36E77620R0001-011.pdf

PDF Posted

Attached to
650-332 New Mental Health Building - Phase 1 (VA-19-00104660)
Solicitation number
36E77620R0001
Issued by

About this file

This federal contract opportunity notice provides details for the solicitation of a design-bid-build construction project for a New Mental Health Building at the Providence VA Medical Center located in Providence, Rhode Island. The project scope includes preparation of site for building operations including demolition and removal of existing structures/equipment, and furnishing all labor, materials, equipment, and infrastructure required to complete construction of the new three-story, approximately 15,300 square foot freestanding mental health building and corresponding site and utility work. The solicitation will be issued as a request for proposal set aside for Service-Disabled Veteran-Owned Small Businesses. The NAICS code is 236220 with a size standard of $36.5 million. The period of performance is approximately 600 calendar days from notice to proceed. The estimated value is between $10-20 million. Questions must be submitted in writing by the specified date. The award date is anticipated to be on or around December 20, 2019.

36E77620R0001 Attachment 10 - CD Drawings - Plumbing.pdf

View the file

Other files

File Type Posted
36E77620R0001-0007000.docx DOCX document
36E77620R0001-0007001.docx DOCX document
36E77620R0001-0006000.docx DOCX document
36E77620R0001-0005060.docx DOCX document
36E77620R0001-0005061.docx DOCX document
36E77620R0001-0005068.pdf PDF
36E77620R0001-0005064.pdf PDF
36E77620R0001-0005069.pdf PDF
36E77620R0001-0005067.pdf PDF
36E77620R0001-0005062.pdf PDF
36E77620R0001-0005070.pdf PDF
36E77620R0001-0005066.pdf PDF
36E77620R0001-0005065.pdf PDF
36E77620R0001-0005063.pdf PDF
36E77620R0001-0005071.pdf PDF
36E77620R0001-0004001.docx DOCX document
36E77620R0001-0004000.docx DOCX document
36E77620R0001-0003000.docx DOCX document
36E77620R0001-0003001.docx DOCX document
36E77620R0001-0002000.docx DOCX document
36E77620R0001-0001001.pdf PDF
36E77620R0001-0001000.docx DOCX document
36E77620R0001-008.pdf PDF
36E77620R0001-007.pdf PDF
36E77620R0001-012.pdf PDF
36E77620R0001-016.docx DOCX document
36E77620R0001-001.docx DOCX document
36E77620R0001-004.pdf PDF
36E77620R0001-005.pdf PDF
36E77620R0001-006.pdf PDF
36E77620R0001-010.pdf PDF
36E77620R0001-013.pdf PDF
36E77620R0001-015.docx DOCX document
36E77620R0001-017.pdf PDF
36E77620R0001-002.pdf PDF
36E77620R0001-014.pdf PDF
36E77620R0001-009.pdf PDF
36E77620R0001-003.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS PIPING LEGENDVALVE LEGEND

PLUMBING EQUIPMENT COORDINATION PLUMBING DRAWING LIST

FD

W.H.

C.O.

C.T.E.

RD

SD

SB OR WB

SDB

V.

CW

HW

HWC

ROOF DRAIN

CONNECT TO EXISTING

CLEANOUT

WALL HYDRANT

DIRECTION OF FLOW

DIRECTION OF PITCH DOWN

FLOOR DRAIN

COLD WATER

CAP ON END OF PIPE

PIPE BREAK

PIPING TO BE REMOVED

EXISTING PIPING TO REMAIN

STORM DRAIN - BELOW FLOOR

SANITARY OR WASTE - BELOW FLOOR

VENT

HOT WATER

HOT WATER CIRCULATION

PIPE DOWN OR DROP

PIPE UP

RUN-OUT OFF BOTTOM

RUN-OUT OFF TOP

G GASG

OD ODB OVERFLOW STORM DRAIN - BELOW FLOOR

VENT - BELOW FLOORV.

W.C.O. WALL CLEANOUT

FLOOR CLEANOUTF.C.O.

O.E.D.&T.

B.F.D.

WS

SA

CWR

V.C.

F.B.O.C.

C.L.D.I.

D. & R.

E.T.R.

CI

V.T.R.

AVTR

INV.

HWR

AC

O.S.&Y.

CD

CFH

GPM

KW

NTS

PSI

SF

SPD

SS

VB

TYP

RM

PC

NIC

HVAC

IN

HP

GAL

FT

GC

DN

DWG

EA.

EAT

EX.

CONTR

DISCONNECT AND REMOVE

EACH

DRAWING

DOWN

EXISTING TO REMAIN

ENTERING AIR TEMPERATURE

EXISTING

AIR CHAMBER

ACID VENT THROUGH ROOF

CUBIC FEET PER HOUR

CEILING DIFFUSER

CAST IRON

BACK FLOW PREVENTER

CEMENT LINED DUCTILE IRON

CONTRACTOR

COLD WATER RISER

POUNDS PER SQUARE INCH

ROOM

PLUMBING CONTRACTOR

FURNISHED BY OTHER CONTRACTOR

GALLONS PER MINUTE

GALLONS

FEET

GENERAL CONTRACTOR

HORSE POWER

HEATING, VENTILATION AND AIR CONDITIONING

HOT WATER RISER

INCHES

NOT IN CONTRACT

NOT TO SCALE

KILOWATTS

INVERT

OPEN END DRAIN AND TRAP

OUTSIDE SCREW AND YOKE

WASTE STACK

VACUUM BREAKER

VENT THROUGH ROOF

VITRIFIED CLAY

TYPICAL

STAINLESS STEEL

SPEED

SQUARE FEET

SHOCK ABSORBER

SD SD STORM DRAIN

SANITARY OR WASTES. OR W.

TP TP TRAP PRIMER

• PLUMBING CONTRACTOR SHALL REFER TO THE ARCHITECTURAL, FIRE

PROTECTION, MECHANICAL, AND ELECTRICAL DRAWINGS AND

SPECIFICATIONS FOR LOCATIONS AND QUANTITIES OF EQUIPMENT

RELEASED TO EACH TRADE.

