36E77620R0001-014.pdf
PDF Posted
- Solicitation number
- 36E77620R0001
About this file
This document provides details for an upcoming federal contract solicitation for construction services. The Department of Veterans Affairs will issue a request for proposal for the design and construction of a new approximately 15,300 square foot freestanding mental health building located at the Providence VA Medical Center campus in Providence, Rhode Island. The project scope includes site preparation, demolition, construction of the building, and associated site and utility work. The solicitation will be a total service-disabled veteran-owned small business set-aside with an anticipated award value between $10-20 million and a period of performance of approximately 600 calendar days from notice to proceed. Questions must be submitted in writing by email no later than the anticipated solicitation date of December 20, 2019.
36E77620R0001 Attachment 13 - CD Drawings - Structure.pdf
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ZONE 4 ZONE 5
WALL COMPONENTS & CLADDING NET WIND PRESSURES (PSF)
REFERENCE: ASCE 7-16, FIG 30.1-1
ROOF TYPE: GABLE OR FLAT ROOF
a=3 FT
TRIBUTARY AREA (SQ FT.) TRIBUTARY AREA (SQ FT.)
10 500 10 500
+31 -34 +31+23 +23-26 -41 -26
ZONE 1 ZONE 2
ROOF COMPONENTS & CLADDING NET WIND PRESSURES (PSF)
REFERENCE: ASCE 7-16, FIG 30.3-2A
ROOF TYPE: GABLE OR FLAT ROOF
a=3 FT
TRIBUTARY AREA (SQ FT.) TRIBUTARY AREA (SQ FT.)
10 100 10 100
+13 -49 +13+10 +10-39 -65 -50
ZONE 3/OVERHANG
TRIBUTARY AREA (SQ FT.)
10 100
+13 +10-88 -61
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
/1
/2
:1
:3
A
M C
U s e rs
\c fo rg u e s \D o c u m e n ts
\4
V
A P
R O
V
ID
E N
C E
R c h ri s b e c k e rs tr u c tu ra l.
c o m
.r v t
SS-001
CGW BSE10 APR 2019
GENERAL NOTES
GENERAL NOTES
1. THE NOTES ON THESE DRAWINGS ARE NOT INTENDED TO REPLACE SPECIFICATIONS. SEE SPECIFICATIONS FOR REQUIREMENTS IN ADDITION TO GENERAL NOTES. INCONSISTENCIES BETWEEN THESE DRAWINGS AND THE SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO PROCEEDING WITH
THE AFFECTED PORTION OF THE WORK.
2. EDITIONS OF MATERIAL STANDARDS REFERENCED ON THIS DRAWING SHALL BE AS INDICATED IN THE
BUILDING CODES.
3. STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH ALL OTHER PROJECT DRAWINGS AND SPECIFICATIONS. CONSULT ALL OTHER PROJECT DOCUMENTS FOR LOCATIONS AND DIMENSIONS OF OPENINGS, CHASES, INSERTS, REGLETS, SLEEVES, DEPRESSIONS, AND OTHER DETAILS NOT SHOWN ON
STRUCTURAL DRAWINGS.
4. ALL DIMENSIONS, EXISTING CONDITIONS, AND AS-BUILT CONDITIONS MUST BE VERIFIED IN THE FIELD. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE STRUCTURAL ENGINEER BEFORE
PROCEEDING WITH THE EFFECTED PART OF THE WORK.
5. SECTIONS AND DETAILS SHOWN ON ANY STRUCTURAL DRAWINGS SHALL BE CONSIDERED TYPICAL FOR SIMILAR CONDITIONS AS DETERMINED BY THE STRUCTURAL ENGINEER. THE STRUCTURAL ENGINEER
RESERVES THE RIGHT TO INTERPRET DETAILS TO ADDRESS OTHER PROJECT CONDITIONS.
6. ALL APPLICABLE FEDERAL, STATE, AND MUNICIPAL REGULATIONS SHALL BE FOLLOWED, INCLUDING THE
FEDERAL DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH ACT.
7. THE STRUCTURE IS DESIGNED TO BE SELF SUPPORTING AND STABLE ONLY AFTER THE STRUCTURAL WORK CONTAINED IN THE STRUCTURAL DRAWINGS IS COMPLETED. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE ERECTION PROCEDURES AND SEQUENCE TO ENSURE THE SAFETY OF THE BUILDING AND ITS COMPONENTS DURING ERECTION. THIS INCLUDES THE ADDITION OF NECESSARY SHORING, SHEETING, TEMPORARY BRACING, GUYS, OR TIE-DOWNS. SUCH MATERIAL SHALL REMAIN THE PROPERTY OF THE
CONTRACTOR AFTER COMPLETION OF THE PROJECT.
8. REFERENCE THE PROJECT SPECIFICATIONS FOR SUBMITTAL AND TESTING REQUIREMENTS.
DESIGN LOADS
1. BUILDING CODE:
INTERNATIONAL BUILDING CODE (IBC), 2018 EDITION
ASCE 7-16 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER
STRUCTURES, RISK CATEGORY II
VA H-18-8 SEISMIC DESIGN REQUIREMENTS
2. DESIGN FLOOR LIVE LOADS:
LOBBIES, FIRST FLOOR, CORRIDORS, & PUBLIC AREAS
OFFICES & EXAM ROOMS
STAIR & EXIT WAYS
LIVE LOAD HAVE BEEN REDUCED WHERE ALLOWED IN ACCORDANCE WITH
IBC 2018 SECTION 1607.10 AND ASCE 7-16 SECTION 4.7.
UNIFORM / CONCENTRATED
100 PSF / 2,000 LBS
80 PSF / 2,000 LBS
100 PSF / 1,000 LBS
3. DESIGN ROOF SNOW LOAD:
GROUND SNOW LOAD (Pg):
SNOW EXPOSURE FACTOR (Ce):
SNOW LOAD IMPORTANCE FACTOR (Is):
SNOW LOAD THERMAL FACTOR (Ct):
FLAT ROOF SNOW LOAD (Pf):
DRIFTS AND DRIFT WIDTHS HAVE BEEN INCLUDED IN ACCORDANCE
WITH ASCE 7-16 SECTION 7.7.
35 PSF
1.0 1.0 1.1
27 PSF
4. DESIGN WIND LOAD:
ULTIMATE DESIGN WIND SPEED (VULT):
NOMINAL DESIGN WIND SPEED (VASD):
WIND EXPOSURE:
INTERNAL PRESSURE COEFFICIENT:
COMPONENTS & CLADDING PER ASCE 7-16
125 MPH
86 MPH (MRI 25)
B ±0.18
SEE TABLES THIS SHEET
5. DESIGN SEISMIC LOADS:
EQUIVALENT LATERAL FORCE PROCEDURE
SEISMIC IMPORTANCE FACTOR (IE):
MAPPED SPECTRAL RESPONSE ACCELERATIONS:
SEISMIC SITE CLASS:
SPECTRAL RESPONSE COEFFICIENTS:
SEISMIC DESIGN CATEGORY:
BASIC STRUCTURAL SYSTEM:
BUILDING FRAME SYSTEM
BASIC SEISMIC FORCE RESISTING SYSTEM:
STEEL SYSTEMS NOT SPECIFICALLY DETAILED FOR SEISMIC
RESISTANCE (R-3)
RESPONSE MODIFICATION FACTOR (R):
SEISMIC RESPONSE COEFFICIENT (CS):
SEISMIC BASE SHEAR (V):
MAXIMUM INTERSTORY DRIFT:
1.0 Ss: 0.176 S1: 0.062 E
SDS: 0.281
SD1: 0.173
C
X: 3 Y: 3 X: 0.070 Y: 0.073
X: 119 KIPS
Y: 126 KIPS
0.02 x STORY HEIGHT
FOUNDATION NOTES (soil supported, ground improved)
1. FOUNDATIONS HAVE BEEN DESIGNED IN ACCORDANCE WITH THE REPORT ENTITLED “EXPLORATIONS AND GEOTECHNICAL SERVICES, PROPOSED VAMC NEW MENTAL HEALTH BUILDING, PHASE 1, 830 CHALKSTONE AVENUE, PROVIDENCE, RHODE ISLAND”, PREPARED BY S.W. COLE ENGINEERING, INC., DATED 1/18/2019.
THE RECOMMENDATIONS OF THE REPORT ARE PART OF THIS WORK. REFER TO THIS REPORT FOR SPECIFIC
RECOMMENDATIONS.
2. FOUNDATION DESIGN IS BASED ON SHALLOW SPREAD FOOTINGS BEARING ON IMPROVED SOILS PER THE REQUIREMENTS OF THE GEOTECHNICAL REPORT. REFER TO THIS REPORT FOR SPECIFIC BEARING
RECOMMENDATIONS.
3. ALLOWABLE BEARING CAPACITY 4,000 PSF
4. EXTEND BOTTOM OF EXTERIOR FOOTINGS AT LEAST 3.5 FEET BELOW THE FINAL EXTERIOR GRADE FOR
PROTECTION AGAINST FROST.
5. NO FILL FOR BUILDING SUPPORT SHALL BE PLACED UNTIL SUBGRADES HAVE BEEN OBSERVED AND
APPROVED BY THE GEOTECHNICAL ENGINEER.
6. REFERENCE THE GEOTECHNICAL REPORT FOR ALL EXCAVATION, BACKFILL, COMPACTION, CONSTRUCTION
DEWATERING AND PERMANENT DRAINAGE REQUIREMENTS.
7. NO BACKFILL SHALL BE PLACED AGAINST FOUNDATION WALLS RETAINING EARTH, UNLESS WALLS ARE
ADEQUATELY BRACED TO PREVENT MOVEMENT OR STRUCTURAL DAMAGE.
8. SOILS EXPOSED AT THE BASE OF ALL SATISFACTORY FOUNDATION EXCAVATIONS SHOULD BE PROTECTED AGAINST ANY DETRIMENTAL CHANGE IN CONDITION, SUCH AS DISTURBANCE FROM RAIN OR FROST.
SURFACE RUNOFF SHALL BE DRAINED AWAY FROM THE EXCAVATIONS AND NOT BE ALLOWED TO POND.
FOUNDATION EXCAVATIONS SHALL BE ADEQUATELY PROTECTED FROM RAINFALL OR FREEZING
CONDITIONS. GROUNDWATER SHOULD BE ANTICIPATED FOR EXCAVATIONS AND APPROPRIATE
DEWATERING MEASURES SHALL BE EMPLOYED.
9. EXCAVATIONS FOR BUILDING CONSTRUCTION SHALL BE IN ACCORDANCE WITH OSHA REQUIREMENTS.
BRACED EXCAVATIONS SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF RHODE ISLAND. DO NOT UNDERMINE EXISTING FOUNDATIONS OF ANY ADJACENT STRUCTURES. REFER TO
THE GEOTECHNICAL REPORT FOR ADDITIONAL AND/OR MORE SPECIFIC REQUIREMENTS.
CONCRETE NOTES
1. CONCRETE WORK SHALL CONFORM TO THE ACI “MANUAL OF CONCRETE PRACTICE,” INCLUDING BUT NOT LIMITED TO ACI 318 “BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE” AND ACI 301
“SPECIFICATIONS FOR STRUCTURAL CONCRETE."
