This federal contract opportunity notice describes a forthcoming solicitation for the construction of a new mental health building project located in Providence, Rhode Island. The Department of Veterans Affairs will issue a request for proposal to award a firm-fixed-price construction contract valued between $10-20 million. The scope of work involves all labor, equipment, and materials necessary for general construction and site work including demolition, utilities, and preparation for a new three-story, 15,300 square foot freestanding mental health facility. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and use NAICS code 236220 with a size standard of $36.5 million. The period of performance is approximately 600 calendar days from notice to proceed. The solicitation is expected to be issued on or around December 20, 2019 with questions due to the specified email by the stated deadline.
36E77620R0001 Attachment 6 - CD Drawings - FA.pdf
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
1. INSTALLATION OF A NEW FULLY ADDRESSABLE FIRE ALARM SYSTEM WITH VOICE EVACUATION. THE SYSTEM SHALL INCLUDE INITIATION BY MANUAL PULL STATIONS, SPRINKLER MONITORING, AND AUTOMATIC DETECTION IN THE FORM OF SMOKE AND HEAT DETECTORS. OCCUPANT NOTIFICATION SHALL BE BY BOTH AUDIO AND VISUAL
SIGNALS UTILIZING SPEAKERS AND STROBES.
GENERAL NOTES
1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH NATIONAL FIRE PROTECTION ASSOCIATION CODES (1, 70, 72, 101), , STATE AND LOCALLY ADOPTED FIRE
REGULATIONS.
2. CONSULT THE PROJECT SPECIFICATIONS AND DESIGN NARRATIVE FOR ADDITIONAL INFORMATION REGARDING THE SYSTEM DESIGN, INTENDED PERFORMANCE, PRODUCTS AND INSTALLATION.
3. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL EQUIPMENT, WIRING, CONDUIT, LABOR, AND MATERIAL REQUIRED TO INSTALL A COMPLETE, OPERATIONAL, AND
CODE COMPLIANT FIRE ALARM SYSTEM AS INDICATED.
4. PLANS ARE DIAGRAMMATIC IN NATURE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE A CODE-COMPLIANT SYSTEM. DISCREPANCIES BETWEEN THE DRAWINGS AND SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF SFC ENGINEERING PARTNERSHIP, INC.
5. NO VISUAL NOTIFICATION REQUIRED IN CONSULT ROOMS PER VA FPDM.
6. AUDIBLE NOTIFICATION TO BE MINIMUM 15 dB ABOVE AMBIENT NOISE LEVELS. ADDITIONAL SPEAKERS TO BE INSTALLED AS REQUIRED.
7. CONSULT MANUFACTURER'S APPROVED SHOP DRAWINGS AND INSTALLATION MANUALS FOR ADDITIONAL INFORMATION.
8. A WORKING SET OF DOCUMENTS SHALL BE MAINTAINED AND USED AS A DRAFT OF THE AS-BUILT DRAWINGS. THIS DRAFT SET SHALL BE AVAILABLE FOR INSPECTION OR REVIEW BY VA OR SFC PERSONNEL. THE DRAFT SET OF DOCUMENTS SHALL BE MAINTAINED ON A 48-HOUR BASIS: AS EACH PIECE OF EQUIPMENT IS INSTALLED, THE LOCATION SHALL BE ACCURATELY RECORDED ON THE DRAFT AS-BUILT DOCUMENTS WITHIN 48 HOURS; AS EACH CIRCUIT IS INSTALLED AND CONNECTED TO EQUIPMENT, THE ROUTING AND CONNECTION ORDER SHALL BE RECORDED ON THE DRAFT AS-BUILT DOCUMENTS WITHIN 48 HOURS. CONSULT THE PROJECT SPECIFICATIONS FOR
COMPLETE INFORMATION ON THE REQUIREMENTS FOR AS-BUILT DOCUMENTATION.
9. FIRE ALARM SYSTEM TO COMMUNICATE WITH EXISTING CAMPUS NOTIFIER FIRE ALARM SYSTEM VIA FIBER OPTIC CABLE STYLE 7. TIE-IN TO BE LOCATED AT BUILDING 32.
