLE MOUNTED TO GASKET AND

ADHERED TO FORM SEAL WITH FRAME.

GASKETED SWEEP TO PREVENT DUST AND

DEBRIS ESCAPE.

ADJUSTABLE UPPER PANEL(S). SLIDES

TO CEILING HEIGHT UP TO 10'-0".

TEMPORARY IC BARRIER WALL CONSTRUCTION

SYSTEM MUST BE 1 HR RATED, PER NFPA 241.

(ALTERNATIVELY PROVIDE FULL FIRE-WATCH)

PROJECT

SITE

NKEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \s w h it c o m b

.G U

ID

O

N D

E S

IG

N

\D o c u m e n ts \1

.5

.0

E

D P h a s e d R e n o v s w h it c o m b g u id o n d e s ig n .c o m

.r v t

/2

/2

:4

:3

P

M

GC100

INFECTION CONTROL/PHASING

PLANGUIDON-CMTA SDVOSB JV, LLC

EMERGENCY DEPARTMENT

RENOVATION

JESSE BROWN VAMC, CHICAGO

537-15-160

1A

06/12/2020 JDF STW

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

100% CONSTRUCTION DOCUMENTS

SCALE: 1 1/2" = 1'-0"GC100

2 TEMPORARY DUST CONTROL BARRIER

SCALE: 1/2" = 1'-0"GC100

3 TEMPORARY INFECTION CONTROL BARRIER DOOR

SCALE: 1/8" = 1'-0"GC100

1 FIRST FLOOR INFECTION CONTROL AND PHASING PLAN

N

SCALE: 1/2" = 1'-0"GC100

4 TEMPORARY INFECTION CONTROL BARRIER

MMLL N O P QML

1.1

2.3

3.5

EXAM RM-11

1470M

EXAM RM-10

1470L

EXAM RM-5

1470E

EXAM RM-6

1470F

ELECTRICAL

14E6

COMM

14T3

BEREAVEMENT

1475A

SOILED UTILITY

EXAM RM-7

1470G

MEDS

1470H

EXAM RM-8

1470J

EXAM RM-9

1470K

STAIR

NO 5A

TOILET

WOMENS TOILET

AD101

NOT IN SCOPE

N O

T I N

S C

O P

E

NOT IN SCOPE

AE502

CLEAR

6'-0" MIN.

AB

CORRIDOR

C1403

STORAGE

COMP AND PENS

STAFF

SECRET OFFICE

DOCTOR OFFICE

1504 DOCTOR OFFICE

WAITING ROOM

SUPV OFFICE

NURSE STATION

AD101

EXAM RM

EXAM RM

EXAM RM

ADMIN OFFICE

CONFERENCE RM

DOCTOR OFFICE

MECH RM

EXAM RM

EXAM RM

DOCTOR OFFICE

MEN'S TOILET

STORAGE

HAC

CORRIDOR

C1401

RADIOLOGY

SCHEDULING

CORRIDOR

C1402

PROJECT

SITE

NKEY PLAN

PHASED INFECTION CONTROL PLAN NOTES #

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GC100.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 3/GC100.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 4/GC100.

PROVIDE TEMPORARY KNOCK DDOWN DOOR.

PHASING PLAN GENERAL NOTES

A

B

REFERENCE SPEC 013533 INFECTION CONTROL REQUIREMENTS FOR

ADDITIONAL APPLICABLE INFORMATION.

PHASING PLANS ARE DIAGRAMMATIC OF THE GENERAL APPROACH.

REFERENCE DISCIPLINE SPECIFIC PLANS, DETAILS, NOTES, SPECS, ETC. FOR

ADDITIONAL INFORMATION.