GENERAL NOTES

ALL PLUMBING EQUIPMENT, VALVES, ETC. SHALL BE INSTALLED WITH CLEARANCE FOR SERVICING

LOCATE PIPES TO FALL WITHIN PARTITIONS, WALLS, OR ROOF CAVITIES AND TO PRECLUDE FURRING, PRECEDENCE OVER SAME SHOWN ON PLUMBING DRAWINGS AND DESCRIBED IN SECTIONS OF THE

LOCATIONS, PLUMBING MOUNTING HEIGHTS, AND DETAILS SHOWN ON ARCHITECTURAL DRAWINGS TAKE

INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT CONFORMANCE WITH EQUIPMENT AND MATERIALS

TAKE ALL MEASURES REQUIRED TO PROTECT OWNER'S PROPERTY AND EQUIPMENT DURING COURSE

IN EVENT OF CONFLICT BETWEEN OR AMONG SPECIFIED REQUIREMENTS AND PERTINENT CODES OR

OR EQUIPMENT, LOCATE AS DIRECTED BY THE ARCHITECT.

OF WORK. SHOULD DAMAGE TO OWNER'S PROPERTY OR EQUIPMENT OCCUR, REPAIR DAMAGE

REGULATIONS, MORE STRINGENT REQUIREMENTS SHALL GOVERN.

AND COORDINATE WITH THE ARCHITECT, ALL OTHER TRADES, BLDG. MANAGEMENT, AND THE OWNER.

CONSULT ALL DRAWINGS, NOTE ARCHITECTURAL DETAILS AND ALL CONDITIONS THAT MAY AFFECT

FOR EQUIPMENT SELECTION. FURNISH AND INSTALL ALL ELEMENTS REQUIRED TO COMPLETE INTENDED

PIPE ROUTING IS SHOWN DIAGRAMMATICALLY ON PLUMBING DRAWINGS AND SHALL BE ADJUSTED

FOR

ALL WORK SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES AND

REGULATIONS.

PIPING SYSTEMS WHETHER OR NOT THESE ELEMENTS ARE SPECIFICALLY SHOWN ON DRAWINGS OR

ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL CLEARANCES AND LIMITATIONS AND

CALLED FOR IN SPECIFICATIONS.

THE WORK AND CARE FOR SAME, WHILE EXECUTING THE WORK UNDER THIS SECTION. COOPERATE

PROMPTLY AT NO COST TO OWNER.

MANUFACTURERS' WRITTEN RECOMMENDATIONS.

SPECIFICATIONS. WHEN ARCHITECTURAL DRAWINGS DO NOT SHOW PRECISE LOCATIONS OF DEVICES

OTHER THAN THAT SHOWN ON ARCHITECTURAL DRAWINGS.

AS RECOMMENDED BY THE MANUFACTURER.

REFER TO SCHEDULES AND SPECIFICATIONS FOR PLUMBING FIXTURES AND EQUIPMENT REQUIRING LOW VOLTAGE. COORDINATE ALL LOW VOLTAGE REQUIREMENTS, INCLUDING ALARMS, WITH CONTROLS

CONTRACTOR.

REFER TO SCHEDULES AND SPECIFICATIONS FOR PLUMBING FIXTURES AND EQUIPMENT REQUIRING

ELECTRICAL POWER. COORDINATE ALL POWER REQUIREMENTS WITH ELECTRICAL CONTRACTOR.

GV GATE VALVE

GLV GLOBE VALVE

BLV BALL VALVE

BFV BUTTERFLY VALVE

DV DRAIN VALVE

SCV SWING CHECK VALVE

LCV LIFT CHECK VALVE

BV BALANCE VALVE

PRV PRESSURE REDUCING VALVE

UNION

FLG FLANGE

PLS PIPE LINE STRAINER

BASKET STRAINERBKS

PIPE ANCHORAN

PIPE GUIDEGD

EXPANSION COMPENSATOREC

PIPE FLEXIBLE CONNECTIONPFC

RV RELIEF VALVE

IS ISOLATION VALVE REFER TO DETAILS AND SPEC.

THERMOMETERTRM

PRESSURE GAUGEPG

FLOW SWITCHFSW

PRESSURE/TEMPERATURE PLUGPT

PIPE CAP

STRAINER WITH DRAIN VALVE AND CAP

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

THERMOSTATIC MIXING VALVETMVTMV

SCHEDULES

CWB COLD WATER - BELOW FLOOR

DN OR DP

BVS BVS BALANCING VALVE SYSTEM

DWG NO. DRAWING TITLE

PJ0.0 PLUMBING - LEGEND & SCHEDULE

PP1.0 PLUMBING - BASEMENT - DOMESTIC WATER PLAN

PP1.1 PLUMBING - FIRST FLOOR - DOMESTIC WATER PLAN

PP1.2 PLUMBING - SECOND FLOOR - DOMESTIC WATER PLAN

PW1.0 PLUMBING - BASEMENT - DRAINAGE PLAN

PW1.1 PLUMBING - FIRST FLOOR - DRAINAGE PLAN

PW1.2 PLUMBING - SECOND FLOOR - DRAINAGE PLAN

PW1.3 PLUMBING - ROOF PLAN

PK0.0 PLUMBING - DETAILS

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH VA RI FACILITIES MANAGEMENT

SERVICE

Approved:

FULLY SPRINKLERED

NEW MENTAL HEALTH

BUILDING 38 - PHASE 1

830 CHALKSTONE AVE PROVIDENCE, RI 02908

650-332

Engineering Discipline:

/1

/2

:4

:4

P

M C

U s e rs

\z d is a lv o \D o c u m e n ts

\1

.0

-V

A M

C P ro v id e n c e

M e n ta l H e a lt h

B ld g

C e n tr a l( z d is a lv o

.r v t

PJ0.0

TB ZTD10 APR 2019

CONSTRUCTION

DOCUMENTS

PLUMBING - LEGEND & SCHEDULE

P - MIXING VALVE SCHEDULE

TAG DESCRIPTION MFR. MODEL

OUTLET TEMP

(F)

PIPE CONNECTION SIZE

REMARKSCW HW OUTLET

TMV THEMOSTATIC

MIXING VALVE

LEONARD XL-200-SW-LF-BDT 120 2 2 2

P - PLUMBING FIXTURE SCHEDULE

TAG DESCRIPTION MFR. MODEL ADA (Y/N)

PIPE CONNECTION SIZE (IN.)

