This document package includes construction drawings and specifications for the Emergency Department Observation Unit Renovation project at the Jesse Brown VA Medical Center in Chicago, Illinois. The project scope involves demolishing an unused office area and expanding and upgrading the emergency department to include additional observational exam and treatment rooms. Improvements to the existing emergency department are also specified. The construction drawings provide architectural, mechanical, electrical, plumbing and fire protection plans and details for the renovation work.
The related federal contract opportunity seeks bids for providing all labor, materials, tools and supervision to complete the construction and renovation work detailed in the project specifications and drawings. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Great Lakes Acquisition Center for Project No. 537-15-160. Bids are due by the date specified in the solicitation for awarding a contract to renovate the emergency department observation unit at the Jesse Brown VA Medical Center located at 820 S. Damen Ave. in Chicago, Illinois 60612.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
SHEET LIST
SHEET
NUMBER SHEET NAME
GI000 COVER SHEET
GI101 LIFE SAFETY PLAN
GC100 INFECTION CONTROL/PHASING PLAN
GC101 FIRST FLOOR - PHASE 1 AND 2
GC102 FIRST FLOOR - PHASE 3 AND 4
GC103 FIRST FLOOR - PHASE 5 AND 6
AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AE002 WALL TYPES
AE003 PROJECT ALTERNATES
AD100 FIRST FLOOR EXISTING PLAN
AD101 DEMOLITION PLANS
AE101 FIRST FLOOR OVERALL ARCHITECTURAL PLAN
AE102 FIRST FLOOR ARCHITECTURAL PLAN - A
AE103 FIRST FLOOR ARCHITECTURAL PLAN - B
AE201 SECOND FLOOR PLAN AND BUILDING SECTION
AE202 ROOF PLAN
AC111 FIRST FLOOR OVERALL REFLECTED CEILING PLAN
AC112 FIRST FLOOR REFLECTED CEILING PLAN - A
AC113 FIRST FLOOR REFLECTED CEILING PLAN - B
AC201 SECOND FLOOR REFLECTED CEILING PLAN
AE501 BUILDING DETAILS
AE502 BUILDING DETAILS
AE601 DOOR SCHEDULE AND DETAILS
AI101 FIRST FLOOR FINISH PLAN
AI201 INTERIOR ELEVATIONS
AI202 INTERIOR ELEVATIONS
AI401 ENLARGED FINISH PLANS AND ELEVATIONS
AI402 ENLARGED RESTROOM FINISH PLANS AND ELEVATIONS
AI501 INTERIOR SECTIONS AND DETAILS
AI601 FINISHES SCHEDULE
QH101 FIRST FLOOR OVERALL EQUIPMENT FLOOR PLAN
QH102 FIRST FLOOR EQUIPMENT PLAN - A
QH103 FIRST FLOOR EQUIPMENT PLAN - B
QH201 TYPICAL EQUIPMENT PLANS AND ELEVATIONS
MH001 MECHANICAL LEGEND, GENERAL NOTES AND SCHEDULES
MH002 MECHANICAL DETAILS
MH003 MECHANICAL DETAILS
MH004 MECHANICAL DETAILS
MH005 MECHANICAL DETAILS
MD101 FIRST FLOOR AIR DISTRIBUTION PLAN - OVERALL DEMOLITION
MD201 FIRST FLOOR HYDRONICS PLAN - OVERALL DEMOLITION
MH101 FIRST FLOOR AIR DISTRIBUTION PLAN - OVERALL NEW WORK
MH102 SECOND FLOOR AIR DISTRIBUTION PLAN - OVERALL NEW WORK
MH103 ROOF AIR DISTRIBUTION PLAN - OVERALL NEW WORK
MH201 ENLARGED MECHANICAL ROOM PLANS
MP101 FIRST FLOOR HYDRONICS PLAN - OVERALL NEW WORK
FP100 FIRST FLOOR FIRE PROTECTION PLAN
PL001 PLUMBING LEGEND,SCHEDULES AND GENERAL NOTES
PL002 PLUMBING DETAILS
PD101 UNDERSLAB PLUMBING PLAN - OVERALL DEMOLITION
PD201 FIRST FLOOR PLUMBING PLAN - OVERALL DEMOLITION
PD301 FIRST FLOOR MEDICAL GAS PLAN - OVERALL DEMOLITION
PL101 UNDERSLAB PLUMBING PLAN - OVERALL NEW WORK
PL201 FIRST FLOOR PLUMBING PLAN - OVERALL NEW WORK
PG101 FIRST FLOOR MEDICAL GAS PLAN - OVERALL NEW WORK
PL301 DOMESTIC WATER RISER
PG201 MEDICAL GAS RISER
PW101 PLUMBING WASTE AND VENT RISER
EJ001 ELECTRICAL LEGEND
EJ100 LIGHT FIXTURES SCHEDULE AND DETAILS
EJ101 ELECTRICAL DETAILS
EJ200 POWER RISER DIAGRAM
EJ201 PANEL SCHEDULES
ED101 PARTIAL FIRST FLOOR PLAN - LIGHTING DEMOLITION
ED201 PARTIAL FIRST FLOOR PLAN - POWER DEMOLITION
ED301 PARTIAL FIRST FLOOR PLAN - SYSTEMS DEMOLITION
EL101 PARTIAL FIRST FLOOR PLAN - LIGHTING
EL101A PARTIAL FIRST FLOOR PLAN - LIGHTING ALTERNATE
EL200 PARTIAL FIRST FLOOR PLAN - PHOTOMETRIC
EP101 PARTIAL FIRST FLOOR PLAN - POWER
EP301 PARTIAL ROOF FLOOR PLAN - POWER
ET101 PARTIAL FIRST FLOOR PLAN - SYSTEMS
FA100 FIRE ALARM RISER DIAGRAM AND DETAILS
FA101 PARTIAL FIRST FLOOR PLAN - FIRE ALARM
CMTA CONSULTING ENGINEERS
MECHANICAL,
PLUMBING, &
FIRE PROTECTION
JESSE BROWN VA MEDICAL CENTER
Jesse Brown VA Medical Center 820 S. Damen Ave.
