This notice provides details for an upcoming federal construction contract opportunity with the Department of Veterans Affairs. The contract is for the construction of a new mental health building located at 830 Chalkstone Ave in Providence, Rhode Island, with an estimated value between $10-20 million. The project scope includes site preparation, demolition, and construction of a three-story, approximately 15,300 square foot freestanding building along with corresponding site and utility work. The solicitation will be issued as a request for proposal on or around December 20, 2019, conducted according to FAR Parts 15, 19, and 36, and evaluated based on procedures in the solicitation. The NAICS code is 236220 with a size standard of $36.5 million. The period of performance is approximately 600 calendar days from notice to proceed. The solicitation will be a total SDVOSB set-aside with offers from other than SDVOSB concerns not considered.
36E77620R0001 Attachment 5 - CD Drawings - Electrical.pdf
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
S
S
S
S
S
S
EGA
TSA
VFD
ECB
PB
MANUAL MOTOR STARTER WITH INTEGRAL THERMAL PROTECTION
MOTOR - "5" INDICATES HORSEPOWER
DRY TYPE TRANSFORMER
JUNCTION BOX
POWER PLAN LEGEND
T
PULL BOX
"60AS" - DENOTES SWITCH AMPERAGE RATING
"40AF" - DENOTES FUSE AMPERAGE RATING
60AS
40AF
ENCLOSED CIRCUIT BREAKER - NEMA 1 ENCLOSURE
DISCONNECT SWITCH - NEMA 1 ENCLOSURE - UNFUSED
DISCONNECT SWITCH - NEMA 1 ENCLOSURE - FUSED
30A-3 POLE UNLESS OTHERWISE NOTED
3P
"3P" - DENOTES 3-POLE
60AT
100AF
100AF - DENOTES CIRCUIT BREAKER FRAME
60AT - DENOTES CIRCUIT BREAKER TRIP
EMERGENCY GENERATOR ANNUNCIATOR
TRANSFER SWITCH ANNUNCIATOR
"3R" - DENOTES NEMA 3R ENCLOSURE
"ADO" INDICATES CONNECTION TO AUTOMATIC DOOR OPERATOR
"ATC" INDICATES CONNECTION FOR AUTOMATIC TEMPERATURE CONTROLS
"B" INDICATES JUNCTION BOX WITH BLANK COVER
"EF" INDICATES CONNECTION TO ELECTRONIC FAUCET OR FLUSH VALVE
"EM" INDICATES CONNECTION TO EMERGENCY POWER CIRCUIT AS
INDICATED
"EWC" INDICATES CONNECTION TO ELECTRIC WATER COOLER
"GD" INDICATES CONNECTION TO GARBAGE DISPOSAL
"HM" INDICATES CONNECTION TO HUMIDIFIER
"MD" INDICATES CONNECTION TO MOTORIZED DAMPER
"NM" INDICATES CONNECTION TO NORMAL POWER CIRCUIT AS INDICATED
"PS" INDICATES CONNECTION TO MOTORIZED PROJECTION SCREEN
"SEC" INDICATES CONNECTION SECURITY DEVICES
"T/D" INDICATES TEL/DATA WIRING
SURFACE MOUNTED PANELBOARD
FLUSH MOUNTED PANELBOARD
T
VARIABLE FREQUENCY DRIVE PROVIDED BY HVAC
CONTRACTOR WIRED BY THE ELECTRICAL CONTRACTOR
3P
ELECTRICAL DRAWING LIST
THIS IS A STANDARD SYMBOL LIST. ALL DEVICE SYMBOLS AND
ABBREVIATIONS MAY NOT NECESSARILY APPEAR ON THE FLOOR PLANS
OR DETAIL SHEET. ONLY THOSE SYMBOLS INDICATED ON THE FLOORS
PLANS ARE USED AND OTHERS SHOULD BE DISREGARDED.
PC PHOTOCELL
EMERGENCY CALL SYSTEM LEGEND
EMERGENCY CALL
T
E
"T"- DENOTES TOILET/ DRESSING ROOM STATION
LOCATION, WALL, MOUNTED DEVICE WITH PUSH BUTTON ESP.
FOR MENTAL HEALTH..
"S"- DENOTES SHOWER STATION LOCATION, WALL
MOUNTED DEVICE WITH PULLCORD.
EMERGENCY CALL SYSTEM SCOPE OF WORK: THE CONTRACTOR IS
RESPONSIBLE FOR PROVIDING A COMPLETE SYSTEM, INCLUDING ALL
EQUIPMENT, DEVICES AND WIRING, AND ALL NECESSARY APPURTENANCES
FOR A COMPLETE INSTALLATION. SCOPE OF WORK TO INCLUDE THE
FOLLOWING):
CABLE PATHWAY SYSTEM, CONSISTING OF CONDUITS, CABLE PATHWAYS,
CABLE TRAYS, HANGERS, WALL PENETRATIONS, & STUB-OUTS ALL DEVICES
AND WIRING (LINE VOLTAGE).
T
N DOME LIGHT LOCATION - CEILING OR WALL AS DIRECTED BY
ARCHITECT OR HOSPITAL PERSONNEL.
PANEL DESIGNATION LEGEND
FLOOR PANEL NUMBER
"4" - 480/277V
"2" - 208/120V
4D 3 2
"D" - DISTRIBUTION PANEL
"M" - MECHANICAL PANEL
"K" - KITCHEN PANEL
"L" - LIGHTING
"P" - POWER
CONDUIT TURNING DOWN
CONDUIT STUBBED 6" ABOVE ACCESSIBLE CEILING
AT 90° ANGLE WITH BUSHED END
FLEXIBLE RACEWAY
J-HOOK CABLE MANAGEMENT TYPICALLY MOUNTED 6" ABOVE
FINISHED CEILING
L4GA-5
J
WIRING METHODS LEGEND
HOMERUN TO PANELBOARD "L4GA" ; BRANCH CIRCUIT No. 5;
NO SLASH LINES INDICATE 2#12 & 1#12G., 3/4"C. UNLESS
OTHERWISE NOTED: MINIMUM SIZE CONDUCTOR #12 AWG/
MINIMUM SIZE CONDUIT 3/4"C.
BASKET STYLE CABLE TRAY ELEVATION TRANSITION
FITTING CONDUIT TURNING UP
4P
AUTOMATIC TRANSFER SWITCH
ONE-LINE DIAGRAM LEGEND
ATS BP
LS "LS" - DENOTES LIFE SAFETY BRANCH
"ELEV" - DENOTES ELEVATOR BRANCH
- DENOTES NUMBER OF POLES; 4 POLE"4P"
- DENOTES AUTOMATIC TRANSFER SWITCH"ATS"
- DENOTES MANUAL TRANSFER SWITCH"MTS"
- DENOTES NUMBER OF POLES; 3 POLE"3P"
GROUND CONNECTION
CR43A1 PANELBOARD "CR43A1"
45 KVA DRY-TYPE TRANSFORMER
KVA
"BP" - DENOTES BYPASS ISOLATION SWITCH
- DENOTES CRITICAL BRANCH"CR"
"EQ" - DENOTES EQUIPMENT BRANCH
"X-RAY" - DENOTES X-RAY EQUIPMENT BRANCH
SPD SURGE PROTECTIVE DEVICE
a
OS
D
3D
EMERGENCY LIGHTING SUPERVISORY RELAY - UL 924 LISTED
REFER TO ELECTRICAL DETAILS FOR ADDITIONAL INFORMATION
LOCAL SWITCH, 4-WAY, DOUBLE POLE, DOUBLE THROW
LOCAL SWITCH, 3-WAY, SINGLE POLE DOUBLE THROW
LOCAL SWITCH, SINGLE POLE
SWITCHES LEGEND
"a" - DENOTES LIGHT FIXTURE CONTROL
OCCUPANCY SENSOR - WALL MOUNTED INTEGRAL, DUAL
TECHNOLOGY, DUAL RELAY SWITCH, WITH INTEGRAL
PHOTOCELL. MOUNT 48" AFF UNLESS NOTED OTHERWISE.
OCCUPANCY SENSOR - WALL MOUNTED INTEGRAL, DUAL
TECHNOLOGY, DUAL RELAY SWITCH. MOUNT 48" AFF
UNLESS NOTED OTHERWISE.
OCCUPANCY SENSOR - WALL MOUNTED INTEGRAL,
DUAL TECHNOLOGY, SINGLE POLE SWITCH. MOUNT
48" AFF UNLESS NOTED OTHERWISE.
OCCUPANCY SENSOR, CEILING MOUNTED, DUAL
TECHNOLOGY.
DIMMER SWITCH, SINGLE POLE
DIMMER SWITCH, 3-WAY
LV LOW VOLTAGE SWITCH
"MS" - DENOTES MASTER STATION OVERRIDE
"a" - DENOTES LOW VOLTAGE SWITCH CIRCUIT a
OS
D
3D
LV
OCCUPANCY SENSOR, CEILING PEDESTAL MOUNTED
CORNER UNIT, DUAL TECHNOLOGY.
OS
ER
OS
OS
OS
FOR CEILING MOUNTED AND CORNER MOUNTED OCCUPANCY SENSORS:
PROVIDE THE APPROPRIATE QUANTITY OF POWER SUPPLIES FOR SINGLE
AND MULTIPLE LEVEL SWITCHING. REFER TO FLOOR PLANS FOR
SWITCHING LAYOUTS TO DETERMINE EXACT QUANTITY OF POWER
SUPPLIES
FR 1
a
FR 1
a
FR 1
a
FR 1
a
1FR
a
REMOTE EMERGENCY LIGHTING, SINGLE HEAD MOUNT 7'-6" AFF
REMOTE EMERGENCY LIGHTING, DUAL HEAD MOUNT 7'-6" AFF
LIGHTING FIXTURE AS DESIGNATED ON LIGHTING
FIXTURE SCHEDULE
"1"
"a"
"FR"
"NL" - DENOTES NIGHT LIGHT FIXTURE
EXIT SIGN - SHADED AREA INDICATES LOCATION AND
QUANTITY OF FACES; DIRECTIONAL ARROWS AS
INDICATED
EMERGENCY BATTERY UNIT, MOUNT 7'-6" AFF; NO. OF
EMERGENCY LIGHTING HEADS AS INDICATED.
- DENOTES PANELBOARD BRANCH CIRCUIT NUMBER
- DENOTES FIXTURE CONTROLLED BY LOCAL SWITCH "a"
- DENOTES FIXTURE TYPE AS NOTED ON
FIXTURE SCHEDULE.
- DENOTES LIGHT FIXTURE ON LIFE SAFETY
BRANCH CIRCUIT
LIGHTING PLAN LEGEND
- DENOTES LIGHT FIXTURE CONNECTED TO
CRITICAL BRANCH CIRCUITRY
3/4" THICK x 8'-0" HIGH x LENGTH AS INDICATED ON THE
DRAWINGS PLYWOOD. PLYWOOD SHALL BE PAINTED GRAY
AND MOUNTED TO WALL.
