This notice provides details for an upcoming federal construction solicitation. The Department of Veterans Affairs intends to solicit bids and award a firm-fixed-price contract for the construction of a new mental health building at the Providence VA Medical Center in Rhode Island. The project scope includes site preparation, demolition, general construction and alterations to provide approximately 15,300 square feet of new program area in a three-story freestanding building. Additional site and utility work is required. The solicitation will be set aside for a service-disabled veteran-owned small business and issued on or around December 20, 2019 as a request for proposal, with a performance period of approximately 600 calendar days. The estimated value of construction is between $10-20 million. Questions must be submitted in writing by the response due date.
36E77620R0001 Attachment 7 - CD Drawings - FX.pdf
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STAFF LOUNGE
STAFF TOILET
CORRIDOR
CLASSROOM
STAIR 2
S
E
G
M
E
N
T
B
S
E
G
M
E
A
STAIR 1
ELEV 1
ELEV 2
CLASSROOM
STORAGE
027A
ELEV. MACH.
TOILET
TOILET
PRRC CUBES
OFFICE
OFFICE
OT OFFICE
OCCUPATIONAL
THERAPY ROOM
OFFICE
ELECTRICAL
TELE/ DATA
ELEVATOR
LOBBY
CONSULT ROOM -
EXTRA
CONSULT ROOM
CONSULT ROOM
CLASSROOM
STAFF LOUNGE
STAFF TOILET
STAFF TOILET
EMERG. ELECT.
018A
WAITING
CORRIDOR
CLASSROOM
STORAGE
S
E
G
M
E
E
G
M
E
Sprinkler Head Schedule Symbol Count Thread K-Factor Description Note
13 1/2" 5.6 UPRIGHT
53 1/2" 5.6 CONCEALED SPRINKLER on Drop
2 1/2" 5.6 SIDEWALL
68 = Total Number of Heads This Floor
NOTES
· New sprinkler riser fed from new water line in water closet
· Separate floor control valve assembly to control each zone (floor)
· Sprinkler system monitored by fire alarm system
· Sprinklers to be centered in tile
UP TO FDC
SEE DETAIL 1
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
T
R
U
E
O
R
T
H
PROJECT NORTH
A
M M
F i r e
P r o t e c t i o n
W
B R
C
P r o v i d e n c e
M e n t a l
H e a l t h D o c u m e n t s R e f e r e n c e s V
A
P r o v i d e n c e
M
H C r c h
R e v i t
V
A M
H
P
R O
V I D
E N
M
R C
H r v t
650-332
NEW MENTAL HEALTH BUILDING -
PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
FULLY SPRINKLEREDVA RI FACILITIES MANAGEMENT
SERVICE
B
A
KEY PLAN
Revisions: Date:
FP-100
TGS GVR10 APR 2019
CONSTRUCTION
DOCUMENTS
1 INDUSTRIAL DRIVE
WINDHAM, NH 03087
(603) 647-8700 www.sfceng.com
SFC
ENGINEERING
1/4" = 1'-0"
C1
BASEMENT FLOOR REFLECTED CEILING PLAN -
SEGMENT B
1/4" = 1'-0"
F1
BASEMENT FLOOR REFLECTED CEILING PLAN -
SEGMENT A
BASEMENT FIRE PROTECTION
PLANS
LEGEND
LAT/LONG SEISMIC BRACE
4-WAY SEISMIC BRACE
HYDRAULIC NODE
ELEVATION OF PIPE
CONSULT ROOM -
EXTRA
STAIR 2
MEETING ROOM
121 SF
OFFICE
CORRIDOR
100B
OFFICE
OFFICE
S
E
G
M
E
E
G
M
E
TLT
TLT
TLT
HAC
COMPUTER LAB
STAIR 1
ELEV 1
ELEV 2
OFFICE
CORRIDOR
100A
CORRIDOR
100B
VESTIBULE
COMMUNICATION
CENTER
TOILET
CONSULT ROOM
RC CUBES
MEDICATION
ROOM
INJECTION ROOM
MEETING ROOM
MAIN
ELECTRICAL
ROOM
121 SF
OFFICE
CONSULT ROOM
CONSULT ROOM
CONSULT ROOM
WAITING
CONSULT ROOM
STORAGE
OFFICE
CORRIDOR
100B
OFFICE
OFFICE
CUBICLES
MAIN
ELECTRICAL
ROOM
SECURITY / WC
STORAGE
101A
S
E
G
M
E
E
G
M
E