INSTALLATION NOTES
1. ALL INSTALLATION WORK SHALL CONFORM WITH THE REQUIREMENTS OF THE NATIONAL FIRE PROTECTION ASSOCIATION'S NATIONAL FIRE ALARM CODE (NFPA 72), 2016 EDITION.
2. FPLR (RISER TYPE) CABLE WILL BE USED ON THIS PROJECT. ALL CABLE SHALL BE IN 3/4" MINIMUM RIGID CONDUIT. FLEXIBLE METAL CONDUIT (FMC) IS PERMITTED ONLY
WHERE SPECIFICALLY APPROVED BY OWNER.
3. ALL INITIATING DEVICES, CONTROL MODULES, MONITOR MODULES, NOTIFICATION APPLIANCES, AND ALL OTHER EQUIPMENT SHALL BE INSTALLED ON STANDARD ELECTRICAL BACK BOXES THAT ARE SECURED TO THE BUILDING STRUCTURE. ALL DEVICES SHALL FIT BOXES WITHOUT THE USE OF EXTENSION RINGS.
4. WHERE EQUIPMENT MUST BE INSTALLED ON SUSPENDED CEILINGS OR BETWEEN BUILDING STRUCTURAL COMPONENTS, ADEQUATE FIXTURE BARS OR OTHER
SUPPORT SHALL BE PROVIDED.
5. THE COVERS OF ALL JUNCTION BOXES SHALL BE PAINTED RED. CONDUIT AND SURFACE MOUNTED BACKBOXES SHALL BE PAINTED TO MATCH THE WALL OR CEILING IT IS ATTACHED TO AND LABELED AS FIRE ALARM IN FINISHED AREAS, UNPAINTED AND LABELLED CONDUIT SHALL BE PERMITTED IN UNOCCUPIED SPACES.
6. CABINET ASSEMBLY AND MOUNTING SHALL BE SUCH THAT ALL SWITCHES AND OPERATOR CONTROLS ARE NO LESS THAN 36 INCHES AND NO MORE THAN 72 INCHES
ABOVE THE FINISHED FLOOR.
7. CONTROL UNITS SHALL BE INSTALLED SO WORKING CLEARANCES ARE MAINTAINED AROUND THE UNITS IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE (NFPA 70-2017).
8. ALL CABLES OR CONDUITS SHALL ENTER THE SIDE OR BOTTOM. NO PENETRATIONS SHALL BE PERMITTED IN THE TOP HORIZONTAL SURFACE OF CONTROL UNIT
ENCLOSURES.
9. ALL EXISTING EQUIPMENT THAT IS REMOVED SHALL BE DISPOSED OF BY THE CONTRACTOR.
10. SEE THE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM ALLOWABLE CIRCUIT LOADING AND WIRE SIZE CALCULATION REQUIREMENTS.
11. WALL MOUNTING HEIGHT OF AUDIBLE NOTIFICATION APPLIANCES SHALL BE AT LEAST 90 INCHES ABOVE THE FINISHED FLOOR AND AT LEAST 6 INCHES BELOW THE CEILING, MEASURED TO THE TOP OF THE APPLIANCE. UNLESS OTHERWISE NOTED, THE NOMINAL MOUNTING HEIGHT SHALL BE 90 INCHES ABOVE THE FINISHED FLOOR, MEASURED TO THE TOP OF THE APPLIANCE.
12. WALL MOUNTING HEIGHT OF VISIBLE APPLIANCES SHALL BE SUCH THAT THE ENTIRE LENS OF THE STROBE IS AT LEAST 80 INCHES ABOVE THE FINISHED FLOOR, BUT NO MORE THAN 96 INCHES. CHECK WITH THE MANUFACTURER FOR A TEMPLATE TO ENSURE THAT THE BACKBOX INSTALLATION MEETS THIS REQUIREMENT. UNLESS OTHERWISE NOTED, THE NOMINAL MOUNTING HEIGHT SHALL BE 90 INCHES ABOVE THE FINISHED FLOOR, MEASURED TO THE CENTER OF THE LENS.
