About this file

This document package includes construction drawings and specifications for an emergency department renovation project. The scope of work involves renovating the existing emergency department observation unit at the Jesse Brown VA Medical Center in Chicago, Illinois, to create a fully functional emergency department observation area. Electrical demolition plans indicate the removal and relocation of various electrical devices and equipment to accommodate the construction. The related federal contract opportunity is solicitation number 36C25220B0023 for a contractor to provide all labor, materials, and supervision for the renovation project in accordance with the construction documents and specifications. The estimated award date is not specified.

View the file

Other files

File Type Posted
AE Responses 537-15-160 Consolidated RFI Amendment 6.xlsx XLSX spreadsheet
36C25220B0023 0006.docx DOCX document
537-15-160 SOW - Mod2.docx DOCX document
IFB Bid opening invitation changed to 10SEP.pdf PDF
36C25220B0023 0005.docx DOCX document
AE Responses 537-15-160 Consolidated RFI Amendment 4.pdf PDF
085113 - Psychiatric windows.docx DOCX document
081710 - Integrated Door Assemblies.docx DOCX document
36C25220B0023 0004.docx DOCX document
087100 - Door Hardware.docx DOCX document
Basement sketch Question 64.png PNG image
024100 - Demolition.pdf PDF
SIGNED Brand Name J and A.pdf PDF
36C25220B0023 0003.docx DOCX document
262416 - Panels.pdf PDF
264313 - Surge Protective Devices.pdf PDF
537-15-160 Consolidated RFI-ADD1.pdf PDF
Bid opening change to 10 AUG Meeting Invitation.pdf PDF
260573 - OCP Device Coordination Study.pdf PDF
C03 36C25220B0023 0002.docx DOCX document
EJ200 - Addendum 1 Elec - 07.23.20.pdf PDF
RFI-001_Guidon Addendum 1.pdf PDF
000100 - Specification Table of Contents.pdf PDF
537-15-160 SOW - Mod1.pdf PDF
36C25220B0023 A0001.docx DOCX document
ATCH 2 537-15-160 sign in sheets 8-9 jul 2020.pdf PDF
ATCH 1 537-15-160 Construction Bid Opening Meeting.pdf PDF
537-15-160 Construction Drawings 1 of 4.pdf PDF
537-15-160 Construction Drawings 3 of 4.pdf PDF
537-15-160 Construction Drawings 2 of 4.pdf PDF
S02 36C25220B0023_2_7-1-2020.docx DOCX document
537-15-160 Construction Drawings 4 of 4.pdf PDF
537-15-160 Project Manual Vol2.pdf PDF
537-15-160 Project Manual Vol1.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PP