MMLLJJ N O P QMLJ

1.1

2.3

3.5

/8

CONSTRUCTION ENTRANCE -

COORDINATE WITH VA ON

PREFERRED LOCATION

PARAMEDIC RM

1470L

EXAM RM-11

1470M

EXAM RM-12

1470N

EXAM RM-4

1470D

EXAM RM-5

1470E

EXAM RM-6

1470F

EXAM RM-7

1470G

SOILED UTILITY

NURSE STATION

CORRIDOR

1496A

M.H. EXAM (FLEX)

M.H. EXAM (FLEX)

M.H. EXAM (FLEX)

M.H. EXAM (FLEX)

CORRIDOR

1496C

CORRIDOR

1496B

NURSE STATION

EMERGENCY RM

MEDS

1470H

STAIR

NO 5A

PATIENT TLT

ELECTRICAL

14E6

COMM

14T3

CORRIDOR

C1404

CORRIDOR

C1404

WOMENS TOILET

TOILET

NOT IN SCOPE

N O

T I N

S C

O P

E

CORRIDOR

C1402

STORAGE

CORRIDOR

C1403

SUPV OFFICE

WAITING ROOM

COMP AND PENS

STAFF

M

IN

5'

C

LE

A R

AB

BEREAVEMENT RM

1475A

CORRIDOR

C1404

STAIR

NO 5A

EXAM RM-8

1470J

EAM RM-9

1470K

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \s w h it c o m b

.G U

ID

O

N D

E S

IG

N

\D o c u m e n ts \1

.5

.0

E

D P h a s e d R e n o v s w h it c o m b g u id o n d e s ig n .c o m

.r v t

/2

/2

:4

:3

P

M

GC101

FIRST FLOOR - PHASE 1 AND 2

GUIDON-CMTA SDVOSB JV, LLC

EMERGENCY DEPARTMENT

RENOVATION

JESSE BROWN VAMC, CHICAGO

537-15-160

1A

06/12/2020 JDF JDJ

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

100% CONSTRUCTION DOCUMENTS

SCALE: 1/8" = 1'-0"GC101

1 FIRST FLOOR PHASING PLAN - PHASE 1

N

N

SCALE: 1/8" = 1'-0"GC101

2 FIRST FLOOR PHASING PLAN - PHASE 2

UPUP

PROJECT

SITE

NKEY PLAN

PHASED INFECTION CONTROL PLAN NOTES #

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GC100.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 3/GC100.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 4/GC100.

PROVIDE TEMPORARY KNOCK DDOWN DOOR.

PHASING PLAN GENERAL NOTES

A

B

REFERENCE SPEC 013533 INFECTION CONTROL REQUIREMENTS FOR

ADDITIONAL APPLICABLE INFORMATION.

PHASING PLANS ARE DIAGRAMMATIC OF THE GENERAL APPROACH.

REFERENCE DISCIPLINE SPECIFIC PLANS, DETAILS, NOTES, SPECS, ETC. FOR

ADDITIONAL INFORMATION.

MMLLJJ N O P QMLJ

1.1

2.3

3.5

/8

CONSTRUCTION ENTRANCE -

COORDINATE WITH VA ON

PREFERRED LOCATION

EXAM RM-12

1470N

EXAM RM-11

1470M

PARAMEDIC RM

1470L

NURSE STATION

EMERGENCY RM

EXAM RM-4

1470D

EXAM RM-5

1470E

EXAM RM-6

1470F

ELECTRICAL

14E6

COMM

14T3

MEDS

EXAM RM-9

PATIENT TLT

CORRIDOR

1496B

NURSE STATION

CORRIDOR

1496A

M.H. EXAM (FLEX)

M.H. EXAM (FLEX)

M.H. EXAM (FLEX)

M.H. EXAM (FLEX)

CORRIDOR

1496C

SUPPLY STORAGE

1492SOILED

TLT

CORRIDOR

1404A

CORRIDOR

C1404

STAIR

NO 5A

AD101

PHASE 3 B

PHASE 3 A

SUPV OFFICE

CORRIDOR

C1403

WAITING ROOM

STORAGE

CORRIDOR

C1402

COMP AND PENS

STAFF

M

IN

5'