Chicago, IL 60612 Building 11B
OWNER
GUIDON DESIGN INC.
ARCHITECT
CMTA CONSULTING ENGINEERS
ELECTRICAL
AREA MAP
VICINITY MAP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \s w h it c o m b
.G U
ID
O
N D
E S
IG
N
\D o c u m e n ts \1
.5
.0
E
D P h a s e d R e n o v s w h it c o m b g u id o n d e s ig n .c o m
.r v t
/2
/2
:4
:0
P
M
GI000
COVER SHEET
GUIDON-CMTA SDVOSB JV, LLC
EMERGENCY DEPARTMENT
RENOVATION
JESSE BROWN VAMC, CHICAGO
537-15-160
1A
06/12/2020 JDF LNS
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GREAT LAKES ACQUISITION CENTER
JESSE BROWN VAMC, CHICAGO
100% CONSTRUCTION DOCUMENTS
EMERGENCY DEPARTMENT RENOVATION
537-15-160
100% CONSTRUCTION DOCUMENTS
CAMPUS MAP
N
N
N
Revisions: Date:
100% RE-SUBMIT 2020/06/29
FD
CODE ANALYSIS LEGEND
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND
REGULATIONS.
ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)
PCI MNL 120-17, 8th EDITION DESIGN HANDBOOK WITH ERRATA
NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018 EDITION
NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION
NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2019
EDITION
NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE
PROTECTION, 2019 EDITION
NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND
THEIR APPURTENANCE, 2019 EDITION.
NFPA 70, NATIONAL ELECTRIC CODE, 2020 EDITION
NFPA 72, NATIONAL FIRE ALARM CODE, 2019 EDITION
NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA
PROCESSING EQUIPMENT, 2020 EDITION
NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2019 EDITION
NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2019 EDITION
NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2018 EDITION
NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2018 EDITION
NFPA 101, LIFE SAFETY CODE, 2018 EDITION
NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS
MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA
5000 AND NFPA 900
ANSI A117.1-2017 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES
ABAAS ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS FOR ACCESSIBLE
DESIGN
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
VA MENTAL HEALTH FACILITIES DESIGN GUIDE, CURRENT VERSION
VA BARRIER FREE DESIGN GUIDE PG-18-13, CURRENT VERSION
ARCHITECTURAL, CURRENT VERSION
ELECTRICAL, CURRENT VERSION
ENERGY SUSTAINABILITY, CURRENT VERSION
EQUIPMENT, CURRENT VERSION
FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015
INTERIOR DESIGN, CURRENT VERSION
PLUMBING, CURRENT VERSION
VA DESIGN MANUALS PG-18-10:
GOVERNING CODES:
CODE CRITERIA
GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
CODE REVIEW
THE 2018 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS.
FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2018 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN
USED.
PROJECT SCOPE
THE PROJECT SCOPE INCLUDES DEMOLITION AND REMODELING OF AN EXISTING UNUSED OFFICE AREA OF THE FACILITY RESULTING IN EXPANSION TO THE EMERGENCY DEPARTMENT FOR OBSERVATIONAL EXAM AND TREATMENT ROOMS OF FULLY FUNCTIONAL AND UPGRADED SPACE. IMPROVEMENTS TO THE EXISTING EMERGENCY
DEPARTMENT ARE ALSO INCLUDED.
CODE ANALYSIS
THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2018 IBC. CONSTRUCTION TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE 1A CONSTRUCTION AND LSC (NFPA 101-2018) CONSTRUCTION AS FOLLOWS:
1. OCCUPANCY TYPE: I-2 INSTITUTIONAL, IBC CHAPTER 3/LSC CHAPTER 18 HEALTHCARE
2. CONSTRUCTION TYPE: 1A (IBC CHAPTER 5)
3. FIRE RESISTIVE RATINGS TYPE 1A CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:
STRUCTURAL FRAME: NONCOMBUSTIBLE, 3-HOUR FIRE RESISTIVE
BEARING WALLS
EXTERIOR: NONCOMBUSTIBLE, 3 - HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 3 - HOUR FIRE RESISTIVE
NON-BEARING WALLS AND PARTITIONS
EXTERIOR: NONCOMBUSTIBLE, 0 - HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 0 - HOUR FIRE-RESISTIVE
FLOOR: NONCOMBUSTIBLE, 2 - HOUR FIRE RESISTIVE
ROOF: NONCOMBUSTIBLE, 1 1/2-HOUR FIRE RESISTIVE
SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 12.3.6)
SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 12.3.6)
4. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.