TELEVISION COAX OUTLET - CEILING OR WALL MOUNTED AS
INDICATED ON ARCHITECTURAL DRAWINGS. PROVIDE WITH
3/4"C TO ABOVE ACCESIBLE CEILING WITH RG6 CABLING TO
CATV TERMINATION POINT.
REFER TO PROVIDENCE DATA AND CABLING SPECIFICATIONS FOR TELE/DATA
WIRING REQUIREMENTS, THE ELECTRICAL CONTRACTOR SHALL PROVIDE
DEVICES AND CABLING BACK TO TERMINATION EQUIPMENT.
"CAP" - DENOTES CEILING MOUNTED WIRELESS ACCESS POINT
"CCTV" - DENOTES DATA DEVICE FOR CONNECTION TO SECURITY
CAMERA. DEVICE TO BE LOCATED ABOVE ACCESSIBLE
CEILING. COORDINATE EXACT LOCATION WITH OWNER AND
SECURITY VENDOR.
AV
2-GANG BACKBOX WITH SINGLE GANG PLASTER RING AND
COVERPLATE (TYPE AND MANUFACTURE PER FACILITY
STANDARDS) WITH 1"C (EMPTY, WITH PULLSTRING)
TERMINATED IN ACCESSIBLE CEILING WITH BELL END BUSHING,
UNLESS OTHER SIZE CONDUIT IS INDICATED ON DRAWINGS.
TV TV
"H" - DENOTES MOUNTED HIGH ON WALL CORDINATE EXACT
LOCATION WITH ARCHITETURAL DRAWINGS AND ELEVATIONS
MOUNT
48" AFF
UNO
COMMUNICATIONS LEGEND (WITH WIRING)
"W" - DENOTES MOUNTED 54" AFF
"W" - DENOTES MOUNTED 48" AFF
"C" - DENOTES MOUNTED 8" ABOVE WORK SURFACE
"C" - DENOTES MOUNTED 8" ABOVE WORK SURFACE
"C" - DENOTES MOUNTED 8" ABOVE WORK SURFACE
COMBINATION VOICE/DATA QUAD OUTLET DEVICE - MOUNTED
18"AFF, UNLESS NOTED OTHERWISE. (1 VOICE, 3 DATA UNLESS
OTHERWISE NOTED) WITH 1"C (WITH PULL STRING) RUN
CONCEALED WITHIN WALL TO ABOVE FINISHED CEILING AND
TERMINATING WITHIN 6" OF CABLE MANAGEMENT SYSTEM.
PROVIDE WITH CAT6 CABLES BACK TO PATCH PANEL SERVING
THE AREA.
VOICE ONLY OUTLET DEVICE - MOUNTED 18" AFF, UNLESS
NOTED OTHERWISE, WITH 1"C (WITH PULL STRING) RUN
CONCEALED WITHIN WALL TO ABOVE FINISHED CEILING AND
TERMINATING WITHIN 6" OF CABLE MANAGEMENT SYSTEM.
PROVIDE WITH CAT6 CABLES BACK TO PATCH PANEL SERVING
THE AREA.
DATA ONLY OUTLET DEVICE (2 DATA) - MOUNTED 18" AFF,
UNLESS NOTED OTHERWISE, WITH 1"C (WITH PULL STRING) RUN
CONCEALED WITHIN WALL TO ABOVE FINISHED CEILING AND
TERMINATING WITHIN 6" OF CABLE MANAGEMENT SYSTEM.
PROVIDE WITH CAT6 CABLES BACK TO PATCH PANEL SERVING
THE AREA.
"TV" - DENOTES DEVICE MOUNTED HIGH ON WALL FOR
TELEVISION. COORDINATE EXACT LOCATION AND
MOUNTING HEIGHT WITH THE ARCHITECT PRIOR
TO INSTALLATION.
INFORMATION TECHNOLOGY (IT) OUTLET DEVICE PROVISIONS -
CEILING MOUNTED WITH 1"C (WITH PULL STRING) RUN
CONCEALED WITHIN WALL TO ABOVE FINISHED CEILING AND
TERMINATING WITHIN 6" OF CABLE MANAGEMENT SYSTEM
"C" - DENOTES MOUNTED 8" ABOVE WORK SURFACE
FLOOR MOUNTED DATA ONLY OUTLET DEVICE (2 DATA) WITH 1"C
(WITH PULL STRING) RUN CONCEALED WITHIN WALL TO ABOVE
FINISHED CEILING AND TERMINATING WITHIN 6" OF CABLE
MANAGEMENT SYSTEM. PROVIDE WITH CAT6 CABLES BACK TO
PATCH PANEL SERVING THE AREA.
J
MS
CIRCUIT BREAKER - AMPERAGE AND NO. OF POLES AS INDICATED.
M UTILITY SERVICE METER
WIRING DEVICE LEGEND
SPECIAL PURPOSE RECEPTACLE NEMA TYPE
AS INDICATED ON THE PLANS
DUPLEX RECEPTACLE GFI TYPE NEMA 5-20R
SINGLE RECEPTACLE NEMA 5-20R
DOUBLE DUPLEX RECEPTACLE NEMA 5-20R
DUPLEX RECEPTACLE NEMA 5-20R
DUPLEX RECEPTACLE NEMA 5-20R
EMERGENCY CRITICAL BRANCH CIRCUIT
DUPLEX RECEPTACLE GFI TYPE NEMA 5-20R
EMERGENCY CRITICAL BRANCH CIRCUIT
"C"-
FLOOR MOUNTED DUPLEX RECEPTACLE NEMA 5-20R. PROVIDE
RECTANGULAR METALLIC CAST IRON ADJUSTABLE FLOOR BOX
WITH ALUMINUM COVERS. PROVIDE CARPET FLANGES AS
REQUIRED.
DENOTES LISTED WEATHER RESISTANT TYPE DEVICE AND
IN-USE COVER AS DESCRIBED IN N.E.C. 2011 SECTION 406.8
CEILING MOUNTED RECEPTACLE
- DENOTES 2 HOUR FIRE RATED POKE-THROUGH
- DENOTES FLUSH FLOOR MOUNTED
"PT"
"F"
DOUBLE DUPLEX RECEPTACLE NEMA 5-20R
EMERGENCY CRITICAL BRANCH CIRCUIT
SINGLE RECEPTACLE NEMA 5-20R
EMERGENCY CRITICAL BRANCH CIRCUIT
ALL RECEPTACLES ARE MOUNTED 18" AFF UNLESS OTHERWISE
NOTED.
"TP"-
"WP"- DENOTES WEATHERPROOF TYPE: NEMA 3R MINIMUM
DENOTES TAMPER PROOF TYPE
DENOTES MOUNTED 8" ABOVE WORK
SURFACE OR COUNTER TOP
"WR"-
"MC"- DENOTES RECEPTACLE MOUNTED IN CASEWORK FOR
MICROWAVE, COORDINATE EXACT LOCATION AND
MOUNTING HEIGHT WITH THE CASEWORK VENDOR AND
ARCHITECT PRIOR TO INSTALLATION
RECEPTACLE TYPE DESIGNATIONS:
"CP"- DENOTES RECEPTACLE MOUNTED IN CEILING FOR PROJECTOR
"CM"- DENOTES RECEPTACLE MOUNTED 8" ABOVE WORK
SURFACE OR COUNTER TOP FOR COFFEE MACHINE
"IH"- DENOTES RECEPTACLE MOUNTED IN CASEWORK BELOW
SINK FOR INSTANT HOT WATER DISPENSER, COORDINATE
EXACT LOCATION AND MOUNTING HEIGHT WITH THE
CASEWORK VENDOR AND ARCHITECT PRIOR TO
INSTALLATION.
"TV"- DENOTES RECEPTACLE MOUNTED HIGH ON WALL FOR
TELEVISION. COORDINATE EXACT LOCATION AND
MOUNTING HEIGHT WITH THE ARCHITECT PRIOR TO
INSTALLATION. PROVIDE TAMPERPROOF TYPE DEVICE IN
PATIENT ACCESSIBLE AREAS
"ICE"- DENOTES RECEPTACLE MOUNTED 8" ABOVE WORK
SURFACE OR COUNTER TOP FOR ICE MACHINE
"REF"- DENOTES RECEPTACLE MOUNTED AT 48" FOR FULL HEIGHT
REFRIGERATOR
"UC"- DENOTES RECEPTACLE MOUNTED AT 18" IN CASEWORK
FOR UNDERCABINET REFRIGERATOR
"PX"- DENOTES RECEPTACLE MOUNTED AT 48"A.F.F. FOR PYXIS
MACHINE
"D"- DENOTES DEVICE FED VIA DEDICATED
BRANCH CIRCUITRY
"BW"-
DENOTES RECEPTACLE MOUNTED AT HEIGHT AS
DETERMINED BY THE ARCHITECT FOR BLANKET WARMER
TRIPLE CHANNEL, SURFACE MOUNTED, ALUMINUM RACEWAY,
DUAL COVER WIREMOLD #AL7450 SERIES OR APPROVED
EQUAL. RACEWAY TO BE MOUNTED 6" ABOVE WORK SURFACE
OR AS DIRECTED BY ARCHITECT AND HOSPITAL
REPRESENTATIVE. RACEWAY TO BE FACTORY PRE-WIRED,
WITH DUPLEX NEMA 5-20R RECEPTACLES FOR NORMAL
POWER, DUPLEX RED NEMA 5-20R RECEPTACLES FOR
EMERGENCY POWER, AND VOICE/DATA PROVISION LOCATIONS.
NORMAL POWER DEVICES 24" ON CENTER, EMERGENCY
POWER DEVICES 48" ON CENTER, AND TELE/DATA LOCATIONS
48" ON CENTER, UNLESS OTHERWISE NOTED. DEVICES WITHIN
6'-0" OF SINKS SHALL BE GFCI PROTECTED.
"TS"- DENOTES RECEPTACLE MOUNTED IN CASEWORK FOR
TOASTER
NOTE: ALL RECEPTACLES SHALL BE HOSPITAL GRADE. ALL
RECEPTACLES WITHIN PATIENT ACCESSIBLE AREAS SHALL BE
TAMPERPROOF TYPE DEVICES.
"USB"- DENOTES COMBINATION USB DEVICE
WIRING METHODS
REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION
NORMAL SYSTEM FEEDERS
EQUIPMENT SYSTEM FEEDERS
NORMAL BRANCH CIRCUITS
THHN/THWN/XHHW
CONDUCTORS IN EMT
THHN/THWN/XHHW CONDUCTORS IN
EMT OR HOSPITAL GRADE AC CABLE
TELEDATA WIRING
CAT6 WIRING IN EMT (REFER TO
COMMUNICATIONS LEGEND FOR
ADDITIONAL INFORMATION)
MECHANICAL EQUIPMENT COORDINATION
ELECTRICAL CONTRACTOR SHALL REFER TO THE MECHANICAL,
PLUMBING, AND FIRE PROTECTION DRAWINGS AND SPECIFICATIONS FOR
LOCATIONS AND QUANTITIES OF EQUIPMENT RELEASED TO EACH TRADE.