2. CONCRETE FOUNDATIONS SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 3,500 PSI.
CONCRETE SLABS SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 3,000 PSI. EXTERIOR SLAB-ON-GRADE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 5,000 PSI. ADDITIONAL CONCRETE MIX PERFORMANCE DATA INCLUDING AIR CONTENT, WATER-CEMENT RATIO, AGGREGATE SIZE, SLUMP, ETC. HAS BEEN INCLUDED IN THE PROJECT SPECIFICATIONS. SEE THE SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS.
3. CONCRETE SHALL NOT BE PLACED IN WATER OR ON FROZEN GROUND.
4. REINFORCING BARS SHALL CONFORM TO ASTM A615 GRADE 60 DEFORMED BARS AND SHALL BE DETAILED, FABRICATED, AND PLACED IN ACCORDANCE WITH ACI 315.
5. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185 AND SHALL BE PROVIDED IN FLAT SHEETS. LAP TWO
SQUARES AT ALL JOINTS AND TIE AT 3'-0" ON CENTER.
6. FIBER REINFORCEMENT SHALL BE TYPE II SYNTHETIC VIRGIN HOMOPOLYMER POLYPROPYLENE FIBERS
CONFORMING TO ASTM C1116.
7. MINIMUM CONCRETE PROTECTIVE COVERING FOR REINFORCEMENT, UNLESS NOTED OTHERWISE, SHALL BE
AS FOLLOWS:
A. SURFACES CAST AGAINST AND PERMANENTLY IN CONTACT WITH EARTH, 3”
B. FORMED SURFACES IN CONTACT WITH EARTH OR EXPOSED TO WEATHER:
#5 BARS AND SMALLER, 1 1/2”
#6 THROUGH #11 BARS, 2”
C. SURFACES NOT IN CONTACT WITH EARTH OR EXPOSED TO WEATHER:
WALLS, SLABS, AND JOISTS #11 AND SMALLER, 1”
BEAMS, GIRDERS, AND COLUMNS; ALL REINFORCEMENT, 1 1/2"
8. REINFORCEMENT SHALL BE CONTINUOUS AROUND CORNERS AND AT INTERSECTIONS. PROVIDE LAPPED BARS AT NECESSARY SPLICES OR HOOKED BARS AT DISCONTINUOUS ENDS. SEE SCHEDULE FOR REQUIRED
REBAR LAP SPLICE LENGTHS.
9. WELDING OF REINFORCEMENT IS NOT PERMITTED, UNLESS SPECIFICALLY INDICATED.
10. CONSTRUCTION AND CONTRACTION JOINTS SHOWN ON DRAWINGS ARE MANDATORY. OMISSIONS, ADDITIONS, OR CHANGES SHALL NOT BE MADE EXCEPT WITH THE SUBMITTAL OF A WRITTEN REQUEST TOGETHER WITH DRAWINGS OF THE PROPOSED JOINT LOCATIONS FOR APPROVAL OF THE STRUCTURAL ENGINEER. WHERE JOINTS ARE NOT SHOWN, OR WHEN ALTERNATE LOCATIONS ARE PROPOSED, DRAWINGS SHOWING LOCATION OF CONSTRUCTION AND CONTRACTION JOINTS AND CONCRETE PLACING SEQUENCE SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER FOR REVIEW PRIOR TO PREPARATION OF THE REINFORCEMENT SHOP DRAWINGS. CONCRETE SHALL BE PLACED WITHOUT HORIZONTAL CONSTRUCTION JOINTS EXCEPT WHERE SHOWN OR NOTED. VERTICAL CONSTRUCTION JOINTS AND STOPS IN CONCRETE BEAMS/GRADE BEAMS SHALL BE MADE AT MIDSPAN OR AT POINTS OF MINIMUM SHEAR, UNLESS NOTED
OTHERWISE.
11. SPACING OF CONSTRUCTION OR CONTRACTION JOINTS, UNLESS NOTED OTHERWISE SHALL BE AS FOLLOWS:
A. FOOTINGS AND WALLS:
MAX SPACING OF 40'-0” OR 15'-0” FROM ANY CORNER. A MINIMUM OF 72 HOURS SHALL ELAPSE BETWEEN ADJACENT CONCRETE PLACEMENTS. COORDINATE JOINT LOCATIONS WITH VENEER CONTROL JOINT
LOCATIONS WHEREVER POSSIBLE.
B. SLABS ON GRADE
MAX SPACING IN EACH DIRECTION OF 36xSLAB DEPTH. LIMIT PLAN ASPECT RATIOS TO 1.5.
12. ANCHOR RODS FOR STRUCTURAL STEEL ATTACHMENTS SHALL BE HEADED RODS CONFORMING TO ASTM F1554, GRADE 36 KSI WELDABLE STEEL, UNLESS NOTED OTHERWISE ON DRAWINGS. ANCHOR RODS FOR ATTACHMENT OF SILL PLATES SHALL BE A307, UNLESS NOTED OTHERWISE ON THE DRAWINGS. ANCHOR RODS THAT ARE TO BE IN CONTACT WITH PRESSURE TREATED LUMBER SHALL BE HOT-DIPPED GALVANIZED.
13. ALL GROUT BENEATH BASE PLATES & BEARING PLATES SHALL BE 5000-PSI (MIN) NON-SHRINK GROUT.
14. SLAB THICKNESSES INDICATED ON THE DRAWINGS ARE MINIMUMS. PROVIDE SUFFICIENT CONCRETE TO ACCOUNT FOR STRUCTURE DEFLECTION, SUBGRADE FLUCTUATIONS, AND TO OBTAIN THE SPECIFIED SLAB
ELEVATION AT THE FLATNESS AND LEVELNESS INDICATED.
15. PROVIDE A 15-MIL POLYOLEFIN VAPOR RETARDER MEETING THE REQUIREMENTS OF ASTM E1745 CLASS A OVER PREPARED SUB BASE (U.N.O). REFERENCE ARCHITECTURAL DRAWINGS AND GEOTECHNICAL REPORT
FOR ADDITIONAL REQUIREMENTS AND VAPOR RETARDER LOCATIONS.
16. FOR ALL OPENINGS IN CONCRETE WALLS AND SLABS, PROVIDE SUPPLEMENTAL REINFORCING AROUND
OPENING AS SHOWN IN THE TYPICAL DETAILS.
17. PROVIDE PVC SLEEVES WHERE PIPES PASS THROUGH EXTERIOR CONCRETE OR SLABS CAST ON GRADE.
ADJACENT SLEEVES SHALL BE SPACED A MINIMUM OF THREE DIAMETERS APART. NO PENETRATIONS SHALL
BE MADE THROUGH FOOTINGS WITHOUT WRITTEN PERMISSION FROM ENGINEER.
18. INSTALLATION OF REINFORCEMENT SHALL BE COMPLETED AT LEAST 24 HOURS PRIOR TO THE SCHEDULED CONCRETE PLACEMENT. NOTIFY STRUCTURAL ENGINEER OF COMPLETION AT LEAST 24 HOURS PRIOR TO THE
SCHEDULED COMPLETION OF THE INSTALLATION OF REINFORCEMENT.
19. ALL ITEMS TO BE EMBEDDED INTO CONCRETE SHALL BE INSTALLED PRIOR TO PLACEMENT OF CONCRETE.
PROVIDE ADDITIONAL REINFORCEMENT AND/OR TEMPLATES AS REQUIRED TO ENSURE THE CORRECT POSITIONS OF EMBEDMENTS. "WET SETTING" OF EMBEDMENTS INTO CONCRETE IS STRICTLY PROHIBITED.
EMBEDMENTS INCLUDE, BUT NOT BY LIMITATION, REINFORCEMENT, REINFORCING DOWELS, EMBEDDED PLATES, ANCHOR RODS, ANCHOR INSERTS, SLEEVES, LOAD TRANSFER PLATES, DIAMOND DOWELS, AND
SHELF BULK HEADS.
PRECAST CONCRETE HOLLOW CORE PLANK
1. PRECAST CONCRETE WORK SHALL CONFORM TO ACI 318 “BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE,” PCI MNL-116 “MANUAL FOR QUALITY CONTROL FOR PLANTS AND PRODUCTION OF PRECAST AND PRESTRESSED CONCRETE PRODUCTS,” AND PCI MNL-120 “DESIGN HANDBOOK-PRECAST AND PRESTRESSED
CONCRETE.”
2. PRESTRESSING TENDONS SHALL CONFORM WITH ASTM A416 (INCLUDING SUPPLEMENT), GRADE 250 OR 270.
3. CONCRETE STRENGTH SHALL BE MINIMUM 5,000 PSI AT 28 DAYS.
4. ALL CONCRETE SHALL BE AIR ENTRAINED MEETING AIR ENTRAINING REQUIREMENTS PER ACI 301 “SPECIFICATIONS FOR STRUCTURAL CONCRETE”, FOR CLASS OF CONCRETE AND APPLICATION. AIR
ENTRAINMENT ALL EXTERIOR CONCRETE 6% ± 1%.
5. PRECAST HOLLOW CORE PLANK SHALL BE DESIGNED FOR THE LIVE LOADS AS INDICATED UNDER “DESIGN LOADS” THIS DRAWING OR AS INDICATED ON LOAD DIAGRAMS. DESIGN SHOULD INCLUDE FOR ALL DEAD
LOADS DUE TO SELF WEIGHT AND APPLIED TOPPINGS AND TREATMENTS.
6. COMPLETE SHOP DRAWINGS AND DESIGN CALCULATIONS SIGNED AND SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF RHODE ISLAND AND SHALL BE SUBMITTED TO THE ARCHITECT AND STRUCTURAL ENGINEER FOR REVIEW PRIOR TO COMMENCEMENT OF THAT PORTION OF THE WORK.
7. COORDINATE WITH ALL ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWING FOR LOCATION OF CUTS AND PENETRATIONS. INDICATE LOCATION OF ALL SHOP AND FIELD CUT PENETRATIONS ON SHOP
DRAWINGS.
MASONRY NOTES
1. MASONRY WORK SHALL CONFORM TO ACI 530.1 "BUILDING CODE REQUIREMENTS AND SPECIFICATIONS FOR
MASONRY STRUCTURES."
2. ALL CONCRETE MASONRY UNITS IDENTIFIED ON THESE DRAWINGS FOR STRUCTURAL PURPOSES, INCLUDING BUT NOT BY LIMITATION, LOAD BEARING WALLS, STAIR SHAFTS, ELEVATOR SHAFTS, AND SHEAR WALLS, SHALL BE CONSTRUCTED FROM ASTM C90 NORMAL WEIGHT 2-CELL BLOCKS.
3. FIRE-RATED MASONRY UNITS SHALL BE PROVIDED WHERE REQUIRED BY THE ARCHITECTURAL DRAWINGS
AND SPECIFICATIONS.
