36E77620R0001-008.pdf

PDF Posted

Attached to
650-332 New Mental Health Building - Phase 1 (VA-19-00104660)
Solicitation number
36E77620R0001
Issued by

About this file

This notice provides details for an upcoming federal construction solicitation. The Department of Veterans Affairs intends to solicit bids and award a firm-fixed-price contract for the construction of a new mental health building at the Providence VA Medical Center in Rhode Island. The project scope includes site preparation, demolition, general construction and alterations to provide approximately 15,300 square feet of new program area in a three-story freestanding building. Additional site and utility work is required. The solicitation will be set aside for a service-disabled veteran-owned small business and issued on or around December 20, 2019 as a request for proposal, with a performance period of approximately 600 calendar days. The estimated value of construction is between $10-20 million. Questions must be submitted in writing by the response due date.

36E77620R0001 Attachment 7 - CD Drawings - FX.pdf

View the file

Other files

File Type Posted
36E77620R0001-0007000.docx DOCX document
36E77620R0001-0007001.docx DOCX document
36E77620R0001-0006000.docx DOCX document
36E77620R0001-0005060.docx DOCX document
36E77620R0001-0005061.docx DOCX document
36E77620R0001-0005068.pdf PDF
36E77620R0001-0005064.pdf PDF
36E77620R0001-0005069.pdf PDF
36E77620R0001-0005067.pdf PDF
36E77620R0001-0005062.pdf PDF
36E77620R0001-0005070.pdf PDF
36E77620R0001-0005066.pdf PDF
36E77620R0001-0005065.pdf PDF
36E77620R0001-0005063.pdf PDF
36E77620R0001-0005071.pdf PDF
36E77620R0001-0004001.docx DOCX document
36E77620R0001-0004000.docx DOCX document
36E77620R0001-0003000.docx DOCX document
36E77620R0001-0003001.docx DOCX document
36E77620R0001-0002000.docx DOCX document
36E77620R0001-0001001.pdf PDF
36E77620R0001-0001000.docx DOCX document
36E77620R0001-007.pdf PDF
36E77620R0001-012.pdf PDF
36E77620R0001-016.docx DOCX document
36E77620R0001-001.docx DOCX document
36E77620R0001-004.pdf PDF
36E77620R0001-005.pdf PDF
36E77620R0001-006.pdf PDF
36E77620R0001-010.pdf PDF
36E77620R0001-013.pdf PDF
36E77620R0001-015.docx DOCX document
36E77620R0001-017.pdf PDF
36E77620R0001-002.pdf PDF
36E77620R0001-011.pdf PDF
36E77620R0001-014.pdf PDF
36E77620R0001-009.pdf PDF
36E77620R0001-003.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STAFF LOUNGE

STAFF TOILET

CORRIDOR

CLASSROOM

STAIR 2

S

E

G

M

E

N

T

B

S

E

G

M

E

A

STAIR 1

ELEV 1

ELEV 2

CLASSROOM

STORAGE

027A

ELEV. MACH.

TOILET

TOILET

PRRC CUBES

OFFICE

OFFICE

OT OFFICE

OCCUPATIONAL

THERAPY ROOM

OFFICE

ELECTRICAL

TELE/ DATA

ELEVATOR

LOBBY

CONSULT ROOM -

EXTRA

CONSULT ROOM

CONSULT ROOM

CLASSROOM

STAFF LOUNGE

STAFF TOILET

STAFF TOILET

EMERG. ELECT.

018A

WAITING

CORRIDOR

CLASSROOM

STORAGE

S

E

G

M

E

E

G

M

E

Sprinkler Head Schedule Symbol Count Thread K-Factor Description Note

13 1/2" 5.6 UPRIGHT

53 1/2" 5.6 CONCEALED SPRINKLER on Drop

2 1/2" 5.6 SIDEWALL

68 = Total Number of Heads This Floor

NOTES

· New sprinkler riser fed from new water line in water closet

· Separate floor control valve assembly to control each zone (floor)