MECHANICAL EQUIPMENT COORDINATION
SL1
d
UP-1
HH
LC
TC
d
SITE LIGHTING AND POWER LEGEND
SITE LIGHTING FIXTURE
SITE LIGHTING BOLLARD
UTILITY POLE
SL2
MANHOLE
HANDHOLE
MH
LIGHTING CONTACTOR
TIME CLOCK
G
G
G
GND
GROUNDING LEGEND
GROUND ROD
GROUNDING COUNTERPOISE - (3) COPPER GROUND
RODSAT 10'-0" ON CENTER. LIGHTING PROTECTION SHALL
USE TRIAD GROUNDING SYSTEM.
GROUNDING CONDUCTOR; 1/0 CU GND MINIMUM -
UNLESS NOTED OTHERWISE
GROUND BAR - 2"H x 1/4" THICK x 18"L, MOUNTED 24"
AFF WITH 2" SPACE BETWEEN GROUND BUS AND
WALL
GROUNDING ELECTRODE CONDUCTOR OF SEPARATELY
DERIVED SYSTEM.
THHN/THWN/XHHW
CONDUCTORS IN EMT
S M
VFD
S M
VFD
PROVIDE BY EC
PROVIDE BY MC
PROJECT GENERAL NOTES
24. WHERE PANELS ARE INDICATED TO BE RELOCATED, THE ELECTRICAL
CONTRACTOR SHALL TRACE OUT EACH CIRCUIT TO DETERMINE WHAT
CIRCUITS FEED AREAS OUTSIDE THE SCOPE OF WORK. CIRCUITS WHICH
MUST BE MAINTAINED ARE TO BE RE-ROUTED TO THE NEW PANEL
LOCATION BY PROVIDING AN ADEQUATELY SIZED PULL BOX AND
SPLICING AND EXTENDING THE CONDUCTORS.
23. THE ELECTRICAL CONTRACTOR SHALL CARRY ALL COSTS ASSOCIATED
WITH DISABLING THE CONNECTIONS TO THE EXISTING MUNICIPAL LOOP
DURING FINAL CONNECTIONS AND TESTING AND SHALL CARRY COSTS FOR
RECONNECTION OF LOOP.
22. MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM SHALL BE
COORDINATED WITH THE FIRM WHO HOLDS THE EXISTING SYSTEM
MAINTENANCE CONTRACT. THE FIRM WHO HOLDS THE EXISTING SYSTEM
MAINTENANCE CONTRACT SHALL MAKE ALL FINAL CONNECTIONS, AND
PERFORM ALL PROGRAMMING AND TESTING. ALL COSTS ASSOCIATED WITH
FINAL CONNECTIONS, PROGRAMMING AND TESTING SHALL BE INCLUDED
UNDER THIS CONTRACT AND SHALL BE THE RESPONSIBILITY OF THE
ELECTRICAL CONTRACTOR.
21. ALL GROUND CONDUCTORS SHALL BE GREEN, ISOLATED GROUND
CONDUCTORS SHALL BE GREEN/ YELLOW STRIPPED, AND NEUTRAL
CONDUCTORS SHALL BE WHITE.
20. FURNISH GROUNDING/ BONDING BUSHINGS ONTO ALL CONDUIT
ENTERING/LEAVING BOXES.
19. CURRENT CARRYING MATERIAL USED SHALL BE COPPER, INCLUDING
PANELBOARD BUS MATERIALS AND TRANSFORMER WINDINGS.
18. FOR EXACT LOCATION OF MECHANICAL EQUIPMENT (AC UNITS, FANS,
PUMPS, ETC.) REFER TO RESPECTIVE TRADES DRAWINGS. FOR ELECTRICAL
INFORMATION, REFER TO MEP COORDINATION SCHEDULE.
17. ELECTRICAL CONTRACTOR IS TO COORDINATE THE EXACT LOCATION
OF LIGHTING FIXTURES IN MECHANICAL AND STORAGE AREAS WITH
OTHER TRADES.
16. FOR EXACT LOCATION OF LIGHTING FIXTURES SEE REFLECTED
CEILING PLAN DRAWINGS. FOR MOUNTING HEIGHT OF UNDER-COUNTER
LIGHTING FIXTURES AND OTHER TASK LIGHTING, REFER TO
ARCHITECTURAL ELEVATION DRAWINGS.
15. CONTRACTOR SHALL VERIFY ALL DOORS SWINGS BEFORE INSTALLING
SWITCH BOXES.
14. MOUNTING HEIGHTS SHALL BE AS INDICATED ON MOUNTING HEIGHT
DETAIL.
1. THE CONTRACTOR SHALL FURNISH LABOR, MATERIALS, TOOLS AND OTHER
EQUIPMENT REQUIRED TO INSTALL THE WORK SHOWN AND SPECIFIED. THE
CONTRACTOR SHALL FURNISH AND INSTALL ITEMS NECESSARY FOR A
COMPLETE ELECTRICAL SYSTEM. MATERIALS SHALL BE NEW AND SHALL
BEAR THE REGISTERED UL MARK. WORK SHALL CONFORM WITH THE
NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 70 (NEC), THE
NATIONAL ELECTRICAL CODE (NEC), AND APPLICABLE FEDERAL, STATE AND
LOCAL CODES. CONTRACTOR SHALL SECURE PERMITS AND PAY THE FEES
REQUIRED TO CARRY OUT HIS WORK. THE CONTRACTOR SHALL FURNISH
COPIES OF CERTIFICATES AND PERMITS TO THE ARCHITECT.
2. THE DRAWINGS AND SPECIFICATIONS INDICATE THE INTENT OF THE
DESIGN AND SHALL BE CONSIDERED AS DIAGRAMMATIC ONLY. EXACT
LOCATIONS FOR OUTLETS AND EQUIPMENT SHALL BE DETERMINED AT THE
SITE AS WORK PROGRESSES. DIMENSIONS AND CONDITIONS SHALL BE
CHECKED AND VERIFIED BY THE CONTRACTOR AT THE SITE. FINAL WORK
SHALL BE DOCUMENTED ON AS BUILT RECORD DRAWINGS.
3. PIPING, CONDUITS AND EQUIPMENT OF ALL TRADES SHALL BE
PROPERLY COORDINATED AND SET TO MAINTAIN THE CLEARANCES
REQUIRED BY APPLICABLE FEDERAL, STATE AND LOCAL CODES.
4. CONDUIT RUNS CROSSING EXPANSION JOINTS SHALL HAVE
EXPANSION OR EXPANSION DEFLECTION TYPE FITTINGS AS REQUIRED.
VERIFY EXISTING JOINTS BY FIELD MEASUREMENTS.
13. OUTDOOR ELECTRICAL EQUIPMENT SHALL BE NEMA 3R TYPE,
UNLESS OTHERWISE NOTED.
12. RECEPTACLES, SWITCHES, LIGHTING FIXTURES, SMOKE DETECTORS,
ETC. INDICATE QUANTITY, EXACT LOCATIONS OF DEVICES SHALL BE
DETERMINED IN THE FIELD AND COORDINATE WITH ARCHITECTURAL
DRAWINGS.
11. ALL BRANCH CIRCUITS (LIGHTING AND POWER) SHALL HAVE A DEDICATED
NEUTRAL CONDUCTOR. COMMON NEUTRALS WILL NOT BE ALLOWED.
10. EXIT SIGNS SHALL BE UNSWITCHED.
9. ALL RECEPTACLES INSTALLED IN UNFINISHED AREAS SHALL BE GFI
TYPE, MOUNTED 4'-0" ABOVE FINISHED FLOOR.
8. PANELBOARD SHALL BE MOUNTED SO THAT THE DISTANCE FROM THE
TOP CIRCUIT BREAKER OPERATING HANDLE TO THE FLOOR SHALL NOT
EXCEED 6'-6".
7. WIRING DEVICES SHALL BE MOUNTED IN ACCORDANCE WITH THE
LATEST REQUIREMENTS OF THE ARCHITECTURAL BARRIERS BOARD.
6. LOAD CENTERS, PANELBOARDS AND SWITCHBOARDS SHALL BE
PROVIDED WITH DEDICATED SPACE EXTENDING FROM THE FLOOR TO THE
STRUCTURAL CEILING WITH A WIDTH AND DEPTH THAT OF THE
EQUIPMENT, INCLUDING ANY ADDITIONAL SPACE DESCRIBED IN OF THE
NEC. NO PIPING, DUCTS OR EQUIPMENT FOREIGN TO THE ELECTRICAL
EQUIPMENT OR ARCHITECTURAL APPURTENANCES SHALL BE PERMITTED
TO BE INSTALLED IN, ENTER OR PASS THROUGH SUCH SPACE.
5. RACEWAYS AND CABLE SHALL BE RUN CONCEALED IN FINISHED SPACES
UNLESS OTHERWISE NOTED.