4. MINIMUM PRISM STRENGTH OF BLOCK SHALL BE F'M = 1500 PSI IN 28 DAYS.
5. MORTAR SHALL CONFORM TO ASTM SPECIFICATION C270, TYPE M OR S.
6. GROUT SHALL CONFORM TO ASTM-C476.
7. REINFORCING FOR BOND BEAMS, LINTEL BLOCKS AND VERTICAL WALL REINFORCING SHALL SHALL CONFORM
TO ASTM A615, GRADE 60.
8. SEE SCHEDULE FOR STANDARD LAP LENGTH OF GRADE 60 MASONRY REINFORCING BARS. WHERE INDICATED, SPLICE BARS WITH COUPLERS OR MECHANICAL DEVICES RATED FOR 125% THE BAR YIELD STRENGTH.
PROVIDE CORNER BARS TO MATCH HORIZONTAL REINFORCEMENT PER THE TYPICAL DETAILS.
9. HORIZONTAL JOINT REINFORCING SHALL BE GALVANIZED LADDER-TYPE REINFORCING WITH 3/16” DIAMETER SIDE RODS AND 9 GAUGE CROSS TIES, U.N.O. REINFORCING SHALL BE PLACED IN MASONRY WALLS AT EVERY
SECOND BLOCK COURSE.
10. CONCRETE MASONRY UNITS SHALL BE LAID IN RUNNING BOND UNLESS OTHERWISE NOTED. PROVIDE FULL MORTAR COVERAGE ON ALL WEBS AND FACE SHELLS. PROVIDE CORNER BLOCKS AND END BLOCKS TO FINISH
ALL 90 DEGREE CORNERS AND WALL OPENINGS.
11. PROVIDE LINTELS AT WALL PENETRATIONS AS SHOWN IN THE LINTEL SCHEDULE.
12. GROUTING PROCEDURES SHALL CONFORM TO ACI 530.1. ALIGN CELLS TO MAINTAIN A CLEAR UNOBSTRUCTED CONTINUOUS VERTICAL CHASE. CELLS MUST BE KEPT CLEAN OF PROTRUSIONS OR FINS OF MORTAR. FILL CELLS OF MASONRY UNITS AND WALL CAVITIES WHERE INDICATED WITH 2,000 PSI GROUT. MAXIMUM GROUT LIFT WITHOUT CLEAN-OUTS SHALL BE 5'-0”. SUPPORT ALL VERTICAL BARS IN CENTER OF GROUTED CELLS
WITH VERTICAL BAR POSITIONER.
13. FIELD PENETRATIONS THROUGH BLOCK WALLS SHALL NOT BE MADE THROUGH BOND BEAMS, LINTELS, OR
GROUTED CELLS.
LINTELS
1. THE FOLLOWING LINTELS SHALL BE USED FOR BRICK MASONRY OPENINGS, U.N.O. ON DRAWINGS OR UNLESS
THERE IS A POINT LOAD IN VINCINITY OF LINTEL:
MASONRY OPENING LINTEL SIZE
UP TO 3'-0" L 3 1/2 x3 1/2 x 5/16 3'-1" TO 4'-6" L 4 x 3 1/2 x 5/16 (LLV) 4'-7" TO 6'-0" L 5 x 3 1/2 x 5/16 (LLV) 6'-1" TO 8'-0" L 6 x 3 1/2 x 5/16 (LLV)
2. PROVIDE ONE ANGLE FOR EACH 4" WALL THICKNESS. FOR 6" WALL THICKNESS, PROVIDE WT OR BUILT-UP SECTION WITH PROPERTIES EQUAL TO OR GREATER THAN 1 1/2 TIMES THE ANGLES PROPERTIES FOR A 4"
WALL THICKNESS.
3. PROVIDE 8" OF BEARING AT EACH END OF ALL LINTELS.
4. ALL EXTERIOR LINTELS SHALL BE HOT-DIPPED GALVANIZED.
STRUCTURAL STEEL NOTES
1. STRUCTURAL STEEL DESIGN, DETAIL, FABRICATION, AND ERECTION SHALL CONFORM TO ANSI/AISC 360 “SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS” AND TO ANSI/AISC303 “CODE OF STANDARD PRACTICE
FOR STEEL BUILDINGS AND BRIDGES."
2. STRUCTURAL STEEL SHAPES SHALL CONFORM TO THE FOLLOWING, UNLESS NOTED OTHERWISE:
A. STEEL PLATES, SHAPES, AND BARS: ASTM A36
B. WIDE-FLANGE SECTIONS: ASTM A992
C. HOLLOW STRUCTURAL SECTIONS (HSS): ASTM A500 GR. C
D. PIPES: ASTM A53 GR. B
3. CONNECTION DESIGN FOR THIS PROJECT IS THE RESPONSIBILITY OF THE FABRICATOR. CONNECTION CALCULATIONS, SIGNED AND SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF RHODE ISLAND, SHALL BE SUBMITTED WITH THE SHOP DRAWINGS FOR THIS PROJECT. SEE THE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. DESIGN AND DETAIL ALL CONNECTIONS ACCORDING TO AISC STANDARD CONNECTION TABLES. DESIGN STANDARD BEAM CONNECTIONS FOR THE MAXIMUM LOAD
CAPACITY OF THE MEMBER, U.N.O. ON THE SIMPLE SHEAR BEAM REACTION SCHEDULE.
4. BOLTED CONNECTIONS SHALL USE 3/4" ASTM F3125, GRADE A325, HIGH STRENGTH BOLTS (U.N.O.), EXCEPT WHERE SLIP CRITICAL CONNECTIONS ARE REQUIRED AND NOTED BY (SC) ON THE DRAWINGS OR AS
REQUIRED BY CONNECTION DESIGN.
5. ALL WELDING SHALL CONFORM TO AWS D1.1. ELECTRODES SHALL CONFORM TO AWS A5.1 E70XX SERIES
(U.N.O.) WITH PROPER ROD TO PRODUCE OPTIMUM WELD (LOW HYDROGEN).
6. SEE CONCRETE NOTES AND DRAWINGS FOR ANCHOR BOLT INFORMATION.
7. PROVIDE 1/4" THICK LEVELING PLATE AND 3/4” ± OF NON SHRINK GROUT UNDER ALL COLUMN BASE PLATES (U.N.O.). LEVELING PLATES SHALL BE SET AND GROUTED PRIOR TO ERECTING COLUMNS. LEVELING NUTS MAY
BE USED AS AN ALTERNATE PROVIDED BASEPLATES ARE SHIMMED IN ACCORDANCE WITH AISC
SPECIFICATIONS UNTIL SUCH TIME AS THE BASEPLATE IS GROUTED.
8. PROVIDE 3/8” MINIMUM STIFFENER PLATES EACH SIDE OF BEAM WEB AT BEAMS FRAMING OVER COLUMNS
AND AT BEAMS SUPPORTING COLUMNS ABOVE.
9. PROVIDE L 4 x 4 x 1/4 DECK SUPPORT ANGLE AS REQUIRED AT COLUMNS WHERE STRUCTURAL MEMBERS DO
NOT FRAME IN AT ALL FOUR SIDES.
10. COAT ALL COLUMNS, BASEPLATES, AND BRACE ELEMENTS ENCASED IN CONCRETE OR BELOW GRADE WITH BITUMINOUS MASTIC COATING. SUBMIT COATING TO ARCHITECT AND ENGINEER FOR APPROVAL.
11. PROVIDE ALL MISCELLANEOUS ANGLES, PLATES, ANCHOR BOLTS, ETC. SHOWN ON ARCHITECTURAL DRAWINGS. COORDINATE WITH MISCELLANEOUS METAL FABRICATOR TO ENSURE COMPLETE COVERAGE OF
ALL ITEMS.
12. ALL STAIR STRUCTURES AND RAILING ASSEMBLIES SHALL BE DESIGNED BY A SPECIALTY ENGINEER ENGAGED BY THE FABRICATOR. ALL DESIGNS SHALL MEET THE REQUIREMENTS OF THE INDICATED BUILDING
CODE. COORDINATE ALL DETAILS WITH THE ARCHITECTURAL DRAWINGS AND SUBMIT COMPLETE
FABRICATION DRAWINGS WITH ALL NECESSARY SUPPORTING ENGINEERING CALCULATIONS FOR REVIEW.
DRAWINGS AND CALCULATIONS SHALL BE STAMPED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE
OF RHODE ISLAND.
METAL DECK
1. METAL DECK DESIGN, DETAIL, FABRICATION, AND ERECTION SHALL CONFORM TO THE STANDARDS OF THE
STEEL DECK INSTITUTE (SDI).
2. REFERENCE PROJECT SPECIFICATIONS FOR DECK ATTACHMENTS, PENETRATION REINFORCEMENT, AND
ACCESSORIES.
3. THE METAL DECK SHALL BE FORMED OF STEEL SHEETS CONFORMING TO THE FOLLOWING STANDARDS: G60 GALVANIZED ZINC COATING, ASTM A653, STRUCTURAL QUALITY, GRADE 33 OR HIGHER. IF INDICATED ON THE DRAWINGS TO BE FIELD PAINTED, PROVIDE GALVANIZED DECK THAT IS FACTORY PRIMED AND COMPATIBLE
WITH TOP COAT.
4. DECK TYPE, GAGE, AND DEPTH SHALL BE AS NOTED ON THE DRAWINGS. PROVIDE 3 SPAN CONDITIONS
MINIMUM (U.N.O.).
ELEVATOR
1. ALL STRUCTURAL ELEMENTS ASSOCIATED WITH THE ELEVATOR SHOWN ON THE DRAWINGS ARE BASED ON PRELIMINARY INFORMATION FROM THE ARCHITECT. PRIOR TO CONSTRUCTION/FABRICATION OF THESE STRUCTURAL ELEMENTS, CONTRACTOR SHALL VERIFY ALL ELEVATOR REQUIREMENTS WITH THE APPROVED ELEVATOR SUBMITTAL INCLUDING, BUT NOT LIMITED TO: ELEVATOR PIT SIZE AND DEPTH, PIT BONDOUTS, SUMP SIZE AND LOCATION, PISTON REQUIREMENTS, LOCATION OF RAIL SUPPORTS AND INSERT LOCATIONS, CLEAR OVERHEAD REQUIREMENTS, OVERHEAD MACHINE SUPPORT STEEL, AND HOIST BEAM/SAFETY BEAM REQUIREMENTS. NOTIFY ARCHITECT AND ENGINEER OF ANY CONFLICTS PRIOR TO PROCEEDING.
2. ANY CHANGE BETWEEN THE APPROVED ELEVATOR SUBMITTAL AND PRELIMINARY INFORMATION WILL
REQUIRE REVIEW BY THE ARCHITECT AND ENGINEER.
3. AT MASONRY HOISTWAYS, SPECIAL MASONRY DETAILING MAY BE REQUIRED TO ALLOW FOR FULL WIDTH OPENING AT BASE AND UPPER LEVEL(S). REFERENCE ELEVATOR REQUIREMENTS AND TYPICAL DETAIL.