FAUCET / VALVE

MOUNTING

REMARKSCW HW W V WALL FLOOR COUNTER

DF-1 DRINKING FOUNTAIN ELKAY EZSTLDDWSVRSK Y 1/2" - - - - X PROVIDE WITH STOPS & SUPPLIES, OFFSET GRID DRAIN, TRAP, & INSULATION KIT.

DS-1 OVERFLOW

DOWNSPOUT

FROET LSP4 N/A - - 4" - - X PROVIDE OVERFLOW STORM DRAINAGE DOWNSPOUT MOUNTED ON THE EXTERIOR OF THE BUILDING.

COORDINATE LOCATION WITH ARCH AND ENSURE DRAINAGE DOES NOT SPILL OVER DOORS OR WINDOWS.

FD-1 FLOOR DRAIN FD-1200-M N/A 1/2" - 4" 2" - X PROVIDE SQUARE FLOOR DRAIN WITH TRAP AND MECHANICAL TRAP PRIMER.

FD-2 FLOOR DRAIN WATTS FD-1200-L N/A 1/2" - 4" 2" - X PROVIDE HEAVY DUTY FLOOR DRAIN WITH TRAP AND MECHANICAL TRAP PRIMER.

HB-1 HOSE BIBB WOODFORD 67 N/A 3/4" - - - - X FREEZE PROOF WALL HYDRANT.

LAV-1 WALL HUNG LAVATORY AMERICAN

STANDARD

LUCERNE 0356.421 Y 1/2" 1/2" 2" 1 1/2" CHICAGO

786-E35ABCP

X PROVIDE WITH STOPS & SUPPLIES, OFFSET GRID DRAIN, TRAP, & INSULATION KIT.

MSB-1 MOP SINK BASIN FIAT TSB3000 N/A 3/4" 3/4" 3" 1 1/2" CHICAGO

445-VBRRCF

X PROVIDE RIM GUARD, MOP RACK, TRAP & DRAIN FITTINGS.

RD-1 COMBINATION ROOF/

OVERFLOW DRAIN

FROET 100C4-OFS N/A - - 4" - - X PROVIDE CONNECTION TO 4" SD AND 4" OD LINES.

RD-2 FROET N/A - - 4" - - X PROVIDE CONNECTION TO 4" SD.

SK-1 HANDWASH SINK ELKAY ECTSR25229BG N/A 1/2" 1/2" 2" 1 1/2" CHICAGO

786-E35ABCP

X PROVIDE WITH STOPS & SUPPLIES, OFFSET GRID DRAIN, TRAP, & INSULATION KIT.

SK-2 HANDWASH SINK ELKAY LRADQ191865 N/A 1/2" 1/2" 2" 1 1/2" CHICAGO

786-E35ABCP

X PROVIDE WITH STOPS & SUPPLIES, OFFSET GRID DRAIN, TRAP, & INSULATION KIT.

WC-1 WATER CLOSET AMERICAN

STANDARD

AFWALL MILLENIUM Y 1 1/2" - 4" 2" 2257.660 X PROVIDE WITH STOPS & SUPPLIES, OFFSET GRID DRAIN, TRAP, & INSULATION KIT.

P - HOT WATER CIRCULATION PUMP SCHEDULE

TAG DESCRIPTION MFR. MODEL

RATED FLOW

(GPM) TDH

ELECTRICAL CONTROLS

REMARKS

HP (EA.

PUMP) RPM VOLTS PH HZ

EMERG.

POWER (Y/N) TYPE

FURNISHED

BY

DCP-1 CIRCULATION

PUMP

TACO 112 6 20 0.333 115 1 60 N DDC ATC PROVIDE WITH VARIABLE SPEED VARIABLE VOLTAGE APPLICATION (00-VV). PROVIDE

CONNECTIONS TO FMS SYSTEM AND DUPLEX CONTROL PANEL. PROVIDE DUPLEX

CONTROL PANEL; PRESSURE GAUGES AND TAPS.

3. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

2. MOUNT TANK ON 4" CONCRETE HOUSING PAD. PAD IS BY GENERAL CONTRACTOR.

1. EXPANSION TANK SIZED TO SUPPORT THE NEW BUILDING AND THE FUTURE BUILDING ADDITION.

P - DOMESTIC EXPANSION TANK SCHEDULE (DET)

TAG LOCATION TYPE

VOLUME

(GALLONS)

ACCEPTANCE VOLUME

(GALLONS)

DIMENSIONS

(DIA. X H) REMARKS

BASIS OF DESIGN

MFR MODEL

DET-1 MECHANICAL ROOM 202 BLADDER 4.4 3.2 11X15 AMTROL ST-12

P - DOMESTIC WATER HEATER SCHEDULE

TAG DESCRIPTION LOCATION MFR MODEL

TANK

CAPACITY

(GAL.)

GAS PRESSURE INPUT WATER TEMP

RECOVERY

(GPH)

ELECTRICAL CONTROLS VENTING

REMARKSMIN. (IN WC) MAX. (IN WC) GAS (MBH) ENTERING (F) LEAVING (F)

EMERG.

POWER (Y/N)

DISCONNECT

(FURNISHED

BY) TYPE

FURNISHED

BY INLET EXHAUST

WH-1 GAS WATER

HEATER

MECHANICAL

ROOM 202

AO

SMITH

BTS 150 50 3 11 150 40 140 190 N ATC DDC ATC 2 2

P - SUMP PUMP SCHEDULE

TAG DESCRIPTION MFR. MODEL

RATED FLOW

(GPM) TDH

DISCHARGE Ø

IN

ELECTRICAL CONTROLS

ACCESSORIES

/ REMARKSHP RPM VOLTS PH HZ

EMERG.