· Sprinkler system monitored by fire alarm system

· Sprinklers to be centered in tile

UP TO FDC

SEE DETAIL 1

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

T

R

U

E

O

R

T

H

PROJECT NORTH

A

M M

F i r e

P r o t e c t i o n

W

B R

C

P r o v i d e n c e

M e n t a l

H e a l t h D o c u m e n t s R e f e r e n c e s V

A

P r o v i d e n c e

M

H C r c h

R e v i t

V

A M

H

P

R O

V I D

E N

M

R C

H r v t

650-332

NEW MENTAL HEALTH BUILDING -

PHASE 1

830 CHALKSTONE AVE PROVIDENCE, RI 02908

FULLY SPRINKLEREDVA RI FACILITIES MANAGEMENT

SERVICE

B

A

KEY PLAN

Revisions: Date:

FP-100

TGS GVR10 APR 2019

CONSTRUCTION

DOCUMENTS

1 INDUSTRIAL DRIVE

WINDHAM, NH 03087

(603) 647-8700 www.sfceng.com

SFC

ENGINEERING

1/4" = 1'-0"

C1

BASEMENT FLOOR REFLECTED CEILING PLAN -

SEGMENT B

1/4" = 1'-0"

F1

BASEMENT FLOOR REFLECTED CEILING PLAN -

SEGMENT A

BASEMENT FIRE PROTECTION

PLANS

LEGEND

LAT/LONG SEISMIC BRACE

4-WAY SEISMIC BRACE

HYDRAULIC NODE

ELEVATION OF PIPE

CONSULT ROOM -

EXTRA

STAIR 2

MEETING ROOM

121 SF

OFFICE

CORRIDOR

100B

OFFICE

OFFICE

S

E

G

M

E

E

G

M

E

TLT

TLT

TLT

HAC

COMPUTER LAB

STAIR 1

ELEV 1

ELEV 2

OFFICE

CORRIDOR

100A

CORRIDOR

100B

VESTIBULE

COMMUNICATION

CENTER

TOILET

CONSULT ROOM

RC CUBES

MEDICATION

ROOM

INJECTION ROOM

MEETING ROOM

MAIN

ELECTRICAL

ROOM

121 SF

OFFICE

CONSULT ROOM

CONSULT ROOM

CONSULT ROOM

WAITING

CONSULT ROOM

STORAGE

OFFICE

CORRIDOR

100B

OFFICE

OFFICE

CUBICLES

MAIN

ELECTRICAL

ROOM

SECURITY / WC

STORAGE

101A

S

E

G

M

E

E

G

M

E

Sprinkler Head Schedule Symbol Count Thread K-Factor Description Note

58 1/2" 5.6 CONCEALED SPRINKLER on Drop

58 = Total Number of Heads This Floor

NOTES

· Separate floor control valve assembly to control each zone (floor)

· Sprinkler system monitored by fire alarm system

· Sprinklers to be centered in tile

LOCATION OF FDC

TO BE CONFIRMED

WITH FIRE

DEPARTMENT

²

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

T

R

R

T

H

PROJECT NORTH

A

M M

F i r e

P r o t e c t i o n

W

B R

C

P r o v i d e n c e

M e n t a l

H e a l t h D o c u m e n t s R e f e r e n c e s V

A

P r o v i d e n c e

M r c h

R e v i t

V

A M

H

P

R O

V I D

E N

R C

H r v t

650-332

NEW MENTAL HEALTH BUILDING -

PHASE 1

830 CHALKSTONE AVE PROVIDENCE, RI 02908

FULLY SPRINKLEREDVA RI FACILITIES MANAGEMENT

SERVICE

B

A

KEY PLAN

Revisions: Date:

FP-101

TGS GVR10 APR 2019

CONSTRUCTION

DOCUMENTS

1 INDUSTRIAL DRIVE

WINDHAM, NH 03087

(603) 647-8700 www.sfceng.com

SFC

ENGINEERING

1/4" = 1'-0"

C1

FIRST FLOOR REFLECTED CEILING PLAN -

SEGMENT B

1/4" = 1'-0"