MOLDED CASE SWITCHMCSW
KAIC
INTERRUPTING CAPACITYIC
BOND BONDING JUMPER
EQUIPMENT GROUND
CONDUCTOR
EGC
AFG
ATS
AWG
CB
CKT
CT
CWS
EMT
MAX
MC METAL CLAD CABLE
MAXIMUM
ELECTRICAL METALLIC TUBING
CONDUIT WALL SEAL
CIRCUIT
CIRCUIT BREAKER
AMERICAN WIRE GAUGE
AUTOMATIC TRANSFER SWITCH
ABOVE FINISHED GRADE
ARC-FAULT CIRCUIT
INTERRUPTER
AFCI
EACHEA
A
AL
ARCH
C
CAT
BLDG
CATALOG
CONDUIT - RACEWAY
BUILDING
ARCHITECT
ALUMINUM
AMPERES
CU
COL
EM
EC
DWG
FT
FMS
HVAC
MCB
kW kVA
GC
EMS ENERGY MANAGEMENT SYSTEM
FACILITIES MANAGEMENT
SYSTEM
GENERAL CONTRACTOR
MAIN CIRCUIT BREAKER
KILOWATTS
KILOVOLT AMPERES
FEET
EMERGENCY
ELECTRICAL CONTRACTOR
DRAWING
COPPER
COLUMN
KCMIL
MCC
THOUSAND CIRCULAR MILS
MOTOR CONTROL CENTER
FA
LTG
ATC
LIGHTING
FIRE ALARM
FU
MCP MOTOR CIRCUIT PROTECTOR
FUSE
ELECTRIC WATER COOLEREWC
ABBREVIATIONS
cd CANDELA
DUAL ELEMENT TIME DELAYDETD
DIAMETERDIA
FIRE ALARM ANNUNCIATORFAA
TWISTED PAIRTP
RNC RIGID NON-METAL CONDUIT
RMC RIGID METAL CONDUIT
N
WITHW/
MLO
NEC
TSP
UL
UNO
WP WEATHERPROOF
UNLESS NOTED OTHERWISE
UNDERWRITER'S
LABORATORIES
TWISTED SHIELDED PAIR
NATIONAL ELECTRICAL CODE
MAIN LUGS ONLY
GALVANIZED RIGID STEEL
CONDUIT
RGS
SATS
PT POTENTIAL TRANSFORMER
MISC
NO
NC
MTD
NL
NTS
SP
PVC
POS
MOUNTED
SPARE
NOT TO SCALE
NIGHT LIGHT
NORMALLY OPEN
NORMALLY CLOSED
MISCELLANEOUS
SWBD
TL
UG
TEL
TWIST LOCK
UNDERGROUND OR UNDER
GRADE
TELEPHONE
SWITCHBOARD
W
TRANS
PWR
PNL
P
POWER
PANEL
WYE
DELTA
TRANSFORMER
WIRE
VOLT
RSC RIGID STEEL CONDUIT
SE SERVICE ENTRANCE
AMPERE FRAMEAF
ABOVE FINISHED FLOORAFF
AMPERE INTERRUPTING CAPACITYAIC
ACT ACOUSTICAL CEILING TILE
ANN ANNUNCIATOR
ANSI
AT AMPERE TRIP
BR BRANCH
CLG CEILING
CMS CABLE MANAGEMENT SYSTEM
CMU CONCRETE MASONRY UNIT
DP DISTRIBUTION PANEL
ELECTRICALELEC
ELEVATORELEV
EO ELECTRICALLY OPERATED
EQUIPMENTEQUIP
EXPLOSION PROOFEXP
FLUORESCENTFLUOR
GROUNDG
GAUGEGA
GENERATORGEN
GROUND FAULTGF
GROUND FAULT INTERRUPTERGFI
GFCI
GWB GYPSUM WALL BOARD
HIGH INTENSITY DISCHARGEHID
HAND-OFF-AUTOHOA
HORSE POWERHP
HERTZHZ
HEATERHTR
HOURHR
GND GROUND
KV KILOVOLTS
KILOVOLT AMPERES REACTIVEkVAR kWH KILOWATTS HOURS
INCANDESCENTINC
IMC INTERMEDIATE METAL CONDUIT
JUNCTION BOXJB
MAIN DISTRIBUTION PANELMDP
MECH MECHANICAL
MTG MOUNTING
MIN MINIMUM
MEDIUM VOLTAGEMV
NOT APPLICABLENA
NEMA
NFPA
NIC NOT IN CONTRACT
OCPD
PANEL BOARDPNLBD
PH PHASE
SW SWITCH
SWITCH GEARSWGR
KEC
STANDBY AUTOMATIC
TRANSFER SWITCH
POLYVINYL CHLORIDE,
RACEWAY
PROVIDED UNDER OTHER
SECTIONS
OVER CURRENT
PROTECTION DEVICE
NATIONAL FIRE PROTECTION
ASSOCIATION
NATIONAL ELECTRICAL
MANUFACTURERS
ASSOCIATION
NEUTRAL (GROUNDED
CONDUCTOR)
KITCHEN EQUIPMENT
CONTRACTOR
THOUSAND AMPERES
INTERRUPTING CAPACITY
HEATING, VENTILATION & AIR
CONDITIONING
GROUND FAULT CIRCUIT
INTERRUPTER
CURRENT TRANSFORMER OR
CABLE TRAY
AUTOMATIC TEMPERATURE
CONTROL
AMERICAN NATIONAL
STANDARDS INSTITUTE
V
CM
S
V
BA
SS
PA
PUBLIC ADDRESS SYSTEM LEGEND
MICROPHONE OUTLET - WALL MOUNTED 18" AFF, UNLESS
NOTED OTHERWISE
"C" - DENOTES FLUSH CEILING MOUNTED
"F" - DENOTES FLUSH FLOOR MOUNTED
SPEAKER - BI-DIRECTIONAL WALL MOUNTED
VOLUME CONTROL UNIT -WALL MOUNTED 48" AFF
PUBLIC ADDRESS SYSTEM AMPLIFIER
"BA" - DENOTES BOOSTER AMPLIFIER
SPEAKER - CEILING OR WALL MOUNTED RESPECTIVELY
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH VA RI FACILITIES MANAGEMENT
SERVICE
Approved:
FULLY SPRINKLERED
NEW MENTAL HEALTH
BUILDING 38 - PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
650-332
Engineering Discipline:
/1
/2
:5
:0
P
M C
R e v it P ro je c ts
\1
.0
-V
A M
C P ro v id e n c e
M e n ta l H e a lt h
B ld g
C e n tr a l( k p ro u ty X
J X
.r v t
EJ0.0
KT BG10 APR 2019
CONSTRUCTION
DOCUMENTS
ELECTRICAL - LEGEND
DWG NO. DRAWING TITLE
EJ0.0 ELECTRICAL - LEGEND
ES0.0 ELECTRICAL - SITE PLAN
ES0.1 ELECTRICAL - LIGHTNING PROTECTION PLAN
EL1.0 ELECTRICAL - BASEMENT - LIGHTING PLAN
EL1.1 ELECTRICAL - FIRST FLOOR - LIGHTING PLAN
EL1.2 ELECTRICAL - SECOND FLOOR - LIGHTING PLAN
EL1.3 ELECTRICAL - BASEMENT - NM PHOTOMETRIC
CALCULATION
EL1.4 ELECTRICAL - BASEMENT - EM PHOTOMETRIC
CALCULATION
EL1.5 ELECTRICAL - FIRST FLOOR - NM PHOTOMETRIC
CALCULATION
EL1.6 ELECTRICAL - FIRST FLOOR - EM PHOTOMETRIC
CALCULATION
EL1.7 ELECTRICAL - SECOND FLOOR - NM PHOTOMETRIC
CALCULATION
EL1.8 ELECTRICAL - SECOND FLOOR - EM PHOTOMETRIC
CALCULATION
EL1.9 ELECTRICAL - SITE - PHOTOMETRIC CALCULATION
EP1.0 ELECTRICAL - BASEMENT - POWER PLAN
EP1.1 ELECTRICAL - FIRST FLOOR - POWER PLAN
EP1.2 ELECTRICAL - SECOND FLOOR - POWER PLAN
EK0.0 ELECTRICAL - RISER DIAGRAMS I
EK0.1 ELECTRICAL - RISER DIAGRAMS II
EK0.2 ELECTRICAL SCHEDULES
EK1.0 ELECTRICAL - DETAILS
EK1.1 ELECTRICAL - DETAILS
Revisions: Date:
S T
A
T E
O F
R H O D
E
I S L A
N D
HOPE
04/16/2019
UP
UP
HH
HH
HH
HH
A
B
APPROXIMATE LOCATION
OF ELECTRICAL ROOM 110
APPROXIMATE LOCATION
OF MAIN ELECTRCAL
ROOM IN BASEMENT
EXISTING GENERATOR
NEW UTILITY
TRANSFORMER
D
C -
UTILITY POLE
BUILDING 14
T E
T
EXISTING TO REMAIN
UTILITY TRANSFORMER
SERVING BUILDING 32.
CONDUIT NOTES:
THE RACEWAY PROVIDED FOR THE SECONDARY FEEDERS
BETWEEN THE MAIN BUILDING TRANSFORMER AND THE
SWITCHBOARD SHALL BE AS RIGID STEEL ELBOWS WITH ONLY
STRAIGHT PORTIONS OF UNDERSLAB RACEWAY ALLOWED TO BE
PVC RACEWAY.
CONDUIT DENOTATIONS:
DUCTBANK SECTION "A"
UTILITY SECONDARIES
PP
NO SCALE
P 4" PVC CONDUIT FOR
SECONDARY FEEDERS
S4P
S4 4" PVC SPARE CONDUIT
DUCTBANK SECTION "B"
GENERATOR SECONDARIES
S4G
NO SCALE
G 4" PVC CONDUIT FOR
EMERGENCY FEEDERS
S4
D 4" PVC CONDUIT FOR
FIBER AND DATA.
S4
DUCTBANK SECTION "C"
NO SCALE
S5 S5
DUCTBANK SECTION "D"
NO SCALE
D S4
S5 5" RIGID GALVANIZED
STEEL CONDUIT
S4
CONTRACTOR SHALL COORDINATE MOUNTING HEIGHT OF
ALL DEVICES WITH ARCHITECTS DRAWINGS PRIOR TO
ROUGH IN.
CIRCUIT NUMBERS ARE FOR DESCRIPTIVE PURPOSES ONLY.
EXACT NUMBERS SHALL BE DETERMINED IN FIELD AND
SHALL BE NOTED ON THE CONTRACTORS AS-BUILT
DRAWINGS.
BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED AND
INSTALLED FOR A MAXIMUM BRANCH CIRCUIT VOLTAGE
DROP OF 3% FROM PANELBOARD. TOTAL VOLTAGE DROP
FROM SERVICE ENTRY TO LAST DEVICE ON CIRCUIT SHALL
NOT EXCEED 5%. REFER TO SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS AND OPTIONS.
SITE PLAN NOTES
1.
2.
3.
UTILITY COMPANY TO PROVIDE NEW UTILITY
TRANSFORMER. CONTRACTOR SHALL INSTALL NEW
CONDUIT FROM NEW UTILITY POLE TO TRANSFORMER.
PRIMARY WIRING BY UTILITY COMPANY. PROVIDE NEW
CONDUIT AND WIRING TO NEW MAIN ELECTRICAL
ROOM. REFER TO RISER DIAGRAM FOR WIRE SIZING.
SITE PLAN KEYED NOTES
PROVIDE NEW UNDERGROUND DUCTBANK TO
EXISTING GENERATOR PANELBOARD WITHIN BUILDING
32. REFER TO RISER DIAGRAM FOR WIRE SIZING.
ELECTRICAL CONTRACTOR SHALL PROVIDE A UL
MASTER CERTIFIED LIGHTNING PROTECTION SYSTEM
ON ROOF THAT CONNECTS TO GROUND RING. REFER TO
SPECIFICATION SECTION FOR ADDITIONAL
INFORMATION.
REFER TO RISER DIAGRAM ON CONTRACT DRAWING EK0.0
FOR ADDITIONAL DETAIL ON ELECTRIC SERVICE.
4.
CONNECT FIBER TO EXISTING SPARE FIBER PATCH
PANEL TERMINAL LOCATED IN BASEMENT OF BUILDING
14. WIRING SHALL BE ROUTED PARALLEL TO EXISTING
RACEWAY
HAND HOLES ARE SHOWN FOR REFERENCE ONLY.
COORDINATE QUANTITY AND PLACEMENT IN FIELD.
5.