13. WHERE COMBINATION AUDIBLE/VISIBLE APPLIANCES ARE USED, THE MOUNTING HEIGHT SHALL BE AS SPECIFIED FOR VISIBLE APPLIANCES.
14. CEILING MOUNTED NOTIFICATION APPLIANCES SHALL BE CENTERED ON ACOUSTICAL CEILING TILES.
15. AUDIBLE NOTIFICATION APPLIANCES, VISIBLE NOTIFICATION APPLIANCES, AND COMBINATION NOTIFICATION APPLIANCES SHALL USE THE SAME STYLE BACKBOX AND
SHALL BE CAPABLE OF BEING INTERCHANGED.
16. WHERE AUDIBLE APPLIANCES ARE ON A SEPARATE CIRCUIT FROM VISIBLE APPLIANCES, BOTH CIRCUIT TYPES SHALL BE PRESENT IN ALL NOTIFICATION APPLIANCE
BACKBOXES TO PERMIT FUTURE CHANGES TO THE SYSTEM.
17. MANUAL PULL STATIONS SHALL BE MOUNTED 42 - 48 INCHES ABOVE THE FINISHED FLOOR, MEASURED TO THE TOP OF THE DEVICE.
18. LOCATE MANUAL PULL STATIONS WITHIN 5 FEET OF DOOR OPENING. EGRESS DOOR SWING MAY NOT BE AS SHOWN ON PLANS. LOCATE MANUAL PULL STATIONS ON
LATCH SIDE OF DOOR WITHIN 5 FEET OF DOOR OPENING.
19. CABLE SHALL BE TYPE FPLR (RISER TYPE) FOR ALL POWER-LIMITED FIRE ALARM CIRCUITS AND SHALL BE TYPE NPLFR (RISER TYPE) FOR NONPOWER-LIMITED FIRE
ALARM CIRCUITS, AS REQUIRED BY ARTICLE 760 OF NFPA 70-2011.
20. ALL CONNECTIONS TO CONTROLS, DEVICES, AND APPLIANCES SHALL BE MADE TO TERMINALS OR PIGTAILS THAT ARE AN INTEGRAL PART OF THE CONTROL, DEVICE, OR APPLIANCE. FIELD MANUFACTURED PIGTAIL LEADS SHALL NOT BE ALLOWED.
21. ALL CONDUCTOR SPLICES SHALL BE MADE ON SCREW-TYPE TERMINAL BLOCKS EXCEPT WHERE THE NUMBER OF CONNECTIONS (WIRE NUTS, OR OTHER LISTED CONDUCTOR CONNECTING DEVICES) WITHIN THE ENCLOSURE IS EIGHT OR LESS. TERMINAL CABINETS WITH RED COVERS SHALL BE PROVIDED AT ALL FIRE ALARM AND REMOTE CONTROL CIRCUIT JUNCTION POINTS WHERE MORE THAN EIGHT CONNECTIONS MUST BE MADE. JUNCTION BOXES WITH TERMINAL STRIPS MAY BE USED WHERE THE NUMBER OF CONNECTIONS IS EIGHT OR LESS. ALL TERMINALS WITHIN A TERMINAL CABINET OR JUNCTION BOX SHALL BE PROPERLY LABELED AND SHALL BE
ACCURATELY SHOWN ON THE AS-BUILT DRAWINGS.
22. FIRE ALARM SYSTEM WIRING SHALL NOT BE PERMITTED TO BE INSTALLED IN THE SAME CABLE, CONDUIT, OR RACEWAY AS POWER OR LIGHTING CIRCUITS EXCEPT AS
ALLOWED IN ARTICLE 760 OF NFPA 70-2011.
23. AC AND DC WIRING SHALL NOT BE PERMITTED IN THE SAME CABLE, CONDUIT, OR RACEWAY.
24. ALL WIRING WITHIN CONTROL EQUIPMENT SHALL BE INSTALLED SO THE WIRING AND THE EQUIPMENT ARE ACCESSIBLE. WIRING SHALL BE INSTALLED SO EQUIPMENT
CAN BE SERVICED OR REMOVED WITHOUT DISCONNECTING OR MOVING UNRELATED CIRCUITS.