VA RI FACILITIES MANAGEMENT
SERVICE
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
NEW MENTAL HEALTH
BUILDING - PHASE 1
650-332
830 CHALKSTONE AVE, PROVIDENCE, R.I. 02908
Revisions: Date:
5 6 7
8.7
A
B
C
D
EE
FF
GG
E.9
E.5
W x3
B P
-B W x3
B
P -A
W x7
B P
-B W x4
B
P -B
W x3
B P
-A
W x3
W x3
W x4
B P
-A W x5
B P
-A
W x3
B P
-A
W x4
B P
-A
W x4
B P
-BW
x4
B P
-BW
x4
B P
-BW
X68 B
P -A
W x4
B P
-AW
x4
B P
-AW
x4
B P
-A
W x4
B P
-A
W x4
B P
-A
F4 (68'-0")* P1 S.K.
F7 F7 (69'-6")
F6
F6
F6
F6
F4 P2 S.K.
F4 P1 S.K.
F5 (-1'-0")
F5 P3 S.K.
F4 P4 S.K.
4" FIBER REINF CONC
SLAB ON GRADE
T/SLAB EL 73'-0"
ELEVATOR PIT
MAT FDN
BELOW
ELEV PITS
STEP FTG
STEP FTG
F5
P2 (SIM)
S.K.
F5 P6 S.K.
15'-0"
7'-0"
12'-0"
10'-0" 23'-0" 21'-0" 21'-0" 21'-0" 26'-0"
SB-302
SB-302
SB-301
SB-301
SB-301
SB-302
C.9
12'-1 1/4"
1'-8 5/8"
/8
/8
125'-11 1/4"
1'-8 5/8"2'-2 5/8"
4.8 5.7
16'-8 13/16" 19'-6" 15'-4 3/4"
10'-1" 61'-6"
2'-1 5/8"2'-2 5/8"
/8
/4
/8
4" FIBER REINF CONC
SLAB ON GRADE
T/SLAB EL 73'-0"
F5 P4 S.K.
F5 P2 S.K.
F5 (68'-0")* P2
F7 (68'-0")* P2
(68'-0")*
(68'-0")*
(7
(72'-0")
(7 -0
(72'-0")
(69'-6")
SB-301
SB-301
STEP FTG
SB-301
SB-302
SB-301
SB-301
NOTE: ORIENT S.K.
AND SHEAR LUG
PARALLEL TO WALL
F5 P3 S.K.F5
P3 S.K.
P=11K
P=33K
P=66K P=127K
P=76K P=76K
P=40K
P=157K
P=125K P=145K P=88K
P=72K P=79K P=84K P=41K
P=54K
P=67K P=132K
P=20K
P=29K
P=39K
P=22K
P=9K
P=26K
P=82K
P=20K
P=45K
P=87K
P=95K
C.J. (TYP)
C .J
(T
Y P
C.J. (TYP)
C .J
(T
Y P
(S E
E W
A L L E
L E
V A
T
IO
N
T H
IS
D
W G
/8
(SEE WALL ELEVATION 2 THIS DWG)
25'-4"
37'-5 1/4"
[74'-2"]
[75'-0"]
[74'-4"][75'-8"]
[76'-4"]
73'-0"
S T
E P
S H
E L F
9'-5" 8'-0"
S T
E P
S H
E L F
72'-4"
71'-0"
71'-0"
71'-0"
/8
[77'-8"]
[80'-4"]
STEP SHELF
STEP SHELF
1'-8 5/8"
W A
L L
/8
W A
L L
/8
SB-301
SB-301
SB-301
SB-302
SB-302
(T Y
P U
.N .O
W A
L L
WALL
1'-2"
WALL
1'-3"
W A
L L
WALL
1'-3"
W A
L L
F4
F4 F4
F4
F4
F4
F4
F5F5
W1
W
W
W
W1
(71'-0")
(7
(7
STEP FTG
15'-9 5/8" 1'-7 5/8"
SB-302
SB-302
18'-1 1/16"
/8
/8
1'-8 5/8"
103.0 0°
STEP STEM
STEP STEM
STEP STEM
/1
S
IM
C .J
(72'-0")
SB-302
ALIGN CHANGE
IN WALL
THICKNESS
W/FACE OF CMU
ELEVATOR SUMP PIT (TYP).
G.C. COORD SIZE &
LOCATION W/APPROVED
ELEVATOR AND MEP
C .J
SB-302
S
IM
SB-301
SB-302
SEE NOTE 15
8'-1" 8'-0" 17'-6"
33'-7" 92'-4 1/4"
1'-7 5/8"
W A
L L
1'-3" WALL
1'-4" WALL
(T Y
P U
.N .O
W A
L L
TYP PERIMETER LINE LOAD = 2.5 K/FT
GROUND IMPROVEMENT DESIGNER
SHALL ACCOUNT FOR 2.0 KSF DEAD
LOAD + LIVE REACTIONS FROM
ELEVATOR EQUIPMENT ON PIT FLOOR
(G.C. COORD W/ APPROVED ELEV)
SEE NOTE 15
H S
S x x /4
(S E
E N
O T
E
(4)#4x36" DIAG
SLAB DOWELS
IN TOP OF SLAB
CONC VERT DUCT
BANK (SEE MEP
DWGs). EXTEND
DUCTBANK CONC
DOWN TO FTG BLW
1'-0"x2'-0" STIP FTG
BLW DUCT BANK W/
(3)#5 HORIZ. EXTEND
#5 MIN 2'-0" INTO COL
FTGs EA END
STEP FTG
F4 4'-0"x4'-0"x1'-0" 4#5
F5 5'-0"x5'-0"x1'-2" 5#6
FOOTING
MARK
FOOTING
SIZE
REINF EACH WAY
BOT U.N.O.
FOOTING SCHEDULE
F6 6'-0"x6'-0"x1'-4" 6#6
F7 7'-0"x7'-0"x1'-6" 7#6
NOTE: AT RETAINING WALL FOOTING DESIGNATION IS FOR ADDITION
OF REBAR MAT ONLY.
FOUNDATION PLAN
1/8"=1'-0"
NOTES:
1. TOP OF WALL EL 73'-0" U.N.O. BY [XX'-XX"]
2. INDICATES TOP OF FOUNDATION SHELF ELEVATION.
3. Fx INDICATES CONCRETE FOOTING. SEE SCHEDULE FOR SIZE & REINF.
4. TOP OF INTERIOR FOOTING EL (72'-0") U.N.O.
5. TOP OF EXTERIOR FOOTING EL (69'-6") U.N.O.
6. Px INDICATES REINF CONCRETE PIER. SEE PIER DETAILS DWG SB-300. NOTE: BOND OUT WALL STEM AS REQD
FOR BASE PLATE. DO NOT BOND OUT BRICKSHELF.
7. TOP OF PIER EL {72'-0"} U.N.O.
8. COORD ALL FLOOR DRAINS (W/ASSOCIATED SLOPES) W/ARCH DWGS.
9. BP-x INDICATES COLUMN BASE PLATE. SEE DWG SF-500 FOR BASE PLATE DETAILS.
10. C.J. INDICATES SLAB CONTRACTION/CONSTRUCTION JOINT. SEE TYP DETAILS DWG SB-300 FOR ADDL INFO.
11. INDICATES FOOTING DESIGN LOAD TO BE CONSIDERED FOR GROUND IMPROVEMENT DESIGN. IN
ADDITION, 80 PSF LIVE LOAD SHALL BE CONSIDERED OVER ENTIRE FLOOR. LOADS PROVIDED ARE PER ASCE7
ASD LOAD COMBINATIONS. FOUNDATION WEIGHTS NOT INCLUDED IN DESIGN LOADS.
12. W1,W2 ETC INDICATES CMU WALL TYPE AND REINFORCEMENT. SEE CMU SECTIONS DWG SB-303.
13. S.K. INDICATES BONDOUT KEY FOR SHEAR LUG (SEE BASE PLATE DETAILS SF-500).
14. DIMENSIONS MARKED * SHALL BE COORDINATED BY G.C. W/APPROVED ELEVATOR PRIOR TO CONSTRUCTION.
15. STEP FTG AS REQD BELOW PIPING (COORD FINAL LOCATIONS WITH CIVIL AND MEP). PROVIDE 6" (MIN)
CLEARANCE FROM TOP OF FTG TO BOT OF PIPING. SLEEVE PIPE THRU WALL. MAINTAIN FDN WALL HORIZ
REINF. SEE DWG SB-300 FOR TYP OPENING IN FDN WALL DETAIL.
16. PROVIDE HSS8x4x1/4 SEPARATOR BEAMS BETWEEN ELEVATOR HOIST WAYS. INTERMEDIATE BEAMS MAY BE REQUIRED BETWEEN FLOORS FOR RAIL SUPPORT. G.C. COORDINATE FINAL QUANTITIY AND ELEVATION OF ALL SEPARATOR BEAMS WITH ELEVATOR MANUFACTURER. BEAR SEPARATOR BEAM EACH END ON BEARING PL
PER TYPICAL DETAIL DWG SF-500.
P=XXK
X'-XX"
T/STL LEVEL 1
85' - 6"
BASEMENT
73' - 0"
GE.5
21'-4"
3'-9 7/8" 4'-0" 3'-4" 4'-8" 4'-0" 1'-5 1/8" 8"
8"
1'-0 5/8"8"
4'-2 1/2" 6'-0" 6'-0" 4'-0" 3'-5 1/8"
84'-4"
82'-4"
80'-4"
78'-4"
76'-4"
84'-4"
[87'-6"]
[85'-8"]
[83'-8"]
[81'-8"]
[79'-8"]
[77'-8"]
[76'-4"]
1'-8 5/8" 1'-3"
5'-0"
(3)#6 @ 8" O.C. O.F. , EACH SIDE OF OPNG
W/HOOKS IN FTG
SB-302
CMU INFILL
T/BOND BEAM
86' - 4"
SEE 5/SB-302
FOR BEAM
REINF
T/STL LEVEL 1
85' - 6"
BASEMENT
73' - 0"
8.7910
7'-0"15'-0"
14'-10 5/8"5'-4"4'-0" 5 3/8"
8"
7'-4"6'-8"5'-4"4'-8"1'-4"
77'-0"
[80'-4"] 79'-8"
82'-4"
1'-7 3/8"1'-8 5/8"
74'-4"
[83'-0"]
[86'-4"] T/BOND BEAM
86' - 4"
WALL ELEVATION 2
1/4"=1'-0"
NOTES:
1. [X'-XX"] INDICATED TOP OF WALL ELEVATION.
2. INDICATES TOP OF FOUNDATION SHELF ELEVATION.X'-XX"
WALL ELEVATION 1
1/4"=1'-0"
NOTES:
1. [X'-XX"] INDICATED TOP OF WALL ELEVATION.
2. INDICATES TOP OF FOUNDATION SHELF ELEVATION.X'-XX"
13'-0" 6'-0"
SECT 1-4/SB-302 SECT 5-6/SB-302
2.0 KSF
1.6 KSF 1.0 KSF
2.0 KSF
RETAINING WALL DESIGN PRESSURES
(FOR GROUND IMPROVEMENT DESIGN)
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
/1
/2
:4 :2
P
M C
U s e rs
\c w ill ia m s \D o c u m e n ts
\R E
V
IT
\4 V
A P
R O
V
ID
E N
C E
R c g w
.r v t
SB-100
CGW BSE10 APR 2019
FOUNDATION PLAN
VA RI FACILITIES MANAGEMENT
SERVICE
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
NEW MENTAL HEALTH
BUILDING - PHASE 1
650-332
REF
M
IN
2' -0
M
IN
2'-0"
PLACE THIS PORTION
OF SLAB AFTER
SLAB ON GRADE CONTRACTION OR
CONSTRUCTION JOINT (TYP)
PREMOLDED JOINT
FILLER (TYP)
TYP INT COLUMN ISOLATION JOINT DETAIL
NOTE: FOR FOOTING SIZE &
REINF SEE SCHEDULE.
