About this file

This document is an architectural floor plan for Level 03 of the USC School of Medicine building, designated as the Hazardous Materials Lead plan. The plan displays the layout of the third floor with detailed room configurations, mechanical systems, and utility distribution networks throughout the space. The crosshatched areas indicate hazardous materials locations, with significant concentrations visible in the eastern and southern portions of the floor plan. The plan is oriented with north pointing upward and includes a grid reference system (columns 6-10, rows A-C) for spatial identification.

The document is prepared for the Office of Construction and Facilities Management by a team including GMK as Program Manager, CH/LOTTE Architects as the Architect, and Charlotte Engineering as Consultant. The plan is part of a 100% Bid Documents package for construction and is fully sprinklered. The drawing is identified as part of the University of Southern California's construction documentation, with relevant professional seals and certifications displayed. This appears to be a technical construction drawing rather than a contract solicitation document.

View the file

Other files

File Type Posted
S06-Amendment 0006-Att 1-SF30-Columbia.pdf PDF
S06 - Amendment 0006-Att 2-Tech Questions-Columbia.pdf PDF
S06 - Amendment 0005-Att 1-Tech Questions-Columbia.pdf PDF
S06-Amendment 0005-Att 2-SF30-Columbia.pdf PDF
S06-Amendment 0004-Att 1- BLDG 3 EHRM - DIV 23 Specs Combined.pdf PDF
S06-Amendment 0004-Att 2 - Lim. AB LBP Report - Bld3 EHRM.pdf PDF
S06-Amendment 0004-Att 5- SF30-Columbia.pdf PDF
S06 -Amendment 0004-Att 4- Tech Questions-Columbia.pdf PDF
S06-36C77626R0032-Amendment 0003.pdf PDF
S04- Pre Bid Conference - Columbia.pptx PPTX presentation
S06-36C77626R0032 Amendment 0002.pdf PDF
S06-36C77626R0032 0001.pdf PDF
S06-Site Visit Sign-In Sheet 03062026-Columbia.pdf PDF
S02-RFP Attachment 12-Specifications-Columbia_Part2.pdf PDF
S02-RFP Attachment 10- Plumbing Drawings-COL.pdf PDF
S06-RFP Attachment 17-Spce Update for 01321615-2025-12.pdf PDF
S02-RFP Attachment 15-Specifications-Columbia_Part5.pdf PDF
S02-RFP Attachment 8- Fire Sup Drawings-COL.pdf PDF
S02-RFP Attachment 5- ARCH Drawings-COL.pdf PDF
S02-RFP Attachment 4-Campus Map-Columbia.pdf PDF
S02-36C77626R0032-Columbia.pdf PDF
S02-RFP Attachment 16-Final SOW-Col.pdf PDF
S02-RFP Attachment 14-Specifications-Columbia_Part4.pdf PDF
S02-RFP Attachment 7- Fire Alarm Drawings-COL.pdf PDF
S02-RFP Attachment 2 Site Visit Information-Columbia.pdf PDF
S02-RFP Attachment 13-Specifications-Columbia_Part3.pdf PDF
S02-RFP Attachment 11-Specifications-Columbia_Part1.pdf PDF
S02-RFP Attachment 9- Mechanical Drawings-COL.pdf PDF
S02-RFP Attachment 6- Electrical Drawings-COL.pdf PDF
S02 - RFP Attachment 3 - Limitations on Subcontracting - Columbia.docx DOCX document
S02-RFP Attachment 1-Wage Rates-Col.txt TXT text file
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USC SCHOOL OF MEDICINE

USC SCHOOL OF MEDICINE

MENS

WOMENS

320A

OIT

ST02

STAIRS

CERNER

ARCHITECTS

312C

MECHANICAL

CONFERENCE

ROOM/ADHOC

WORK AREA

320E

PRIVATE

OFFICE

320D

PRIVATE

OFFICE

320B

BRIEFING

CENTER

330A

PIPE CLOSET

320BA

330A

330AA

330B

320BB

320F

PRIVATE

OFFICE

320G

PRIVATE

OFFICE

320C

STORAGE

CERNER

CONTROL

CENTER/WORK

SPACES

(NO WORK)

(NO WORK)

(NO WORK)

EV01

ELEVATOR

(NO WORK)

FIRST FLOOR ROOF BELOW

ELECTRICAL

COMM.

312A

312B

CONFERENCE

ROOM/ADHOC

WORK AREA

312A

RECEPTION

312AB

W1

320G320F320E320D

320A

312B

CORRIDOR

CORRIDOR

312C

W1W1W1

W1W1W1

W1W1W1W1W1W1W1W1

W1 W1 W1 W1

W1

W1

W1

W1

W1 W1

W1

W1

: ABATE BEIGE AND BLUE

COLORED PLASTER ON THE

EXISTING COLUMN AT THIS

LOCATION WHICH HAS LEAD

BASED PAINT PRESENT.

: ABATE BEIGE COLORED PAINT

WHERE VISIBLE FROM THE EXISTING

ORIGINAL STEEL WINDOW FRAME HEAD,

JAMBS AND SILLS THAT IS STILL

PRESENT ON THE SURFACES OF THE

ORIGINAL STEEL WINDOWS WHICH HAS

LEAD BASED PAINT PRESENT. ABATE

THE ORANGE PAINT WHERE VISIBLE

FROM THE EXISTING STEEL LINTELS

THAT ARE BELOW THE EXISTING

WINDOWS WHICH HAS LEAD BASED

PAINT PRESENT.

W1

W1

W1

W1

W1

P1

P1P1

P1P1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% BID DOCUMENTS

FOR CONSTRUCTION

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT GMK Associates, Inc.

1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Thomas M. Weiland, AIA

STAMPPROGRAM MANAGER

321 4 5 6 7 8 9 10

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA

CONSULTANT

Charlotte Engineers, LLP 5838 Monroe Road Charlotte, NC 28212 704-531-3000 Michael Eaves FULLY SPRINKLERED

C :\U se rs \G H of fm an \D oc um en ts \2 _S ta nd al on e_ R _d w hi te D 5L Q B.

rv t

7/ /2 :1 3:

A M

HL100

LEVEL 03 - HAZARDOUS

MATERIALS LEAD

EHRM - RENOVATE B3 FOR EHRM

ADMIN AND TRAINING

COLUMBIA, SC

544-22-703

B3

07/15/2025 GRH

SCALE: 1/8" = 1'-0"1 LEVEL 03 - HAZARDOUS MATERIALS LEAD

N

PLAN NORTH

Rev. No. Revisions: Date:

File details come from the government source that posted it. Updated .