25. ALL WIRING WITHIN CONTROL UNITS, JUNCTION BOXES, AND TERMINAL CABINETS SHALL BE NEATLY TRIMMED, DRESSED, LABELLED AND INSTALLED IN GUTTERS OR CHANNELS. WIRING IN CONTROL UNITS AND TERMINAL CABINETS SHALL BE INSTALLED PARALLEL TO OR AT RIGHT ANGLES TO THE SIDES AND BACK OF THE ENCLOSURE.
26. PENETRATIONS MADE OR USED (IF ALREADY EXISTING) IN ANY FIRE RATED BARRIER, SUCH AS STAIRWELLS, SHALL BE FILLED AND PATCHED WITH A MATERIAL THAT PROVIDES A FIRE RATING EQUAL TO OR GREATER THAN THE PENETRATED ASSEMBLY. PROPRIETARY FILLER MATERIALS MUST BE APPROVED OR LISTED AS FIRE-RATED FILLER MATERIALS. PRIOR TO USING SUCH MATERIALS, SUBMIT COMPLETE MANUFACTURER'S INFORMATION FOR APPROVAL.
27. LOCATIONS OF DEVICES ON DRAWINGS ARE APPROXIMATE. DO NOT SCALE DRAWINGS. THESE PLANS ARE INTENDED TO SHOW THE DESIGN REQUIREMENTS OF THE
SYSTEM AND SHOULD NOT BE USED FOR A DEVICE COUNT WITHOUT FIELD VERIFICATION.
28. VISIBLE ALARM NOTIFICATION APPLIANCES ARE REQUIRED IN PUBLIC AND COMMON AREAS, INCLUDING EMPLOYEE WORK AREAS.
29. EXISTING CAMPUS FIRE ALARM SYSTEM TO REMAIN OPERATIONAL. NEW FIRE ALARM REPLACEMENT TO BE INSTALLED WITHOUT MODIFYING EXISTING SYSTEM.
FAS ANNUNCIATOR
FIRE ALARM CONTROL PANEL
ELEVATOR STATUS/RECALL
VOICE EVACUATION PANEL
cd cd
FSA
FCP
FTR
ESR
NAC
VEP
P
H
J
120V
MM
FIRE ALARM SYMBOLS LIST
RM
E
R
E
FAS TRANSPONDER/ TRANSMITTER
NOTIFICATION APPLIANCE BOOSTER PANEL
CEILING MOUNTED SPEAKER/ HORN
CEILING MOUNTED SPEAKER W/ LIGHT
CEILING MOUNTED HORN W/ LIGHT
BELL
CEILING MOUNTED STROBE
EMERGENCY LIGHT, BAT POWERED
EMERGENCY LIGHT/ EXIT SIGN, BAT POWERED
ILLUMINATED EXIT SIGN, SINGLE FACE
ILLUMINATED EXIT SIGN, DOUBLE FACE
MANUAL PULL STATION
RELAY MODULE
MONITOR MODULE
MASTER BOX
HEAT DETECTOR
RATE OF RISE DETECTOR
HEAT DETECTOR (CONTROLS ELEVATOR)
SINGLE STATION SMOKE ALARM
SMOKE DETECTOR
SMOKE DETECTOR (CONTROLS ELEVATOR)
SMOKE DETECTOR IN DUCT
CARBON MONOXIDE DETECTOR
CARBON MONOXIDE/ SMOKE DETECTOR (COMBO)
120V CARBON MONOXIDE/ SMOKE ALARM (COMBO)
FLAME DETECTOR
FIRE SERVICE/ EMERGENCY TELEPHONE STATION
A ACCESSIBLE TELEPHONE STATION
TELEPHONE STATION JACK
TELEPHONE HAND SET
TAMPER DETECTION SWITCH
FLOW DETECTOR SWITCH
PRESSURE DETECTOR SWITCH
ABORT SWITCH
FIRE EXTINGUISHER
MAGNETIC DOOR HOLDER
SPEAKER/ HORN
cd
SPEAKER W/ STROBE
HORN W/ STROBE
cd
STROBE
ELEVATOR PIT
BASEMENT (PRIMARY RECALL)
FIRST FLOOR (SECONDARY RECALL)
TOP OF SHAFT
ELEVATOR CAR
ELEVATOR MACHINE
ROOM
PRIMARY RECALL (TO FIRST FLOOR)
SECONDARY RECALL (TO GROUND FLOOR)
SHUNT TRIP
DETECTOR TO ACTUATE SECONDARY RECALL
DETECTOR TO ACTUATE PRIMARY RECALL
DETECTOR TO ACTUATE PRIMARY
RECALL
DETECTOR TO ACTUATE PRIMARY RECALL
(NOT REQUIRED IN UNSPRINKLERED SHAFTS
UNLESS USED FOR SMOKE DAMPERS, ETC.)