CONC SLAB ON GRADE
(SEE PLAN)
FILL POCKET W/CONC
COL (SEE PLAN)
CORNER BARS TO
MATCH HORIZ
REINF
CORNER INTERSECTION
DOWELS TO
MATCH HORIZ
REINF
TYP WALL REINF DETAILS
REF
16 db 16 db
(TYP)
40 db
(T Y
P d b
TYP OPENING IN WALL OR SLAB DETAIL
(TYP)
40 db
(T
YP)1'
-0
(T Y
P d b
ADDL #5 E.F.
@ RECT OPNG
#5 E.F. (TYP 4 SIDES)
TYP CONSTRUCTION JOINT IN WALL
TYP HORIZ REINF
(EXTEND FOR
SPLICE)
SEE TABLE
LAP
PROVIDE 3/4" CHAMFER
STRIP EA SIDE
(S E
E P
L A
N
1 1/2" x3 1/2" KEYWAY
FULL HEIGHT OF WALL
1 1/2"x3 1/2" KEY t t
2t 2t
TYP SLAB ON GRADE CONST JOINT DETAIL
TYP SLAB DETAIL U.N.O.
CONC SLAB ON GRADE. ALL SLABS ON
GRADE ARE TO BE CURED PER THE
SPECIFICATIONS.
1 1/4" DEEP, EARLY
ENTRY SAWCUT
(S E
E P
L A
N
SLAB ON GRADE CONTRACTION
JOINT DETAIL U.N.O.
8"
(S E
E P
L A
N
(S E
E P
L A
N
(S E
E P
L A
N
1#4
TYP SLAB ON GRADE
DEPRESSION DETAIL
N.T.S.
N.T.S.
N.T.S. t = SLAB THICKNESS
N.T.S.
N.T.S.
N.T.S. N.T.S.
(S E
E P
L A
N
TYP REINF
TYP CONTRACTION
JOINT IN WALL
N.T.S.
REF
REF
TYP INTERIOR FOOTING DETAIL U.N.O.
N.T.S.
SEE SOILS REPORT &
EARTHWORK SPEC FOR
UNDERSLAB PREPARATION
VAPOR BARRIER (SEE ARCH)
BAR SIZE
LAP LENGTH
3,500 PSI
REBAR LAP SPLICE TABLE
#3
#4
#5
#6
#7
#8
30"
36"
48"
56"
81"
93"
5,000 PSI
24"
32"
42"
48"
72"
80" t
NOTE: FOR ADDL INFO
SEE FDN WALL SECTIONS
#4 @ 16" O.C.
48"
24"
TYPICAL SLAB DETAIL AT DOOR
t
N.T.S. t = SLAB THICKNESS t
2t
1'-0" MIN
MATCH FOOTING
REINF
TYP STEP FOOTING DETAIL
N.T.S. t=FOOTING THICKNESS
(TYP)
LAP LENGTH
WALL DWLS (WHERE
PRESENT) TO EXTEND
TO BOT BARS (TYP)
(TYP)
LAP LENGTH
REVEAL JOINT IN FORM, EA
SIDE (SEE CONC SPECS)
REF
REF
P1/P1A
6#6 VERT
W/MATCHING DWLS
#4 TIES: 2@3" O.C. AT
TOP, BAL @12" O.C.
(S E
E P
L A
N
(SEE PLAN)
NOTES:
1. WALL REINF NOT SHOWN FOR CLARITY. U.N.O.
2. INDICATES FDN WALL SHELF. SEE PLANS AND WALL SECTIONS FOR ADDL INFO.
3. OMIT TOP CROSS TIES AT SHEAR KEYS. PERIMETER TIES TO REMAIN.
PIER DETAILS
1/2"=1'-0"
P2/P2A8"
REF
REF
6#6 VERT
W/MATCHING DWLS
#4 TIES: 2@3" O.C. AT
TOP, BAL @12" O.C. 8"8"
(S E
E P
L A
N
1'-4"
4 1/2"
N.T.S.
REF
REF
REF
REF REF
8" 8"
1'-4"
(S E
E P
L A
N
6#6 VERT
W/MATCHING DOWELS
#4 TIES: 2@3" O.C.
TOP, BAL @12" O.C.
E
E
(SEE PLAN)
(S E
E P
L A
N
(S E
E P
L A
N
1'-4"
(SEE PLAN)
/2
1'-8 5/8"
6" 8"
/8
1'-4"
8" 8"
"1
P3 P4
P5 P6
#4 TIES: 2@3" O.C.
TOP, BAL @12" O.C.
6#6 VERT
W/MATCHING DOWELS
REF
1'-4"
8" 8"
/8
1'-8 5/8"
8" 6"
#4 TIES: 2@3" O.C.
TOP, BAL @12" O.C.
6#6 VERT
W/MATCHING DOWELS
TYP EXT COLUMN ISOLATION JOINT DETAIL
' -0 "
CONTRACTION OR
CONSTRUCTION JOINT (TYP)
PREMOLDED JOINT FILLER (TYP)
PLACE THIS PORTION
OF SLAB AFTER
SLAB ON GRADE
INSIDE FACE
OF FDN WALL
N.T.S.
SEE PLAN
PLACE THIS PORTION
OF SLAB AFTER
SLAB ON GRADE
CONTRACTION OR
CONSTRUCTION JOINT (TYP)
PREMOLDED JOINT
FILLER (TYP)
ALT INT COLUMN ISOLATION JOINT DETAIL
N.T.S.
REF
REF
TOOL EDGE (TYP)
#4 DRILL & EPOXY
(3" EMBED) INTO
SLAB EA CORNER
ROUGHEN SURFACE TO 1/4"
AMPLITUDE & APPLY BONDING
AGENT PRIOR TO PLACING
NEW CONCRETE
#3@12" E.W. FOR T < 4"
#4@12" E.W. FOR T > 4"
NOTE: COORD PAD SIZE WITH MEP
CONTRACTOR BASED ON ACTUAL
EQUIPMENT SELECTION.
TYP EQUIPMENT HOUSEKEEPING PAD DETAIL
N.T.S.
(S E
E M
E C
H
V A
R
IE
S
RIGID INSULATION (SEE ARCH)
REF
MIN
2'-0"Ø
(S E
E P
L A
N
4 1/2"
OMIT NOTCH IN
STEM AT P1A
/2
OMIT NOTCH IN
STEM AT P2A
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
/1
/2
:1
:1
A
M C
U s e rs
\c fo rg u e s \D o c u m e n ts
\4
V
A P
R O
V
ID
E N
C E
R c h ri s b e c k e rs tr u c tu ra l.
c o m
.r v t
SB-300
CGW BSE10 APR 2019
TYPICAL FOUNDATION DETAILS
VA RI FACILITIES MANAGEMENT
SERVICE
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
NEW MENTAL HEALTH
BUILDING - PHASE 1
650-332
T/SLAB EL
(SEE PLAN)
T/FTG EL
(SEE PLAN)
T/WALL EL
(SEE PLAN)
T/SHELF EL
(SEE PLAN)
REF
T/SLAB EL
(SEE PLAN)
T/FTG EL
(SEE PLAN)
T/WALL EL
(SEE PLAN)
T/SHELF EL
(SEE PLAN)
T/SLAB EL
(SEE PLAN)
T/FTG EL
(SEE PLAN)
T/SHELF EL
(SEE PLAN)
T/WALL EL
(SEE PLAN)
REF
T/SHELF EL
(SEE PLAN)
REF
T/WALL EL
(SEE PLAN)
T/SLAB EL
(SEE PLAN)
T/FTG EL
(SEE PLAN)
LEVEL EL
(SEE PLAN)
REF
T/FTG EL
(SEE PLAN)
T/SLAB EL
(SEE ARCH) T/SLAB EL
(SEE PLAN)
T/FTG EL
(SEE PLAN)
T/WALL EL
(SEE PLAN)
T/FTG EL
(SEE PLAN)
T/SLAB EL
(SEE PLAN)
"3
(M
IN
) SHELF
8"
FIN GRADE (SEE
SITE/CIVIL)
WALL SYSTEM (SEE ARCH)
#5@24" O.C. HORIZ E.F.
3#5 CONT
#4@24" O.C. VERT E.F.
W/HOOKS IN FTG
2'-0"
(SEE PLAN)
F.O. FDN
CONC SLAB ON GRADE
(SEE PLAN)
PERIMETER FDN DRAIN
(SEE CIVIL DWGS)
RIGID INSUL (SEE ARCH)
6"
1'-2" 5"5"
#5 CONT IN STEM
SUBBASE PER THE
REQUIREMENTS OF THE
GEOTECH REPORT (TYP
ALL DETAILS THIS DWG).
(M
IN
FIN GRADE (SEE
SITE/CIVIL)
WALL SYSTEM (SEE ARCH)
(SEE PLAN)
F.O. FDN
REINF CONC PIER (SEE
PIER DETAILS DWG SB-300)
SLAB BONDOUT AT COL
W COL (SEE DWG SB-300)
FOR FTG SIZE &
REINF (SEE PLAN)
CONC SLAB ON GRADE
(SEE PLAN)
PERIMETER FDN DRAIN
(SEE CIVIL DWGS)
RIGID INSUL (SEE PLAN)
SHELF
8"
REINF CMU WALL (SEE
TYP DETS DWG SB-303)
CONC SLAB ON GRADE
(SEE PLAN)
#5 CONT IN STEM
#5@24" O.C. VERT E.F.
W/ HOOKS IN FTG
(M
IN
#5@24" O.C. HORIZ E.F.
4 1/2" 1'-3" 4 1/2"
2'-0"
(SEE PLAN)
F.O. FDN
2 1/2"
8" 7"
E M
B E
D
D O
W E
L
G.C. NOTE: POSITION
OF VERT REINF 2 1/2"
FROM FACE
3#5 CONT
T/FTG EL
(SEE PLAN)
#4 SLAB DOWELS
@24" O.C.
#5@24" O.C.
HORIZ
#5@24" O.C.
VERT W/ALT
HOOKS IN FTG
CONC SLAB ON
GRADE (SEE PLAN)
24"
M
IN
#5@12" O.C. E.W.
TOP & BOT
#5@12" O.C. E.W. BOT
AT SUMP PIT
ELEVATOR
HOISTWAY
CONT WATERSTOP
(TYP)
T/SLAB EL
(SEE PLAN)
8" 8"
CMU WALL
BEYOND
MIN
1'-0"
ELEVATOR SUMP PIT (G.C. COORD
SIZE W/ ELEVATOR MANUF AND MEP).