5. ALLOWABLE HEIGHT: EXISTING (IBC, TABLE 504.3)
6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: EXISTING
7. ALLOWABLE AREA: EXISTING FLOOR PLATE TO REMAIN
8. BUILDING SEPARATION: BASED ON A FIRE SEPARATION A 1 -HOUR FIRE RESISTANCE WALL RATING IS REQUIRED. (IBC, TABLE 602)
9. OCCUPANCY SEPARATION: A TWO HOUR OCCUPANCY SEPARATION IS REQUIRED BETWEEN THE CLINIC SUITE B OCCUPANCY (LCS CHAPTER 18) AND HEALTHCARE I-2
OCCUPANCY (LSC 18.1.3.4)
SECTIONS OF HEALTH CARE FACILITIES SHALL BE PERMITTED TO BE CLASSIFIED AS OTHER OCCUPANCIES, PROVIDED THAT THEY MEET BOTH OF THE FOLLOWING
CONDITIONS: (LSC 18.1.3.3)
(1) THEY ARE NOT INTENDED TO PROVIDE SERVICES SIMULTANEOUSLY FOR FOUR OR MORE INPATIENTS FOR PURPOSES OF HOUSING, TREATMENT, OR
CUSTOMARY ACCESS BY INPATIENTS INCAPABLE OF SELF-PRESERVATION.
CODE ANALYSIS - NFPA 101, INSTITUTIONAL HEALTHCARE CHAPTER 18
CODE CRITERIA (CONTINUED)
(2) THEY ARE SEPARATED FROM AREAS OF HEALTH CARE OCCUPANCIES BY CONSTRUCTION HAVING A MINIMUM 2-HOUR FIRE RESISTANCE RATING IN ACCORDANCE
WITH CHAPTER 8.18.1.3.4 CONTIGUOUS NON-HEALTH CARE OCCUPANCIES.
10. MEANS OF EGRESS
• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 8 FEET.
• AISLES, CORRIDORS, AND RAMPS IN ADJUNCT AREAS NOT INTENDED FOR THE HOUSING, TREATMENT, OR USE OF INPATIENTS SHALL BE NOT LESS THAN 44 IN. (1120
MM) IN CLEAR AND UNOBSTRUCTED WIDTH.
• CLEAR WIDTH OF DOORS SHALL BE CLEAR 42 INCHES FROM SLEEPING ROOMS; DIAGNOSTIC AND TREATMENT AREAS, SUCH AS X-RAY, SURGERY, OR PHYSICAL
THERAPY.
• CLEAR WIDTH OF DOORS SHALL BE CLEAR 32 INCHES
• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.
• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED (LSC 7.4.1)
• MAXIMUM TRAVEL DISTANCE, FULLY SPRINKLED: 200 FEET (LSC 18.2.6.2.1)
• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 18.2.5.3)
• DEAD END CORRIDORS SHALL NOT EXCEED 30 FEET. (LSC 18.2.5.2)
• MEANS OF EGRESS SHALL BE ILLUMINATED PER 7.9. (LSC 18.2.6.2.1)
• EMERGENCY LIGHTING SHALL BE PER 7.9. (LSC 18.2.9)
• EXIT SIGNAGE SHALL BE PROVIDED 7.10. (LSC 18.2.10)
11. WHERE GENERAL ANESTHESIA OR LIFE SUPPORT EQUIPMENT IS USED AND ESSENTIAL ELECTRICAL SYSTEM PER NFPA 99 SHALL BE PROVIDED.
12. HAZARDOUS AREAS. ANY HAZARDOUS AREAS SHALL BE PROTECTED IN ACCORDANCE WITH SECTION 8.7, AND THE AREAS DESCRIBED IN TABLE 18.3.2.1 SHALL BE
PROTECTED AS INDICATED. (LSC 18.3.2.2)
TABLE 18.3.2.1 HAZARDOUS AREA PROTECTION
HAZARDOUS AREA DESCRIPTION: PROTECTION / SEPARATION (MINIMUM FIRE RESISTANCE RATING)
• ROOMS WITH SOILED LINEN IN VOLUME EXCEEDING 64 GAL (242 L): 1 HOUR
• STORAGE ROOMS LARGER THAN 50 FT2(4.6 M2) BUT NOT EXCEEDING 100 FT2 (9.3 M2) AND STORING COMBUSTIBLE MATERIAL: SEE 18.3.6.3.11.
• STORAGE ROOMS LARGER THAN 100 FT2 (9.3 M2) AND STORING COMBUSTIBLE MATERIAL: 1 HOUR
• ROOMS WITH COLLECTED TRASH IN VOLUME EXCEEDING 64 GAL (242 L): 1 HOUR
13. INTERIOR FINISH
• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 10.2 OF THE NFPA 101 TO CLASS A MATERIALS. (LSC 18.4.3.6.2)
CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.
• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I.
• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS SERVING
AS FURNISHINGS OR DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE REQUIREMENTS OF NFPA 701, STANDARD METHODS OF
FIRE TESTS FOR FLAME-RESISTANT TEXTILES AND FILMS.
• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA 260, NFPA 261, NFPA 266, 16 CFR 1632, ASTME E1537, AND ASTME E1590
14. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA 10.
15. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.
• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA 72. (LSC 9.6.1)
• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 18.3.4.2.1)(LSC 9.6.2)
• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS PER 9.6.3. (LSC 18.3.4.3)
• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.
• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION SYSTEM PER 9.6.4. (LSC 18.3.4.3.2)
16. FIRE SUPPRESSION:
SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE WITH NFPA 13.
THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2019 EDITION OF NFPA 13 AND THE CURRENT EDITION OF THE DEPARTMENT OF
VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:
STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:
ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 250 GPM
ALL OTHER AREAS SHALL BE PROTECTED AS:
LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 100 GPM
ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE FM APPROVED QUICK RESPONSE SPRINKLERS.
17. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS SHALL BE CONSTRUCTED AND MAINTAINED PER NFPA 241.
MMLL
JJHHHGF
N O P QM
LJI
1.1
2.3
3.5
TRAVEL DISTANCE= 86'-0"
TRAVEL DISTANCE= 200'
4770 SF
15032
I
DIAGONAL DISTANCE= 163'-0"
TRAVEL DISTANCE= 188'-0"
EXIT SEPARATION= 130'-0"
D E
A D
E N
D C
O R
R
ID
O R
L E
N G
T H
/8
1678 SF
10017
B
3523 SF
15023
I
223 SF
A
NOT IN SCOPENOT IN SCOPE
NOT IN SCOPE
N O
T I N
S C
O P
E
NOT IN SCOPE
FEC
FEC
FEC
491 SF
I
701 SF
I
E X
IT
E X
IT
RESIDENT AND
STAFF LOUNGE
1499C
NURSE STATION -
M.H. (FLEX)
M.H. EXAM (FLEX)
RM-20
M.H. EXAM (FLEX)
RM-21
M.H. EXAM (FLEX)
RM-19
M.H. EXAM (FLEX)
RM-18
OB EXAM AND AII
RM-16
AII ANTEROOM
M.H. EXAM AND AII
(FLEX) RM-17
SUPPLY STORAGE
1452EQUIPMENT
STORAGE
SOILED UTILITY
TOILET
LOUNGE
TOILET
1462A
EQUIPMENT
ED MGR. (FUTURE
BEREAVEMENT)
ON-CALL 1
ON-CALL
BATHROOM
1466C
ON-CALL 2
1466B
EXAM RM-1
1470A
EXAM RM-2
1470B
EXAM RM-3
1470C
EXAM RM-4
1470D
EXAM RM-5
1470E
EXAM RM-6
1470F
EXAM RM-15
1470R
EXAM RM-13
1470P
EXAM RM-14
1470Q EXAM RM-12
1470N
EXAM RM-11
1470M
EXAM RM-10
1470L
EXAM RM-9
1470J
MEDS
EXAM RM-8
1470H
EXAM RM-7
1470G
HAC
CORRIDOR
1474B
CORRIDOR
1474A
CORRIDOR
1474C
NURSE STATION - 1
EMERGENCY ROOM
PATIENT TLT
CORRIDOR
1404A
ELECTRICAL
14E6
COMM
14T3
CORRIDOR
C1407
CLEAN LINEN
CFD SUPPLY
TOILET
VA POLICE
CORRIDOR
C1404
STAIR
NO 5A
MECH ROOM
1499B
CORRIDOR
C1403
CORRIDOR
C1402
CORRIDOR
C1401
STORAGE
COMP AND PENS
STAFF
SECRET OFFICE
DOCTOR OFFICE
DOCTOR OFFICE
TOILET
1499A
WAITING ROOM
SUPV OFFICE
NURSE STATION
PROJECT
SITE
NKEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \s w h it c o m b
.G U
ID
O
N D
E S
IG
N
\D o c u m e n ts \1
.5
.0
E
D P h a s e d R e n o v s w h it c o m b g u id o n d e s ig n .c o m
.r v t
/2
/2
:4
:1
P
M
GI101
LIFE SAFETY PLAN
GUIDON-CMTA SDVOSB JV, LLC
EMERGENCY DEPARTMENT
RENOVATION
JESSE BROWN VAMC, CHICAGO
537-15-160
1A
06/12/2020 JDF STW
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"GI101
1 FIRST FLOOR LIFE SAFETY PLAN
N
LIFE SAFETY OCCUPANCY COUNT
AREA SF OCC OCC FACTOR # OF OCC
Level 1
BREAK ROOM/LOUNGE 223 SF A 15 15
EAST SUPPORT 491 SF I 150 4
EAST SUPPORT 701 SF I 150 5
OFFICE (COMP AND PEN) 1678 SF B 100 17
NEW ED (OU) 3523 SF I 150 23
EXISTING ED 4770 SF I 150 32
11385 SF 96
UP
INFECTION CONTROL PLAN NOTES #
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C + D
PATIENT RISK GROUP: HIGH OR HIGHEST, PER SPEC.
CLASS OF PRECAUTION MATRIX: IV
PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GC100.
PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD
READER ACCESS. REFER TO ELEVATION 3/GC100.
PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 4/GC100. SYSTEM SHALL BE 1 HR RATED.
REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING
INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED
CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR
PLATE OF THE PROJECT BOUNDARY.
ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN
A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND
BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY
WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.
MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH
4 MIL. POLY SHEET.
ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
INFECTION CONTROL GENERAL NOTES
PHASING GENERAL NOTES
A
B
PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
TEMPORARY IC BARRIER WALL
CONSTRUCTION (DUST WALL)
3 5/8" STEEL STUDS @ 16"
O.C.
