ED201 - Addendum 1 Elec - 07.23.20.pdf
PDF 331 KB Posted
- Solicitation number
- 36C25220B0023
About this file
This document package includes construction drawings and specifications for an emergency department renovation project. The scope of work involves renovating the existing emergency department observation unit at the Jesse Brown VA Medical Center in Chicago, Illinois, to create a fully functional emergency department observation area. Electrical demolition plans indicate the removal and relocation of various electrical devices and equipment to accommodate the construction. The related federal contract opportunity is solicitation number 36C25220B0023 for a contractor to provide all labor, materials, and supervision for the renovation project in accordance with the construction documents and specifications. The estimated award date is not specified.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PP
PP
PROJECT
SITE
MMLLJJHHHG N O P QMLJI
1.1
2.3
3.5
LPA
D4
D1 D7
D2
D2D2
D2
D2D2
D2
D2D2
D2
D2D2
D2
D2
MECH RM
DOCTOR OFFICE
DOCTOR OFFICE
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
ADMIN OFFICE
CONFERENCE RM
STORAGE
MENS TOILET
WOMENS TOILET
TOILET
ON CALL
TOILET
1491A
ON CALL
1491B
CORRIDOR
C1404
STAIR
NO 5A
SOILED UTILITY
BEREAVEMENT
1475A
ELECTRICAL
14E6
COMM
14T3
LOUNGE
EQUIP STORAGE
ED MGR
EXAM RM-7
1470G
EXAM RM-6
1470F
EXAM RM-5
1470E
EXAM RM-4
1470D
EXAM RM-3
1470C
EXAM RM-2
1470B
CFD SUPPLY
EXAM RM-1
1470A
TOILET
VA POLICE
EXAM RM-15
1470R
EXAM RM-14
1470Q
EXAM RM-13
1470P
EXAM RM-12
1470N
EXAM RM-11
1470M
PARAMEDIC RM
1470L
EXAM RM-9
1470K
EXAM RM-8
1470J
MEDS
1470H
NURSE STATION EMERGENCY RM
STORAGE
HAC
MECHANICAL ROOM
CORRIDOR
C1403
COMP AND PENS STAFF
SECRET OFFICE
DOCTOR OFFICE
DOCTOR OFFICE
TOILET
1499A
WAITING ROOM
SUPV OFFICE
DOCTOR OFFICE
EXIST. 120/208V
NORMAL POWER
PANEL GM
EXIST. 120/208V
CRITICAL BRANCH
PANEL GECM
EXIST. 277/480V
EQUIPMENT BRANCH
PANEL GEQK
EXIST. 277/480V
NORMAL POWER
PANEL GHM
EXIST. 120/208V
CRITICAL BRANCH
PANEL GECL
EXIST. 120/208V
LIFE SAFETY
PANEL GEL
EXIST. 120/208V
NORMAL POWER
PANEL GLA
EXIST. 120/208V
NORMAL POWER
PANEL GL
EXIST. 120/208V
NORMAL POWER
PANEL LP-1-1
EXIST. 277/480V
NORMAL POWER
PANEL H-DP-1-1
EXIST. 120/208V
CRITICAL BRANCH
PANEL CLP-1-1
EXIST. 277/480V
EQUIPMENT BRANCH
PANEL H-EDP-1-1
NOTE:
REFER TO ARCHITECTURAL
SHEETS GC100-GC103 FOR ALL
PHASING INFORMATION.
D8D8
1VFD - 7.5 HP
VFD - 3 HP1
I LL IN O IS
S N
A H
A
TR
E B
O R
NTHONY
LICENSED
PROFESSIONAL
OF
ENGINEER
062.059710
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
100% RE-SUBMIT 2020/06/29
Revisions: Date:
C U s e rs
\s m o o re
\D o c u m e n ts
\R
I V
C E
E
L E
C T
R
IC
A L s m o o re Q
F A
.r v t
/2
/2
:4
:3
P
M
ED201
PARTIAL FIRST FLOOR PLAN -
POWER DEMOLITIONGUIDON-CMTA SDVOSB JV, LLC
1221 N. PENNSYLVANIA ST. SUITE 200
INDIANAPOLIS, IN 46202
CMTA CONSULTING ENGINEERS
903 SPRING ST.
JEFFERSONVILLE, IN 47130
EMERGENCY DEPARTMENT
RENOVATION
820 S. DAMEN AVE.
537-15-160
5/30/2020 CMTA CMTA
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1" = 160'-0"
KEYPLAN
ELECTRICAL DEMOLITION NOTES:
A. DOTTED LINES INDICATE ITEMS FOR REMOVAL (UON) AND THIN SOLID
LINES INDICATE EXISTING ITEMS TO REMAIN.
B. THE CONTRACTOR SHALL MAINTAIN THE CONTINUITY OF EXISTING
CIRCUITS THAT CONTAIN DEVICES OR EQUIPMENT THAT ARE TO
REMAIN. WHEN DEMOLITION OF AN ELECTRICAL DEVICE (OR CIRCUIT) IS
INDICATED ON THE DRAWINGS: THE CONTRACTOR SHALL ENSURE
THAT OTHER DEVICES OR EQUIPMENT "UPSTREAM" OR "DOWNSTREAM"
ON THE CIRCUITS SHALL REMAIN IN "PRE- DEMOLITION" WORKING
ORDER. "LEFT-OVER" CIRCUIT BREAKERS SHALL REMAIN, BE SWITCHED
TO OFF POSITION, AND BE LABELED AS SPARES IN THEIR PANELS.