Sprinkler Head Schedule Symbol Count Thread K-Factor Description Note
58 1/2" 5.6 CONCEALED SPRINKLER on Drop
58 = Total Number of Heads This Floor
NOTES
· Separate floor control valve assembly to control each zone (floor)
· Sprinkler system monitored by fire alarm system
· Sprinklers to be centered in tile
LOCATION OF FDC
TO BE CONFIRMED
WITH FIRE
DEPARTMENT
²
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
T
R
R
T
H
PROJECT NORTH
A
M M
F i r e
P r o t e c t i o n
W
B R
C
P r o v i d e n c e
M e n t a l
H e a l t h D o c u m e n t s R e f e r e n c e s V
A
P r o v i d e n c e
M r c h
R e v i t
V
A M
H
P
R O
V I D
E N
R C
H r v t
650-332
NEW MENTAL HEALTH BUILDING -
PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
FULLY SPRINKLEREDVA RI FACILITIES MANAGEMENT
SERVICE
B
A
KEY PLAN
Revisions: Date:
FP-101
TGS GVR10 APR 2019
CONSTRUCTION
DOCUMENTS
1 INDUSTRIAL DRIVE
WINDHAM, NH 03087
(603) 647-8700 www.sfceng.com
SFC
ENGINEERING
1/4" = 1'-0"
C1
FIRST FLOOR REFLECTED CEILING PLAN -
SEGMENT B
1/4" = 1'-0"
F1
FIRST FLOOR REFLECTED CEILING PLAN -
SEGMENT A
FIRST FLOOR FIRE PROTECTION
PLANS
LEGEND
LAT/LONG SEISMIC BRACE
4-WAY SEISMIC BRACE
STAIR 1
ELEV 1
ELEV 2
MECHANICAL
ROOM
CIRCULATION
²
Sprinkler Head Schedule Symbol Count Thread K-Factor Description Note
10 1/2" 5.6 UPRIGHT
5 1/2" 5.6 CONCEALED SPRINKLER on Drop
15 = Total Number of Heads This Floor
NOTES
· Separate floor control valve assembly to control each zone (floor)
· Sprinkler system monitored by fire alarm system
· Sprinklers to be centered in tile
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
T
R
R
T
H
PROJECT NORTH
A
M M
F i r e
P r o t e c t i o n
W
B R
C
P r o v i d e n c e
M e n t a l
H e a l t h D o c u m e n t s R e f e r e n c e s V
A
P r o v i d e n c e
M r c h
R e v i t
V
A M
H
P
R O
V I D
E N
R C
H r v t
650-332
NEW MENTAL HEALTH BUILDING -
PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
FULLY SPRINKLEREDVA RI FACILITIES MANAGEMENT
SERVICE
B
A
KEY PLAN
Revisions: Date:
FP-102
TGS GVR10 APR 2019
CONSTRUCTION
DOCUMENTS
1 INDUSTRIAL DRIVE
WINDHAM, NH 03087
(603) 647-8700 www.sfceng.com
SFC
ENGINEERING
1/4" = 1'-0"
F1
SECOND FLOOR REFLECTED CEILING PLAN -
SEGMENT A
SECOND FLOOR FIRE PROTECTION
PLANS
LEGEND
LAT/LONG SEISMIC BRACE
4-WAY SEISMIC BRACE
HYDRANT FLOW TEST DATA
DATE: 10/23/2018
TIME: 11:30 PM
LOCATION: VALLEY STREET @ WOLCOTT STREET
HYDRANT ELEVATION: 9' BELOW BASEMENT FINISHED FLOOR
STATIC PRESSURE: 70
RESIDUAL PRESSURE: 66
FLOW: 2,122
SCOPE OF WORK
1. INSTALLATION OF A NEW AUTOMATIC SPRINKLER SYSTEM THROUGHOUT THE BUILDING IN ACCORDANCE WITH NFPA 13 (2016).
GENERAL NOTES
1. ALL GENERAL NOTES & DETAILS ARE TO BE CONSIDERED APPLICABLE TO ALL SPRINKLER DRAWINGS FOR THIS PROJECT. REFERENCE PROJECT NARRATIVE AND
SPECIFICATIONS FOR FURTHER DETAILS.
2. THE DRAWINGS ARE DIAGRAMATIC IN NATURE AND EXACT LOCATIONS AND ARRANGEMENTS OF EQUIPMENT SHALL BE DETERMINED IN FIELD WITH DUE
CONSIDERATION OF STRUCTURAL, ELECTRICAL AND ARCHITECTURAL SYSTEMS.
3. THE FIRE PROTECTION CONTRACTOR SHALL ENSURE THAT THE DESIGN OF THE FIRE PROTECTION SYSTEM MEETS ALL REQUIREMENTS OF THE AUTHORITY HAVING
JURISDICTION. SEE SPECIFICATIONS FOR FURTHER INFORMATION.