26.0001
NONE
12" YELLOW WARNING TAPE SHALL
RUN THE LENGTH OF CONDUIT RUN
(TYPICAL)
REFER TO SITE PLANS FOR QUANTITIES
6" CLEAN SAND
30" (MIN) COMPACT NATIVE BACKFILL
VOID OF OBJECTS OVER
TWO INCHES IN DIAMETER
AND VOID OF DECOMPOSED
MATERIAL.
TYPICAL DIRECT BURIAL DUCT BANK SECTION
3" CONCRETE
ENCASEMENT
030' 15'
GRAPHIC SCALE
30' 60' 120'
SCALE: 1" = 30' - 0"
CONDUIT PENETRATION THROUGH EXISTING WALL
26.6507
NONE
FLANGED TYPE SEALING
BUSHING AS SPECIFIED
CONCRETE, BRICK, OR
CMU WALL
INSIDE OF
STRUCTURE
OUTSIDE OF
STRUCTURE
MEMBRANE CLAMP
CONDUIT
DUCT BANK
JUNCTION
BOX
RIGID STEEL
CONDUIT
PROVIDE
FIRESTOP
PROVIDE WATER
PROOFINGGRADE
SLEEVE OR SLEEVE OPENING
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH VA RI FACILITIES MANAGEMENT
SERVICE
Approved:
FULLY SPRINKLERED
NEW MENTAL HEALTH
BUILDING 38 - PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
650-332
Engineering Discipline:
/1
/2
:1
:5
P
M C
U s e rs
\b g ri ff in
\D o c u m e n ts \1
.0
-V
A M
C P ro v id e n c e
M e n ta l H e a lt h B ld g
C e n tr a l(
B
G R
IF
F
IN
.r v t
ES0.0
KT BG10 APR 2019
CONSTRUCTION
DOCUMENTS
ELECTRICAL - SITE PLAN
Revisions: Date:
BUILDING 32
cbellao Stamp
UP
FINISHED
GRADE
EXOTHERMIC
WELD
12" MIN
48" MIN
EXISTING
GROUND GRID
#4/0 BARE
COPPER
GROUND
BUILDING
LIGHTNING
PROTECTION
SYSTEM
#1/0 BARE COPPER DOWN
CONDUCTOR IN 1" PVC
SCHEDULE 40 CONDUIT
LIGHTING PROTECTION DOWN
CONDUCTOR (TYP)
CONNECTION TO STRUCTURAL STEEL
(TYP)
#1/0 AWG BARE COPPER GROUND
CABLE (TYP) CIRCLE AROUND
BUILDING 4'-0" FROM EXTERIOR WALL
08' 4'
GRAPHIC SCALE
8' 16' 24'
SCALE: 1/8" = 1' - 0"
SITE PLAN KEYED NOTES
1 GROUND RING SHALL ENCIRCLE ENTIRE BUILDING AND
CONSIST OF #1/0 AWG BURIED 3 FEET BELOW SURFACE.
GROUND RING SHALL CONNECT TO BUILDING STEEL AT
EVERY OTHER COLUMN. GROUND RING SHALL HAVE
ENCASED ELECTRODE, HAVING AT LEAST 20 FEET OF
EXPOSED COPPER.
LIGHTNING PROTECTION SYSTEM NOTES:
1. PROVIDE A UL MASTER LABELED LIGHTNING
PROTECTION SYSTEM IN COMPLIANCE WITH UL 96A, LP1-
175, AND NFPA 780. THE SYSTEM SHALL CONSIST OF THE
FOLLOWING:
A. COPPER CABLE, WITH SOLID AIR TERMINALS
B. AIR TERMINALS SHALL INCLUDE BASES
SPECIFICALLY DESIGNED FOR ROOF MATERIAL.
C. AIR TERMINALS SHALL BE SOLID COPPER.
2. CONTRACTOR SHALL PREPARE A COMPLETE
LIGHTNING PROTECTION SYSTEM DESIGN STAMPED BY
A REGISTERED DESIGN PROFESSIONAL FOR REVIEW
AND APPROVAL BY THE ENGINEER. DOCUMENTS SHALL
INCLUDE LAYOUT OF LIGHTING PROTECTION SYSTEM
INCLUDING AIR TERMINALS, DOWN CONDUCTORS,
MOUNTING HARDWARE, CONDUCTORS, SUPPORTS, AND
ALL NECESSARY ANCILLARY EQUIPMENT.
3. REFER TO SPECIFICATION SECTIONS 260526
(GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS)
AND 264100 (FACILITY LIGHTNING PROTECTION) FOR
ADDITIONAL DETAIL.
LIGHTNING PROTECTION SYSTEM DETAIL
NO SCALE
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH VA RI FACILITIES MANAGEMENT
SERVICE
Approved:
FULLY SPRINKLERED
NEW MENTAL HEALTH
BUILDING 38 - PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
650-332
Engineering Discipline:
/1
/2
:1
:5
P
M C
U s e rs
\b g ri ff in
\D o c u m e n ts \1
.0
-V
A M
C P ro v id e n c e
M e n ta l H e a lt h B ld g
C e n tr a l(
B
G R
IF
F
IN
.r v t
ES0.1
KT BG10 APR 2019
CONSTRUCTION
DOCUMENTS
ELECTRICAL - LIGHTNING
PROTECTION PLAN
1/8" = 1'-0"ES0.1
1 ELECTRICAL - LIGHTNING PROTECTION PLAN
Revisions: Date:
cbellao
OS
OS
OS
OSOSOSOS
OS
OSOS
OS OS
OSOS
OS
OS
OS
OS
OS
CIRCUIT NUMBERS ARE FOR DESCRIPTIVE PURPOSES ONLY.
EXACT NUMBERS SHALL BE DETERMINED IN FIELD AND
SHALL BE NOTED ON THE CONTRACTORS AS-BUILT
DRAWINGS.
EXIT SIGNS, FIXTURES DESIGNATED AS NIGHT LIGHTS, AND
EMERGENCY BATTERY UNITS SHALL BE CONNECTED TO AN
UNSWITCHED, CONSTANT "ON" SOURCE AS INDICATED.
FIXTURES SHOWN TO INCLUDE EMERGENCY BALLAST SHALL
HAVE ADDITIONAL "CONSTANT ON" SOURCE.
BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED AND
INSTALLED FOR A MAXIMUM BRANCH CIRCUIT VOLTAGE
DROP OF 3% FROM PANELBOARD. TOTAL VOLTAGE DROP
FROM SERVICE ENTRY TO LAST DEVICE ON CIRCUIT SHALL
NOT EXCEED 5%. REFER TO SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS AND OPTIONS
LIGHTING PLAN NOTES
1.
2.
3.
4.
EMERGENCY LIGHTING BYPASS RELAYS ARE NOT SHOWN
ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF
THE ELECTRICAL CONTRACTOR TO REVIEW THE LIGHTING
DRAWINGS AND PROVIDE EMERGENCY LIGHTING BYPASS
RELAYS AS REQUIRED TO MEET LOCAL AND STATE BUILDING
CODES. THE ELECTRICAL CONTRACTOR SHALL FURNISH
AND INSTALL A UL 924 LISTED EMERGENCY LIGHTING
BYPASS RELAY DEVICE IN ALL ROOMS AND AREAS
INDICATED WITH EMERGENCY LIGHTING (LIFE SAFETY OR
CRITICAL). THIS INCLUDES PROVIDING A MINIMUM OF ONE
BYPASS RELAY PER LIGHTING CONTROL DEVICE (E.G.
SWITCH, DIMMER, OCCUPANCY SENSOR, ETC.) SERVING
EMERGENCY LIGHTS TO AUTOMATICALLY BYPASS THE
LIGHTING CONTROL WHEN NORMAL POWER IS LOST AND
TURN THE EMERGENCY LIGHTING TO FULL ON. THE
ELECTRICAL CONTRACTOR SHALL COORDINATE EXACT
BYPASS RELAY TYPE WITH THE LIGHTING CONTROL SYSTEM
AND LIGHTING FIXTURES PROVIDED TO ENSURE A FULLY
FUNCTIONAL LIGHTING SYSTEM IS INSTALLED MEETING ALL
LOCAL AND STATE REGULATIONS. BYPASS RELAY SHALL BE
MODEL ELCU-100 AS MANUFACTURED BY WATTSTOPPER OR
EQUAL.
5.
THE INTENT IS TO PROVIDE LIGHTING FIXTURES, CONTROLS,
WIRING AND CONDUIT. LIFE SAFETY LIGHTING SHALL BE
ADDRESSED THROUGH INTEGRAL BATTERY BACKUP.ALL
LIGHTING FIXTURES SHALL BE CONTROLLED BY LOCAL
LIGHTING CONTROLS WITH THE EXCEPTION AS FOLLOW:
STAIRWELLS SHALL BE CONTROLLED VIA INTEGRAL
OCCUPANCY SENSING LIGHTING FIXTURES WHICH FAIL ON.
EXTERIOR LIGHTING FIXTURES SHALL BE CONTROLLED BY
COMBINATION TIME-CLOCK AND PHOTO CELL. THE TIME-
CLOCK SHALL BE AN ASTRONOMICAL TIMECLOCK CAPABLE
OF 7-DAY SCHEDULES AND PRE-SET HOURS.
6.
LR-2 LR-2E LR-2 LR-2 LR-2E
LR-2
LP-1E
LP-1E
LP-1ELP-1
LP-1E
LP-1E
LR-3E LR-3
LR-3
LR-3 LR-3 LR-3
LR-3LR-3
LR-3 LR-3E
LR-2E
LR-2
LR-2E
LR-2
LR-3
LR-3E
LR-3
LR-3E LR-3E
LR-3
LR-3 LR-3
LR-3E
LR-3LR-3LR-3
LR-3
LR-3 LR-3
LR-3
LR-3
LR-3
LR-3
LR-3
LR-3 LR-3
LR-3 LR-3
LR-3E LR-3
LR-3LR-3
LR-3 LR-3
LR-3
LR-3
LR-3
LR-3
LR-3
LR-3
LR-3
LR-3
LR-3E
LR-3
LR-3
LR-3
LR-3
LR-3
LR-3
LR-3
LR-3
LR-3E
LR-3
JJ-1JJ-1
CONSULT ROOM
CONSULT ROOM
EMERG. ELECT.