COMPRESSIBLE FOAM OR RUBBER SILL
6-MIL FIRE RETARDANT POLY
INTERIOR SIDE
CEILING
2" DEEP LEG 3 5/8" STEEL SLIP TRACK
3 5/8" STEEL STUD TRACK
/4
M
IN
CONTINUOUSLY ADHERE 6-MIL. FIRE
RETARDANT POLY TO DECK WITH TAPE
CONTINUOUSLY ADHERE FIRE RETARDANT
POLY TO FLOOR WITH TAPE
EXISTING DECK
CONSTRUCTION
SIDE
OCCUPIED
SIDE
1/2" VINYL FACED BATT INSULATION
CONTINUOUS POLYETHYLENE HINGE.
ADJUSTABLE HYDRAULIC CLOSER
AVAILABLE.
SELF LATCHING, LOCKING HANDLE WITH
KEYED OUTSIDE AND THUMBTURN INSIDE.
4 DIGIT COMBINATION PUSHBUTTON LOCK
AVAILABLE.
1/4" x 2" SOLID ALUMINUM THRESHOLD
STRIP WITH NEOPRENE GASKET
MATERIAL SEAL TO THE FLOOR.
1" x 1" ANGLE MOUNTED TO GASKET AND
ADHERED TO FORM SEAL WITH FRAME.
GASKETED SWEEP TO PREVENT DUST AND
DEBRIS ESCAPE.
ADJUSTABLE UPPER PANEL. SLIDES TO
CEILING HEIGHT UP TO 10'-0".
PUBLIC SIDE SYSTEM MUST BE 1 HR RATED, PER NFPA 241.
(ALTERNATIVELY PROVIDE FULL FIRE-WATCH)
MMLLJJHHHGF N O P QMLJI
1.1
2.3
3.5
MECH RM
DOCTOR OFFICE
DOCTOR OFFICE
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
ADMIN OFFICE
CONFERENCE RM
STORAGE
MENS TOILET
WOMENS TOILET
TOILET
ON CALL
TOILET
1491A
ON CALL
1491B
CORRIDOR
C1404
CORRIDOR
C1404
STAIR
NO 5A
SOILED UTILITY
BEREAVEMENT
1475A
ELECTRICAL
14E6
COMM
14T3
LOUNGE
EQUIP STORAGE
ED MGR
EXAM RM-7
1470G
EXAM RM-6
1470F
EXAM RM-5
1470E
EXAM RM-4
1470D
EXAM RM-3
1470C
EXAM RM-2
1470B
CFD SUPPLY
EXAM RM-1
1470A
TOILET
VA POLICE
EXAM RM-15
1470R
EXAM RM-14
1470Q
EXAM RM-13
1470P
EXAM RM-12
1470N
EXAM RM-11
1470M
PARAMEDIC RM
1470L
EXAM RM-9
1470K
EXAM RM-8
1470J
MEDS
1470H
NURSE STATION
EMERGENCY RM
CORRIDOR
C1407
CLEAN LINEN
PHASE 1
PHASE 2
PHASE 2
PHASE 3 B
PHASE 4
PHASE 4
PHASE 4
PHASE 5
PHASE 5PHASE 6
* REFER TO FOLLOWING SHEETS FOR PHASE
DRAWINGS WITH MORE CLARIFICATION ON
PHASING
NOT IN SCOPENOT IN SCOPE
NOT IN SCOPE
N O
T I N
S C
O P
E
NOT IN SCOPE
SUPV OFFICE
WAITING ROOM
CORRIDOR
C1403
COMP AND PENS
STAFF
SECRET OFFICE
DOCTOR OFFICE
1494 DOCTOR OFFICE
TOILET
1499A
MECHANICAL ROOM
PH
A
SE
PHASE 3 A
2 3
2 3
CORRIDOR
C1404
A
LL
P H
A
SE
S
AB
IC/PHASING LEGEND
TEMPORARY WALLS. SEE PLAN AND
PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS
DOORS
REFERENCE AREA FOR ABOVE
CEILING WORK ON FLOOR BELOW.
REFER TO ENGINEERING DRAWINGS
FOR FULL SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
CONSTRUCTION PHASE 1
CONSTRUCTION PHASE 2
RENOVATE AREA OUTSIDE OF
EMERGENCY ROOM AS SHOWN. DEMO ONE
ON-CALL ROOM.
RENOVATE AREA SHOWN;
CONSTRUCT NEW EXAM ROOM, MED. ROOM.
CONSTRUCT 1 EXAM ROOM AS TEMP SOILED
UTILITY. THIS EXAM ROOM RENOVATED IN PHASE
4 FOR FULL EXAM FUNCTION.
BED COUNT: EX + 0 (ACCESS)
BED COUNT: EX + 2
CONSTRUCTION PHASE 3
CONSTRUCTION PHASE 4
CONSTRUCTION PHASE 6
RENOVATE AREA AS SHOWN FOR NEW CORRIDOR,
EQUIPMENT ROOM, AND REMAINDER OF EXAM
ROOMS CONNECTED TO PHASE 1.
RESTORE TEMP SOILED UTILITY TO EXAM ROOM
(AS STATED IN PHASE 2). DEMO OFFICE AND
EQUIPMENT STORAGE TO ON-CALL.
NEW I.C.U. DOORS AND FINISHES, AND PARTIAL
NEW FLOOR FINISH AND CEILING
NEW I.C.U. DOORS AND FINISHES, AND PARTIAL
NEW FLOOR FINISH AND CEILING.
COMPLETE FLOOR AND CEILING FINISH.