DETECTOR TO ACTUATE SHUNT
TRIP
DETECTOR TO ACTUATE SHUNT TRIP; LOCATE 135° HEAT
DETECTOR WITHIN 2 FEET OF ANY SPRINKLER HEAD
NOTE: LOBBY DETECTORS SHALL BE LOCATED
WITHIN 21 FEET OF THE ELEVATOR CAR
DETECTOR TO ACTUATE SHUNT TRIP; LOCATE 135° HEAT DETECTOR WITHIN
2 FEET OF ANY SPRINKLER HEAD
ELEVATOR HOISTWAY
TYPICAL ELEVATOR RECALL DETAIL
FIREMAN'S HAT (FLASH IF ELEVATOR SHAFT OR MACHINE
ROOM IS IN ALARM)
MICROPHONEMIC
M
INPUT/ OUTPUT MATRIX
MANUAL PULL
SMOKE/HEAT DETECTION
A B C D E F G H I
AC
TU
AT
E A
UD
IBL
E A
LA
RM
SI
GN
AL
AC
TU
AT
E A
UD
IBL
E S
UP
ER
VIS
OR
Y S
IG
NA
L
AC
TU
AT
E E
VA
CU
AT
IO
N
SIG
NA
L
AC
TU
AT
E A
UD
IBL
E T
RO
UB
LE
SI
GN
AL
X
ANNUNCIATION ACTION
SYSTEM INPUTS
X
X
X
RE
LE
AS
E M
AG
D
OO
R
HO
LD
ER
S
SMOKE/HEAT DETECTION (DOOR) X
RE
CA
LL
EL
EV
AT
OR
X
X X
* ELEVATOR RECALL
PRIMARY FLOOR: FIRST
SECONDARY FLOOR: GROUND
3 SMOKE/HEAT DETECTION (ELEVATOR)* X XX
X
X
TR
AN
SM
IT
FIR
E A
LA
RM
SI
GN
AL
TR
AN
SM
IT
SU
PE
RV
ISO
RY
SI
GN
AL
TR
AN
SM
IT
TR
OU
BL
E S
IG
NA
L
X
X
X
X
SH
UT
DO
WN
HV
AC
U
NI
T
PRESSURE SWITCH
TAMPER SWITCH
FIRE ALARM AC POWER FAILURE
FIRE ALARM SYSTEM LOW BATTERY
OPEN CIRCUIT
GROUND FAULT
NOTIFICATION APPLIANCE CIRCUIT SHORT
A B C D E F
X
FLOW SWITCH
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
G H I J
HVAC DUCT DETECTORS
13 13
X X X
J
FOR CEILING HEIGHTS LESS THAN 86",
THE VISUAL LENS MOUNTING HEIGHT
SHALL BE WITHIN 6" OF THE CEILING.
FIRE
AUDIBLE/VISUAL
& VISUAL ONLY
APPLIANCES
SYNCHRONIZE MORE THAN
TWO APPLIANCES IN ANY
FIELD OF VIEW.
REF. 80" MIN (IBC)
REF. 96" MAX (IBC)
ABOVE FINISHED FLOOR
96" MAX (NFPA)
ABOVE FINISHED
FLOOR TO TOP
OF LENS
80" (ADA)
80" MIN (NFPA)
TO BOTTOM OF LENS
NOTE: REFER TO THE PROPER
DEVICE INSTALLATION
INSTRUCTIONS FOR BACKBOX
MOUNTING HEIGHT.
