36E77620R0001-0005066.pdf
PDF Posted
- Solicitation number
- 36E77620R0001
About this file
This document provides details for a federal construction contract opportunity for the New Mental Health Building - Phase 1 project located at the Department of Veterans Affairs Medical Center in Providence, Rhode Island. The solicitation will be for a firm-fixed-price design-bid-build contract to complete construction of a new approximately 15,300 square foot three-story freestanding mental health building including site work and utilities. The project is anticipated to be solicited as a total Service-Disabled Veteran-Owned Small Business set-aside with an estimated value between $10-20 million and a period of performance of approximately 600 calendar days from notice to proceed. The solicitation is expected to be issued on December 20, 2019 with all questions due to the specified email address.
36E77620R0001 0005 Attachment 2 - AE112 - SECOND FLOOR REFLECTED CEILING PLAN-ADD1.pdf
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OS
CEILING LEGEND
GWB CEILING @ 8'-0" AFF UNO
NOTES:
1. ALL CEILINGS TO BE 9'-0" AFF UNLESS NOTED
OTHERWISE
2. REFER TO SHEET GI002 FOR ALL ABBREVIATIONS
3. CONTRACTOR TO VERIFY LOCATIONS OF MAIN
CEILING TEES BEFORE PROCEEDING WITH FIXTURE
INSTALLATION. NOTIFY ARCHITECT OF
INTERFERENCES.
4. NOTIFY ARCHITECT OF ANY DISCREPANCIES
BETWEEN ARCHITECTURAL REFLECTED CEILING
PLANS AND ELECTRICAL LIGHTING PLANS PRIOR TO
CONSTRUCTION.
5. REFER TO LIFE SAFETY PLANS FOR LOCATIONS OF
STROBES AND EXIT SIGNS.
6. ALL CEILING GRILLES, TRIM EDGES AND SLOT
DIFFUSERS TO MATCH ADJACENT CEILING COLOR.
7. ALL SPRINKLER HEADS TO OCCUR AT CENTER OF
TILES.
8. LAYOUT TILES AS SHOWN IN REFLECTED CEILING
PLANS. CENTER GRID IN ROOM, UNO.
9. SEE AF SHEETS FOR ROOM FINISH SCHEDULE FOR
CEILING FINISH INFORMATION.
10. WHERE NO CEILING MATERIAL IS SHOWN THE
STRUCTURE ABOVE IS TO BE EXPOSED, U.N.O.
11. GENERAL LAYOUT AND SIZE OF LIGHT FIXTURES
ARE SHOWN.
ELECTRICAL SYMBOLS:
SYMBOLS INDICATE BASIS OF DESIGN LOCATIONS
MECHANICAL SYMBOLS:
SYMBOLS INDICATE BASIS OF DESIGN LOCATIONS
ACOUSTICAL TILE CEILING 2'-0" x 2'-0" ON
METAL SUSPENSION GRID @ 9'-0" AFF
UNO
RECESSED CEILING
FIXTURE
(EMERGENCY)
4' L CEILING/WALL
SURFACE STRIP LIGHT
SUPPLY
DIFFUSER
RETURN
GRILLE
SPECIALTY
PENDANT
INTERIOR
RECESSED
CAN
S
SMOKE
DETECTOR
FIRE PROTECTION SYMBOLS:
SYMBOLS DESIGNATE DESIGN INTENT, AND BASIS OF
DESIGN LOCATIONS . FINAL LAYOUT TO COMPLY
WITH ALL CODES AND REGULATIONS.
LAYOUT SHALL COMPLY W/ MEP BASIS OF DESIGN
DRAWINGS AND ALL CODES AND REGULATIONS.