POWER (Y/N)

DISCONNECT

(FURNISHED

BY) TYPE

FURNISHED

BY

SP-1 ELECTRIC SUMP

PUMP

STANCOR SE-50 OVM ELV 50 20 4 0.5 3450 208 1 N ATC DDC ATC

Revisions: Date:

WATTS

S T

A

T E

O F

R H O D

E

I S L A

N D

HOP E

R P

B P

1 PROVIDE NEW 3" G ENTRANCE EQUIPMENT. REFERENCE

DETAIL GAS METER & REGULATOR DETAIL #231123-01 ON

SHEET PK0.0 FOR CONNECTION AND PIPING REQUIREMENTS.

COORDINATE WITH LOCAL UTILITY.

PLUMBING KEYED NOTES

PROVIDE NEW 3" CWB ENTRANCE EQUIPMENT. RUN 3" CW

BELOW BUILDING AND EXTEND 10' BEYOND BUILDING

EXTERIOR. COORDINATE LOCATION AND ELEVATION WITH

CIVIL. CONNECTION BY CIVIL.

GRAPHIC SCALE

4' 2' 0 4' 8' 12'

SCALE: 1/4" = 1' - 0"

LAV-1

LAV-1

LAV-1

WC-1

WC-1

WC-1

SK-1

SK-2

B V

S

3/4" HW

3/4" HWC

2" G UP

1 1/2" CW

2" G DP

MSB-1

3" CW DN

DF-1

3/4" CW UP

3/4" CW

3/4" HWC

3/4" HW

3" CW

C W

/4

H

W

/4

H

W C

3/4" CW

3/4" HW

3/4" HWC

/4

H

W

/4

H

W C

STAIR 1

ELEV 1

ELEV 2

WATER SERVICE

CLASSROOM STORAGE

027A

ELEV. CONTROL ROOM

TOILET

TOILET

CORRIDOR

PRRC CUBES

OFFICE

OFFICE

OT OFFICE

OCCUPATIONAL THERAPY ROOM

OFFICE

ELECTRICAL

TELE/ DATA

ELEVATOR LOBBY

CONSULT ROOM - EXTRA

022CONSULT ROOM

CONSULT ROOM

CLASSROOM

CLASSROOM

STAFF TOILET

EMERG. ELECT.

018A

WAITING

C

D

E

F

G

76543 1 2

8.7

3" CW DP

4' - 6"

/2

C W

1/2" CW DP

1/2" HW DP

1/2" CW DP

1/2" HW DP

3/4" HW DP

3/4" CW DP

3" CWB

3/4" HWC UP

3/4" HW UP

3" CW UP

1/2" CW DP

1/2" HW DP

PROVIDE TRAP

PRIMER FOR (2)

FD-1 AND 1/2" CW

LINE FOR SUPPLY

1 1/2" CW DP

1/2" HW DP

1/2" CW DP

PROVIDE TRAP PRIMER AND 1/2" CW LINE FOR FD-1

HB-13/4" DP

FD-1

FD-1

FD-1

1/2" CW DP

LAV-1

WC-1

SK-2

BVS

3/4" HW

3/4" HWC

1 1/2" CW

3/4" CW UP

STAFF LOUNGE

STAIR 2

STAFF TOILET

CORRIDOR

A

B

8.7

1/2" HW DP

1/2" CW DP

1/2" HW DP

1/2" CW DP

1 1/2" CW DP

PROVIDE TRAP PRIMER AND 1/2" CW LINE FOR FD-1

FD-2

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH VA RI FACILITIES MANAGEMENT

SERVICE

Approved:

FULLY SPRINKLERED

NEW MENTAL HEALTH

BUILDING 38 - PHASE 1

830 CHALKSTONE AVE PROVIDENCE, RI 02908

650-332

Engineering Discipline:

/1

/2

:4

:4

P

M C

U s e rs

\z d is a lv o \D o c u m e n ts

\1

.0

-V

A M

C P ro v id e n c e

M e n ta l H e a lt h

B ld g

C e n tr a l( z d is a lv o

.r v t

PP1.0

TB ZTD10 APR 2019

CONSTRUCTION

DOCUMENTS

PLUMBING - BASEMENT -

DOMESTIC WATER PLAN

GAS METER ASSEMBLY:

PROVIDE AND COORDINATE GAS METER CONCRETE PAD

REQUIREMENTS WITH GAS COMPANY.

BOILERS LOAD NOTES

B-1= 1000 CFH

B-2= 1000 CFH

B-3= 1000 CFH (REDUNTANT) NOT INCLUDED IN TOTAL GAS LOAD.

DOM. HW

WH-1= 150 CFH

WH-2= 150 CFH (FUTURE) NOT INCLUDED IN TOTAL GAS LOAD.

TOTAL 2300 CFH TOTAL CONNECTED LOAD @7" W.C. PRESSURE

NOTE:

COORDINATE GAS PRESSURE REQUIREMENTS W/GAS

COMPANY & PROVIDE GAS PRESSURE REGULATOR VALVE

ASSEMBLY SIZED AT INDICATED PRESSURES & CAPACITIES

1/4" = 1'-0"PP1.0

1 BASEMENT LEVEL - PLUMBING - DOMESTIC - PART A

1/4" = 1'-0"PP1.0

3 BASEMENT LEVEL - PLUMBING - DOMESTIC - PART B

Revisions: Date:

S T

A

T E

O F

R H O D

E

I S L A

N

GRAPHIC SCALE

4' 2' 0 4' 8' 12'

SCALE: 1/4" = 1' - 0"

SK-1

SK-1

LAV-1

WC-1

WC-1

WC-1

WC-1

LAV-1

LAV-1

LAV-1

B V

S

3/4" HW

3/4" HWC

3/4" HWC

3/4" HW

1 1/2" CW

MSB-1

3" G

(2300 CFH)