F1

FIRST FLOOR REFLECTED CEILING PLAN -

SEGMENT A

FIRST FLOOR FIRE PROTECTION

PLANS

LEGEND

LAT/LONG SEISMIC BRACE

4-WAY SEISMIC BRACE

STAIR 1

ELEV 1

ELEV 2

MECHANICAL

ROOM

CIRCULATION

²

Sprinkler Head Schedule Symbol Count Thread K-Factor Description Note

10 1/2" 5.6 UPRIGHT

5 1/2" 5.6 CONCEALED SPRINKLER on Drop

15 = Total Number of Heads This Floor

NOTES

· Separate floor control valve assembly to control each zone (floor)

· Sprinkler system monitored by fire alarm system

· Sprinklers to be centered in tile

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

T

R

R

T

H

PROJECT NORTH

A

M M

F i r e

P r o t e c t i o n

W

B R

C

P r o v i d e n c e

M e n t a l

H e a l t h D o c u m e n t s R e f e r e n c e s V

A

P r o v i d e n c e

M r c h

R e v i t

V

A M

H

P

R O

V I D

E N

R C

H r v t

650-332

NEW MENTAL HEALTH BUILDING -

PHASE 1

830 CHALKSTONE AVE PROVIDENCE, RI 02908

FULLY SPRINKLEREDVA RI FACILITIES MANAGEMENT

SERVICE

B

A

KEY PLAN

Revisions: Date:

FP-102

TGS GVR10 APR 2019

CONSTRUCTION

DOCUMENTS

1 INDUSTRIAL DRIVE

WINDHAM, NH 03087

(603) 647-8700 www.sfceng.com

SFC

ENGINEERING

1/4" = 1'-0"

F1

SECOND FLOOR REFLECTED CEILING PLAN -

SEGMENT A

SECOND FLOOR FIRE PROTECTION

PLANS

LEGEND

LAT/LONG SEISMIC BRACE

4-WAY SEISMIC BRACE

HYDRANT FLOW TEST DATA

DATE: 10/23/2018

TIME: 11:30 PM

LOCATION: VALLEY STREET @ WOLCOTT STREET

HYDRANT ELEVATION: 9' BELOW BASEMENT FINISHED FLOOR

STATIC PRESSURE: 70

RESIDUAL PRESSURE: 66

FLOW: 2,122

SCOPE OF WORK

1. INSTALLATION OF A NEW AUTOMATIC SPRINKLER SYSTEM THROUGHOUT THE BUILDING IN ACCORDANCE WITH NFPA 13 (2016).

GENERAL NOTES

1. ALL GENERAL NOTES & DETAILS ARE TO BE CONSIDERED APPLICABLE TO ALL SPRINKLER DRAWINGS FOR THIS PROJECT. REFERENCE PROJECT NARRATIVE AND

SPECIFICATIONS FOR FURTHER DETAILS.

2. THE DRAWINGS ARE DIAGRAMATIC IN NATURE AND EXACT LOCATIONS AND ARRANGEMENTS OF EQUIPMENT SHALL BE DETERMINED IN FIELD WITH DUE

CONSIDERATION OF STRUCTURAL, ELECTRICAL AND ARCHITECTURAL SYSTEMS.

3. THE FIRE PROTECTION CONTRACTOR SHALL ENSURE THAT THE DESIGN OF THE FIRE PROTECTION SYSTEM MEETS ALL REQUIREMENTS OF THE AUTHORITY HAVING

JURISDICTION. SEE SPECIFICATIONS FOR FURTHER INFORMATION.

4. INSPECTION/TEST DRAIN ASSEMBLES SHALL BE PIPED TO GRADE. COORDINATE LOCATIONS WITH OWNERS REPRESENTATIVE. PIPING SHALL BE GALVANIZED STEEL.

5. INSTALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND GOOD PRACTICE NORMAL TO THE TRADE. INSTALLATION SHALL

INCLUDE PROVISIONS FOR ACCESS TO NORMAL MAINTENANCE ITEMS. PROVIDE ADEQUATE STRUCTURAL SUPPORTS AND SECURE MOUNTING METHODS WITH

PROVISIONS FOR VIBRATION ISOLATION AND EXPANSION WHERE REQUIRED.

6. PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS & GUIDES AS NECESSARY TO PREVENT UNDUE STRAIN ON PIPING.

7. SEE DETAILS AND PIPING DIAGRAMS FOR ADDITIONAL FITTINGS AND VALVING NECESSARY TO COMPLETE THE PIPING OF THE SYSTEM.

8. ALL PIPING SHALL BE RUN AS CLOSE TO STRUCTURAL MEMBERS AS POSSIBLE.

9. ALL WET PIPING TO BE BLACK IRON. ALL DRY PIPING TO BE GALVANIZED. SPRINKLER HEAD FINISHES SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL.

10. FITTINGS SHALL BE RATED TO OPERATE AT 125 PSI.

11. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS AND APPROVALS.

INSTALLATION NOTES

1. SPRINKLER SYSTEM TO PROVIDE COMPLETE COVERAGE IN COMPLIANCE WITH NFPA 13 (2016).

2. ALL SYSTEMS TO BE FLUSHED AND HYDROSTATICALLY TESTED IN ACCORDANCE TO NFPA 25 BEFORE BEING PLACED IN SERVICE.

3. DESIGN AND INSTALLATION TO CONFORM WITH NFPA 13 (2016).

4. CONCEALED PENDENT SPRINKLERS TO BE INSTALLED IN ALL FINISHED AREAS IN CENTER OF TILE.

5. HANGERS ARE TO BE U.L. LISTED AND F.M. APPROVED.

6. DESIGN CRITERIA

6.1. LIGHT HAZARD: 0.10 GPM/FT2 OVER 1500 FT2

6.2. ORDINARY GROUP 1: 0.15 GPM/FT2 OVER 1500 FT2.

7. PIPING TO SEISMICALLY BRACED AND SUPPORTED PER NFPA 13 AND COMPATIBLE WITH HOLLOW CORE PLANK

8. ALL AREAS CONTAINING SPRINKLER PIPING WILL BE MAINTAINED ABOVE 40 DEGREES FAHRENHEIT

9. THE CLEARANCE BETWEEN THE DEFLECTOR AND THE TOP OF ANY STORAGE SHALL BE 18 IN. OR GREATER..

10. ALL SPRINKLERS SHALL BE ALIGNED PARALLEL TO CEILING OR ROOF.

11. PIPING LESS THAN 2" TO BE SCHEDULE 40 BLACK STEEL WITH THREADED FITTINGS.

12. PIPING 2" AND LARGER TO BE SCHEDULE 10 BLACK STEEL WITH GROOVED AND MECHANICAL FITTINGS.

13. ALL PIPE LOCATIONS ARE TO BE FIELD MEASURED PRIOR TO FABRICATION AND INSTALLATION BY SPRINKLER CONTRACTOR.

14. ALARM AND ELECTRICAL WIRING BY OTHERS.

DETAILS

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

T

R

R

T

H

PROJECT NORTH

A

M M

F i r e

P r o t e c t i o n

W

B R

C

P r o v i d e n c e

M e n t a l

H e a l t h D o c u m e n t s R e f e r e n c e s V

A

P r o v i d e n c e

M r c h

R e v i t

V

A M

H

P

R O

V I D

E N

R C

H r v t

650-332

NEW MENTAL HEALTH BUILDING -

PHASE 1

830 CHALKSTONE AVE PROVIDENCE, RI 02908

FULLY SPRINKLEREDVA RI FACILITIES MANAGEMENT

SERVICE

B

A

KEY PLAN

Revisions: Date:

FP-500

TGS GVR10 APR 2019

CONSTRUCTION

DOCUMENTS

1 INDUSTRIAL DRIVE

WINDHAM, NH 03087

(603) 647-8700 www.sfceng.com

SFC

ENGINEERING

FIRE PROTECTION DETAILS

Sheets and Views
WBRC VA DD Fire Protection-FP-100
WBRC VA DD Fire Protection-FP-101
WBRC VA DD Fire Protection-FP-102
WBRC VA DD Fire Protection-FP-500