MAGNETIC
DOOR
HOLDER
FINISHED
WALL
FINISHED
FLOOR
48" MAX (ADA)
48" MAX (NFPA)
42" MIN (NFPA)
MEASUREMENTS
SHOWN ARE TO TOP
OF PULL HANDLE
FIRE FIRE
AUDIBLE ONLY
A/C SUPPLY
OR RETURN
DIFFUSER
3' (MIN)
CEILING
NFPA 72 AUDIBLE APPLIANCE
6" MIN BELOW
FINISHED CEILING
CEILING MOUNTED
SMOKE/HEAT
DETECTORS
90" MIN ABOVE FINISHED FLOOR (OTHER
MOUNTING HEIGHTS SHALL BE PERMITTED BY
THE AHJ PROVIDING IT MEETS THE SOUND
LEVEL OUTPUT REQUIRED.)
TO EXIT DOOR
5' (MAX.)
DOOR
WIDTH
LESS 3"
5"
MANUAL
PULL
STATION
HEAT DETECTORS
NEVER HERE
WALL MOUNTED
SMOKE/HEAT
DETECTOR
4"
NOTE: MEASUREMENTS
SHOWN ARE TO THE
CLOSEST EDGE OF THE
DETECTOR.
4"
12" (MAX)
SIDE WALL
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
T
R
U
E
N
O
R
T
H
PROJECT NORTH
A
M M
F i r e
P r o t e c t i o n
W
B R
C
P r o v i d e n c e
M e n t a l
H e a l t h D o c u m e n t s R e f e r e n c e s V
A
P r o v i d e n c e
M
H C
A r c h
R e v i t
V
A M
H
P
R O
V I D
E N
M
R C
H r v t
650-332
NEW MENTAL HEALTH BUILDING -
PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
TGS GVR10 APR 2019
FULLY SPRINKLEREDVA RI FACILITIES MANAGEMENT
SERVICE
B
A
KEY PLAN
Revisions: Date:
FA-001
1 INDUSTRIAL DRIVE
WINDHAM, NH 03087
(603) 647-8700 www.sfceng.com
SFC
ENGINEERING
CONSTRUCTION
DOCUMENTS
FIRE ALARM
GENERAL INFORMATION
A
B
CLASSROOM
STAFF LOUNGE
STAIR 2
STAFF TOILET
CORRIDOR
8.7
S
E
G
M
E
T
B
S
E
G
M
E
E
G
M
E
E
G
M
E
F
E
C
P
RM
A
B
C
D
E
F
G
765431 2
STAIR 1
ELEV 1
ELEV 2
WATER SERVICE
CLASSROOM
STORAGE
027A
ELEV. MACH.
TOILET
TOILET
HAC
CORRIDOR
OFFICE
OFFICE
OT OFFICE
OCCUPATIONAL
THERAPY ROOM
OFFICE
ELECTRICAL
TELE/ DATA
ELEVATOR
LOBBY
CONSULT ROOM -
EXTRA
CONSULT ROOM
CONSULT ROOM
CLASSROOM
STAFF LOUNGE
STAFF TOILET
CORRIDOR
EMERG. ELECT.