HB-1

TLT

TLT

TLT

HAC

COMPUTER LAB

STAIR 1

ELEV 1

ELEV 2

OFFICE

CORRIDOR

100A

CORRIDOR

100B

VESTIBULE

COMMUNICATION CENTER

TOILET

CONSULT ROOM

RC CUBES

MEDICATION ROOM

CUBICLES

INJECTION ROOM

CONSULT ROOM

OFFICE

OFFICE

CONSULT ROOM

CONSULT ROOM

CONSULT ROOM

SECURITY / WC STORAGE

101A

WAITING

MAIN ELECTRICAL ROOM

STORAGE

OFFICE

3/4" CW UP

TO HB-1

1 1/2" CW

DF-1

3/4" CW DP

3/4" HWC

3/4" HW

3" CW

1 1/2" CW DN

1 1/2" HW UP

3/4" HWC UP

3" G DN

PROVIDE TRAP PRIMER AND 1/2" CW LINE FOR FD-1

3" G DN

3/4" HWC DN

3/4" HW DN

3" CW DN

B

C

D

E

F

G

76543 1 2

8.7

1/2" CW DP

1/2' HW DP

1/2" CW DP

1/2" HW DP

1/2" CW DP

1/2" HW DP

1 1/2" CW DP

1/2" HW DP

1/2" CW DP

PROVIDE TRAP PRIMER AND

1/2" CW LINE FOR FD-1

2 1/2" CW

1 1/4" G

(150 CFH)

FD-1

FD-1

FD-1

1/2" CW DP

1/2" HW DP

PROVIDE TRAP

PRIMER FOR (2)

FD-1 AND 1/2" CW

LINE FOR SUPPLY

FD-1

1/2" CW DP

1/2' HW DP

HB-1

CONSULT ROOM - EXTRA

STAIR 2

MEETING ROOM

OFFICE

A

B

8.7

3/4" CW UP

1 PROVIDE NEW 1 1/4" G CAPPED FOR FUTURE BUILDING.

PROVIDE NEW 2 1/2" CW CAPPED FOR FUTURE BUILDING.

PLUMBING KEYED NOTES

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH VA RI FACILITIES MANAGEMENT

SERVICE

Approved:

FULLY SPRINKLERED

NEW MENTAL HEALTH

BUILDING 38 - PHASE 1

830 CHALKSTONE AVE PROVIDENCE, RI 02908

650-332

Engineering Discipline:

/1

/2

:4

:5

P

M C

U s e rs

\z d is a lv o \D o c u m e n ts

\1

.0

-V

A M

C P ro v id e n c e

M e n ta l H e a lt h

B ld g

C e n tr a l( z d is a lv o

.r v t

PP1.1

TB ZTD10 APR 2019

CONSTRUCTION

DOCUMENTS

PLUMBING - FIRST FLOOR -

DOMESTIC WATER PLAN

1/4" = 1'-0"PP1.1

1 LEVEL 1 - PLUMBING - DOMESTIC - PART A

1/4" = 1'-0"PP1.1

2 LEVEL 1 - PLUMBING - DOMESTIC - PART B

Revisions: Date:

S T

A

T E

O F

R H O D

E

I S L A

N

TMV

WH-1

DCP-1

DET-1

1 1/2" CW DN

1 1/2" HW DN

3/4" HWC DN

3" G DN

3" G

(2000 CFH)

MECHANICAL ROOM

MECHANICAL ROOM

202CIRCULATION

ELEV 1

ELEV 2

STAIR 1

F

G

1 2

8.7

3/4" CW DN FOR HB ON ROOF

3/4" CW

R P

B P

R P

B P

R P

B P

1 1/2" CW

HB-1

1 PROVIDE 2 1/2" G TAP FOR HVAC BOILER. CONNECTION BY HVAC

CONTRACTOR. TYP. OF (3). PROVIDE GAS SHUT OFF VALVE FOR

EACH.

PLUMBING KEYED NOTES

2 PROVIDE 3/4" CW TO HVAC HUMIDIFIER. PROVIDE WATTS 007

DOUBLE CHECK VALVE ASSEMBLY. SPILL BACKFLOW

DRAINGED TO CLOSEST FLOOR DRAIN. CONNCETION TO

HUMIDIFIER BY HVAC.

3 PROVIDE 3/4" CW TO HVAC CHILLED WATER SYSTEM.

PROVIDE WATTS 007 DOUBLE CHECK VALVE ASSEMBLY.

SPILL BACKFLOW DRAINGED TO CLOSEST FLOOR DRAIN.

COORDINATE LOCATION WITH HVAC CHILLED WATER PIPING

SCHEMATIC.

4 REFERENCE GAS FIRED WATER HEATER DETAIL ON SHEET

PK0.0 FOR WATER HEATER PIPING DETAIL.

5 PROVIDE 1/2" CW FOR TRAP PRIMERS. COORDINATE TRAP

PRIMER LOCATION(S) IN FEILD AND FEED ALL FD-1 IN

MECHANICAL ROOM.

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH VA RI FACILITIES MANAGEMENT

SERVICE

Approved:

FULLY SPRINKLERED

NEW MENTAL HEALTH

BUILDING 38 - PHASE 1

830 CHALKSTONE AVE PROVIDENCE, RI 02908

650-332

Engineering Discipline:

/1

/2

:4

:5

P

M C

U s e rs

\z d is a lv o \D o c u m e n ts

\1

.0

-V

A M

C P ro v id e n c e

M e n ta l H e a lt h

B ld g

C e n tr a l( z d is a lv o

.r v t

PP1.2

TB ZTD10 APR 2019

CONSTRUCTION

DOCUMENTS

PLUMBING - SECOND FLOOR -

DOMESTIC WATER PLAN

1/4" = 1'-0"PP1.2

1 LEVEL 2 - PLUMBING DOMESTIC PLAN

Revisions: Date:

S T

A

T E

O F

R H O D

E

I S L A

N

1 EXTEND NEW 4" SDB 10' BEYOND BUILDING EXTERIOR.

COORDINATE LOCATION AND ELEVATION WITH CIVIL.