PROVIDE 3/4" DEEP BAR GRATE
W/L2x2x1/4 FASTENED W/ EPOXY
ANCHORS (ALL GALV, (2) SIDES MIN)
RIGID INSUL
(SEE ARCH)
SEE FDN PLAN AND
SECT 3 THIS DWG
REINF CMU WALL (SEE
TYP DET DWG SB-303)
8"
EXTEND WALL DOWELS BELOW
SUMP PIT WHERE REQD
(SEE PLAN)
F.O. FDN
2 1/2"
L
A P
E M
B E
D
D
O W
E L
G.C. NOTE: POSITION
OF VERT REINF 2 1/2"
FROM FACE
AT ELEVATOR DOOR
EMBED PL 3/8x8x1'-0" W/ (4)1/2"Øx4" LONG
HEADED STUDS
(BEYOND, TYP)
HSS SEPARATOR BEAM
BEYOND (SEE PLAN )
1/4
1/4
TYP
CONT BOND BREAKER
(SEE ARCH)
CONC SLAB ON GRADE
(SEE PLAN)
RIGID INSUL (SEE ARCH)
8" 8" 8"
2'-0"
3#5 CONT
8" REINF CMU W/ MATCHING
DWLS (SEE TYP CMU
DETAILS DWG SB-303)
#5@24" O.C.
HORIZ
#4@24" O.C. VERT
W/ALT HOOKS IN FTG
E M
B E
D
D
O W
E L
L A
P
2" NOMINAL C.I.P. TOPPING
8" HOLLOW CORE
PRECAST PLANK
SHELF
8" 6"
(SEE PLAN)
F.O. FDN
8" 8" 8"
2'-0"
(M
IN
SEE SECTION 1 FOR
ADDITIONAL INFO
3#5 CONT
#5@24" O.C.
HORIZ
#4@48" O.C.
VERT W/ALT
HOOKS IN FTG
C L R
/2
CONC SLAB ON GRADE W/ NON-
SLIP BROOM FINISH (SEE PLAN).
PROVIDE TOOLED EDGES AND
JOINTS WHERE EXPOSED TO VIEW
DOOR (SEE ARCH)
SLOPE
(SEE ARCH)
#4@18" O.C. E.W.
COMPACTED
STRUCT FILL
#4 SLAB DOWELS
@18" O.C. (TYP)
24"
SLAB CONTROL JOINT
POUR TOPPING OVER WALL
AT SECT 7A, T/SLAB DEPRESSED
FOR PAVER SYSTEM
SB-302
A
CONC SLAB ON GRADE
(SEE PLAN)
#4@24" O.C. VERT E.F.
W/ HOOKS IN FTG
(M
IN
6" 1'-4" 6"
2'-4"
MASONRY VENEER
(SEE ARCH)
G.C. OPTION TO
EXTEND REINF
TO FTG
ADDL #4@24" O.C.
O.F. AT STEM
CURTAIN WALL
(SEE ARCH)
#5@24" O.C. HORIZ E.F.
BLKG (SEE ARCH)
SB-302
B
#5@12" O.C.
TOP & BOT
8" REINF CMU W/MATCHING
DWLS (SEE TYP CMU
DETAILS DWG SB-303)
#5@24" O.C.
HORIZ (TYP)
#5@24" O.C. VERT
W/ALT HOOKS IN FTG
(TYP)
(T Y
P
L
A P
(T Y
P
D
W L
E M
B E
D
8"
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
/1
/2
:1
:1
A
M C
U s e rs
\c fo rg u e s \D o c u m e n ts
\4
V
A P
R O
V
ID
E N
C E
R c h ri s b e c k e rs tr u c tu ra l.
c o m
.r v t
SB-301
CGW BSE10 APR 2019
FOUNDATION SECTIONS &
DETAILS
VA RI FACILITIES MANAGEMENT
SERVICE
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
NEW MENTAL HEALTH
BUILDING - PHASE 1
650-332
830 CHALKSTONE AVE, PROVIDENCE, R.I. 02908
SECTION
1/2" = 1'-0" SB-100
SECTION
1/2" = 1'-0" SB-100
2 SECTION
1/2" = 1'-0" SB-100
SECTION
1/2" = 1'-0" SB-100
SECTION
1/2" = 1'-0" SB-100
SECTION
1/2" = 1'-0" SF-101
7 SECTION
1/2" = 1'-0" SB-100
SECTION
1/2" = 1'-0" SB-100
7/7A
LEVEL EL
(SEE PLAN)
T/SLAB EL
(SEE PLAN)
T/SHELF EL
(SEE PLAN)
T/FTG EL
(SEE PLAN)
REF
LEVEL EL
(SEE PLAN)
T/STEEL EL
(SEE PLAN)
T/SLAB EL
(SEE PLAN)
T/FTG EL
(SEE PLAN)
T/SHELF EL
(SEE PLAN)
T/PIER EL
(SEE PLAN)
REF
T/SLAB EL
(SEE PLAN)
T/SHELF EL
(SEE PLAN)
T/FTG EL
(SEE PLAN)
LEVEL EL
(SEE PLAN)
T/SHELF EL
(SEE PLAN)
T/WALL EL
(SEE PLAN)
REF
T/SLAB EL
(SEE PLAN)
T/FTG EL
(SEE PLAN)
LEVEL EL
(SEE PLAN)
REF
T/SLAB EL
(SEE PLAN)
T/SHELF EL
(SEE PLAN)
T/FTG EL
(SEE PLAN)
T/WALL EL
(SEE PLAN)
REF
LEVEL EL
(SEE PLAN)
T/SLAB EL
(SEE PLAN)
T/FTG EL
(SEE PLAN)
REF
T/SHELF EL
(SEE PLAN)
LEVEL EL
(SEE PLAN)
T/WALL EL
(SEE PLAN)
1'-2"
FIN GRADE (SEE
SITE/CIVIL)
WALL SYSTEM (SEE ARCH)
CONT BOND BREAKER
(SEE ARCH)
#5@24" O.C. HORIZ E.F.
3#5 CONT BOT
#5@24" O.C. VERT I.F.
13'-0"
CONC SLAB ON GRADE
(SEE PLAN)
PERIMETER FDN DRAIN
(SEE CIVIL DWGS), TYP
RIGID INSUL (SEE ARCH)
3'-0"8'-10"
(SEE PLAN)
F.O. FDN
2" NOMINAL C.I.P.
TOPPING
8" HOLLOW CORE
PRECAST PLANK
SHELF
8"
6"
RIGID INSUL
(SEE ARCH)
#6@8" O.C. VERT O.F.
W/HOOKS IN FTG.
12#5 CONT TOP
#6@8" O.C. TOP
#5 CONT
SUBBASE PER THE
REQMNTS OF THE
GEOTECH REPORT (TYP AT
ALL SECTIONS THIS DWG)
SB-302
A
REINF CONC PIER (SEE PIER
DETAILS DWG SB-300)
W COL (SEE DWG PLANS)
WALL SYSTEM
(SEE ARCH)
(SEE PLAN)
F.O. FDN
SHELF
8"
CONT BOND BREAKER
(SEE ARCH)
CONC SLAB ON GRADE
(SEE PLAN)
RIGID INSUL (SEE ARCH)
#5 CONT
PROVIDE 2#4 VERT
IN STEM EXTENSION
FIN GRADE
(SEE SITE/CIVIL)
13'-0"
SEE SECTION 1, THIS
DWG FOR ADDL INFO
WALL HORIZ REINF
(SEE SECTION 1
THIS DWG), V ERT
REINF NOT SHOWN
FOR CLARITY
NOTE: RAISED STEM AT SECT 2 (SIM)
8'-10"
RAISED STEM AT SIM
MASONRY VENEER
(SEE ARCH)
STORE FRONT
(SEE ARCH)
SHELF
8" 6"
(SEE PLAN)
F.O. FDN
GROUT PLANK
ENDS AT WELD PL's
1'-2"
13'-0"
3'-0"8'-10"
SEE SECTION 1, THIS
DWG FOR ADDL INFO
NOTE: AT CFMF WALL
W/ VENEER, OMIT
STOREFRONT
SUPPORT ANGLE AND
EMBED PLATES
DETAIL AT TYPICAL VENEER WALL
SB-302
A
SB-302
B
1'-2"
FIN GRADE (SEE
SITE/CIVIL)
CONT BOND BREAKER
(SEE ARCH)
2#5 CONT BOT
6'-0"
CONC SLAB ON GRADE
(SEE PLAN)
PERIMETER FDN DRAIN
(SEE CIVIL DWGS)
RIGID INSUL (SEE ARCH)
1'-1"3'-9"
(SEE PLAN)
F.O. FDN
SHELF
8" 6"
RIGID INSUL
(SEE ARCH)
4#5 CONT TOP
#5@8" O.C. TOP
12" SOLID GROUTED CMU
FACE OF FDN WALL
BEYONDPROVIDE DAYTON D-102-A 90º
HOOKED DOWEL BAR
SPLICER (ALIGNED W/BOND
BEAM REINF AND EMBEDDED
IN C.I.P. EA END).
#6@8" O.C. VERT
W/HOOK IN FTG
BOND BEAMS @16" O.C. W/2#5 HORIZ.
PROVIDE THRD ENDS AND INSERT INTO
COUPLERS AT C.I.P. WALL. LAP REINF
30" AT BEAM MID-POINT.
#5@24" O.C. VERT
4#5 HORIZ IN STEM
W BEAM (SEE PLAN
WALL REINF PER SECT 1 THIS DWG
KICKER AND PLATE CONN
PER SECT 4 THIS DWG
(2) #6 x7'-0" LONG
HORIZ TOP + BOT W/
#3 STIRRUPS @12" O.C.
FILL GAP W/
NON-SHRINK GROUT
1'-3"
FIN GRADE (SEE
SITE/CIVIL)
WALL SYSTEM (SEE ARCH)
CONT BOND BREAKER
(SEE ARCH)
#5@24" O.C. HORIZ E.F.
2#5 CONT BOT
#5@24" O.C. VERT I.F.
W/HOOKS IN FTG
6'-0"
CONC SLAB ON GRADE
(SEE PLAN)
PERIMETER FDN DRAIN
(SEE CIVIL DWGS)
RIGID INSUL (SEE ARCH)
1'-0"3'-9"
(SEE PLAN)
F.O. FDN
SHELF
8"
7"
RIGID INSUL
(SEE ARCH)
#6@8" O.C. VERT O.F.
4#5 CONT TOP
#5@8" O.C. TOP
#5@24" O.C. HORIZ
8" REINF CMU W/ MATCHING
DWLS (SEE TYP CMU
DETAILS DWG SB-303)
E M
B E
D
D W
L
G.C. NOTE: POSTION OF VERT
REINF 2 1/2" FROM INSIDE FACE
2 1/2"
FIN GRADE (SEE
SITE/CIVIL)
(SEE PLAN)
F.O. FDN
SEE SECTION 1, THIS
DWG FOR ADDL INFO
3/8"x6"x LENGTH
REQD BENT PL,
INSTALL AFTER
TOPPING PLACEMENT
MIN
4"
6"
2" NOMINAL C.I.P.