018A
CLASSROOM STORAGE
027A
CLASSROOM
ELEV 2
ELEV 1
CLASSROOM
STAFF TOILET
OCCUPATIONAL THERAPY ROOM
OFFICE
OT OFFICE
ELECTRICAL
TELE/ DATA
CORRIDOR
OFFICE
OFFICE
PRRC CUBES
WATER SERVICE
CONSULT ROOM - EXTRA
TOILET
TOILET
ELEV. CONTROL ROOM
STAIR 1
ELEVATOR LOBBY
WAITING
CORRIDOR
D D D
O S
O S
D D D D
D
O S
LR-2LR-2E
LW-1
LP-1E
LW-2E
LR-2
C
D
E
F
G
76543 1 2
8.7
/2 EL1.0
/2 EL1.0
LD-1E
LD-1E
LD-1E
EX-1
EX-1
EX-1
EX-1 LR-4
LW-3
LW-3
aD
- 2CR411
- 1NP421
1 1
1 1 2
1 1
1 1 2
1b 1a
1a1b
2b 1a
1a1b
1b 1a
1 1 2
LW-3
bD
HAC
CLASSROOM STORAGE
027B
LW-1
LW-1
LW-2E
- 7CR411
c3D aD ac ac ac ac ac ac ac ac ac c3D bD bc bc bc bc bc bc bc bc bc
LR-2E
LR-2
LR-2
LR-3E
LR-3
LR-3
LR-3
LR-3
LW-2E
CORRIDOR
STAIR 2
STAFF TOILET
STAFF LOUNGE
DOS
A
B
8.7
/1 EL1.0
/1 EL1.0
LD-1
EX-1
EX-1
LR-3
LW-3
LW-2E
GRAPHIC SCALE
4' 2' 0 4' 8' 12'
SCALE: 1/4" = 1' - 0"
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH VA RI FACILITIES MANAGEMENT
SERVICE
Approved:
FULLY SPRINKLERED
NEW MENTAL HEALTH
BUILDING 38 - PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
650-332
Engineering Discipline:
/1
/2
:5
:2
P
M C
R e v it P ro je c ts
\1
.0
-V
A M
C P ro v id e n c e
M e n ta l H e a lt h
B ld g
C e n tr a l( k p ro u ty X
J X
.r v t
EL1.0
CMB BRG10 APR 2019
CONSTRUCTION
DOCUMENTS
ELECTRICAL - BASEMENT -
LIGHTING PLAN
1/4" = 1'-0"EL1.0
1 ELECTRICAL - BASEMENT - LIGHTING PLAN - PART A
1/4" = 1'-0"EL1.0
2 ELECTRICAL - BASEMENT - LIGHTING PLAN - PART B
FULL WIDTH
OF SOFFIT
Revisions: Date:
S T
A
T E
O F
R H O D
E
I S L A
N D
OS
OS
OS OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
J
OS
CIRCUIT NUMBERS ARE FOR DESCRIPTIVE PURPOSES ONLY.
EXACT NUMBERS SHALL BE DETERMINED IN FIELD AND
SHALL BE NOTED ON THE CONTRACTORS AS-BUILT
DRAWINGS.
EXIT SIGNS, FIXTURES DESIGNATED AS NIGHT LIGHTS, AND
EMERGENCY BATTERY UNITS SHALL BE CONNECTED TO AN
UNSWITCHED, CONSTANT "ON" SOURCE AS INDICATED.
FIXTURES SHOWN TO INCLUDE EMERGENCY BALLAST SHALL
HAVE ADDITIONAL "CONSTANT ON" SOURCE.
BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED AND
INSTALLED FOR A MAXIMUM BRANCH CIRCUIT VOLTAGE
DROP OF 3% FROM PANELBOARD. TOTAL VOLTAGE DROP
FROM SERVICE ENTRY TO LAST DEVICE ON CIRCUIT SHALL
NOT EXCEED 5%. REFER TO SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS AND OPTIONS
LIGHTING PLAN NOTES
1.
2.
3.
4.
EMERGENCY LIGHTING BYPASS RELAYS ARE NOT SHOWN
ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF
THE ELECTRICAL CONTRACTOR TO REVIEW THE LIGHTING
DRAWINGS AND PROVIDE EMERGENCY LIGHTING BYPASS
RELAYS AS REQUIRED TO MEET LOCAL AND STATE BUILDING
CODES. THE ELECTRICAL CONTRACTOR SHALL FURNISH
AND INSTALL A UL 924 LISTED EMERGENCY LIGHTING
BYPASS RELAY DEVICE IN ALL ROOMS AND AREAS
INDICATED WITH EMERGENCY LIGHTING (LIFE SAFETY OR
CRITICAL). THIS INCLUDES PROVIDING A MINIMUM OF ONE
BYPASS RELAY PER LIGHTING CONTROL DEVICE (E.G.
SWITCH, DIMMER, OCCUPANCY SENSOR, ETC.) SERVING
EMERGENCY LIGHTS TO AUTOMATICALLY BYPASS THE
LIGHTING CONTROL WHEN NORMAL POWER IS LOST AND
TURN THE EMERGENCY LIGHTING TO FULL ON. THE
ELECTRICAL CONTRACTOR SHALL COORDINATE EXACT
BYPASS RELAY TYPE WITH THE LIGHTING CONTROL SYSTEM
AND LIGHTING FIXTURES PROVIDED TO ENSURE A FULLY
FUNCTIONAL LIGHTING SYSTEM IS INSTALLED MEETING ALL
LOCAL AND STATE REGULATIONS. BYPASS RELAY SHALL BE
MODEL ELCU-100 AS MANUFACTURED BY WATTSTOPPER OR
EQUAL.
5.
LIGHTING PLAN KEYED NOTES
1 LIGHT FIXTURES IN WAITING ROOM 102 SHALL BE
CONTROLLED VIA TIMECLOCK.
THE INTENT IS TO PROVIDE LIGHTING FIXTURES, CONTROLS,
WIRING AND CONDUIT. LIFE SAFETY LIGHTING SHALL BE
ADDRESSED THROUGH INTEGRAL BATTERY BACKUP. ALL
LIGHTING FIXTURES SHALL BE CONTROLLED BY LOCAL
LIGHTING CONTROLS WITH THE EXCEPTION AS FOLLOW:
STAIRWELLS SHALL BE CONTROLLED VIA INTEGRAL
OCCUPANCY SENSING LIGHTING FIXTURES WHICH FAIL ON.
EXTERIOR LIGHTING FIXTURES SHALL BE CONTROLLED BY
COMBINATION TIME-CLOCK AND PHOTO CELL. THE TIME-
CLOCK SHALL BE AN ASTRONOMICAL TIMECLOCK CAPABLE
OF 7-DAY SCHEDULES AND PRE-SET HOURS.
6.
LR-1 LR-1E LR-1 LR-1 LR-1E LR-1
LR-2
LR-2E
LR-2
LR-2
LR-1E
LR-2ELR-2 LR-2
LP-1E
LP-1E
LR-3
LR-3
LR-3 LR-3E
LR-3 LR-3
LR-3
LR-3
LR-3
LR-3
LR-3E
LR-3
LR-3
LR-3E
LR-3
LR-5
LR-3
LR-3E
LR-3
LR-3E
LR-3
LR-3
LR-3
LR-3
LR-3E
LR-3
LR-3
LR-3
LR-3
LR-3E
LR-3
LR-3E
LR-3
LR-3
LR-3E
LR-3 LR-3
LR-3
LR-3
LR-3
OFFICE
OFFICE
CUBICLES
CONSULT ROOM
CONSULT ROOM
MEDICATION ROOM
INJECTION ROOM
CONSULT ROOM
TOILET
STORAGE
CONSULT ROOM
COMPUTER LAB
COMMUNICATION CENTER
CORRIDOR
100B
OFFICE
OFFICE
RC CUBES
CONSULT ROOM
TLT
TLT
TLT
HAC
CORRIDOR
100A
VESTIBULE
SECURITY / WC STORAGE
101AWAITING
CORRIDOR
100A
STAIR 1
ELEV 1
ELEV 2
O S
O S
O S
D D D
DOS
O S
D
D
D
D
D
D
O S
D
LR-2
LR-2
LW-2E
C
D
E
F
G
76543 1 2
8.7
LS-2LS-2LS-2LS-2
/2 EL1.1
/2 EL1.1
D
LW-2E
LD-1E
LD-1E
LD-1E
LD-1E
LW-1
EX-1
EX-1
EX-1
EX-1
EX-1
LR-4
LW-3
LW-3
LD-1 LD-1 LD-1
LD-2E LD-2E LD-2E LD-2E
- 2NP421
- 4CR411
4 4 4 4
2 2 2 2
2 4 2
2 2 2
4 2 2
2 4
2a 2
24a
2a 2
22a
LW-3 2
LW-3
LD-2E
MAIN ELECTRICAL ROOM
aD bD
LR-1
SL-1
SL-1
SL-1
SL-1 SL-1 SL-1 SL-1
44 44 44
SL-1
SL-1
- 44NP211
LS-1LS-1E
LS-2LS-2
- 2NP421
LR-2
LR-2E
LR-3
LR-3E
STAIR 2
CONSULT ROOM - EXTRA
D
LW-2E
A
B
8.7
LR-3
/1 EL1.1
/1 EL1.1
LR-3
EX-1
EX-1
LR-3E
LR-3
MEETING ROOM
SL-1
SL-1
SL-1E
LW-2E
SL-1
SITE LIGHT
GRAPHIC SCALE
4' 2' 0 4' 8' 12'
SCALE: 1/4" = 1' - 0"
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH VA RI FACILITIES MANAGEMENT
SERVICE
Approved:
FULLY SPRINKLERED
NEW MENTAL HEALTH
BUILDING 38 - PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
650-332
Engineering Discipline:
/1
/2
:5
:2
P
M C
R e v it P ro je c ts
\1
.0
-V
A M
C P ro v id e n c e
M e n ta l H e a lt h
B ld g
C e n tr a l( k p ro u ty X
J X
.r v t
EL1.1
CMB BRG10 APR 2019
CONSTRUCTION
DOCUMENTS
ELECTRICAL - FIRST FLOOR -
LIGHTING PLAN
1/4" = 1'-0"EL1.1
1 ELECTRICAL - FIRST FLOOR - LIGHTING PLAN - PART A
1/4" = 1'-0"EL1.1
2 ELECTRICAL - FIRST FLOOR - LIGHTING PLAN - PART B
FULL WIDTH
OF SOFFIT
Revisions: Date:
S T
A
T E
O F
R H O D
E
I S L A
N D
CIRCUIT NUMBERS ARE FOR DESCRIPTIVE PURPOSES ONLY.
EXACT NUMBERS SHALL BE DETERMINED IN FIELD AND
SHALL BE NOTED ON THE CONTRACTORS AS-BUILT
DRAWINGS.
EXIT SIGNS, FIXTURES DESIGNATED AS NIGHT LIGHTS, AND
EMERGENCY BATTERY UNITS SHALL BE CONNECTED TO AN
UNSWITCHED, CONSTANT "ON" SOURCE AS INDICATED.
FIXTURES SHOWN TO INCLUDE EMERGENCY BALLAST SHALL
HAVE ADDITIONAL "CONSTANT ON" SOURCE.
BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED AND
INSTALLED FOR A MAXIMUM BRANCH CIRCUIT VOLTAGE
DROP OF 3% FROM PANELBOARD. TOTAL VOLTAGE DROP
FROM SERVICE ENTRY TO LAST DEVICE ON CIRCUIT SHALL
NOT EXCEED 5%. REFER TO SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS AND OPTIONS
LIGHTING PLAN NOTES
1.