EB
EMERGENCY
BATTERY PACK
EXIT SIGN
WOOD-LOOK PLANK CEILING. SEE PLAN
FOR LAYOUT. WD-1A FOR EXTERIOR,
WD-1B FOR INTERIOR
SPRINKLER
HEAD
EXHAUST
GRILLE
LINEAR DIFFUSER
A - ALIGN W/ GRID
B - CENTER ON GRID
SPEAKER
OS OCCUPANCY
SENSOR
N
CEILING MOUNT
NURSE CALL LIGHT
CEILING MOUNTED
CAMERA
RECESSED CEILING
FIXTURE
GLASSBREAKS
F
G
5431 2
STAIR 1
ELEV 1
ELEV 2
MECHANICAL
ROOM
CIRCULATION
9' - 6"
10' - 0" 23' - 0" 21' - 0" 21' - 0" 22' - 3"
/8
E.5
E.9 8' - 4"
10' - 0"
F1
AE607
A A A A
B4
AE403
Sim F9
AE306
C3
AE521
9' - 6"
METAL FRAMING
SCHEDULED CEILING
CONTINUOUS METAL
FRAMED HEADER
AS INDICATED
AS INDICATED
SCHEDULED CEILING
METAL FRAMING BRACE 32"
O.C. TIE TO SLAB ABOVE
5/8" GYPSUM BOARD FASCIA TO
6" ABOVE FINISHED CEILING
SCHEDULED CEILING
METAL FRAMING
CONTINUOUS
METAL FRAMING
HEADER
CONTINUOUS METAL CORNER BEAD
5/8" GYPSUM BOARD SOFFIT
AS INDICATED
AS INDICATED
SCHEDULED CEILING
AS INDICATED
AS INDICATED
GWB
SEE PLAN FOR DIMENSION
METAL STUD FRAMING, TYP
B O
O K
C A
S E
T O
F L
O O
R
CONTINUOUS METAL FRAMING
TO STRUCTURE ABOVE
METAL CEILING ANGLE
5/8" GYPSUM W ALLBOARD
WOOD BLOCKING W/ LAMINATE
REVEAL TO MATCH BOOKCASE
SEE BOOKCASE DETAIL F3/AE520
7'-7 1/2"
/2
VARIES
4" CEILING TRIM
TRANSITION
LINEAR METAL W OOD
LOOK CEILING (WD-1B)
SCHEDULED CEILING
CARRIER TRACK FOR
WOOD LOOK METAL
CEILING
9' - 4"
9' - 0"
6" METAL WOOD-LOOK
LINEAR PLANK CEILING
(WD-1B)
LINEAR LIGHT FIXTURE.
LIGHTING AND DIFFUSERS
TO OCCUR IN SINGLE 6"
PANEL. SEE ELEC/MECH
FOR MORE INFO.
NOTE: DIFFUSER LINEAR
DETAIL TO BE SIMILAR.
USE CEILING MAIN BEAMS
TO CREATE BRACING
BETWEEN CEILINGS
LINEAR CARRIER
LIGHTING AND DIFFUSERS
SUPPORTED TO
STRUCTURE ABOVE
MOLDING TO MATCH WOOD
LOOK CEILING
9' - 4"
1"
COLUMN COVER
EXTERIOR STOREFRONT.
SEE DETAIL /F3 AE512
GWB CEILING AT TOP
OF COLUMN
STRUCTURAL COLUMN
2" TRIM TRANSITION
LINEAR METAL
WOOD LOOK
CEILING (WD-1B)
SCHEDULED WINDOW
WD BLOCKING
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH
/2
/2
:4
:1
A
M U
A u to d e s k A u to s a v e s \R e v it \4
V A
M H
P R
O V
ID
E
N C
E M
H C
A
R C
H m ic h a e l.
b ru n o .r v t
AE112
650-332
NEW MENTAL HEALTH BUILDING -
PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
JRB ARW10 APR 2019
CONSTRUCTION
DOCUMENTS
SECOND FLOOR REFLECTED
CEILING PLAN
FULLY SPRINKLERED
VA RI FACILITIES MANAGEMENT
SERVICE
B
A
KEY PLAN
1/4" = 1'-0"
F1 SECOND FLOOR REFLECTED CEILING PLAN - SEGMENT A
3" = 1'-0"
C4 CEILING TRANSITION SECTION
3" = 1'-0"
C6 SOFFIT AND FASCIA SECTION
3" = 1'-0"
B8 GYPSUM SOFFIT SECTION
3" = 1'-0"
C8 FASCIA @ OFFICE BOOKCASE SECTION
3" = 1'-0"
B4 INTERIOR - W OOD CEILING TO AT TRANSITION SECTION
3" = 1'-0"
C1 INTERIOR - LIGHTING @ W OOD CEILING DETAIL
3" = 1'-0"
B1 INTERIOR - COLUMN COVER @ CURTAIN W ALL
Revisions: Revision Description Date:
1 ADDENDUM 1 21 JAN 2020
| Sheets |
| AE110 - BASEMENT REFLECTED CEILING PLANS |
| AE111 - FIRST FLOOR REFLECTED CEILING PLANS |
| AE112 - SECOND FLOOR REFLECTED CEILING PLAN |
File details come from the government source that posted it. Updated .