PLUMBING KEYED NOTES

2 EXTEND NEW 6" SB 10' BEYOND BUILDING EXTERIOR.

COORDINATE LOCATION WITH CIVIL.

GRAPHIC SCALE

4' 2' 0 4' 8' 12'

SCALE: 1/4" = 1' - 0"

LAV-1

LAV-1

LAV-1

WC-1

WC-1

WC-1

SK-1

SK-2

4" SB

4" SB

4" S UP & DN

3" V UP

2" V

2" V

4" SB

MSB-1

SP-1

SP-1

4" SB

STAIR 1

ELEV 1

ELEV 2

WATER SERVICE

CLASSROOM STORAGE

027A

ELEV. CONTROL ROOM

TOILET

TOILET

CORRIDOR

PRRC CUBES

OFFICE

OFFICE

OT OFFICE

OCCUPATIONAL THERAPY ROOM

OFFICE

ELECTRICAL

TELE/ DATA

ELEVATOR LOBBY

CONSULT ROOM - EXTRA

CONSULT ROOM

CONSULT ROOM

CLASSROOM

CLASSROOM

STAFF TOILET

EMERG. ELECT.

018A

WAITING

3" V UP

4" S UP

S B

2" V

CORRIDOR

CORRIDOR

C

D

E

F

G

76543 1 2

8.7

STORAGE

MIN. INVERT = 82.5'

FD-1

2" V UP

2" S UP& DN

8" SD UP

DF-1

1 1/2" V RISE & 2" S DN

S B

4" SB

S B

4" SB

3" SB DN

4" SD UP

MIN. INVERT = 83.5'

CO

2" V DN

FD-1

FD-1

2" VB

2" VB2" V DN

2" VB

2" V RISE

MIN. INVERT = 84.5'

4" SD UP

4" SD UP

CO

4" SD UP

4" SD

4" SD

1 1/2" V RISE & 2" S DN 1 1/2" V RISE & 2" S DN

1 1/2" V RISE & 2" S DN

1 1/2" V UP

LAV-1

SK-2

2" V

4" SB

STAIR 2

STAFF TOILET

CORRIDOR

CORRIDOR

A

B

8.7

FD-2

2" V RISE & 4" S DN

1 1/2" V RISE & 2" S DN

2" V DN

2" VB

1 1/2" V RISE & 2" S DN

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH VA RI FACILITIES MANAGEMENT

SERVICE

Approved:

FULLY SPRINKLERED

NEW MENTAL HEALTH

BUILDING 38 - PHASE 1

830 CHALKSTONE AVE PROVIDENCE, RI 02908

650-332

Engineering Discipline:

/1

/2

:4

:5

P

M C

U s e rs

\z d is a lv o \D o c u m e n ts

\1

.0

-V

A M

C P ro v id e n c e

M e n ta l H e a lt h

B ld g

C e n tr a l( z d is a lv o

.r v t

PW1.0

TB ZTD10 APR 2019

CONSTRUCTION

DOCUMENTS

PLUMBING - BASEMENT -

DRAINAGE PLAN

1/4" = 1'-0"PW1.0

1 BASEMENT LEVEL - DRAINAGE- PART A

1/4" = 1'-0"PW1.0

3 BASEMENT LEVEL - DRAINAGE- PART B

Revisions: Date:

S T

A

T E

O F

R H O D

E

I S L A

N

SCALE: 1/4" = 1' - 0"

4" SD UP

4" OD UP TO

RD-1

(600 SQ. FT.)

4" VTR

4" SD DN

4" S UP

4" VTR

4" SD UP TO

RD-2

(1075 SQ. FT.)

WC-1

4" SD DN

SK-1

SK-1

LAV-1

WC-1

LAV-1

LAV-1

WC-1

WC-1

MSB-1

4" S DN

3" V DN

CO

TLT

TLT

TLT

HAC

COMPUTER LAB

STAIR 1

ELEV 1

ELEV 2

OFFICE

CORRIDOR

100A

CORRIDOR

100B

VESTIBULE

COMMUNICATION CENTER

TOILET

CONSULT ROOM

RC CUBES

MEDICATION ROOM

CUBICLES

INJECTION ROOM

CONSULT ROOM

OFFICE

OFFICE

CONSULT ROOM

CONSULT ROOM

CONSULT ROOM

SECURITY / WC STORAGE

101A

WAITING

MAIN ELECTRICAL ROOM

STORAGE

OFFICE

4" SD UP 4" SB

3" V

C

D

E

F

G

76543 1 2

8.7

CO

DF-1

CO

4" SB DN

4" SB

CO

4" SB

2" V UP

2" S UP & DN

4" SD DN

LAV-1

DS-1

CO

CO

3" V RISE & DN

4" S DN

3" V RISE & 2" V DN

1 1/2" V RISE & 2" S DN

4" S UP

2" V DN

2" V DN

1 1/2" V RISE & 2" S DN

CO

1 1/2" V RISE & 2" S DN

2" V DN

2" V RISE & 4" S DN

1 1/2" V RISE & 2" S DN

4" SD UP TO CONOPY RD-2.

PIPING CONTAINED IN CANOPY.

(125 SQ. FT.)

4" SD UP TO CONOPY RD-2.

PIPING CONTAINED IN CANOPY.

(406 SQ. FT.)

CO

CO

CO

4" SD UP

4" OD UP TO

RD-1

(240 SQ. FT.)

4" SD UP

4" OD UP TO

RD-1

(600 SQ. FT.)

4" SD DN

DS-1

O D

4" OD

CO

CO

4" OD DN 4" OD DN

O D

CO

CO

4" SD DN

4" SD DP

4" SD DP

CO

CO

4" SD DP

4" SD

CO

4" SD

CO

CO

CO

4" SD

4" SD DP

FD-1

FD-1

2" VB

2" VB

FD-1

2" VB

FD-1

4" SD

CO

1 1/2" V RISE & 2" S DN

S D

4" SD

1 1/2" V DN

4" SD UP TO

RD-2

(1000 SQ. FT.)