2.
3.
4.
EMERGENCY LIGHTING BYPASS RELAYS ARE NOT SHOWN
ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF
THE ELECTRICAL CONTRACTOR TO REVIEW THE LIGHTING
DRAWINGS AND PROVIDE EMERGENCY LIGHTING BYPASS
RELAYS AS REQUIRED TO MEET LOCAL AND STATE BUILDING
CODES. THE ELECTRICAL CONTRACTOR SHALL FURNISH
AND INSTALL A UL 924 LISTED EMERGENCY LIGHTING
BYPASS RELAY DEVICE IN ALL ROOMS AND AREAS
INDICATED WITH EMERGENCY LIGHTING (LIFE SAFETY OR
CRITICAL). THIS INCLUDES PROVIDING A MINIMUM OF ONE
BYPASS RELAY PER LIGHTING CONTROL DEVICE (E.G.
SWITCH, DIMMER, OCCUPANCY SENSOR, ETC.) SERVING
EMERGENCY LIGHTS TO AUTOMATICALLY BYPASS THE
LIGHTING CONTROL WHEN NORMAL POWER IS LOST AND
TURN THE EMERGENCY LIGHTING TO FULL ON. THE
ELECTRICAL CONTRACTOR SHALL COORDINATE EXACT
BYPASS RELAY TYPE WITH THE LIGHTING CONTROL SYSTEM
AND LIGHTING FIXTURES PROVIDED TO ENSURE A FULLY
FUNCTIONAL LIGHTING SYSTEM IS INSTALLED MEETING ALL
LOCAL AND STATE REGULATIONS. BYPASS RELAY SHALL BE
MODEL ELCU-100 AS MANUFACTURED BY WATTSTOPPER OR
EQUAL.
5.
THE INTENT IS TO PROVIDE LIGHTING FIXTURES, CONTROLS,
WIRING AND CONDUIT. LIFE SAFETY LIGHTING SHALL BE
ADDRESSED THROUGH INTEGRAL BATTERY BACKUP. ALL
LIGHTING FIXTURES SHALL BE CONTROLLED BY LOCAL
LIGHTING CONTROLS.
6.
LR-2LR-2ELR-2
MECHANICAL ROOM
CIRCULATION
ELEV 1
ELEV 2
STAIR 1
D
E
F
G
76543 1 2
8.7
LW-2E
EX-1
EX-1
LR-4
63 3
- 6CR411
LS-1
LS-1E
LS-1
LS-1
LS-1
LS-1E
LS-1
LS-1 LS-1
LS-1E
3 6
3 3
3 3
EX-1
EX-1
a
3a
JJ-1
LW-2E
SL-2SL-2
SL-1
44 44
LS-1
GRAPHIC SCALE
4' 2' 0 4' 8' 12'
SCALE: 1/4" = 1' - 0"
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH VA RI FACILITIES MANAGEMENT
SERVICE
Approved:
FULLY SPRINKLERED
NEW MENTAL HEALTH
BUILDING 38 - PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
650-332
Engineering Discipline:
/1
/2
:5
:2
P
M C
R e v it P ro je c ts
\1
.0
-V
A M
C P ro v id e n c e
M e n ta l H e a lt h
B ld g
C e n tr a l( k p ro u ty X
J X
.r v t
EL1.2
CMB BRG10 APR 2019
CONSTRUCTION
DOCUMENTS
ELECTRICAL - SECOND FLOOR -
LIGHTING PLAN
1/4" = 1'-0"EL1.2
1 ELECTRICAL - SECOND FLOOR - LIGHTING PLAN - PART A
FULL WIDTH
OF SOFFIT
Revisions: Date:
S T
A
T E
O F
R H O D
E
I S L A
N D
J J
NT
NT
N
N
J
J J
T V
2H
M
J
J
T V
2H
N T
N
DB
N
J
J
N D
S
J
J
N
DB
08' 4'
GRAPHIC SCALE
8' 16' 24'
SCALE: 1/8" = 1' - 0"
CONTRACTOR SHALL COORDINATE MOUNTING HEIGHT OF
ALL DEVICES WITH ARCHITECTS DRAWINGS PRIOR TO
ROUGH IN.
CIRCUIT NUMBERS ARE FOR DESCRIPTIVE PURPOSES ONLY.
EXACT NUMBERS SHALL BE DETERMINED IN FIELD AND
SHALL BE NOTED ON THE CONTRACTORS AS-BUILT
DRAWINGS.
BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED AND
INSTALLED FOR A MAXIMUM BRANCH CIRCUIT VOLTAGE
DROP OF 3% FROM PANELBOARD. TOTAL VOLTAGE DROP
FROM SERVICE ENTRY TO LAST DEVICE ON CIRCUIT SHALL
NOT EXCEED 5%. REFER TO SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS AND OPTIONS.
POWER PLAN NOTES
COORDINATE EXACT LOCATIONS OF ALL MECHANICAL
EQUIPMENT WITH HVAC, PLUMBING, AND FIRE PROTECTION
DRAWINGS.
ALL RECEPTACLES WITHIN 6' OF A SINK SHALL BE PROVIDED
WITH GFCI PROTECTION.
ALL RECEPTACLES IN SPACES DESIGNATED AS "WAITING
ROOM" SHALL BE TAMPERPROOF.
1.
2.
3.
4.
5.
6.
POWER PLAN KEYED NOTES
1 PROVIDE 2#12, 1#12G FOR ELECTRIC DOOR HARDWARE.
DOOR HARDWARE FURNISHED BY OTHERS.
2 UTILITY CONDUITS TO STUB UP THROUGH CHASE. ENTIRE
INTERIOR RUN OF CONDUITS SHALL BE ENCASED IN 3" OF
CONCRETE. SEE CONDUIT ENTRANCE DETAIL ON DRAWING
EK1.0. COORDINATE ROUTING WITH STRUCTURAL ENGINEER
TO AVOID STRUCTURAL FOOTINGS.
3 PROVIDE BOGEN PA SYSTEM HEAD-END. HEAD-END UNIT
SHALL BE MOUNTED IN RACK.
4 PROVIDE 2.2KVA APC SMART UPS WITH MANAGEMENT CARD.
THE BASIS OF DESIGN FOR THE ELEVATOR IS A 20HP
THYSEENKRUPP TRACTION ELEVATOR. CONTRACTOR SHALL
NOTIFY ARCHITECT AND ENGINEER IF MOTOR HORSEPOWER
IS DIFFERENT THAN BASIS OF DESIGN.
7.
CUH-38-0-01
CR411 CR211T5
CLASSROOM
CLASSROOM
CLASSROOM STORAGE
027A
STAFF TOILET
EMERG. ELECT.
018A
TELE/ DATA
ELECTRICAL
OFFICE
OCCUPATIONAL THERAPY ROOM
016CORRIDOR
OT OFFICE
OFFICE
OFFICE
PRRC CUBES
TOILET
TOILET
ELEV. CONTROL ROOM
CONSULT ROOM
CONSULT ROOM
CONSULT ROOM - EXTRA
WATER SERVICE
ELEV 2
ELEV 1
WAITING
ELEVATOR LOBBY
STAIR 1
AC-38-1-02
C
C
REF
C
C C
C
C
C C
C
PROJECTOR
PROJECTOR
- 6,8NP211 - 5,7NP211
- 2,4NP211
- 1,3NP211
- 1CR211
ELEV-1
ELEV #2 LTS
C
C
NP211
C
D
E
F
G
76543 1 2
8.7
- 10NP211
10 10
- 11NP211
11 11
- 12NP211
- 13NP211
- 14NP211
- 15NP211
- 16NP211
- 19NP211
- 18NP211
18 18
- 20NP211
- 21NP211
- 22NP211
- 23NP211
23 23 23
- 24NP211
- 25NP211
- 26NP211
- 27NP211
-CR211 12
- 28NP211
- 29NP211
- 30NP211
-CR211 11
- 34NP211
WATER
FOUNTAIN
POWER
/2 EP1.0
/2 EP1.0
ATCATC
- 35NP211
- 37NP211
CAMERA
- 10CR211
- 39,41NP211
NEMA 6 - 40R
WP
C
C
STORAGE
- 3CR211
CAM CAM
ELEV-2
ELEV #1 LTS
CLASSROOM STORAGE
027B
OVEN
SP-1
- 42NP211
SP-1
- 9NP211
KH-1
- 45NP211
SCREEN
SCREEN
- 46NP211
WAP
WAP
MC
HAC
- 48NP211
- 38NP211
- 1,3,5CR411
- 8,10,12CR411
UPS
UPS
- 6CR211
- 4CR211
SECURITY
HEAD-END
UNIT
- 49NP211
CUH-38-0-02
STAIR 2
CORRIDOR
STAFF TOILET
STAFF LOUNGE
032C
REF
C
C
USB
USB
- 3,5,7NP221
C
A
B
8.7
- 31NP211
- 32NP211
- 33NP21133
/1 EP1.0
/1 EP1.0
- 36NP211
- 4MDP
- 5MDP
CH-38-0-02
CH-38-0-01
MC
- 47NP211
SCREEN
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH VA RI FACILITIES MANAGEMENT
SERVICE
Approved:
FULLY SPRINKLERED
NEW MENTAL HEALTH
BUILDING 38 - PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
650-332
Engineering Discipline:
/1
/2
:5
:3
P
M C
R e v it P ro je c ts
\1
.0
-V
A M
C P ro v id e n c e
M e n ta l H e a lt h
B ld g
C e n tr a l( k p ro u ty X
J X
.r v t
EP1.0
KT BG10 APR 2019
CONSTRUCTION
DOCUMENTS
ELECTRICAL - BASEMENT -
POWER PLAN
1/4" = 1'-0"EP1.0
1 ELECTRICAL - BASEMENT - POWER PLAN - PART A
1/4" = 1'-0"EP1.0
2 ELECTRICAL - BASEMENT - POWER PLAN - PART B
Revisions: Date:
S T
A
T E
O F
R H O D
E
I S L A
N D
JJ
N
N
N
N T
NT
NT
NM
S
S B
JJ
J
TV2
H
J
N T
J
N
S S
S
SSS
S
S
S
J
J
S
CONTRACTOR SHALL COORDINATE MOUNTING HEIGHT OF
ALL DEVICES WITH ARCHITECTS DRAWINGS PRIOR TO
ROUGH IN.
CIRCUIT NUMBERS ARE FOR DESCRIPTIVE PURPOSES ONLY.
EXACT NUMBERS SHALL BE DETERMINED IN FIELD AND
SHALL BE NOTED ON THE CONTRACTORS AS-BUILT
DRAWINGS.
BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED AND
INSTALLED FOR A MAXIMUM BRANCH CIRCUIT VOLTAGE
DROP OF 3% FROM PANELBOARD. TOTAL VOLTAGE DROP
FROM SERVICE ENTRY TO LAST DEVICE ON CIRCUIT SHALL
NOT EXCEED 5%. REFER TO SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS AND OPTIONS.
