This document provides details for a federal construction contract opportunity for a new mental health building project. The Department of Veterans Affairs will solicit bids and award a firm-fixed-price contract for design-bid-build construction services located at 830 Chalkstone Ave in Providence, Rhode Island. The project scope includes site preparation, demolition, and construction of a three-story, approximately 15,300 square foot freestanding building to provide new mental health program area. Corresponding site and utility work is also required. The solicitation will be a request for proposal conducted in accordance with FAR Parts 15, 19, and 36 and evaluated using procedures in the solicitation. The opportunity is set aside as a total Service-Disabled Veteran-Owned Small Business set-aside. The NAICS code is 236220 with a size standard of $36.5 million. The solicitation will issue on or around December 20, 2019 with a period of performance of approximately 600 calendar days from notice to proceed. The magnitude of construction is estimated between $10-20 million. Questions must be submitted in writing by email no later than the date specified in the solicitation.

36E77620R0001 Attachment 9 - CD Drawings - LS.pdf

View the file

Other files

File Type Posted
36E77620R0001-0007000.docx DOCX document
36E77620R0001-0007001.docx DOCX document
36E77620R0001-0006000.docx DOCX document
36E77620R0001-0005060.docx DOCX document
36E77620R0001-0005061.docx DOCX document
36E77620R0001-0005068.pdf PDF
36E77620R0001-0005064.pdf PDF
36E77620R0001-0005069.pdf PDF
36E77620R0001-0005067.pdf PDF
36E77620R0001-0005062.pdf PDF
36E77620R0001-0005070.pdf PDF
36E77620R0001-0005066.pdf PDF
36E77620R0001-0005065.pdf PDF
36E77620R0001-0005063.pdf PDF
36E77620R0001-0005071.pdf PDF
36E77620R0001-0004001.docx DOCX document
36E77620R0001-0004000.docx DOCX document
36E77620R0001-0003000.docx DOCX document
36E77620R0001-0003001.docx DOCX document
36E77620R0001-0002000.docx DOCX document
36E77620R0001-0001001.pdf PDF
36E77620R0001-0001000.docx DOCX document
36E77620R0001-008.pdf PDF
36E77620R0001-007.pdf PDF
36E77620R0001-012.pdf PDF
36E77620R0001-016.docx DOCX document
36E77620R0001-001.docx DOCX document
36E77620R0001-004.pdf PDF
36E77620R0001-005.pdf PDF
36E77620R0001-006.pdf PDF
36E77620R0001-013.pdf PDF
36E77620R0001-015.docx DOCX document
36E77620R0001-017.pdf PDF
36E77620R0001-002.pdf PDF
36E77620R0001-011.pdf PDF
36E77620R0001-014.pdf PDF
36E77620R0001-009.pdf PDF
36E77620R0001-003.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R E

F

REF.

UP

IBC Building “Use” Groups Business (B)

NFPA 101 Building Occupancies Business

Building height 3 Stories

Number of stories below grade 0

Footprint (Approximately) 6,350 ft2

Construction Type II-B [IBC], II (000) [NFPA]

Site access Regent Avenue

Suppression System Fully sprinklered; NFPA-13 2016 compliant

Fire Alarm System Addressable; NPPA-72 2016 compliant

Floor Egress Capacity

Basement Stair 1 Stair 2

Door – 34”/0.2 = 170 persons

Door – 34”/0.2 = 170 persons

Stair – 44”/0.3 = 146 persons

Stair – 44”/0.3 = 146 persons

Total = 292

Level 1 Main Entrance Stair 2

Door – 41”/0.2 = 205 persons

Door – 34”/0.2 = 170 persons

Total = 375

Level 2 Stair 1

Door – 34”/0.2 = 170 persons

Stair – 44”/0.3 = 146 persons

Total = 146

IBC Table 601: Rating

Primary Structural Frame 0 hours

Exterior Bearing Walls 0 hours

Interior Bearing Walls 0 hours

Exterior Nonbearing Walls (IBC Table 602)

FSD < 10 feet 1 hour

FSD > 30 feet 0 hours

Floor construction and secondary members 0 hours

Roof construction and secondary members 0 hours

NFPA 101 Table 8.3.4.2: Rating Fire Door

Exit Stairs 1 hour 1 hour

Shafts 1 hour 1 hour

Elevator Shaft 1 hour 1 hour

Other fire barriers 1 hour ¾ hour

IBC Section Building Height Building Area (ft2)

Table 503 3 Stories (55 feet) 23,000

Section 504.2: Automatic Sprinkler Height Increase 1 Story (20 feet) N/A

Section 506.2: Open Frontage Area Increase (76% Open) N/A 11,730

Section 506.3: Automatic Sprinkler Area Increase N/A 46,000

Maximum Permitted per IBC 4 Stories (75 feet) 80,730

Actual Height and Area 3 Stories A 6,350

Occupancy Maximum Dead-end Corridor

(ft)

Maximum Common Path of Travel

(ft)

Maximum Travel Distance

(ft)

Business 50 100 300

Floor Use Area (ft2) Occupant Load Factor

(ft2/person)

Occupants

Basement Business 4,238 100 gross 43

Waiting / Lounge 481 15 net 33

Classrooms 890 20 net 45*

Occupational Therapy 473 100 gross 5

Storage / Mechanical 268 500 gross 1

Total 127

Level 1 Business 5,156 100 gross 52

Waiting / Meeting

Room

467 15 net 32

Storage / Mechanical 240 500 gross 1

Computer Lab 487 50 net 10

Total 95

Level 2 Mechanical 1,250 500 gross 3

Total 3

*Maximum occupancy sign of 49 people to be posted

Path 1

Path 1

Path 2

Exit Capacity: 146

Exit Capacity: 146

A

B

C

D

E

F

G

765431 2

STAIR 1

ELEV 1

WATER SERVICE

CLASSROOM

STORAGE

027A

ELEV. CONTROL

ROOM

TOILET

TOILET

HAC

CORRIDOR

OFFICE

OFFICE

OT OFFICE

OCCUPATIONAL

THERAPY ROOM

OFFICE

ELECTRICAL

TELE/ DATA

ELEVATOR LOBBY

CONSULT ROOM -

EXTRA

CONSULT ROOM

CONSULT ROOM

CLASSROOM

STAFF LOUNGE

STAIR 2

STAFF TOILET

CORRIDOR

EMERG. ELECT.

