This document provides specifications for surge protective devices (SPD) for installation at the Jesse Brown VA Medical Center in Chicago, Illinois. The specifications require SPDs meeting UL 1449 and IEEE C62.41.2 standards, with a minimum surge current of 120kA per phase and NEMA 1 enclosures. Acceptance testing includes visual inspection, electrical connection torque testing, alarm and indicator operation verification. The related federal contract opportunity is for emergency renovation of the VA medical center's Emergency Department Observation Unit under solicitation 36C25220B0023. The work includes all labor, materials, tools and components detailed in the scope of work to fully construct and renovate the observation unit.

View the file

Other files

File Type Posted
AE Responses 537-15-160 Consolidated RFI Amendment 6.xlsx XLSX spreadsheet
36C25220B0023 0006.docx DOCX document
537-15-160 SOW - Mod2.docx DOCX document
IFB Bid opening invitation changed to 10SEP.pdf PDF
36C25220B0023 0005.docx DOCX document
AE Responses 537-15-160 Consolidated RFI Amendment 4.pdf PDF
085113 - Psychiatric windows.docx DOCX document
081710 - Integrated Door Assemblies.docx DOCX document
36C25220B0023 0004.docx DOCX document
087100 - Door Hardware.docx DOCX document
Basement sketch Question 64.png PNG image
024100 - Demolition.pdf PDF
SIGNED Brand Name J and A.pdf PDF
36C25220B0023 0003.docx DOCX document
262416 - Panels.pdf PDF
537-15-160 Consolidated RFI-ADD1.pdf PDF
Bid opening change to 10 AUG Meeting Invitation.pdf PDF
260573 - OCP Device Coordination Study.pdf PDF
C03 36C25220B0023 0002.docx DOCX document
EJ200 - Addendum 1 Elec - 07.23.20.pdf PDF
RFI-001_Guidon Addendum 1.pdf PDF
000100 - Specification Table of Contents.pdf PDF
537-15-160 SOW - Mod1.pdf PDF
ED201 - Addendum 1 Elec - 07.23.20.pdf PDF
36C25220B0023 A0001.docx DOCX document
ATCH 2 537-15-160 sign in sheets 8-9 jul 2020.pdf PDF
ATCH 1 537-15-160 Construction Bid Opening Meeting.pdf PDF
537-15-160 Construction Drawings 1 of 4.pdf PDF
537-15-160 Construction Drawings 3 of 4.pdf PDF
537-15-160 Construction Drawings 2 of 4.pdf PDF
S02 36C25220B0023_2_7-1-2020.docx DOCX document
537-15-160 Construction Drawings 4 of 4.pdf PDF
537-15-160 Project Manual Vol2.pdf PDF
537-15-160 Project Manual Vol1.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jesse Brown VAMC May 30, 2020 VA: 537-15-160 Emergency Renovations 100% Construct ion Documents Chicago, IL 60064 01-01-17

26 43 13 - 1

SECTION 26 43 13

SURGE PROTECTIVE DEVICES

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies the furnishing, installat ion, and connection of

Type 2 Surge Protective Devices, as defined in NFPA 70, and indicated as SPD in this section.

1.2 RELATED WORK

A. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL IN STALLATIONS:

Requirements that apply to all sections of Division 26.

B. Section 26 24 16, PANELBOARDS: For factory-insta lled or external SPD.

1.3 QUALITY ASSURANCE

A. Quality Assurance shall be in accordance with Pa ragraph, QUALIFICATIONS

(PRODUCTS AND SERVICES) in Section 26 05 11, REQUIR EMENTS FOR

ELECTRICAL INSTALLATIONS.

1.4 SUBMITTALS

A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements:

1. Shop Drawings:

a. Submit sufficient information to demonstrate com pliance with drawings and specifications.

b. Include electrical ratings and device nameplate data.

2. Manuals:

a. Submit, simultaneously with the shop drawings, c ompanion copies of complete maintenance and operating manuals inclu ding technical data sheets, wiring diagrams, and information for o rdering replacement parts.

b. If changes have been made to the maintenance and operating manuals originally submitted, submit updated mainte nance and operating manuals two weeks prior to the final insp ection.

3. Certifications: Two weeks prior to final inspect ion, submit the following.

a. Certification by the manufacturer that the SPD c onforms to the requirements of the drawings and specifications.

b. Certification by the Contractor that the SPD has been properly installed.

26 43 13 - 2

1.5 APPLICABLE PUBLICATIONS

A. Publications listed below (including amendments, addenda, revisions, supplement and errata) form a part of this specific ation to the extent referenced. Publications are referenced in the text by the basic designation only.

B. Institute of Engineering and Electronic Engineer s (IEEE):

IEEE C62.41.2-02........Characterization of Surges in Low-Voltage (1000

V and Less) AC Power Circuits

IEEE C62.45-08..........Surge Testing for Equipment Connected to Low-

Voltage (1000 V and Less) AC Power Circuits

C. National Fire Protection Association (NFPA):

70-17...................National Electrical Code (N EC)

D. Underwriters Laboratories, Inc. (UL):

UL 1283-15..............Electromagnetic Interferenc e Filters

UL 1449-14..............Surge Protective Devices

PART 2 - PRODUCTS

2.1 PANELBOARD SPD

A. General Requirements:

1. Comply with UL 1449 and IEEE C62.41.2.

2. Modular design with field-replaceable modules, o r non-modular design.

3. Fuses, rated at 200 kA interrupting capacity.

4. Bolted compression lugs for internal wiring.

5. Integral disconnect switch.

6. Redundant suppression circuits.

7. LED indicator lights for power and protection st atus.

8. Audible alarm, with silencing switch, to indicat e when protection has failed.

9. Form-C contacts rated at 5 A and 250-V ac, one n ormally open and one normally closed, for remote monitoring of protectio n status.

Contacts shall reverse on failure of any surge dive rsion module or on opening of any current-limiting device.

10. Four-digit transient-event counter.

B. Surge Current per Phase: Minimum 120kA per phas e.

2.3 ENCLOSURES

A. Enclosures: NEMA 1.

26 43 13 - 3

PART 3 - EXECUTION

3.1 INSTALLATION

A. Installation shall be in accordance with the NEC , as shown on the drawings, and manufacturer’s instructions.

B. Factory-installed SPD: Panelboard manufacturer s hall install SPD at the factory.

D. Do not perform insulation resistance tests on pa nelboards or feeders with the SPD connected. Disconnect SPD before cond ucting insulation resistance tests, and reconnect SPD immediately aft er insulation resistance tests are complete.

3.2 ACCEPTANCE CHECKS AND TESTS

A. Perform in accordance with the manufacturer's re commendations. In addition, include the following:

1. Visual Inspection and Tests:

a. Compare equipment nameplate data with specificat ions and approved shop drawings.

b. Inspect physical, electrical, and mechanical con dition.

c. Verify that disconnecting means and feeder size and maximum length to SPD corresponds to approved shop drawings .

d. Verifying tightness of accessible bolted electri cal connections by calibrated torque-wrench method.

e. Vacuum-clean enclosure interior. Clean enclosur e exterior.

f. Verify the correct operation of all sensing devi ces, alarms, and indicating devices.

3.3 FOLLOW-UP VERIFICATION

A. After completion of acceptance checks and tests, the Contractor shall show by demonstration in service that SPD are in go od operating condition and properly performing the intended func tion.

3.4 INSTRUCTION

A. Provide the services of a factory-trained techni cian for one 2-hour training period for instructing personnel in the ma intenance and operation of the SPD, on the date requested by the COR.