C. REMOVE ALL ASSOCIATED BACKBOXES, CONDUIT AND CONDUCTORS
FOR DEVICES / FIXTURES / ETC. BEING REMOVED (BACK TO SOURCE)
(UON). CONTRACTOR SHALL PATCH AND REPAIR ANY EXISTING WALLS,
FLOORS OR CEILINGS WHERE DEVICES ARE SHOWN TO BE REMOVED
(PATCH AND REPAIR TO RECEIVE NEW FINISHES - SEE ARCHITECTURAL
PLANS).
D. COORDINATE DISPOSAL OF ALL FIXTURES, DEVICES, ETC. (INDICATED
FOR DEMOLITION) WITH OWNER. TURN OVER ITEMS REMOVED TO
OWNER AT THEIR OPTION.
E. CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING WALLS /
CEILINGS AS REQUIRED WHERE DEVICES ARE BEING REMOVED OR
INSTALLED.
F. EXISTING ELECTRICAL SYSTEMS IN CONFLICT WITH CONSTRUCTION
SHALL BE RELOCATED TO PERMIT INSTALLATION OF DEVICES AND
EQUIPMENT SHOWN ON PLANS.
G. CONTRACTOR SHALL SEAL ALL EXISTING AND NEW PENETRATIONS OF
BUILDING ENVELOPE (EXTERIOR WALLS, ROOF, ETC.) WATER-TIGHT
AND AS APPROVED BY COR. ROOFING SHALL BE RESTORED BY A
LICENSED ROOFING CONTRACTOR BASED ON WRITTEN INSTRUCTIONS
AND DETAILS FROM ROOFING MANUFACTURER AS REQUIRED TO
MAINTAIN ROOF WARRANTY. REFER TO ARCHITECTURAL AND
ENGINEERING PLANS AND SPECIFICATIONS FOR FURTHER
REQUIREMENTS.
H. DEVICES INDICATED WITH AN ''R'' SHALL BE RELOCATED. REMOVE,
PROTECT, AND REINSTALL IN NEW LOCATION INDICATED ON NEW
WORK PLANS. INTERCEPT AND EXTEND ALL EXISTING CABLING TO NEW
LOCATION. CLEAN AND RE-LAMP RELOCATED LUMINAIRES.
I. ALL EXISTING PANELS AFFECTED BY THIS CONTRACTOR'S WORK SHALL
BE PROVIDED WITH NEW TYPE-WRITTEN PANEL DIRECTORIES AND
INSERT SLEEVES. PANEL DIRECTORIES SHALL NOT USE ROOM NAMES
OR NUMBERS FROM THESE DRAWINGS. DIRECTORIES SHALL BE
DETAILED AND COORDINATED WITH OWNER'S SUITE NUMBERS, FINAL
ROOM NUMBERS, IT RACK NAMES, WORKSTATION DESIGNATIONS, ETC.
UNUSED BREAKERS SHALL BE IN OFF POSITION.
TAGGED NOTES
D1 REMOVE PANEL AND ASSOCIATED FEEDERS COMPLETELY
BACK TO UPSTREAM PANEL. RELABEL UPSTREAM
DISTRIBUTION CIRCUIT BREAKER AS SPARE. CONTRACTOR TO
REWORK EXISTING BRANCH CIRCUITS TO REMAIN AND
CONNECT TO NEW PANELBOARD "GP".
D2 REMOVE RECEPTACLE. BRANCH CIRCUITING AND CONDUIT TO
REMAIN AND BE USED IN INSTALLATION OF NEW DEVICE.
REFER TO POWER PLAN FOR ADDITIONAL DETAILS.
D4 TEMPORARILY REMOVE ALL CEILING MOUNTED DEVICES IN
THIS AREA TO ACCOMMODATE CEILING REMOVAL AND ABOVE
CEILING WORK BY OTHER TRADES. RE-INSTALL DEVICES IN
SAME LOCATION IN NEW CEILING AND RESTORE TO WORKING
ORDER.
D7 REMOVE ELECTRICAL POWER TO VARIABLE FREQUENCY
DRIVES (VFD) AND ALL MECHANICAL EQUIPMENT BEING
REMOVED IN THIS ROOM. REMOVE ALL ASSOCIATED
CIRCUITING, CONDUIT AND DISCONNECTS COMPLETELY BACK
TO SOURCE. COORDINATE WORK WITH MECHANICAL
CONTRACTOR.
D8 CONDENSING UNIT TO BE REMOVED IN THE MECHANICAL
SCOPE OF WORK. REMOVE ELECTRICAL DISCONNECT
SWITCH, ASSOCIATED ELECTRICAL CONNECTIONS AND
BRANCH CIRCUIT COMPLETELY.
SCALE: 1/8" = 1'-0"ED201
1 PARTIAL FIRST FLOOR PLAN - POWER DEMOLITION
BID ALTERNATES
ALTERNATE #1: DO NOT REMOVE RECEPTALCES IN EXISTING ED EXAM ROOMS
OR ON OUTSIDE WALLS OF ED EXAM ROOMS. REFER TO SHEET AE003 IN
ARCHITECTURAL PLANS FOR ADDITIONAL INFORMATION.
ALTERNATE #2: DO NOT REMOVE RECEPTACLES AT ED NURSE STATION
CASEWORK. REFER TO SHEET AE003 IN ARCHITECTURAL PLANS FOR
ADDITIONAL INFORMATION.
Addendum No. 1 2020/07/23
| Sheets |
| ED201 - PARTIAL FIRST FLOOR PLAN - POWER DEMOLITION |
| EJ200 - POWER RISER DIAGRAM |
File details come from the government source that posted it. Updated .