PP

PROJECT

SITE

MMLLJJHHHG N O P QMLJI

1.1

2.3

3.5

LPA

D4

D1 D7

D2

D2D2

D2

D2D2

D2

D2D2

D2

D2D2

D2

D2

MECH RM

DOCTOR OFFICE

DOCTOR OFFICE

EXAM RM

EXAM RM

EXAM RM

EXAM RM

EXAM RM

ADMIN OFFICE

CONFERENCE RM

STORAGE

MENS TOILET

WOMENS TOILET

TOILET

ON CALL

TOILET

1491A

ON CALL

1491B

CORRIDOR

C1404

STAIR

NO 5A

SOILED UTILITY

BEREAVEMENT

1475A

ELECTRICAL

14E6

COMM

14T3

LOUNGE

EQUIP STORAGE

ED MGR

EXAM RM-7

1470G

EXAM RM-6

1470F

EXAM RM-5

1470E

EXAM RM-4

1470D

EXAM RM-3

1470C

EXAM RM-2

1470B

CFD SUPPLY

EXAM RM-1

1470A

TOILET

VA POLICE

EXAM RM-15

1470R

EXAM RM-14

1470Q

EXAM RM-13

1470P

EXAM RM-12

1470N

EXAM RM-11

1470M

PARAMEDIC RM

1470L

EXAM RM-9

1470K

EXAM RM-8

1470J

MEDS

1470H

NURSE STATION EMERGENCY RM

STORAGE

HAC

MECHANICAL ROOM

CORRIDOR

C1403

COMP AND PENS STAFF

SECRET OFFICE

DOCTOR OFFICE

DOCTOR OFFICE

TOILET

1499A

WAITING ROOM

SUPV OFFICE

DOCTOR OFFICE

EXIST. 120/208V

NORMAL POWER

PANEL GM

EXIST. 120/208V

CRITICAL BRANCH

PANEL GECM

EXIST. 277/480V

EQUIPMENT BRANCH

PANEL GEQK

EXIST. 277/480V

NORMAL POWER

PANEL GHM

EXIST. 120/208V

CRITICAL BRANCH

PANEL GECL

EXIST. 120/208V

LIFE SAFETY

PANEL GEL

EXIST. 120/208V

NORMAL POWER

PANEL GLA

EXIST. 120/208V

NORMAL POWER

PANEL GL

EXIST. 120/208V

NORMAL POWER

PANEL LP-1-1

EXIST. 277/480V

NORMAL POWER

PANEL H-DP-1-1

EXIST. 120/208V

CRITICAL BRANCH

PANEL CLP-1-1

EXIST. 277/480V

EQUIPMENT BRANCH

PANEL H-EDP-1-1

NOTE:

REFER TO ARCHITECTURAL

SHEETS GC100-GC103 FOR ALL

PHASING INFORMATION.

D8D8

1VFD - 7.5 HP

VFD - 3 HP1

I LL IN O IS

S N

A H

A

TR

E B

O R

NTHONY

LICENSED

PROFESSIONAL

OF

ENGINEER

062.059710

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

100% RE-SUBMIT 2020/06/29

Revisions: Date:

C U s e rs

\s m o o re

\D o c u m e n ts

\R

I V

C E

E

L E

C T

R

IC

A L s m o o re Q

F A

.r v t

/2

/2

:4

:3

P

M

ED201

PARTIAL FIRST FLOOR PLAN -

POWER DEMOLITIONGUIDON-CMTA SDVOSB JV, LLC

1221 N. PENNSYLVANIA ST. SUITE 200

INDIANAPOLIS, IN 46202

CMTA CONSULTING ENGINEERS

903 SPRING ST.

JEFFERSONVILLE, IN 47130

EMERGENCY DEPARTMENT

RENOVATION

820 S. DAMEN AVE.

537-15-160

5/30/2020 CMTA CMTA

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1" = 160'-0"

KEYPLAN

ELECTRICAL DEMOLITION NOTES:

A. DOTTED LINES INDICATE ITEMS FOR REMOVAL (UON) AND THIN SOLID

LINES INDICATE EXISTING ITEMS TO REMAIN.

B. THE CONTRACTOR SHALL MAINTAIN THE CONTINUITY OF EXISTING

CIRCUITS THAT CONTAIN DEVICES OR EQUIPMENT THAT ARE TO

REMAIN. WHEN DEMOLITION OF AN ELECTRICAL DEVICE (OR CIRCUIT) IS

INDICATED ON THE DRAWINGS: THE CONTRACTOR SHALL ENSURE

THAT OTHER DEVICES OR EQUIPMENT "UPSTREAM" OR "DOWNSTREAM"

ON THE CIRCUITS SHALL REMAIN IN "PRE- DEMOLITION" WORKING

ORDER. "LEFT-OVER" CIRCUIT BREAKERS SHALL REMAIN, BE SWITCHED

TO OFF POSITION, AND BE LABELED AS SPARES IN THEIR PANELS.

C. REMOVE ALL ASSOCIATED BACKBOXES, CONDUIT AND CONDUCTORS

FOR DEVICES / FIXTURES / ETC. BEING REMOVED (BACK TO SOURCE)

(UON). CONTRACTOR SHALL PATCH AND REPAIR ANY EXISTING WALLS,

FLOORS OR CEILINGS WHERE DEVICES ARE SHOWN TO BE REMOVED

(PATCH AND REPAIR TO RECEIVE NEW FINISHES - SEE ARCHITECTURAL

PLANS).

D. COORDINATE DISPOSAL OF ALL FIXTURES, DEVICES, ETC. (INDICATED

FOR DEMOLITION) WITH OWNER. TURN OVER ITEMS REMOVED TO

OWNER AT THEIR OPTION.

E. CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING WALLS /

CEILINGS AS REQUIRED WHERE DEVICES ARE BEING REMOVED OR

INSTALLED.

F. EXISTING ELECTRICAL SYSTEMS IN CONFLICT WITH CONSTRUCTION

SHALL BE RELOCATED TO PERMIT INSTALLATION OF DEVICES AND

EQUIPMENT SHOWN ON PLANS.

