5-RFP2009 - Part G - Attachment F - Subcontractors List - Final.pdf

PDF 199 KB Posted

Attached to
Computer-Aided Dispatch / Automatic Vehicle Location (CAD/AVL) System Replacement
Solicitation number
2009
Issued by
Alexandria City, Virginia

About this file

This is an Attachment F Subcontractor's List form from the City of Alexandria, Virginia, issued as part of a 2009 Request for Proposals (RFP) for a Computer-Aided Dispatch/Automatic Vehicle Location (CAD/AVL) System Replacement for DASH. The form is designed to document all prime contractors and first-tier subcontractors who will perform work under the resulting contract, along with a breakdown of work types and percentage allocations. The document provides a structured template requiring bidders to identify each participating vendor, designate their SWaM/DBE status, specify the general type of work to be performed, and indicate the approximate percentage of total work assigned to each entity, with all percentages totaling 100 percent of the bid amount.

The document requires the authorized signatory for the bidder or offeror to complete the form by entering vendor names, work classifications, and percentage allocations across multiple rows for the prime contractor and up to six first-tier subcontractors. The form emphasizes transparency in subcontracting arrangements and compliance with Small, Women-owned, and Minority-owned (SWaM) and Disadvantaged Business Enterprise (DBE) participation requirements. The prime contractor may retain a portion of work to be performed by their own forces as permitted by the bid documents. No specific response deadlines, award dates, or contract terms are indicated on this attachment, as it serves solely as a subcontracting disclosure document within the broader RFP package.

View the file

Other files

File Type Posted
12-RFP2009 - Part H - Exhibits Title Page - Final.pdf PDF
21-RFP2009 - Part B - Scope of Work - Final .pdf PDF
19-RFP2009 - Part H - Exhibit L - Security Controls Contract Language - Final.pdf PDF
4-RFP2009 - Part G - Attachment E - Reference Sheet - Final.pdf PDF
13-RFP2009 - Part H - Exhibit A - Definitions - Final.pdf PDF
11-RFP2009 - Part G - Attachment M - City of Alexandria Cloud Vendor Assessment Tool (Cloud).xlsx XLSX spreadsheet
18-RFP2009 - Part H - Exhibit K - ITS Data Classification Policy - Final.pdf PDF
10-RFP2009 - Part G - Attachment L - City of Alexandria Cloud Vendor Assessment Tool (On Premise).xlsx XLSX spreadsheet
22-RFP2009 - Part C - Special Terms and Conditions - Final.pdf PDF
1-RFP2009 - Part G - Attachment A - Authorized Signatory Statement - Final.pdf PDF
8-RFP2009 - Part G - Attachment J - Current DASH Fixed-Route Vehicles - Final.pdf PDF
2-RFP2009 - Part G - Attachment C - Required Information Form - Final.pdf PDF
17-RFP2009 - Part H - Exhibit J - COA - Confidentiality and Non-Disclosure Agreement - Final.pdf PDF
9-RFP2009 - Part G - Attachment K - Current DASH Fixed-Route On-Board Vehicle Systems - Final.pdf PDF
23-RFP2009 - Part D - General Terms and Conditions - Final.pdf PDF
25-RFP2009 - Part F - Evaluation and Method of Award - Final.pdf PDF
20-RFP2009 - Part A - General Information - Final.pdf PDF
16-RFP2009 - Part H - Exhibit I - MAPT Cooperative Rider Clause - Final.pdf PDF
7-RFP2009 - Part G - Attachment I - System Requirements Matrix - Final (Updated).pdf PDF
3-RFP2009 - Part G - Attachment D - Certifications - Final.pdf PDF
24-RFP2009 - Part E - Instructions to Offerors - Final.pdf PDF
26-RFP2009 - Part G - Attachment G - No Response Form - Final.pdf PDF
15-RFP2009 - Part H - Exhibit H - Information Technology Ts and Cs - Final.pdf PDF
14-RFP2009 - Part H - Exhibit D - Federal or Grant Funding Provisions - Final.pdf PDF
6-RFP2009 - Part G - Attachment H - Offeror Pricing Schedule - Final (Updated).pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Alexandria

Attachment F

Subcontractor's List

The following list provides the name of the Prime Contractor and their 1st Tier Sub-Contractors who shall perform the Work in reference to the Solicitation referenced at the top of this page and its resulting Contract. The general type of work to be performed and the approximate percentage of the total work per Prime and 1st Tier Sub-Contractor shall be annotated. (Note: The Prime Contractor may be required to perform a percentage of the total work with their own forces as required in the bid documents).

Vendor Name SWaM/DBE

Select & Enter Number

Type of Work % of Total Work

Prime Contractor

1st Tier Subcontractors

Total % of Bid Amount 100%

Bidder/Offeror Name:_________________________Date: _____________________________

Signature of Authorized Signatory: _________________________________________________

Name & Title of Authorized Signatory: ______________________________________________

No.:

SWaMDBE Select Enter NumberPrime Contractor:
Prime ContractorRow1:
SWaMDBE Select Enter NumberRow2:
Type of WorkRow2:
of Total WorkRow2:
1st Tier SubcontractorsRow1:
SWaMDBE Select Enter NumberRow4:
Type of WorkRow4:
of Total WorkRow4:
1st Tier SubcontractorsRow2:
SWaMDBE Select Enter NumberRow5:
Type of WorkRow5:
of Total WorkRow5:
1st Tier SubcontractorsRow3:
SWaMDBE Select Enter NumberRow6:
Type of WorkRow6:
of Total WorkRow6:
1st Tier SubcontractorsRow4:
SWaMDBE Select Enter NumberRow7:
Type of WorkRow7:
of Total WorkRow7:
1st Tier SubcontractorsRow5:
SWaMDBE Select Enter NumberRow8:
Type of WorkRow8:
of Total WorkRow8:
1st Tier SubcontractorsRow6:
SWaMDBE Select Enter NumberRow9:
Type of WorkRow9:
of Total WorkRow9:
BidderOfferor Name:
Date:
Signature10_es_:signer:signature:
Signature11_es_:signer:signature:
Text13: RFP
Text11: Request for Proposals (RFP)
Text15: RFP
Text14: 2009
Text12: CAD/AVL System Replacement

File details come from the government source that posted it. Updated .