TOPPING
8" HOLLOW CORE
PRECAST PLANK
EMBED PL (BY
PLANK MANUF)
4'-0"
1/4 6
1/4
3 SIDES
AT SIM: WALL STEM
ABOVE PLANK
WALL SYSTEM (SEE ARCH)
1'-2"
13'-0"
3'-0"8'-10"
PL 3/8x10x0'-10" W/(4)-1/2"Øx4" LG HEADED
STUDS (CENTER ON BENT PL)
3.0K (ult.)
1/4
TYP
L3x3x1/4 KICKER, INSTALL AFTER
TOPPING PLACEMENT
PL 3/8x10x1'-0" @4'-0" O.C. MAX W/(4)-1/2"Øx4" LG HEADED
STUDS (COORD LOCATION
W/PRECAST EMBED PL)
SHELF
8"
6"
1/4
3 SIDES
EMBED PL (BY PRECASTER).
PROVIDE (2) PER PLANK,
STAGGERED EA PLANK
ROUND BAR SLUG AND EMBED PLATE
(BY PLANK MANUF, SEE DETAIL THIS
DWG FOR LAYOUT). TYP EMBED PLATE
LOAD 5.0K (ult.) INSTALL SLUG AFTER
TOPPING IS PLACED. SLUG MAY NOT BE
REQD IF PLANK CAMBER COMES OUT
FULLY
L6x6x3/8x0'-6"
GROUT PLANK
ENDS AT WELD PLs
/2
(TYP) BY
PLANK
MANUF
DESIGN
REQMNTS
CONT GALV L3x2x1/4 LLV, ANCHOR STL AND LVL PLs
ABV TO ANGLE W/
ANCHORS @8" O.C. (SEE
ARCH FOR ADDL INFO)
CONT LVL BLKG (SEE ARCH)
EMBED PL 3/8x3x0'-6" W/(2)-1/2"Ø x4" HEADED
STUDS @ 8" O.C. MAX
A N
G L E
/4
T
O P
SHIM AS REQD
3"
/2
T Y
P
3/16 2
3/16 2
CONT STL PL (SEE ARCH)
ANCHOR STL AND LVL PLs
TO FDN STEM W/ CAST-IN
ANCHORS @8" O.C. (SEE
ARCH FOR ADDL INFO)
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
/1
/2
:1
:1
A
M C
U s e rs
\c fo rg u e s \D o c u m e n ts
\4
V
A P
R O
V
ID
E N
C E
R c h ri s b e c k e rs tr u c tu ra l.
c o m
.r v t
SB-302
CGW BSE10 APR 2019
FOUNDATION SECTIONS &
DETAILS
VA RI FACILITIES MANAGEMENT
SERVICE
FULLY SPRINKLERED
NEW MENTAL HEALTH
BUILDING - PHASE 1
650-332
830 CHALKSTONE AVE, PROVIDENCE, R.I. 02908
SECTION
1/2" = 1'-0" SB-100
1 SECTION
1/2" = 1'-0" SB-100
2 SECTION
1/2" = 1'-0" SB-100
SECTION
1/2" = 1'-0" SB-100
5 SECTION
1/2" = 1'-0" SB-100
SECTION
1/2" = 1'-0" SB-100
DETAIL
1" = 1'-0" SB-301
A
DETAIL
1" = 1'-0" SB-301
B
CONSTRUCTION
DOCUMENTS
Revisions: Date:
SB-302
SB-100, SF-101 SB-100, SF-101 SB-100, SF-101
SB-100, SF-101
SB-100, SF-101
T/BOND BEAM EL
(86'-4")
T/BOND BEAM EL
(99'-8")
T/BOND BEAM EL
(113'-0")
T/BOND BEAM EL
(99'-0")
T/BOND BEAM EL
(86'-4")
T/BOND BEAM EL
99'-8"
T/BOND BEAM EL
(113'-0")
T/BOND BEAM EL
(86'-4")
OPENING
WALL TYPE W1 SECTION (TYP, U.N.O.)
N.T.S.
JOINT REINF @ 16" O.C.
BTWN BOND BEAMS
(TYP)
#5@32" O.C. (TYP U.N.O.)
NOTES:
1. COORDINATE BOND BEAM LOCATIONS WITH
DOOR LOCATIONS. PROVIDE CONTINUOUS
BOND BEAMS WHENEVER POSSIBLE.
2. SUBMIT MASONRY REINFORCING SHOP
DRAWINGS FOR REVIEW. SEE THE GENERAL
NOTES & SPECIFICATIONS FOR SPECIFIC
REQUIREMENTS.
3. PROVIDE CORNER BARS FOR BOND BEAM
REINF W/30" LAP.
BOND BEAMS W/2#5 CONT.
-LOCATE AT FLOOR LEVELS, MID-HEIGHT
BETWEEN FLOORS & TOP OF WALL (TYP)
CMU LINTEL SCHEDULE (U.N.O.)
CLEAR SPAN
3'-6"+ - 6'-0"
WIDTH
8" 8"
DEPTH
2#5 CONT
REINF
8" 16" 2#5 CONT6'-0" - 12'-0"
NOTE: SEE SECTIONS &
DETAILS FOR ADDL CMU
REQMNTS
AT FREE END
TYP PLAN DETAILS AT CMU WALLS
N.T.S.
AT CORNER
NOTES:
1. PROVIDE LADUR TIE HORIZ REINF @16" O.C. U.N.O.
2. PROVIDE MATCHING CORNER & INTERSECTION DOWELS AT ALL
BOND BEAMS.
3. ALL REINFORCED CELLS ARE TO BE FULLY GROUTED.
4. PROVIDE 30" MIN LAP SPLICES.
5. PROVIDE LINTELS ABOVE ALL OPENINGS PER THE SCHEDULE.
EXTEND BEYOND EDGE OF OPENING.
3#5
#5@32" O.C.
(TYP)
#5 E.S. OF OPENING (TYP )
NOTE: PROVIDE SOLID
GROUTED WALLS
WHERE INDICATED
(TYP)
2 5/8"
WALL TYPE W2 SECTION
N.T.S.
JOINT REINF @ 16" O.C.
BTWN BOND BEAMS
(TYP)
#5@32" O.C. (TYP U.N.O.)
NOTES:
1. INCORPORATE THE REQUIREMENTS OF WALL
TYPE W1 U.N.O.
2. SEE SECTIONS & DETAILS FOR ADDITIONAL
REQUIREMENTS.
BOND BEAMS W/2#5 CONT.
-LOCATE AT 32" O.C.
(TYP)
2 5/8"
16"
BEARING LENGTH AT ENDS
16"
GROUT ALL CELLS
SOLID AT W2
< 3'-6" 8" 8" 2#5 CONT 8"
1 3
PRECAST PLANK
(SEE PLAN)
SOLID GROUTED WALL
LINTEL OVER M.O.
WHERE WHERE NO
CONT BOND BEAM
(SEE SCHED)
2#5 VERT EA SIDE
OF OPENING
3#5 VERT AT
CORNER (TYP)
#5@32" O.C. VERT
(TYP, U.N.O.)
BOND BEAMS @32"
O.C. BTWN FLRS (TYP)
VERT LAP 30" (TYP, U.N.O.)
(COORD LAP LOCATIONS
W/GROUT LIFTS)
HATCH INDICATES CONT
BOND BEAM W/2#5 HORIZ
(SEE TYP DETAILS)
PROVIDE MATCHING
CORNER REINF AT BOND
BEAM HORIZ REINF
30"
30"
EMBED VERT REINF 12"
INTO FDN (TYP)
C.I.P. FDN
(SEE PLAN)
8.710
3#5 VERT THIS
SIDE OF OPENING
3#5 VERT AT
CORNER (TYP)
#5@32" O.C. VERT
(TYP, U.N.O.)
BOND BEAMS @32"
O.C. BTWN FLRS (TYP)
VERT LAP 30" (TYP, U.N.O.)
(COORD LAP LOCATIONS
W/GROUT LIFTS)
HATCH INDICATES CONT
BOND BEAM W/2#5 HORIZ
(SEE TYP DETAILS)
PROVIDE MATCHING
CORNER REINF AT BOND
BEAM HORIZ REINF
30"
30"
PRECAST PLANK
(SEE PLAN)
SOLID GROUTED WALL
C.I.P. FDN (SEE PLAN)
EMBED VERT REINF 12"
INTO FDN (TYP)
LAP VERT REINF 30" U.N.O.
(COORD LAP LOCATIONS
W/GROUT LIFTS)
3#5 VERT AT
CORNER
WHERE BOND BEAM IN
RETURN WALL BEYOND,
PROVIDE MATCHING
CORNER BARS
PRECAST ROOF PLANK
PROVIDE INTERMEDIATE
BOND BEAM BETWEEN
FLOORS
NOTE: T/BOND BEAM
AT TOP OF WALL FOR
STAIR 2 EL 26'-0"
BOND BEAM LINTEL OVER
OPENING WHERE NO CONT
BOND BEAM (SEE SCHED, TYP)
#5@32" O.C. VERT (TYP)
HATCH INDICATES CONT
BOND BEAM W/2#5 HORIZ
(SEE TYP DETAILS)
#5 VERT EA SIDE
OF OPNG (TYP)
C.I.P. FDN
30"
30"
(T Y
P
D
W L
E M
B E
D
#5 AT EA END
OF OPNG (TYP)
8" CMU INFILL
DRILL & EPOXY DWLS
W/4" EMBED (TYP)
ELEVATOR
DOOR ELEVATOR
DOOR
24" DEEP BOND BEAM W/2#5 HORIZ
IN EA COURSE W/MATCHING
CORNER REINF AT ENDS. PROVIDE
BOND BEAM AROUND ENTIRE
PERIMETER OF ELEVATOR SHAFT.
PROVIDE GALV BRICK WIRE-TIE
CONN @16" O.C. AT INFILL
INTERFACE. FASTEN W/GALV
CONCRETE SCREWS W/1 3/4"
EMBED MIN (TYP)
CONT 8" BOND BEAM
LINTEL W/2#5 HORIZ
#5 VERT @32" O.C.
(TYP, U.N.O.)
(S
IM
A T
S E
C O
N D
F L
O O
R
G R
O U
N D
F L
O O
R
IN
T E
R M
E D
IA
T
E F
L O
O R
TYP CMU INFILL DETAIL AT ELEVATOR FRONT WALL
NOTES:
1. THIS DETAIL ONLY APPLIES IF ELEVATOR MANUF REQUIRES BOTTOM AND/OR TOP OF ELEVATOR FRONT WALL TO REMAIN COMPLETELY OPEN DURING INSTALLATION. REVERT TO TYP CMU WALL DETAILS IF NOT APPLICABLE.
2. SUBMIT ALL MASONRY WALL REINF SHOP DRAWINGS FOR REVIEW PRIOR TO CONSTRUCTION.
1/4"=1'-0"
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
/1
/2
:1
:1
A
M C
U s e rs
\c fo rg u e s \D o c u m e n ts
\4
V
A P
R O
V
ID
E N
C E
R c h ri s b e c k e rs tr u c tu ra l.
c o m
.r v t
SB-303
CGW BSE10 APR 2019
CMU SECTIONS AND DETAILS
VA RI FACILITIES MANAGEMENT
SERVICE
FULLY SPRINKLERED
NEW MENTAL HEALTH
BUILDING - PHASE 1
650-332
830 CHALKSTONE AVE, PROVIDENCE, R.I. 02908
1/4" = 1'-0"
W2 CMU WALL ELEVATION AT
STAIR 1/ELEVATORS
1/4" = 1'-0"
W2 CMU WALL ELEVATION AT STAIR 2
1/4" = 1'-0"
TYP CMU WALL ELEVATION U.N.O.
CONSTRUCTION
DOCUMENTS
5 6 7
8.7
A
B
C
D
EE
FF
GG
15'-0"
7'-0"
12'-0"
10'-0" 23'-0" 21'-0" 21'-0" 21'-0" 26'-0"
E.9
E.5
W x
W x
W x
W x
W16x26
W16x26 W16x26 W16x26 W16x26
W x
W x
W16x36
W x
W16x45
W x
W16x36
W16x36
W16x40
W16x36
W24x76
W x
W x
W x
W x
W x
W x
W16x40
W x
W16x31W16x31W16x31W16x31
W16x26
W16x26
W x
W x
W16x31
STAIR
STAIR ELEV ELEV
W x4
PO
ST U
P
C.9
4.8 5.7 W x
SOLID GROUTED CMU FULL
HEIGHT WALL AT WALL TYPE W2
(SEE SB-303 FOR ELEVATION)
W 10x45
BP-A
W 10x45
BP-A
W x4
BP-A
W 10x39
BP-A
W 10x39
BP-A
W 10x39
BP-A
W 10x39
BP-A
W 10x39
BP-A
W 10x45
BP-A
SF-501
SF-501
SF-501
SF-502
SB-302
SB-302
SB-302
SF-501
SF-501
RAISED STEM AT
STOREFRONT PER
4/SB-302 (SEE ARCH
FOR EXTENTS)
15'-4 3/4"16'-8 13/16" 19'-6"
KICKER TO EMBED PL IN
PLANK (SEE 1/SF-502)
KICKER TO EMBED PL IN
PLANK (SEE 4/SF-501)
KICKER TO EMBED PL IN
PLANK (SEE 4/SF-501)
6" EXT SLAB ON GRADE
W/ #4@18" O.C. TOP
(T/ SLAB EL 86'-1 5/8")
P1 {83'-4"}
P2 {83'-4"}
P5 {83'-4"}
P1 {83'-4"}
P2A {83'-4"}
P1A {83'-4"}
P2 {83'-4"}
P2 {83'-4"}
P2 {83'-4"}
(SEE WALL ELEVATION 2/SB-100)
25'-4"
(S E
E W
A L
L E
L E
V A
T
IO
N
/S B
-1
T/ WALL
86'-4"
[87'-6"]
[87'-6"]
[87'-6"]
HATCHED AREA INDICATES
(UNFACTORED) LIVE LOAD =
100 PSF AT CORRIDORS AND
LOBBY. (SEE ARCH FOR
DIMENSIONS AND EXTENTS)
85'-8"
W x
W
W
W1
W2
W
W
W
W2
W1
SB-301
FOLDING PARTITION
BELOW BEAM (SEE ARCH)
6" EXT SLAB ON GRADE
W/ #4@18" O.C. TOP
(T/ SLAB EL 86'-4")
SB-301
DOWEL FDN WALL W/
3#5x24" LONG, DRILL &
EPOXY W/8" EMBED
(TYP)
DOWEL FDN WALL W/
(3)#5x24" LONG, DRILL
& EPOXY W/ 8" EMBED
(TYP)
T/ FTG EL 83'-4"
SF-501
E .O
.P
/4
E.O.P.
11 1/4"
E .O
.P
/4
E .O
.P
E
.O .P
5 1/4" E.O.P.
10 1/4" E.O.P.
E.O.P.
5 1/4"
E .O
.P
/4
E.O.P.
5 1/4"
E .O
.P
/8 "E.O.P.
8'-2 3/4"
SB-302
SB-302
SOLID GROUTED CMU FULL
HEIGHT WALL AT TYPE W2
(SEE SB-303 FOR ELEVATION)
SB-302
SIM
SB-302
3'-2" 15'-2"
7A
C .J
PLANK MANUF NOTE: EXTENTS OF
1-HOUR FIRE RATED PLANK (SEE
ARCH DRAWINGS FOR ADDL INFO)
PRECAST SITE STAIR (NOT BY E.O.R.).
PRECASTER PROVIDE CONNS TO PIN
TOP OF SITE STAIR TO ENTRY FDNS.
6'-0"
(TYP)
4'-0" 1'-0"
(T Y
P
PRECASTER
EXTEND EMBED
PLATE FOR
KICKERS FROM
EACH DIRECTION
(TYP)
4'-0" 1'-6"
SB-302
KICKER TO EMBED
PL CONN (SEE 4 AND
5 ON SB-302)
103.0 0°
BEAM BEARING PL
(SEE DETAIL SF-500)
SB-302
SIM
SEE NOTE 14
SEE NOTE 14
SF-500
B
SF-500
A
(PROVIDE ADDITIONAL KICKERS PER 5/SF-501)
STACKED FOLDING PARTITION LOCATION
(S E
A L E
D
G.C. NOTE: STAIR SHAFT RELIES ON STEEL FRAME
AND ITS CONNECTIONS TO THE STEEL FRAME FOR
PERMANANENT RESTRAINT UNDER LATERAL LOADS.
G.C. SHALL SEQUENCE CONSTRUCTION SUCH THAT
STEEL FRAME IS CAPABLE OF RESISTING LATERAL
FORCES FROM CMU SHAFTS PRIOR TO CMU
CONSTRUCTION. AS AN ALTERNATE, THE G.C. MAY
PROVIDE TEMPORARY LATERAL BRACING FOR CMU
SHAFTS DURING CONSTRUCTION (G.C. SHALL SUBMIT
SUPPORT CALCULATIONS STAMPED BY A LICENSED
PROFESSIONAL ENGINEER IN THE STATE OF RHODE
ISLAND)
G.C. NOTE: STAIR SHAFT RELIES ON STEEL FRAME AND
ITS CONNECTIONS TO THE STEEL FRAME FOR
PERMANANENT RESTRAINT UNDER LATERAL LOADS. G.C.
SHALL SEQUENCE CONSTRUCTION SUCH THAT STEEL
FRAME IS CAPABLE OF RESISTING LATERAL FORCES
FROM CMU SHAFTS PRIOR TO CMU CONSTRUCTION. AS
AN ALTERNATE, THE G.C. MAY PROVIDE TEMPORARY
LATERAL BRACING FOR CMU SHAFTS DURING
CONSTRUCTION (G.C. SHALL SUBMIT SUPPORT
CALCULATIONS STAMPED BY A LICENSED PROFESSIONAL
ENGINEER IN THE STATE OF RHODE ISLAND)
G.C. NOTE: REFER TO NOTES
ON SECTION 1/SF-501 FOR
OVERALL STABILITY OF
MOMENT FRAME DURING
CONSTRUCTION
H S
S x x /4
(S E
E N
O T
E
CONC VERT
DUCT BANK (SEE
MEP DWGS)
SF-501
FIRST FLOOR FRAMING PLAN
1/8"=1'-0"
NOTES:
1. INDICATES SPAN DIRECTION OF 8" PRECAST HOLLOW CORE PLANK (DESIGNED
BY OTHERS) W/2" FIBER REINFORCED CONCRETE TOPPING. TOP OF TOPPING EL 86'-4".
2. TOP OF WALL EL 86'-4" U.N.O. BY [XX'-XX"].
3. TOP OF FOUNDATION SHELF EL 85'-8" U.N.O. BY .
4. Px INDICATES REINF CONC PIER. SEE PIER DETAILS DWG SB-300.
5. TOP OF PIER EL INDICATED BY {XX'-XX"}.
6. TOP OF STEEL EL 85'-6" U.N.O. BY (±X'-XX").
7. INDICATES MOMENT CONN. SEE TYP DETAIL DWG SF-500.
8. PLANK DESIGNER TO ACCOUNT FOR PLANK SELF WEIGHT, 25 PSF 2" CIP TOPPING, 12
PSF ADDL DEAD LOAD AND 80 PSF LIVE LOAD. SEE PLAN FOR ADDL LIVE LOAD INFO.
ALL LOADS ARE UNFACTORED.
9. W1,W2 ETC INDICATES CMU WALL TYPE AND REINFORCEMENT. SEE CMU SECTIONS
DWG SB-303.
10. PRECAST PLANK MANUFACTURER PROVIDE PLANK CAPABLE OF ATTAINING 1-HOUR
FLOOR RATING FOR THE EXTENTS INDICATED ON PLAN. PROVIDE SUPPORTING
CALCULATIONS WITH PLANK DESIGN SUBMITTAL.
11. E.O.P. INDICATES EDGE OF PLANK DIMENSION.
12. C.J. INDICATES CONTRACTION JOINT (SEE DETAILS SB-300).
13. PRECAST PLANK LAYOUT IS TO BE DETERMINED BY THE PRECAST PLANK SUPPLIER.
14. INDICATES LOCATION WHERE GROUP OF FIELD CORES ARE ANTICIPATED. PLANK
DESIGNER SHALL COORD FINAL CORE SIZE, LOCATION & QUANTITIES W/MEP DWGS.
PLANK DESIGNER SHALL ACCOMMODATE THESE CORES IN DESIGN & PRESCRIBE
ACCEPTABLE LOCATIONS IN LAYOUT DWGS. PLANK DESIGNER IS RESPONSIBLE TO
CONFIRM AS-CORED LOCATION IN FIELD ARE CONSISTENT W/DESIGN INTENT.
15. INDICATES LOCATION OF CAST OPENING IN PLANK. PLANK DESIGNER SHALL
COORD FINAL SIZE, LOCATIONS & QUANTITIES W/MEP DWGS. PLANK MANUF/DESIGNER
SHALL DESIGN & SUPPLY ANY HEADERS/FRAMES REQUIRED FOR OPENINGS.
16. PROVIDE HSS8x4x1/4 SEPARATOR BEAMS BETWEEN ELEVATOR HOIST WAYS.
INTERMEDIATE BEAMS MAY BE REQUIRED BETWEEN FLOORS FOR RAIL SUPPORT. G.C.
COORDINATE FINAL QUANTITIY AND ELEVATION OF ALL SEPARATOR BEAMS WITH
ELEVATOR MANUFACTURER. BEAR SEPARATOR BEAM EACH END ON BEARING PL PER
TYPICAL DETAIL DWG SF-500.
X'-XX"
PRECAST
STAIR
C.I.P. ENTRY
FDNS
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
/1
/2
:1
:2
A
M C
U s e rs
\c fo rg u e s \D o c u m e n ts
\4
V
A P
R O
V
ID
E N
C E
R c h ri s b e c k e rs tr u c tu ra l.
c o m
.r v t
SF-101
CGW BSE10 APR 2019
FIRST FLOOR FRAMING PLAN
VA RI FACILITIES…
This is the start of the file's text. The full file is on GovTribe.