018AWAITING

PRRC CUBES

CLASSROOM

STAFF TOILET

E.5

E.9

8.7

STORAGE

CLASSROOM

STORAGE

027B

F.E. F.E.

F.E.

F.E.

Dead End: 29' - 6"

D e a d E n d

/8

BUILDING INFORMATION

HEIGHT AND AREA

REQUIRED FIRE RESISTANCE RATING

ALLOWABLE TRAVEL DISTANCES

EGRESS CAPACITY

OCCUPANT LOADING

1HR FIRE SEPARATION

EGRESS PATH

LEGEND

FIRE EXTINGUISHERF.E.

1HR RATED CEILING ASSEMBLY SUPPORTED BY 1HR CONSTRUCTION

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH

/1

/2

:5

:0

A

M M

F ir e

P ro te c ti o n

W

B R

C P ro v id e n c e

M e n ta l H e a lt h

\A u to C

A D

\C o n c e p ts

\W B

R C

V A

D D

.r v t

LS-101

650-332

NEW MENTAL HEALTH BUILDING -

PHASE 1

830 CHALKSTONE AVE PROVIDENCE, RI 02908

TGS GVR10 APR 2019

CONSTRUCTION

DOCUMENTS

BASEMENT LIFE SAFETY PLAN

AND ANALYSISSFC Engineering

1 Industrial Drive Windham, NH, 03087 603-647-8700

Fire Protection Engineering:

FULLY SPRINKLERED

VA RI FACILITIES MANAGEMENT

SERVICE

1/8" = 1'-0"

BASEMENT LIFE SAFETY PLAN

Travel Distances

Travel Path Travel Distance

Path 1 86' - 6"

Path 2 137' - 2"

Path 3 120' - 0"

Path 4 126' - 0"

Path 5 114' - 4"

Second 146 Persons

First 375 Persons

Basement 292 Persons

Floor Egress Capacity

Revisions: Date:

UP

UP

G-2

G-2

A1 AG-3 12

Path 4

Path 3

Exit Capacity: 205

Exit Capacity: 170

A

B

C

D

E

F

G

765431 2

TLT

TLT

TLT

HAC

CORRIDOR

100A

CORRIDOR

100B

VESTIBULE

COMMUNICATION

CENTER

RC CUBES

MEDICATION ROOM

CUBICLES

INJECTION ROOM

OFFICE

OFFICE

CONSULT ROOM

CONSULT ROOM

CONSULT ROOM

STAIR 2

COMPUTER LAB

SECURITY / WC

STORAGE

101A

WAITING

CONSULT ROOM

CONSULT ROOM -

EXTRA

CONSULT ROOM

STORAGE

OFFICE

OFFICE

TOILET

STAIR 1

ELEV 1

E.5

E.9

8.7

MAIN ELECTRICAL

ROOM

MEETING ROOM

F.E.

F.E.

F.E.

Dead End: 17' - 1"

D e a d E n d

/8

Fire Department Connection

Path 5

Exit Capacity: 146

A

B

C

D

E

F

G

765431 2

E.5

E.9

8.7

STAIR 1

ELEV 1

MECHANICAL ROOM

CIRCULATION

F.E.

F.E.

1HR FIRE SEPARATION

EGRESS PATH

LEGEND

1HR SLAB SUPPORTED BY 1HR FIREPROOFED CONSTRUCTION

FIRE EXTINGUISHERF.E.

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD

WBRC

A R C H I T E C T S • E N G I N E E R S

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH

/1

/2

:5

:0

A

M M

F ir e

P ro te c ti o n

W

B R

C P ro v id e n c e

M e n ta l H e a lt h

\A u to C

A D

\C o n c e p ts

\W B

R C

V A

D D

.r v t

LS-102

650-332

NEW MENTAL HEALTH BUILDING -

PHASE 1

830 CHALKSTONE AVE PROVIDENCE, RI 02908

TGS GVR10 APR 2019

CONSTRUCTION

DOCUMENTS

FIRST AND SECOND FLOOR LIFE

SAFETY PLANSSFC Engineering

1 Industrial Drive Windham, NH, 03087 603-647-8700

Fire Protection Engineering:

FULLY SPRINKLERED

VA RI FACILITIES MANAGEMENT

SERVICE

1/8" = 1'-0"

FIRST FLOOR LIFE SAFETY PLAN

1/8" = 1'-0"

SECOND FLOOR LIFE SAFETY PLAN

Travel Distances

Travel Path Travel Distance

Path 1 86' - 6"

Path 2 137' - 2"

Path 3 120' - 0"

Path 4 126' - 0"

Path 5 114' - 4"

Second 146 Persons

First 375 Persons

Basement 292 Persons

Floor Egress Capacity

Revisions: Date:

Sheets
LS-101 - BASEMENT LIFE SAFETY PLAN AND ANALYSIS
LS-102 - FIRST AND SECOND FLOOR LIFE SAFETY PLANS

File details come from the government source that posted it. Updated .