G. CONTRACTOR SHALL SEAL ALL EXISTING AND NEW PENETRATIONS OF

BUILDING ENVELOPE (EXTERIOR WALLS, ROOF, ETC.) WATER-TIGHT

AND AS APPROVED BY COR. ROOFING SHALL BE RESTORED BY A

LICENSED ROOFING CONTRACTOR BASED ON WRITTEN INSTRUCTIONS

AND DETAILS FROM ROOFING MANUFACTURER AS REQUIRED TO

MAINTAIN ROOF WARRANTY. REFER TO ARCHITECTURAL AND

ENGINEERING PLANS AND SPECIFICATIONS FOR FURTHER

REQUIREMENTS.

H. DEVICES INDICATED WITH AN ''R'' SHALL BE RELOCATED. REMOVE,

PROTECT, AND REINSTALL IN NEW LOCATION INDICATED ON NEW

WORK PLANS. INTERCEPT AND EXTEND ALL EXISTING CABLING TO NEW

LOCATION. CLEAN AND RE-LAMP RELOCATED LUMINAIRES.

I. ALL EXISTING PANELS AFFECTED BY THIS CONTRACTOR'S WORK SHALL

BE PROVIDED WITH NEW TYPE-WRITTEN PANEL DIRECTORIES AND

INSERT SLEEVES. PANEL DIRECTORIES SHALL NOT USE ROOM NAMES

OR NUMBERS FROM THESE DRAWINGS. DIRECTORIES SHALL BE

DETAILED AND COORDINATED WITH OWNER'S SUITE NUMBERS, FINAL

ROOM NUMBERS, IT RACK NAMES, WORKSTATION DESIGNATIONS, ETC.

UNUSED BREAKERS SHALL BE IN OFF POSITION.

TAGGED NOTES

D1 REMOVE PANEL AND ASSOCIATED FEEDERS COMPLETELY

BACK TO UPSTREAM PANEL. RELABEL UPSTREAM

DISTRIBUTION CIRCUIT BREAKER AS SPARE. CONTRACTOR TO

REWORK EXISTING BRANCH CIRCUITS TO REMAIN AND

CONNECT TO NEW PANELBOARD "GP".

D2 REMOVE RECEPTACLE. BRANCH CIRCUITING AND CONDUIT TO

REMAIN AND BE USED IN INSTALLATION OF NEW DEVICE.

REFER TO POWER PLAN FOR ADDITIONAL DETAILS.

D4 TEMPORARILY REMOVE ALL CEILING MOUNTED DEVICES IN

THIS AREA TO ACCOMMODATE CEILING REMOVAL AND ABOVE

CEILING WORK BY OTHER TRADES. RE-INSTALL DEVICES IN

SAME LOCATION IN NEW CEILING AND RESTORE TO WORKING

ORDER.

D7 REMOVE ELECTRICAL POWER TO VARIABLE FREQUENCY

DRIVES (VFD) AND ALL MECHANICAL EQUIPMENT BEING

REMOVED IN THIS ROOM. REMOVE ALL ASSOCIATED

CIRCUITING, CONDUIT AND DISCONNECTS COMPLETELY BACK

TO SOURCE. COORDINATE WORK WITH MECHANICAL

CONTRACTOR.

D8 CONDENSING UNIT TO BE REMOVED IN THE MECHANICAL

SCOPE OF WORK. REMOVE ELECTRICAL DISCONNECT

SWITCH, ASSOCIATED ELECTRICAL CONNECTIONS AND

BRANCH CIRCUIT COMPLETELY.

SCALE: 1/8" = 1'-0"ED201

1 PARTIAL FIRST FLOOR PLAN - POWER DEMOLITION

BID ALTERNATES

ALTERNATE #1: DO NOT REMOVE RECEPTALCES IN EXISTING ED EXAM ROOMS

OR ON OUTSIDE WALLS OF ED EXAM ROOMS. REFER TO SHEET AE003 IN

ARCHITECTURAL PLANS FOR ADDITIONAL INFORMATION.

ALTERNATE #2: DO NOT REMOVE RECEPTACLES AT ED NURSE STATION

CASEWORK. REFER TO SHEET AE003 IN ARCHITECTURAL PLANS FOR

ADDITIONAL INFORMATION.

Addendum No. 1 2020/07/23

Sheets
ED201 - PARTIAL FIRST FLOOR PLAN - POWER DEMOLITION
EJ200 - POWER RISER DIAGRAM

File details come from the government source that posted it. Updated .