CONSULT ROOM - EXTRA

STAIR 2

MEETING ROOM

OFFICE

A

B

8.7

CO

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH VA RI FACILITIES MANAGEMENT

SERVICE

Approved:

FULLY SPRINKLERED

NEW MENTAL HEALTH

BUILDING 38 - PHASE 1

830 CHALKSTONE AVE PROVIDENCE, RI 02908

650-332

Engineering Discipline:

/1

/2

:4

:0

P

M C

U s e rs

\z d is a lv o \D o c u m e n ts

\1

.0

-V

A M

C P ro v id e n c e

M e n ta l H e a lt h

B ld g

C e n tr a l( z d is a lv o

.r v t

PW1.1

TB ZTD10 APR 2019

CONSTRUCTION

DOCUMENTS

PLUMBING - FIRST FLOOR -

DRAINAGE PLAN

1/4" = 1'-0"PW1.1

1 LEVEL 1 - DRAINAGE- PART A

1/4" = 1'-0"PW1.1

2 LEVEL 1 - DRAINAGE- PART B

Revisions: Date:

S T

A

T E

O F

R H O D

E

I S L A

N

WH-1

8" OD TO RD-1

8" SD TO RD-1

(711 SQ.FT)

4" S DN

CIRCULATION

MECHANICAL ROOM

4" VTR

F

G

8.7

4" VTR

2" V DN

CO

4" SD TO RD-1

4" OD TO RD-1

(710 SQ.FT)

4" SD TO RD-1

4" OD TO RD-1

(710 SQ.FT)

CO

4" SD

CO4" SB 4" SB

V

4" V

4" V DN

4" SD DN

4" SD

S B

S B

4" V

V

CO

CO

CO

4" OD

4" OD

4" OD

4" V DN

4" V DN

4" S DN

4" VB RISE

4" S DN

4" VB RISE

4" VB RISE

4" S DN

4" VB RISE

4" S DN

4" VB RISE

4" S DN

4" V DN

4" V DN

4" V DN

4" VB

4" VB

4" VB

4" VB

4" VB

1 2 3 4 5 6

F

G

E.9

E.5

4" OD DP

4" OD DN

FD-2

FD-2

FD-2

FD-2

FD-2

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH VA RI FACILITIES MANAGEMENT

SERVICE

Approved:

FULLY SPRINKLERED

NEW MENTAL HEALTH

BUILDING 38 - PHASE 1

830 CHALKSTONE AVE PROVIDENCE, RI 02908

650-332

Engineering Discipline:

/1

/2

:4

:0

P

M C

U s e rs

\z d is a lv o \D o c u m e n ts

\1

.0

-V

A M

C P ro v id e n c e

M e n ta l H e a lt h

B ld g

C e n tr a l( z d is a lv o

.r v t

PW1.2

TB ZTD10 APR 2019

CONSTRUCTION

DOCUMENTS

PLUMBING - SECOND FLOOR -

DRAINAGE PLAN

1/4" = 1'-0"PW1.2

1 LEVEL 2- DRAINAGE PLAN

Revisions: Date:

S T

A

T E

O F

R H O D

E

I S L A

N

SCALE: 1/4" = 1' - 0"

4" VTR

4" VTR

B

C

D

E

F

G

76543 1 2

8.7

4" VTR

4" VTR

RD-1 RD-1 RD-1

RD-1

RD-1

RD-1

RD-2

RD-2

RD-2

4" SD DN

4' OD DN

(711 SQ.FT.)

4" SD DN

4' OD DN

(710 SQ.FT.)

4" SD DN

4' OD DN

(710 SQ.FT.)

4" SD DN

4' OD DN

(600 SQ.FT.)

4" SD DN

4' OD DN

(240 SQ.FT.)

4" SD DN

4' OD DN

(400 SQ.FT.)

4" SD DN

(406 SQ.FT.)

4" SD DN

(125 SQ.FT.)

4" SD DN

(1075 SQ.FT.)

B

8.7

RD-2

4" SD DN

(1000 SQ. FT)

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH VA RI FACILITIES MANAGEMENT

SERVICE

Approved:

FULLY SPRINKLERED

NEW MENTAL HEALTH

BUILDING 38 - PHASE 1

830 CHALKSTONE AVE PROVIDENCE, RI 02908

650-332

Engineering Discipline:

/1

/2

:4

:1

P

M C

U s e rs

\z d is a lv o \D o c u m e n ts

\1

.0

-V

A M

C P ro v id e n c e

M e n ta l H e a lt h

B ld g

C e n tr a l( z d is a lv o

.r v t

PW1.3

TB ZTD10 APR 2019

CONSTRUCTION

DOCUMENTS

PLUMBING - ROOF PLAN

1/4" = 1'-0"PW1.3

1 ROOF - PLUMBING- PART A

1/4" = 1'-0"PW1.3

2 ROOF - PLUMBING- PART B

Revisions: Date:

S T

A

T E

O F

R H O D

E

I S L A

N

TRAP SEAL PRIMER DIAGRAM

FINISHED

FLOOR

FLOOR DRAIN

1/2" TRAP PRIMER LINE

TRAP PRIMER VALVE

DEBRIS LOOP REQUIRED TO

LIMIT FORIEGN MATERIAL

FROM ENTERING TRAP

PRIMER.

DOMESTIC WATER LINE

SERVING ACTIVE FIXTURES.

SLEEVE

THROUGH SLAB

NO SCALE

221119-01

SERVICE SHUT OFF VALVE

M

IN

R E

Q U

IR

E

D

NOTE:

PROVIDE ACCESS PANEL TO

TRAP PRIMER FOR REGULAR

MAINTENANCE AND

TESTING.