C

LE

A R

AE201

NOT IN SCOPE

N O

T I N

S C

O P

E

AB

SOILED UTILITY

EXAM RM-7

1470G

CONFERENCE RM

CORRIDOR

C1404

WOMENS TOILET

ON CALL

TOILET

MMLLJJHHHG N O P QMLJI

1.1

2.3

3.5

/8

/8

CONSTRUCTION ENTRANCE

C O

N S

T R

U C

T

IO

N E

N T

R A

N C

E

C O

O R

D

IN

A T

E W

IT

H

V A

O N

P

R E

F E

R R

E D

L O

C A

T

IO

N

PARAMEDIC RM

1470L

EXAM RM-11

1470M

EXAM RM-12

1470N

EXAM RM-13

1470P

EXAM RM-14

1470Q

EXAM RM-15

1470RCLEAN LINEN

CORRIDOR

C1407

TOILET

VA POLICE

NURSE STATION

EMERGENCY RM

CFD SUPPLY

ELECTRICAL

14E6

COMM

14T3

STAIR

NO 5A

MEDS

EXAM RM-9

EXAM RM-8

PATIENT TLT

CORRIDOR

1496B

NURSE STATION

CORRIDOR

1496A

M.H. EXAM (FLEX)

M.H. EXAM (FLEX)

M.H. EXAM (FLEX)

M.H. EXAM (FLEX)

EXAM RM-7

HAC

M.H. SECLUSION

CORRIDOR

1496C

M.H. EXAM (FLEX)

EQUIPMENT

STORAGE

SOILED UTILITY

TLT

OB EXAM

CORRIDOR

C1404A

CORRIDOR

C1404

NOT IN SCOPENOT IN SCOPE

NOT IN SCOPE

N O

T I N

S C

O P

E

SUPV OFFICE

WAITING ROOM

STORAGE

COMP AND PENS

STAFF

CORRIDOR

C1402

CORRIDOR

C1403

M

IN

5'

C

LE

A R

EXAM RM-1

1470A

AB

LOUNGE

EQUIP STORAGE

ED MGR

EXAM RM-6

1499D

EXAM RM-5

1499E

EXAM RM-4

1499F

EXAM RM-3

1499G

CORRIDOR

C1404

NURSE STATION

EMERGENCY RM

1470T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \s w h it c o m b

.G U

ID

O

N D

E S

IG

N

\D o c u m e n ts \1

.5

.0

E

D P h a s e d R e n o v s w h it c o m b g u id o n d e s ig n .c o m

.r v t

/2

/2

:4

:5

P

M

GC102

FIRST FLOOR - PHASE 3 AND 4

GUIDON-CMTA SDVOSB JV, LLC

EMERGENCY DEPARTMENT

RENOVATION

JESSE BROWN VAMC, CHICAGO

537-15-160

1A

06/12/2020 JDF JDJ

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

100% CONSTRUCTION DOCUMENTS

SCALE: 1/8" = 1'-0"GC102

1 FIRST FLOOR PHASING PLAN - PHASE 3

SCALE: 1/8" = 1'-0"GC102

2 FIRST FLOOR PHASING PLAN - PHASE 4

NN

PROJECT

SITE

NKEY PLAN

PHASED INFECTION CONTROL PLAN NOTES #

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GC100.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 3/GC100.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 4/GC100.

PROVIDE TEMPORARY KNOCK DDOWN DOOR.

PHASING PLAN GENERAL NOTES

A

B

REFERENCE SPEC 013533 INFECTION CONTROL REQUIREMENTS FOR

ADDITIONAL APPLICABLE INFORMATION.

PHASING PLANS ARE DIAGRAMMATIC OF THE GENERAL APPROACH.

REFERENCE DISCIPLINE SPECIFIC PLANS, DETAILS, NOTES, SPECS, ETC. FOR

ADDITIONAL INFORMATION.