RENOVATE REMAINDER OF NURSE STATION AND
FINISH FLOORING AND CEILING.
BED COUNT: EX + 3
BED COUNT: EX + 1
BED COUNT: EX + 7
RENOVATE REMAINDER OF SPACE ALONG THE
PERIMETER CORRIDOR.
CONSTRUCTION PHASE 5
REFURBISH/RENOVATE PARTIAL NURSE STATION,
FLOOR AND CEILING.
BED COUNT: EX + 1
COMPLETE TEMPORARY/SWING ROOMS INTO
EXAM ROOMS
ADJUSTABLE HYDRAULIC CLOSER
AVAILABLE.
1/4" x 2" SOLID ALUMINUM THRESHOLD
STRIP WITH NEOPRENE GASKET
MATERIAL SEAL TO THE FLOOR.
1" x 1" ANGLE MOUNTED TO GASKET AND
ADHERED TO FORM SEAL WITH FRAME.
GASKETED SWEEP TO PREVENT DUST AND
DEBRIS ESCAPE.
ADJUSTABLE UPPER PANEL(S). SLIDES
TO CEILING HEIGHT UP TO 10'-0".
TEMPORARY IC BARRIER WALL CONSTRUCTION
SYSTEM MUST BE 1 HR RATED, PER NFPA 241.
(ALTERNATIVELY PROVIDE FULL FIRE-WATCH)
PROJECT
SITE
NKEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \s w h it c o m b
.G U
ID
O
N D
E S
IG
N
\D o c u m e n ts \1
.5
.0
E
D P h a s e d R e n o v s w h it c o m b g u id o n d e s ig n .c o m
.r v t
/2
/2
:4
:3
P
M
GC100
INFECTION CONTROL/PHASING
PLANGUIDON-CMTA SDVOSB JV, LLC
EMERGENCY DEPARTMENT
RENOVATION
JESSE BROWN VAMC, CHICAGO
537-15-160
1A
06/12/2020 JDF STW
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
SCALE: 1 1/2" = 1'-0"GC100
2 TEMPORARY DUST CONTROL BARRIER
SCALE: 1/2" = 1'-0"GC100
3 TEMPORARY INFECTION CONTROL BARRIER DOOR
SCALE: 1/8" = 1'-0"GC100
1 FIRST FLOOR INFECTION CONTROL AND PHASING PLAN
N
SCALE: 1/2" = 1'-0"GC100
4 TEMPORARY INFECTION CONTROL BARRIER
MMLL N O P QML
1.1
2.3
3.5
EXAM RM-11
1470M
EXAM RM-10
1470L
EXAM RM-5
1470E
EXAM RM-6
1470F
ELECTRICAL
14E6
COMM
14T3
BEREAVEMENT
1475A
SOILED UTILITY
EXAM RM-7
1470G
MEDS
1470H
EXAM RM-8
1470J
EXAM RM-9
1470K
STAIR
NO 5A
TOILET
WOMENS TOILET
AD101
NOT IN SCOPE
N O
T I N
S C
O P
E
NOT IN SCOPE
AE502
CLEAR
6'-0" MIN.
AB
CORRIDOR
C1403
STORAGE
COMP AND PENS
STAFF
SECRET OFFICE
DOCTOR OFFICE
1504 DOCTOR OFFICE
WAITING ROOM
SUPV OFFICE
NURSE STATION
AD101
EXAM RM
EXAM RM
EXAM RM
ADMIN OFFICE
CONFERENCE RM
DOCTOR OFFICE
MECH RM
EXAM RM
EXAM RM
DOCTOR OFFICE
MEN'S TOILET
STORAGE
HAC
CORRIDOR
C1401
RADIOLOGY
SCHEDULING
CORRIDOR
C1402
PROJECT
SITE
NKEY PLAN
PHASED INFECTION CONTROL PLAN NOTES #
PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GC100.
PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD
READER ACCESS. REFER TO ELEVATION 3/GC100.
PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 4/GC100.
PROVIDE TEMPORARY KNOCK DDOWN DOOR.
PHASING PLAN GENERAL NOTES
A
B
REFERENCE SPEC 013533 INFECTION CONTROL REQUIREMENTS FOR
ADDITIONAL APPLICABLE INFORMATION.
PHASING PLANS ARE DIAGRAMMATIC OF THE GENERAL APPROACH.
REFERENCE DISCIPLINE SPECIFIC PLANS, DETAILS, NOTES, SPECS, ETC. FOR
ADDITIONAL INFORMATION.