018A
WAITING
PRRC CUBES
CLASSROOM
STAFF TOILET
E.5
E.9
S
E
G
M
E
E
G
M
E
E
G
M
E
E
G
M
E
STORAGE
CLASSROOM
STORAGE
027B
FEC
F
E
C
F
E
C
P
P
MM
MM
MM
AREA OF REQUIRED
INTELLIGIBILITY
LEGEND
RM
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
T
R
R
T
H
PROJECT NORTH
A
M M
F i r e
P r o t e c t i o n
W
B R
C
P r o v i d e n c e
M e n t a l
H e a l t h D o c u m e n t s R e f e r e n c e s V
A
P r o v i d e n c e
M r c h
R e v i t
V
A M
H
P
R O
V I D
E N
R C
H r v t
650-332
NEW MENTAL HEALTH BUILDING -
PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
TGS GVR10 APR 2019
FULLY SPRINKLEREDVA RI FACILITIES MANAGEMENT
SERVICE
B
A
KEY PLAN
Revisions: Date:
FA-100
1 INDUSTRIAL DRIVE
WINDHAM, NH 03087
(603) 647-8700 www.sfceng.com
SFC
ENGINEERING
CONSTRUCTION
DOCUMENTS
1/4" = 1'-0"
C1
BASEMENT FLOOR REFLECTED CEILING PLAN -
SEGMENT B
1/4" = 1'-0"
F1
BASEMENT FLOOR REFLECTED CEILING PLAN -
SEGMENT A
BASEMENT FIRE ALARM PLANS
UP
A
B
OFFICE
OFFICE
STAIR 2
CONSULT ROOM -
EXTRA
8.7
S
E
G
M
E
E
G
M
E
E
G
M
E
E
G
M
E
MEETING ROOM
P
UP
A
B
C
D
E
F
G
765431 2
TLT
TLT
TLT
HAC
CORRIDOR
100A
CORRIDOR
100B
VESTIBULE
COMMUNICATION
CENTER
RC CUBES
CUBICLES
INJECTION ROOM
MAIN
ELECTRICAL
ROOM
OFFICE
OFFICE
CONSULT ROOM
CONSULT ROOM
CONSULT ROOM
COMPUTER LAB
SECURITY / WC
STORAGE
101A
WAITING
CONSULT ROOM
CONSULT ROOM -
EXTRA
CONSULT ROOM
STORAGE
OFFICE
OFFICE
TOILET
STAIR 1
ELEV 1
ELEV 2
E.5
E.9
S
E
G
M
E
E
G
M
E
E
G
M
E
E
G
M
E
MEETING ROOM
75 15
P
F C P
RED
GREEN
AREA OF REQUIRED
INTELLIGIBILITY
LEGEND
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
T
R
R
T
H
PROJECT NORTH
A
M M
F i r e
P r o t e c t i o n
W
B R
C
P r o v i d e n c e
M e n t a l
H e a l t h D o c u m e n t s R e f e r e n c e s V
A
P r o v i d e n c e
M r c h
R e v i t
V
A M
H
P
R O
V I D
E N
R C
H r v t
650-332
NEW MENTAL HEALTH BUILDING -
PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
TGS GVR10 APR 2019
FULLY SPRINKLEREDVA RI FACILITIES MANAGEMENT
SERVICE
B
A
KEY PLAN
Revisions: Date:
FA-101
1 INDUSTRIAL DRIVE
WINDHAM, NH 03087
(603) 647-8700 www.sfceng.com
SFC
ENGINEERING
CONSTRUCTION
DOCUMENTS
1/4" = 1'-0"
C1
FIRST FLOOR REFLECTED CEILING PLAN -
SEGMENT B
1/4" = 1'-0"
F1
FIRST FLOOR REFLECTED CEILING PLAN -
SEGMENT A
FIRST FLOOR FIRE ALARM PLANS
F
G
765431 2
MECHANICAL
ROOM
CIRCULATION
STAIR 1
ELEV 1
ELEV 2
E.5
E.9
P
AREA OF REQUIRED
INTELLIGIBILITY
LEGEND
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
T
R
R
T
H
PROJECT NORTH
A
M M
F i r e
P r o t e c t i o n
W
B R
C
P r o v i d e n c e
M e n t a l
H e a l t h D o c u m e n t s R e f e r e n c e s V
A
P r o v i d e n c e
M r c h
R e v i t
V
A M
H
P
R O
V I D
E N
R C
H r v t
650-332
NEW MENTAL HEALTH BUILDING -
PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
TGS GVR10 APR 2019
FULLY SPRINKLEREDVA RI FACILITIES MANAGEMENT
SERVICE
B
A
KEY PLAN
Revisions: Date:
FA-102
1 INDUSTRIAL DRIVE
WINDHAM, NH 03087
(603) 647-8700 www.sfceng.com
SFC
ENGINEERING
CONSTRUCTION
DOCUMENTS
1/4" = 1'-0"
F1
SECOND FLOOR REFLECTED CEILING PLAN -
SEGMENT A
SECOND FLOOR FIRE ALARM
PLANS
NOTIFIER NFS2-640
FACP
LOCATED IN
MAIN ENTRANCE
BUILDING 38
BATTERY CABINET
120VAC
UPS1
STROBE CIRCUIT 1
SPEAKER CIRCUIT 1
120VAC
#12 FPLR SOLIDTO EXISTING CAMPUS NOTIFIER FIRE ALARM SYSTEM
TIE INTO EXISTING FIBER OPTIC LOOP AT BUILDING 32
2 WATT
BASEMENT
HORN/STROBE CIRCUIT 1
TO ANNUNCIATORS/ MICROPHONES
2 WATT
STROBE CIRCUIT 2
STROBE CIRCUIT 3
DAA-50
MM
120VAC
SPEAKER CIRCUIT 1
BOOSTER TRIP
110 110
EXTERIOR HORN/ STROBES
BASEMENT
FIRST FLOOR
LOOP SHALL BE NON SILENCEABLE UNTIL SYSTEM IS
RESET
GENERAL NOTES
RISER DIAGRAM IS DIAGRAMMATIC IN NATURE; DEVICE COUNTS AND WIRING SHALL BE PROVIDED BY CONTRACTOR.
WIRE TYPES SHALL BE IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND MANUFACTURER RECOMMENDATIONS.
INITIATING AND NOTIFICATION CIRCUITS SHALL BE #14 TWISTED FPLR SOLID.
FIRE ALARM CONTROL PANEL (FACP) SHALL BE MOUNTED AT A MAXIMUM OF 72" ABOVE FINISHED FLOOR (A.F.F.), WHEN MEASURING TO THE TOP OF THE CABINET.
AUDIO/VISUAL DEVICES SHALL BE MOUNTED AT A MINIMUM OF 80" A.F.F (TO BOTTOM OF LENS).
AUDIO/VISUAL DEVICES SHALL BE MOUNTED AT A MAXIMUM OF 96" A.F.F. (TO CENTER OF LENS) OR 6" BELOW CEILING HEIGHT.
SYSTEMS CONTAINING MULTIPLE SLC AND NAC LOOPS SHALL BE DIFFERENTIATED WITH PERMANENT LABELING AT ALL TERMINATIONS AND JUNCTION BOXES.
INTELLIGENT LOOP SHALL BE
#14 TWISTED FPLR SOLID
SLC LOOP 1
RISER DIAGRAM
2 WATT
RED GREEN
SECOND FLOOR
x1x2x7 x2x4 x2x2x5 x2x3 x8
FIRST FLOOR
SECOND FLOOR
x4 x3 x2
2 WATT 1
2 WATT
2 WATT
x7 x4 x2 x3
2 WATT
30 75
2 WATT
x3 x1
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
T
R
R
T
H
PROJECT NORTH
A
M M
F i r e
P r o t e c t i o n
W
B R
C
P r o v i d e n c e
M e n t a l
H e a l t h D o c u m e n t s R e f e r e n c e s V
A
P r o v i d e n c e
M r c h
R e v i t
V
A M
H
P
R O
V I D
E N
R C
H r v t
650-332
NEW MENTAL HEALTH BUILDING -
PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
TGS GVR10 APR 2019
FULLY SPRINKLEREDVA RI FACILITIES MANAGEMENT
SERVICE
B
A
KEY PLAN
Revisions: Date:
FA-600
1 INDUSTRIAL DRIVE
WINDHAM, NH 03087
(603) 647-8700 www.sfceng.com
SFC
ENGINEERING
CONSTRUCTION
DOCUMENTS
FIRE ALARM RISER DIAGRAM
| Sheets and Views |
| WBRC VA DD Fire Alarm-FA-001 |
| WBRC VA DD Fire Alarm-FA-100 |
| WBRC VA DD Fire Alarm-FA-101 |
| WBRC VA DD Fire Alarm-FA-102 |
| WBRC VA DD Fire Alarm-FA-600 |
File details come from the government source that posted it. Updated .