MMLLJJHHHG N O P QMLJI

1.1

2.3

3.5

/8

4' - 3 5/8" 8' - 5 3/4" 12' - 11 3/8" 12' - 11 1/8" 12' - 7 1/2" 13' - 4 1/4"

/8

/8

CONSTRUCTION ENTRANCE -

COORDINATE WITH VA FOR COR

APPROVED LOCATION

C

LE

A R

5'

M

IN

NURSE STATION

EMERGENCY RM

1470T

EXAM RM-6

1470F

EXAM RM-5

1470E

EXAM RM-4

1470D

EXAM RM-3

1470C

EXAM RM-2

1470B

EXAM RM-1

1470A

CORRIDOR

C1407

CLEAN LINEN

TOILET

VA POLICE

COMM

14T3

ELECTRICAL

14E6

ON-CALL 1

ON-CALL

BATHROOM

ED MGR. (FUTURE

BEREAVEMENT)

SOILED

TLT

EQUIPMENT

STORAGE

M.H. EXAM (FLEX)

CORRIDOR

1496C

M.H. SECLUSION

HAC

EXAM RM-7

OB EXAM

CORRIDOR

1496B

PATIENT TLT

EXAM RM-8

MEDS

EXAM RM-9

NURSE STATION

M.H. EXAM (FLEX)

M.H. EXAM (FLEX)

CORRIDOR

1496A

M.H. EXAM (FLEX)

M.H. EXAM (FLEX)

CORRIDOR

C1404

CORRIDOR

1404A

STAIR

NO 5A

NOT IN SCOPENOT IN SCOPE

NOT IN SCOPE

N O

T I N

S C

O P

E

CORRIDOR

C1402

CORRIDOR

C1403

WAITING ROOM

SUPV OFFICE

COMP AND PENS

STAFF

STORAGE

EXAM RM-15

1499B

N

AB

STORAGE ROOM

EXAM RM-13

1470P

EXAM RM-12

1470N

EXAM RM-11

1470M

PARAMEDIC RM

1470L

EXAM RM-14

1470Q

NURSE STATION

EMERGENCY RM

1470T

LLJJHHHGF LJI

1.1

2.3

3.5

/8

/8

NURSE STATION

EMERGENCY RM

1470T

EXAM RM-6

1470F

EXAM RM-5

1470EEXAM RM-4

1470D

EXAM RM-3

1470C

EXAM RM-2

1470B

EXAM RM-1

1470A

CORRIDOR

C1407

CLEAN LINEN

TOILET

VA POLICE

COMM

14T3

ELECTRICAL

14E6

ON-CALL 1

ON-CALL 2

ON-CALL

BATHROOM

ED MGR. (FUTURE

BEREAVEMENT)

TLT

1456A

LOUNGE

SOILED

TLT

MEDS

CORRIDOR

C1404

CORRIDOR

1404A

NOT IN SCOPE

NOT IN SCOPE

EXAM RM-15

1499B

N

AB

NURSE STATION

EMERGENCY RM

1470T

CORRIDOR

C1407

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \s w h it c o m b

.G U

ID

O

N D

E S

IG

N

\D o c u m e n ts \1

.5

.0

E

D P h a s e d R e n o v s w h it c o m b g u id o n d e s ig n .c o m

.r v t

/2

/2

:4

:0

P

M

GC103

FIRST FLOOR - PHASE 5 AND 6

GUIDON-CMTA SDVOSB JV, LLC

EMERGENCY DEPARTMENT

RENOVATION

JESSE BROWN VAMC, CHICAGO

537-15-160

1A

06/12/2020 JDF JDJ

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

100% CONSTRUCTION DOCUMENTS

SCALE: 1/8" = 1'-0"GC103

1 FIRST FLOOR PHASING PLAN - PHASE 5SCALE: 1/8" = 1'-0"GC103

2 FIRST FLOOR PHASING PLAN - PHASE 5

File details come from the government source that posted it. Updated .