4. INSPECTION/TEST DRAIN ASSEMBLES SHALL BE PIPED TO GRADE. COORDINATE LOCATIONS WITH OWNERS REPRESENTATIVE. PIPING SHALL BE GALVANIZED STEEL.
5. INSTALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND GOOD PRACTICE NORMAL TO THE TRADE. INSTALLATION SHALL
INCLUDE PROVISIONS FOR ACCESS TO NORMAL MAINTENANCE ITEMS. PROVIDE ADEQUATE STRUCTURAL SUPPORTS AND SECURE MOUNTING METHODS WITH
PROVISIONS FOR VIBRATION ISOLATION AND EXPANSION WHERE REQUIRED.
6. PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS & GUIDES AS NECESSARY TO PREVENT UNDUE STRAIN ON PIPING.
7. SEE DETAILS AND PIPING DIAGRAMS FOR ADDITIONAL FITTINGS AND VALVING NECESSARY TO COMPLETE THE PIPING OF THE SYSTEM.
8. ALL PIPING SHALL BE RUN AS CLOSE TO STRUCTURAL MEMBERS AS POSSIBLE.
9. ALL WET PIPING TO BE BLACK IRON. ALL DRY PIPING TO BE GALVANIZED. SPRINKLER HEAD FINISHES SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL.
10. FITTINGS SHALL BE RATED TO OPERATE AT 125 PSI.
11. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS AND APPROVALS.
INSTALLATION NOTES
1. SPRINKLER SYSTEM TO PROVIDE COMPLETE COVERAGE IN COMPLIANCE WITH NFPA 13 (2016).
2. ALL SYSTEMS TO BE FLUSHED AND HYDROSTATICALLY TESTED IN ACCORDANCE TO NFPA 25 BEFORE BEING PLACED IN SERVICE.
3. DESIGN AND INSTALLATION TO CONFORM WITH NFPA 13 (2016).
4. CONCEALED PENDENT SPRINKLERS TO BE INSTALLED IN ALL FINISHED AREAS IN CENTER OF TILE.
5. HANGERS ARE TO BE U.L. LISTED AND F.M. APPROVED.
6. DESIGN CRITERIA
6.1. LIGHT HAZARD: 0.10 GPM/FT2 OVER 1500 FT2
6.2. ORDINARY GROUP 1: 0.15 GPM/FT2 OVER 1500 FT2.
7. PIPING TO SEISMICALLY BRACED AND SUPPORTED PER NFPA 13 AND COMPATIBLE WITH HOLLOW CORE PLANK
8. ALL AREAS CONTAINING SPRINKLER PIPING WILL BE MAINTAINED ABOVE 40 DEGREES FAHRENHEIT
9. THE CLEARANCE BETWEEN THE DEFLECTOR AND THE TOP OF ANY STORAGE SHALL BE 18 IN. OR GREATER..
10. ALL SPRINKLERS SHALL BE ALIGNED PARALLEL TO CEILING OR ROOF.
11. PIPING LESS THAN 2" TO BE SCHEDULE 40 BLACK STEEL WITH THREADED FITTINGS.
12. PIPING 2" AND LARGER TO BE SCHEDULE 10 BLACK STEEL WITH GROOVED AND MECHANICAL FITTINGS.
13. ALL PIPE LOCATIONS ARE TO BE FIELD MEASURED PRIOR TO FABRICATION AND INSTALLATION BY SPRINKLER CONTRACTOR.
14. ALARM AND ELECTRICAL WIRING BY OTHERS.
DETAILS
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title
Approved:
Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
T
R
R
T
H
PROJECT NORTH
A
M M
F i r e
P r o t e c t i o n
W
B R
C
P r o v i d e n c e
M e n t a l
H e a l t h D o c u m e n t s R e f e r e n c e s V
A
P r o v i d e n c e
M r c h
R e v i t
V
A M
H
P
R O
V I D
E N
R C
H r v t
650-332
NEW MENTAL HEALTH BUILDING -
PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
FULLY SPRINKLEREDVA RI FACILITIES MANAGEMENT
SERVICE
B
A
KEY PLAN
Revisions: Date:
FP-500
TGS GVR10 APR 2019
CONSTRUCTION
DOCUMENTS
1 INDUSTRIAL DRIVE
WINDHAM, NH 03087
(603) 647-8700 www.sfceng.com
SFC
ENGINEERING
FIRE PROTECTION DETAILS
| Sheets and Views |
| WBRC VA DD Fire Protection-FP-100 |
| WBRC VA DD Fire Protection-FP-101 |
| WBRC VA DD Fire Protection-FP-102 |
| WBRC VA DD Fire Protection-FP-500 |
File details come from the government source that posted it. Updated .