WATERPROOF FLEXIBLE

CAULKING INSIDE SLEEVE

TO DRAINAGE

SYSTEM

ELEVATOR SUBMERSIBLE PUMPS

DIAGRAM

NO SCALE

221329-01

ELEVATOR SUMP PUMP

WITH AUTOMATIC LEVEL

CONTROL AND OIL

MINDER

CONCRETE ELEVATOR

SUMP PIT BY OTHER

DIVISION

CHECK VALVE

GATE VALVE

UNION

PUMP

DISCHARGE

TO SANITARY

DRAIN

HIGH LEVEL ALARM

ELEC. RECEPTACLE

BY OTHER DIVISION

STEEL OPEN GRATE

CONSULTANT

PLUG-IN

POWER

CORD

ROOF DRAIN PIPING DIAGRAM

PLUMBING CONTRACTOR

TO FIRESTOP OPENING IN

ROOF ASSEMBLY

ROOF DRAIN

BASKET

STRAINER

CLAMPING RING

UNDER-DECK CLAMP

NOTE:

FOR ADDITIONAL

REQUIREMENTS SEE

ARCHITECTURAL

DRAWINGS.

NO-HUB

COUPLING REFER

TO SPEC. FOR

BAND REQ.

STORM DRAIN PIPE

CLEANOUT

BLOCKING BY

GENERAL

CONTRACTOR

TAPERED

INSULATION BY

ROOFING

CONTRACTOR

ROOF

MEMBRANE BY

ROOFING

CONTRACTOR

ROOF

PLANK

INSULATION CLEVIS

HANGER (TYP.)

NO SCALE

221423-01

WATER SERVICE ENTRANCE - 3" METER

NO SCALE

221116-02

DOMESTIC COLD WATER

TO PLUMBING SYSTEM

PRESSURE GAUGE

WITH SNUBBER (TYP.

ALL)

CITY

APPROVED

COMPOUND

WATER METER

BALL VALVE

(TYP.)

STRAINER BY SAME

MFG. AS WATER METER RPBP SEE DETAIL

FOR MORE

INFORMATIONPIPE SUPPORT (TYP.)

TEST PORT WITH

REMOVABLE CAP

3/4" DRAIN

WITH CAP

METER

NC

PIPE HANGER DIAGRAM

PIPE HANGER 1A

BAND OR CLEVIS

TYPE

18 GA. STEEL SHIELD TYPICAL FOR

ALL TYPE HANGERS WHERE

INSULATED PIPING OCCURS. SHIELD

BY INSULATION CONTRACTOR.

NO SCALE

HANGER ROD SECURE

TO STRUCTURE

FIBERGLASS

INSULATION TYPICAL

FOR ALL INSULATED

PIPING

PIPE

220529-01

GAS FIRED WATER HEATER PIPING DIAGRAM

C W

120°FHWC120°FHW

120°FHWC

CW

GAS

FINISHED

SLAB/FLOOR

DRAIN VALVE

(TYP.)

TO FLOOR

DRAIN

(TYP.)

THERMAL

EXPANSION

TANK

DOMESTIC

HW RECIRC.

PUMP (TYP.)

STRAINER

(TYP.)

CONCRETE

HOUSEKEEPIN

G PAD (TYP.)

DIRT LEG

(TYP.)

°F

H W

GAS

FIRED

WATER

HEATER

G A

S

NEUTRALIZATION

KIT (TYP.)

GAS

TRAIN

(TYP.)

140°FHW

FLUE BY HVAC

CONTRACTOR

(TYP.)

VALVED &

CAPPED

CONDENSATE

DRIP PAN

(TYP.)

NO SCALE

°F

H W

THERMOSTATIC

MIXING VALVE

ASSEMBLY

(TYP.)

°F

H W

C W

CW

DIRT LEG

(TYP.)

G A

S

GAS

TRAIN

(TYP.)

C W

THERMAL

CHECK VALVE

VACUUM RELIEF

VALVE (TYP) 6"

ABOVE TOP OF

HOT WATER TANK

221526-01

GAS METER & REGULATOR DETAIL

A P

P R

O X

SEE

SPECS

BUILDING WALL

CAP

UNION

FINISHED GRADE

INSULATED FITTING

SHUT-OFF VALVE

VENT WITH WEATHER ELL

SHUT-OFF VALVE

SEISMIC SHUT-OFF VALVE

GAS METER BY

GAS COMPANY

CAPPED PIPE FOR

EMERGENCY GAS

CONNECTION

[GPR] WITH LOW

PRESSURE SHUT-OFF

6" LONG

DIRT LEG

NO SCALE

231123-01

PROVIDE 6" CONCRETE PAD

WHEN BASE MOUNTED GAS

METER IS PROVIDED

SHUT-

OFF

VALVE

PIPE SLEEVE

BY GAS COMPANYBY PLBG. CONTR.

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH VA RI FACILITIES MANAGEMENT

SERVICE

Approved:

FULLY SPRINKLERED

NEW MENTAL HEALTH

BUILDING 38 - PHASE 1

830 CHALKSTONE AVE PROVIDENCE, RI 02908

650-332

Engineering Discipline:

/1

/2

:4

:4

P

M C

U s e rs

\z d is a lv o \D o c u m e n ts

\1

.0

-V

A M

C P ro v id e n c e

M e n ta l H e a lt h

B ld g

C e n tr a l( z d is a lv o

.r v t

PK0.0

TB ZTD10 APR 2019

CONSTRUCTION

DOCUMENTS

PLUMBING - DETAILS

Revisions: Date:

S T

A

T E

O F

R H O D

E

I S L A

N

170338.01-VAMC Providence - Mental Health Bldg -Central(2018)_zdisalvo
PJ0.0 - PLUMBING - LEGEND & SCHEDULE
PP1.0 - PLUMBING - BASEMENT - DOMESTIC WATER PLAN
PP1.1 - PLUMBING - FIRST FLOOR - DOMESTIC WATER PLAN
PP1.2 - PLUMBING - SECOND FLOOR - DOMESTIC WATER PLAN
PW1.0 - PLUMBING - BASEMENT - DRAINAGE PLAN
PW1.1 - PLUMBING - FIRST FLOOR - DRAINAGE PLAN
PW1.2 - PLUMBING - SECOND FLOOR - DRAINAGE PLAN
PW1.3 - PLUMBING - ROOF PLAN
PK0.0 - PLUMBING - DETAILS