MMLLJJ N O P QMLJ
1.1
2.3
3.5
/8
CONSTRUCTION ENTRANCE -
COORDINATE WITH VA ON
PREFERRED LOCATION
PARAMEDIC RM
1470L
EXAM RM-11
1470M
EXAM RM-12
1470N
EXAM RM-4
1470D
EXAM RM-5
1470E
EXAM RM-6
1470F
EXAM RM-7
1470G
SOILED UTILITY
NURSE STATION
CORRIDOR
1496A
M.H. EXAM (FLEX)
M.H. EXAM (FLEX)
M.H. EXAM (FLEX)
M.H. EXAM (FLEX)
CORRIDOR
1496C
CORRIDOR
1496B
NURSE STATION
EMERGENCY RM
MEDS
1470H
STAIR
NO 5A
PATIENT TLT
ELECTRICAL
14E6
COMM
14T3
CORRIDOR
C1404
CORRIDOR
C1404
WOMENS TOILET
TOILET
NOT IN SCOPE
N O
T I N
S C
O P
E
CORRIDOR
C1402
STORAGE
CORRIDOR
C1403
SUPV OFFICE
WAITING ROOM
COMP AND PENS
STAFF
M
IN
5'
C
LE
A R
AB
BEREAVEMENT RM
1475A
CORRIDOR
C1404
STAIR
NO 5A
EXAM RM-8
1470J
EAM RM-9
1470K
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \s w h it c o m b
.G U
ID
O
N D
E S
IG
N
\D o c u m e n ts \1
.5
.0
E
D P h a s e d R e n o v s w h it c o m b g u id o n d e s ig n .c o m
.r v t
/2
/2
:4
:3
P
M
GC101
FIRST FLOOR - PHASE 1 AND 2
GUIDON-CMTA SDVOSB JV, LLC
EMERGENCY DEPARTMENT
RENOVATION
JESSE BROWN VAMC, CHICAGO
537-15-160
1A
06/12/2020 JDF JDJ
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"GC101
1 FIRST FLOOR PHASING PLAN - PHASE 1
N
N
SCALE: 1/8" = 1'-0"GC101
2 FIRST FLOOR PHASING PLAN - PHASE 2
UPUP
PROJECT
SITE
NKEY PLAN
PHASED INFECTION CONTROL PLAN NOTES #
PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GC100.
PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD
READER ACCESS. REFER TO ELEVATION 3/GC100.
PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 4/GC100.
PROVIDE TEMPORARY KNOCK DDOWN DOOR.
PHASING PLAN GENERAL NOTES
A
B
REFERENCE SPEC 013533 INFECTION CONTROL REQUIREMENTS FOR
ADDITIONAL APPLICABLE INFORMATION.
PHASING PLANS ARE DIAGRAMMATIC OF THE GENERAL APPROACH.
REFERENCE DISCIPLINE SPECIFIC PLANS, DETAILS, NOTES, SPECS, ETC. FOR
ADDITIONAL INFORMATION.
MMLLJJ N O P QMLJ
1.1
2.3
3.5
/8
CONSTRUCTION ENTRANCE -
COORDINATE WITH VA ON
PREFERRED LOCATION
EXAM RM-12
1470N
EXAM RM-11
1470M
PARAMEDIC RM
1470L
NURSE STATION
EMERGENCY RM
EXAM RM-4
1470D
EXAM RM-5
1470E
EXAM RM-6
1470F
ELECTRICAL
14E6
COMM
14T3
MEDS
EXAM RM-9
PATIENT TLT
CORRIDOR
1496B
NURSE STATION
CORRIDOR
1496A
M.H. EXAM (FLEX)
M.H. EXAM (FLEX)
M.H. EXAM (FLEX)
M.H. EXAM (FLEX)
CORRIDOR
1496C
SUPPLY STORAGE
1492SOILED
TLT
CORRIDOR
1404A
CORRIDOR
C1404
STAIR
NO 5A
AD101
PHASE 3 B
PHASE 3 A
SUPV OFFICE
CORRIDOR
C1403
WAITING ROOM
STORAGE
CORRIDOR
C1402
COMP AND PENS
STAFF
M
IN
5'
C
LE
A R
AE201
NOT IN SCOPE
N O
T I N
S C
O P
E
AB
SOILED UTILITY
EXAM RM-7
1470G
CONFERENCE RM
CORRIDOR
C1404
WOMENS TOILET
ON CALL
TOILET
MMLLJJHHHG N O P QMLJI
1.1
2.3
3.5
/8
/8
CONSTRUCTION ENTRANCE
C O
N S
T R
U C
T
IO
N E
N T
R A
N C
E
C O
O R
D
IN
A T
E W
IT
H
V A
O N
P
R E
F E
R R
E D
L O
C A
T
IO
N
PARAMEDIC RM
1470L
EXAM RM-11
1470M
EXAM RM-12
1470N
EXAM RM-13
1470P
EXAM RM-14
1470Q
EXAM RM-15
1470RCLEAN LINEN
CORRIDOR
C1407
TOILET
VA POLICE
NURSE STATION
EMERGENCY RM
CFD SUPPLY
ELECTRICAL
14E6
COMM
14T3
STAIR
NO 5A
MEDS
EXAM RM-9
EXAM RM-8
PATIENT TLT
CORRIDOR
1496B
NURSE STATION
CORRIDOR
1496A
M.H. EXAM (FLEX)
M.H. EXAM (FLEX)
M.H. EXAM (FLEX)
M.H. EXAM (FLEX)
EXAM RM-7
HAC
M.H. SECLUSION
CORRIDOR
1496C
M.H. EXAM (FLEX)
EQUIPMENT
STORAGE
SOILED UTILITY
TLT
OB EXAM
CORRIDOR
C1404A
CORRIDOR
C1404
NOT IN SCOPENOT IN SCOPE
NOT IN SCOPE
N O
T I N
S C
O P
E
SUPV OFFICE
WAITING ROOM
STORAGE
COMP AND PENS
STAFF
CORRIDOR
C1402
CORRIDOR
C1403
M
IN
5'
C
LE
A R
EXAM RM-1
1470A
AB
LOUNGE
EQUIP STORAGE
ED MGR
EXAM RM-6
1499D
EXAM RM-5
1499E
EXAM RM-4
1499F
EXAM RM-3
1499G
CORRIDOR
C1404
NURSE STATION
EMERGENCY RM
1470T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \s w h it c o m b
.G U
ID
O
N D
E S
IG
N
\D o c u m e n ts \1
.5
.0
E
D P h a s e d R e n o v s w h it c o m b g u id o n d e s ig n .c o m
.r v t
/2
/2
:4
:5
P
M
GC102
FIRST FLOOR - PHASE 3 AND 4
GUIDON-CMTA SDVOSB JV, LLC
EMERGENCY DEPARTMENT
RENOVATION
JESSE BROWN VAMC, CHICAGO
537-15-160
1A
06/12/2020 JDF JDJ
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"GC102
1 FIRST FLOOR PHASING PLAN - PHASE 3
SCALE: 1/8" = 1'-0"GC102
2 FIRST FLOOR PHASING PLAN - PHASE 4
NN
PROJECT
SITE
NKEY PLAN
PHASED INFECTION CONTROL PLAN NOTES #
PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GC100.
PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD
READER ACCESS. REFER TO ELEVATION 3/GC100.
PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 4/GC100.
PROVIDE TEMPORARY KNOCK DDOWN DOOR.
PHASING PLAN GENERAL NOTES
A
B
REFERENCE SPEC 013533 INFECTION CONTROL REQUIREMENTS FOR
ADDITIONAL APPLICABLE INFORMATION.
PHASING PLANS ARE DIAGRAMMATIC OF THE GENERAL APPROACH.
REFERENCE DISCIPLINE SPECIFIC PLANS, DETAILS, NOTES, SPECS, ETC. FOR
ADDITIONAL INFORMATION.
MMLLJJHHHG N O P QMLJI
1.1
2.3
3.5
/8
4' - 3 5/8" 8' - 5 3/4" 12' - 11 3/8" 12' - 11 1/8" 12' - 7 1/2" 13' - 4 1/4"
/8
/8
CONSTRUCTION ENTRANCE -
COORDINATE WITH VA FOR COR
APPROVED LOCATION
C
LE
A R
5'
M
IN
NURSE STATION
EMERGENCY RM
1470T
EXAM RM-6
1470F
EXAM RM-5
1470E
EXAM RM-4
1470D
EXAM RM-3
1470C
EXAM RM-2
1470B
EXAM RM-1
1470A
CORRIDOR
C1407
CLEAN LINEN
TOILET
VA POLICE
COMM
14T3
ELECTRICAL
14E6
ON-CALL 1
ON-CALL
BATHROOM
ED MGR. (FUTURE
BEREAVEMENT)
SOILED
TLT
EQUIPMENT
STORAGE
M.H. EXAM (FLEX)
CORRIDOR
1496C
M.H. SECLUSION
HAC
EXAM RM-7
OB EXAM
CORRIDOR
1496B
PATIENT TLT
EXAM RM-8
MEDS
EXAM RM-9
NURSE STATION
M.H. EXAM (FLEX)
M.H. EXAM (FLEX)
CORRIDOR
1496A
M.H. EXAM (FLEX)
M.H. EXAM (FLEX)
CORRIDOR
C1404
CORRIDOR
1404A
STAIR
NO 5A
NOT IN SCOPENOT IN SCOPE
NOT IN SCOPE
N O
T I N
S C
O P
E
CORRIDOR
C1402
CORRIDOR
C1403
WAITING ROOM
SUPV OFFICE
COMP AND PENS
STAFF
STORAGE
EXAM RM-15
1499B
N
AB
STORAGE ROOM
EXAM RM-13
1470P
EXAM RM-12
1470N
EXAM RM-11
1470M
PARAMEDIC RM
1470L
EXAM RM-14
1470Q
NURSE STATION
EMERGENCY RM
1470T
LLJJHHHGF LJI
1.1
2.3
3.5
/8
/8
NURSE STATION
EMERGENCY RM
1470T
EXAM RM-6
1470F
EXAM RM-5
1470EEXAM RM-4
1470D
EXAM RM-3
1470C
EXAM RM-2
1470B
EXAM RM-1
1470A
CORRIDOR
C1407
CLEAN LINEN
TOILET
VA POLICE
COMM
14T3
ELECTRICAL
14E6
ON-CALL 1
ON-CALL 2
ON-CALL
BATHROOM
ED MGR. (FUTURE
BEREAVEMENT)
TLT
1456A
LOUNGE
SOILED
TLT
MEDS
CORRIDOR
C1404
CORRIDOR
1404A
NOT IN SCOPE
NOT IN SCOPE
EXAM RM-15
1499B
N
AB
NURSE STATION
EMERGENCY RM
1470T
CORRIDOR
C1407
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \s w h it c o m b
.G U
ID
O
N D
E S
IG
N
\D o c u m e n ts \1
.5
.0
E
D P h a s e d R e n o v s w h it c o m b g u id o n d e s ig n .c o m
.r v t
/2
/2
:4
:0
P
M
GC103
FIRST FLOOR - PHASE 5 AND 6
GUIDON-CMTA SDVOSB JV, LLC
EMERGENCY DEPARTMENT
RENOVATION
JESSE BROWN VAMC, CHICAGO
537-15-160
1A
06/12/2020 JDF JDJ
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"GC103
1 FIRST FLOOR PHASING PLAN - PHASE 5SCALE: 1/8" = 1'-0"GC103
2 FIRST FLOOR PHASING PLAN - PHASE 5