POWER PLAN NOTES
COORDINATE EXACT LOCATIONS OF ALL MECHANICAL
EQUIPMENT WITH HVAC, PLUMBING, AND FIRE PROTECTION
DRAWINGS.
ALL RECEPTACLES WITHIN 6' OF A SINK SHALL BE PROVIDED
WITH GFCI PROTECTION.
ALL RECEPTACLES IN SPACES DESIGNATED AS "WAITING
ROOM" SHALL BE TAMPERPROOF.
1.
2.
3.
4.
5.
6.
POWER PLAN KEYED NOTES
1 PROVIDE 2#12, 1#12G FOR ELECTRIC DOOR HARDWARE.
DOOR HARDWARE FURNISHED BY OTHERS.
OFFICE
OFFICE
CUBICLES
CONSULT ROOM
CONSULT ROOM
INJECTION ROOM
MEDICATION ROOM
CONSULT ROOM
TOILET
STORAGE
CORRIDOR
100B
COMPUTER LAB
OFFICE
OFFICE
112RC CUBES
TLT
TLT
CORRIDOR
100A
COMMUNICATION CENTER
CONSULT ROOM
SECURITY / WC STORAGE
101AVESTIBULE
WAITING
STAIR 1
ELEV 1
ELEV 2
HAC
TLT
C C
WP
C
D
E
F
G
76543 1 2
8.7
- 11NP221
- 13NP221
- 14NP221
14 14
- 16NP221 16 16
- 15NP221
- 17NP221
- 18NP221
- 19NP221
- 21NP221
- 20NP221
21 21
- 22NP221
- 23NP221
- 28NP221
- 29NP221
- 30NP221
- 31NP221
- 32NP221
- 33NP221
- 37NP221
- 38NP221
- 39NP221
- 40NP221
WATER FOUNTAIN POWER
/2 EP1.1
/2 EP1.1
ATC ATC
- 41NP221
C
C C
C C C
16 16 16
- 24NP221
24 24 24
252525
26 26 26
- 26NP221
- 25NP221
- 27NP221
CAMCAM
CAM
NP221
MAIN ELECTRICAL ROOM
NP421
T8
CONSULT ROOM
- 43NP221
- 45NP221
- 2CR211
C
- 46NP221
- 9NP221
- 48NP221
ADO
C
- 5CR211
- 7CR211
C
REF
ADO PUSH
BUTTON (TYP) CUH-38-1-01
- 1NP221
WIRELESS ADO
C
FACP
10STAIR 2
CONSULT ROOM - EXTRA
WP
A
B
8.7
- 34NP221
/1 EP1.1
/1 EP1.1
- 42NP221
- 36NP221
CAM
- 35NP221
MEETING ROOM
- 44NP221
GRAPHIC SCALE
4' 2' 0 4' 8' 12'
SCALE: 1/4" = 1' - 0"
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH VA RI FACILITIES MANAGEMENT
SERVICE
Approved:
FULLY SPRINKLERED
NEW MENTAL HEALTH
BUILDING 38 - PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
650-332
Engineering Discipline:
/1
/2
:5
:4
P
M C
R e v it P ro je c ts
\1
.0
-V
A M
C P ro v id e n c e
M e n ta l H e a lt h
B ld g
C e n tr a l( k p ro u ty X
J X
.r v t
EP1.1
KT BG10 APR 2019
CONSTRUCTION
DOCUMENTS
ELECTRICAL - FIRST FLOOR -
POWER PLAN
1/4" = 1'-0"EP1.1
1 ELECTRICAL - FIRST FLOOR - POWER PLAN - PART A
1/4" = 1'-0"EP1.1
2 ELECTRICAL - FIRST FLOOR - POWER PLAN - PART B
Revisions: Date:
S T
A
T E
O F
R H O D
E
I S L A
N D
J
M M
JJ J
M M
M
CONTRACTOR SHALL COORDINATE MOUNTING HEIGHT OF
ALL DEVICES WITH ARCHITECTS DRAWINGS PRIOR TO
ROUGH IN.
CIRCUIT NUMBERS ARE FOR DESCRIPTIVE PURPOSES ONLY.
EXACT NUMBERS SHALL BE DETERMINED IN FIELD AND
SHALL BE NOTED ON THE CONTRACTORS AS-BUILT
DRAWINGS.
BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED AND
INSTALLED FOR A MAXIMUM BRANCH CIRCUIT VOLTAGE
DROP OF 3% FROM PANELBOARD. TOTAL VOLTAGE DROP
FROM SERVICE ENTRY TO LAST DEVICE ON CIRCUIT SHALL
NOT EXCEED 5%. REFER TO SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS AND OPTIONS.
POWER PLAN NOTES
COORDINATE EXACT LOCATIONS OF ALL MECHANICAL
EQUIPMENT WITH HVAC, PLUMBING, AND FIRE PROTECTION
DRAWINGS.
1.
2.
3.
4.
NP431
CIRCULATION
MECHANICAL ROOM
ELEV 1
ELEV 2
STAIR 1
DCP-1
UH-38-2-01
HWP-38-2-01 HWP-38-2-02 HWP-38-2-03
BL-38-2-03 BL-38-2-02 BL-38-2-01
UH-38-2-02
CU-38-2-01
CU-38-2-02
EF-38-2-01
ATC
- 6,8NP231
- 7NP231
NP231
D
E
F
G
76543 1 2
8.7
- 14NP231
CHWP-38-2-01 CHWP-38-2-02
EF-38-2-02
- 15NP231
ERV-38-2-01
H-38-2-01
WH-1
CAM
- 3,5NP231- 2,4NP231- 7,9,11NP431
- 2,4,6NP431
- 1,3,5NP431
- 17NP231
- 8,10,12NP431 - 13,15,17NP431
- 14,16,18NP431
CAM
CAM
-NP231 16
EF-38-2-03
- 10,12NP231
- 9,11NP231
- 13NP231 - 18NP231
- 1NP231
- 19NP231
- 21NP231
VFD VFD
- 6MDP - 7MDP
- 20NP231
- 9CR211
WP
-NP231 22
-NP211 43
22WP
22WP
EPO EPO EPO
GRAPHIC SCALE
4' 2' 0 4' 8' 12'
SCALE: 1/4" = 1' - 0"
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
CONSULTANT ARCHITECT/ENGINEER OF RECORD
WBRC
A R C H I T E C T S • E N G I N E E R S
WWW.WBRCAE.COM
BANGOR, MAINE 207-947-4511
PORTLAND, MAINE 207-828-4511
SARASOTA, FLORIDA 941-556-0757
STAMP
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Project TitleDrawing Title Phase
Location
Issue Date
Project Number
Building Number
Drawing Number
Checked Drawn
TRUE NORTH
PROJECT NORTH VA RI FACILITIES MANAGEMENT
SERVICE
Approved:
FULLY SPRINKLERED
NEW MENTAL HEALTH
BUILDING 38 - PHASE 1
830 CHALKSTONE AVE PROVIDENCE, RI 02908
650-332
Engineering Discipline:
/1
/2
:5
:4
P
M C
R e v it P ro je c ts
\1
.0
-V
A M
C P ro v id e n c e
M e n ta l H e a lt h
B ld g
C e n tr a l( k p ro u ty X
J X
.r v t
EP1.2
KT BG10 APR 2019
CONSTRUCTION
DOCUMENTS
ELECTRICAL - SECOND FLOOR -
POWER PLAN
1/4" = 1'-0"EP1.2
1 ELECTRICAL - SECOND FLOOR - POWER PLAN - PART A
Revisions: Date:
S T
A
T E
O F
R H O D
E
I S L A
N D
SWITCHBOARD
MDP
480/277V
3PHASE
1200A
MCB
NORM
P421 480/277V
3PHASE
100A
MCB
NORM
BASEMENT FLOOR
P211 208/120V
3PHASE
100A
MCB
NORM
T8
225KVA
NORM
P221 208/120V
3PHASE
600A
MCB
CR411
480/277V
3PHASE
100A
MCB
CR211
208/120V
3PHASE
400A
MCB
CRIT.
T5
75KVA
P431 480/277V
3PHASE
100A
MCB
NORM
FIRST FLOOR
SECOND FLOOR
3 SETS OF (3#600 KCMIL & 1#600KCMIL GSC, 4"C)
750kVA UTILITY
PAD MOUNTED
TRANSFORMER
MAIN ELECTRICAL ROOM 110
ELECTRICAL CLOSET 018A ELECTRICAL ROOM 018
MECHANICAL ROOM 202
DB
208/120V
3PHASE
1000A
MLO
EMERGENCY ELECTRICAL
ROOM
CRIT.
NORM
P231 208/120V
3PHASE
200A
MCB
CRIT.
BUILDING 32
1 PROVIDE 400A-3P ENCLOSED CIRCUIT BREAKER. TAP EXISTING SWITCHBOARD'S BUS
USING 10 FOOT TAP RULE IN ACCORDANCE WITH NEC 240.21(D).
UPON PENETRATION INTO BUILDING, CONDUIT SHALL BE CONCRETE ENCASED UNTIL
TERMINATION IN MAIN ELECTRICAL ROOM AND SWITCHBOARD. CONCRETE
ENCASEMENT SHALL CONSIST OF 3" OF CONCRETE AROUND CONDUITS. SEE
CONDUIT ENTRANCE DETAIL ON DRAWING EK1.0.
TO NEW UTILITY
POLE
STEP-UP
TRANSFORMER
SPD
ELEV-2 ELEV-1
60AF
50AT
60AF
50AT
CH-38-0-01 CH-38-0-02
100AF
60AT
100AF
60AT
TO MDPTO MDP
UTILITY METER
DATA RACK
MULTI-MODE 62.5/125 OPTICAL
FIBER CABLE, AND
50 PAIR 24 AWG TYPE 89 CAT3
CABLE TO BUILDING 14
ECB
E
3#6 & 1#10G, 3/4"C
BRANCH CIRCUIT SCHEDULE
60A-2P/2W
120 VOLT & 277 VOLT 1PH, 2W. CIRCUITS
50A-1P
40A-2P/2W
30A-2P/2W
50A-2P/2W
60A-1P
20A-2P/2W
CIRCUIT BREAKER
30A-1P
40A-1P
208 VOLT & 480 VOLT 1PH, 2W. CIRCUITS
2#4 & 1#10G - 3/4"C.
2#6 & 1#10G - 3/4"C.
2#12 & 1#12G - 3/4"C.
2#10 & 1#10G - 3/4"C.
2#8 & 1#10G - 3/4"C.
2#6 & 1#10G - 3/4"C.
2#4 & 1#10G - 3/4"C.
CONDUCTORS
2#10 & 1#10G - 3/4"C.
2#8 & 1#10G - 3/4"C.
50A-3P/3W
60A-3P/3W
40A-3P/3W
30A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .