This document is a detailed Ventilation Schedules drawing (MV600) for a VA project to construct a new Sterile Processing Services (SPS) facility at the Royal C. Johnson Veterans Memorial Hospital in Sioux Falls, South Dakota. The drawing provides comprehensive technical specifications for multiple air handling units (AHU-1 and AHU-2), exhaust fans, terminal air boxes, air valves, and associated HVAC equipment.

Key technical details include two primary air handling units: AHU-1 for the Sterile Processing Area with 12,000 CFM capacity and 100% outside air, and AHU-2 for administrative areas with 5,000 CFM capacity and mixed air VAV configuration. The systems include features like fully redundant supply fans, heating and cooling coils, humidifiers, UV light treatment, and multiple stage filtration (MERV 8, 13, and 14 filters). The ventilation design supports critical spaces like scope processing, decontamination areas, clean workrooms, and various support spaces, with precise airflow control and temperature management for each zone.

View the file

Other files

File Type Posted
S06 - Amend 0010 - RFP - 36C77624R0115 - SPS - Sioux Falls_rev.docx DOCX document
S06 - Amend 0010 - RFP - 36C77624R0115 - SPS - Sioux Falls.docx DOCX document
S06 - Amend 0009 - Att 12 - DWG EP111 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 07 - List of DWG Sheets - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 03 - DWG AC101 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 10 - Ele Sch - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 16 - DWG ES401 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 04 - DWG AD111 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 08 - DWG CD101 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 01 - Sign-In Sheet - Ele Site Visit- 05142025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 20 - DWG GI001 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 13 - DWG ES099 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 06 - DWG GC111 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 17 - DWG ES500 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 09 - Add Ele Questions and Responses - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 15 - DWG ES400 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 11 - DWG EP101 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 18 - DWG ES501 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 02 - Narrative to KTRs - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 14 - DWG ES100 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 05 - DWG AE111 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0008 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
36C77624R0115 0007.pdf PDF
Amend 0007 - Att 01 - RFI Attachments.pdf PDF
Amend 0007 - Att 02 - RFI QandA.pdf PDF
S06 - Amend 0006 - Att 01- RFP - Sign-In Sheet - Site Visit - 04082025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0006 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0006 - Att 02 - Wage Rates - 03142025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0005 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0004 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0003 - RFP - Sign-in Sheet - Site Visit - 03252025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0003 - RFP - Site Visit Presentation - SPS - Sioux Falls.pdf PDF
S06 - Amend 0003 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-05 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-02 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-08 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-03 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-09 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-07 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-11 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-10 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-01 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-06 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-04 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amendment 0001 - SPS - Sioux Falls.pdf PDF
RFP - Att 02 - 02142025 - Specs - Vol I - SPS - Sioux Falls.pdf PDF
36C77624R0115_1.docx DOCX document
RFP - Att 01-01 - DWG - 02142025 - SPS - Sioux Falls.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I O W A

S E

D

PROFESS IONA

27052

L

IC

E N

L E

N G

I N E

E R

DELLAN J.

LLEWELLYN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/1

.0

V A

-W a s h

D C

-V A

S io u x F a lls

N e w

S P

S /M

E P

T

.0

V A

W a s h D

C -V

A S io u x F a lls

N e w S

P S

C

.r v t

/9

/2

:2

:5

P M

MV600

VENTILATION SCHEDULES CONSTRUCT NEW SPS

Sioux Falls, SD.

438-460

02/14/2025 DAVING DELLLE16584

REFERENCE SCALE IN INCHES

0 1 2 3

PROJECT #

IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS

DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE

THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN

APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.

2882 106TH STREET

DES MOINES, IA 50322

515.334.9906 FAX: 515.334.9908

www.imegcorp.com

19004249.04

NOTES:

1.REFERENCE SPECIFICATION SECTION 23 73 00 INDOOR CENTRAL-STATION AIR-HANDLING UNITS.

2.PROVIDE SHAFT GROUNDING AS REQUIRED IN THE MOTOR SPECIFICATION 23 05 12.

3.ONE FULLY REDUNDANT (N+1) SUPPLY FAN SHALL BE PROVIDED FOR EACH FAN ARRAY. SCHEDULED RPM AND BHP REPRESENT N PERFORMANCE.

4.PROVIDE 1 VFD PER SUPPLY FAN.

5.CHILLED WATER COIL IS SELECTED WITH 100% WATER. GLYCOL HEATING WATER COIL IS SELECTED WITH 30% PROPYLENE GLYCOL.

6.TOTAL EXTERNAL STATIC PRESSURE DOES NOT INCLUDE FILTER LOADING. MANUFACTURER SHALL INCLUDE DIRTY FILTER ALLOWANCE IN TOTAL STATIC PRESSURE CALCULATION.

7.STEAM PRESSURE INDICATED IS THE PRESSURE AVAILABLE DOWNSTREAM OF THE CONTROL VALVE.

8.PROVIDE AHU WITH INTERNAL MOTOR REMOVAL RAILS FOR FAN MOTOR SERVICING.

AIR HANDLING SCHEDULE - 100% OUTSIDE AIR

TAG

NAME SERVICE

SUPPLY FAN (NOTE 2, 3, & 4)

MINIMUM

OUTSIDE

AIR CFM

HEATING COIL - GLYCOL HEATING WATER

(NOTE 5) HUMIDIFIER (NOTE 7) COOLING COIL - CHILLED WATER (NOTE 5) ULTRA-VIOLET LIGHT COMBINATION FILTER (NOTE 6) FINAL FILTER ELECTRICAL MAXIMUM DIMENSIONS

WEIGHT MANUFACTURER MODEL NOTES

NO.

OF

FANS

CFM

TOTAL

MIN.

CFM

EXT.

S.P. TYPE

RPM

(NOTE D)

BHP

EACH

(NOTE E)

MHP

EACH

(NOTE E)

EAT

°F

LAT

°F

EWT

°F

LWT

°F GPM MBH

MAX.

A.P.D.

IN.

W.C.

W.P.D

. FEET

HEAD TYPE CFM

STEAM

CAPACITY

(LBS/HR)

STEAM

PSIG MANUFACTURER

EAT

DB

°F

EAT

WB

°F

LAT

DB

°F

LAT

WB

°F

EWT

°F

LWT

°F

TOTAL

MBH GPM

W.P.D.

FEET

HEAD

MAX.

A.P.D.

IN.

W.C.

NUMBER

OF

ROWS

INTENSITY

AT COIL

SURFACE

TOTAL

POWER

(WATTS)

FIRST STAGE FILTER SECOND STAGE FILTER

TYPE

FACE

VELOCITY

PRESSURE

DROP NO. OF

POWER

CONNECTIONS VOLTAGE PHASES

DISCONNECT(S)

CONTROLLER

STATER(S)

SCCR

NO. OF

AUXILIARY

CONNECTIONS LENGTH WIDTH HEIGHTTYPE

FACE

VELOCITY

PRESSURE DROP

TYPE

FACE

VELOCITY

PRESSURE DROP

CLEAN DIRTY

BY

(NOTE A)

TYPE

(NOTE B)

BY

(NOTE A)

TYPE

(NOTE C)CLEAN DIRTY CLEAN DIRTY

AHU-1 STERILE PROCESSING

AREA

4 12000 12000 2.5 PLENUM 3420 6 6.5 12000 -20.0 65.0 175 145 73.4 1329 0.1 4.7 DISPERSION

TUBE

12,000 341 15 DRI-STEAM 95 78 46.8 46.8 40 52 1165.1 193.2 9.17 0.66 4 31.4 W/ft² 1480 MERV 8 270 .2 .74 MERV 13 270 .2 1 MERV 14 270 0.2 0.88 1 480 3 EC F MFR VFD 65000 3 351" 86" 90" 15169 TEMTROL CUSTOM NOTE 8

NOTES:

1.PROVIDE SHAFT GROUNDING AS REQUIRED IN THE MOTOR SPECIFICATION 23 05 12.

2.PROVIDE FAN WITH SOLID STATE SPEED CONTROL FOR USE BY TAB CONTRACTOR IN INITIAL BALANCING.

3.PROVIDE FAN IN A DUAL FAN CONFIGURATION WITH SHARED INLET PLENUM AND BYPASS AIR DAMPERS. DUAL FANS SHALL BE n+1 REDUNDANT SUCH THAT EACH FAN IS INDEPENDENTLY CAPABLE OF OPERATING AT THE SCHEDULED AIRFLOW. AT FULL SPEED (SCHEDULED AIRFLOW), THE BYPASS DAMPER WILL BE

COMPLETELY CLOSED. BYPASS DAMPER WILL MODULATE OPEN TO MAINTAIN A MINIMUM STACK HEIGHT OF 20 FEET AS THE EXHAUST FAN RAMPS DOWN.

4.PROVIDE EACH FAN WITH MANUFACTURER’S ISOLATION DAMPERS AND ONE MANUFACTURER’S BYPASS DAMPER. TEMPERATURE CONTROLS CONTRACTOR SHALL PROVIDE ACTUATORS AND END SWITCHES FOR ALL DAMPERS AND CONFIRM POSITION PRIOR TO START-UP SEQUENCING.

5.PROVIDE FANS WITH FINISH THAT INCLUDES AN EPOXY BASE COAT AND ELECTROSTATIC POWDER COATED HI-PRO POLYESTER TOPCOAT.

FAN SCHEDULE

TAG NAME SERVICE CFM

S.P.

IN.

W.C.

FAN

CLASS

WHEEL

DIA.

INCHES

FAN

RPM

(NOTE F)

DRIVE

TYPE

MAX.

AMCA

SONES

BACKDRAFT

DAMPER

TYPE

CURB

TYPE

(NOTE G)

ELECTRICAL (NOTE 1)

WEIGHT

VIBRATION

ISOLATION

MANUFACTURER MODEL NOTESBHP MHP VOLTAGE PHASES

DISCONNECT CONTROLLER/ STARTER

TYPE DEFL.

BY

(NOTE A)

TYPE

(NOTE B)

BY

(NOTE A)

TYPE

(NOTE C) SCCR

EF-1 CLEAN WORKROOM INSTRUMENT SET ASSEMBLY 1760 1.75 I 18 1539 DIRECT 15.6 MOD MFR 1.05 1.5 480 3 EC NF MFR VFD 5000 98 N/A 0.00" PENN BARRY DX14B NOTE 1

EF-2A/B DECONTAMINATION WORK AREA 8220 3.50 II 25.9 1170 BELT 85 MOD GC 7.88 10 480 3 EC NF MFR VFD 65000 1048 M4 0.75" MK PLASTICS AXIJET-F 3000 NOTES 1, 3, 4, & 5

EF-3 GENERAL EXHAUST 1200 1.00 I 20 1455 DIRECT 11.8 MOD MFR 0.36 0.5 120 1 EC NF MFR FV 5000 66 N/A 0.00" PENN BARRY DX16Q1GP NOTE 2

EF-4 GENERAL EXHAUST 150 0.25 I 16 1215 DIRECT 6.25 MOD MFR 0.06 0.25 120 1 EC NF MFR FV 5000 51 N/A 0.00" PENN BARRY DX13QGP NOTE 2

SF-1 PIPE BASEMENT VENTILATION 24000 0.50 I 20 515 DIRECT 13.84 MOD MFR 5.2 6 480 3 EC NF MFR VFD 5000 98 N/A 0.00" PENN BARRY LF40BC NOTE 1

NOTES:

1.MOUNT HOOD ON MANUFACTURER’S CURB. TOP OF CURB SHALL BE A MINIMUM OF 18” ABOVE TOP OF ROOF INSULATION.

2.MAXIMUM HEIGHT MEASURED FROM TOP OF CURB TO TOP OF EQUIPMENT.

HOOD SCHEDULE

TAG

NAME SERVICE CFM

THROAT SIZE

THROAT

VELOCITY

STATIC

PRESSURE

DROP

FREE

AREA

(FT ²) CONFIGURATION

MAX.

HEIGHT

(NOTE 2)

DAMPER

TYPE

CURB

TYPE

MAX. DIMENSIONS

WEIGHT MANUFACTURER MODEL NOTESWIDTH LENGTH LENGTH WIDTH HEIGHT

OAH-1 AHU-1 12000 36 54 889 0.08 13.5 GRAVITY HOOD 24 MOD MFR 92.5 68.5 17 110.6 PENN BARRY PG3654 NOTE 1

OAH-2 AHU-2 5000 20 42 833 0.07 6 GRAVITY HOOD 20 MOD MFR 62.5 50.5 13 64.1 PENN BARRY PG2436 NOTE 1

OAH-3 5-AC10 INTAKE 4750 18 24 950 0.09 5 GRAVITY HOOD 18 MOD MFR 58.5 42.5 11 53.6 PENN BARRY PG2036 NOTE 1

RAH-1 AHU-2 4000 24 30 667 0.06 6 GRAVITY HOOD 17 MOD MFR 56.5 38.5 10 50 PENN BARRY PG2436 NOTE 1

RAH-2 5-EF12 EXHAUST 625 12 18 625 0.05 1 GRAVITY HOOD 12 MOD MFR 20.5 20.5 5 18.9 PENN BARRY PG1212 NOTE 1

RAH-3 5-AC10 RELIEF 4750 18 24 543 0.04 8.75 GRAVITY HOOD 18 MOD MFR 62.5 44.5 11 63.4 PENN BARRY PG2036 NOTE 1

NOTES:

1.NEITHER RADIATED NOR DISCHARGE SOUND LEVELS SHALL EXCEED NC 35 AT 1.5" INLET STATIC PRESSURE WHEN TESTED PER AHRI STANDARD 885-2008 USING 5/8" 20-LB DENSITY MINERAL FIBER

CEILING TILE.

2.TOTAL AIR PRESSURE DROP OF TAB AND REHEAT COIL SHALL NOT EXCEED 0.50" WC. PROVIDE REHEAT COILS SEPARATE FROM BOXES IF REQUIRED TO MEET AIR PRESSURE DROP REQUIREMENTS.

3.REFER TO CONTROL DRAWINGS FOR DESCRIPTION OF CONTROL TYPE.

4.SENSOR TYPES: 1 - SENSOR ONLY, 2 - SENSOR WITH ADJUSTMENT, 3 - SENSOR WITH OVERRIDE, 4 - SENSOR WITH ADJUSTMENT AND OVERRIDE.

5.HEATING COIL IS BASED ON HEATING AIR FLOW. WATER PRESSURE DROP OF REHEAT COILS SHALL NOT EXCEED 5'. PROVIDE REHEAT COILS SEPARATE FROM BOXES IF REQUIRED TO MEET WATER

PRESSURE DROP REQUIREMENTS.

6.WHEN LAT °F, EWT °F, AND GPM VALUES ARE BLANK, HEATING COIL IS NOT REQUIRED FOR TAB.

7.HEATING COIL SELECTION SHALL BE BASED ON A FIXED LEAVING AIR TEMPERATURE AND VARIABLE FLOW (GPM). PROVIDE FINAL MAXIMUM FLOW RATE (GPM) TO TEST & BALANCE TEMPERATURE

CONTROLS CONTRACTORS.

TERMINAL AIR BOX SCHEDULE - SINGLE DUCT

TAG

NAME AREA SERVED

CFM HEATING COIL (NOTES 5, 6, & 7) MIN. INLET

SIZE (IN.)

DIA.

CONTROL

TYPE

(NOTE 3)

SENSOR

TYPE

(NOTE 4) MANUFACTURER

MODEL

(NOTES 1, 2) NOTES

COOLING

MAX.

HEATING

MAX. MIN. EAT °F LAT °F

EWT

°F

LWT

°F

MAX.

GPM

TAB-2-01 C50 CORRIDOR 400 400 400 55.0 85.0 180 150 0.9 6" TYPE B TYPE 1 TITUS DESV NOTES 1, 2

TAB-2-02 H2 CONFERENCE 350 350 175 55.0 85.0 180 150 0.8 6" TYPE B TYPE 3 TITUS DESV NOTES 1, 2

TAB-2-03 H4 OFFICE 200 200 80 55.0 85.0 180 150 0.5 6" TYPE B TYPE 4 TITUS DESV NOTES 1, 2

TAB-2-04 H5 OFFICE 125 125 80 55.0 85.0 180 150 0.5 6" TYPE B TYPE 4 TITUS DESV NOTES 1, 2

TAB-2-05 H8 STAFF LOUNGE 450 450 150 55.0 85.0 180 150 1.0 8" TYPE B TYPE 3 TITUS DESV NOTES 1, 2

TAB-2-06 H9 OFFICE 200 200 80 55.0 85.0 180 150 0.5 6" TYPE B TYPE 4 TITUS DESV NOTES 1, 2

TAB-2-07 H10 OFFICE 200 200 80 55.0 85.0 180 150 0.5 6" TYPE B TYPE 4 TITUS DESV NOTES 1, 2

TAB-2-08 H11 OFFICE 200 200 80 55.0 85.0 180 150 0.5 6" TYPE B TYPE 4 TITUS DESV NOTES 1, 2

TAB-2-09 H12 MENS LOCKER 425 425 425 55.0 85.0 180 150 0.9 8" TYPE B TYPE 2 TITUS DESV NOTES 1, 2

TAB-2-10 H13 WOMENS LOCKER 425 425 425 55.0 85.0 180 150 0.9 8" TYPE B TYPE 2 TITUS DESV NOTES 1, 2

TAB-2-11 C50 CORRIDOR 350 350 350 55.0 85.0 180 150 0.8 6" TYPE B TYPE 1 TITUS DESV NOTES 1, 2

NOTES:

1.CONTRACTOR SHALL DETERMINE PROPER BORDER TYPE TO MATCH CEILING CONSTRUCTION.

2.REFER TO DRAWINGS FOR NECK SIZE. ALL BRANCH DUCTWORK TO AIR TERMINALS SHALL BE NECK SIZE UNLESS NOTED OTHERWISE.

3.DUCTED RETURN

4.FRONT BLADES VERTICAL UNLESS OTHERWISE NOTED.

5.FLUSH FACE PANEL.

6.ALL BALANCING DAMPERS SHOWN ABOVE HARD LID CEILINGS SHALL BE ELECTRONIC REMOTELY OPERATED TYPE; GENERALLY, ALL GRILLES AND DIFFUSERS SERVED BY

AHU-1 OR EF-2A/B HAVE BALANCING DAMPERS LOCATED ABOVE HARD LID CEILINGS. MECHANICAL CONTRACTOR SHALL REVIEW ARCHITECTURAL REFLECTED CEILING PLANS AND VERIFY QUANTITY PRIOR TO BID. REFERENCE SPECIFICATION SECTION 23 31 00 FOR ADDITIONAL INFORMATION.

AIR TERMINAL SCHEDULE

TAG

NAME

FACE

SIZE (IN.)

(NOTE 2) TYPE BORDER MATERIAL FINISH

VOLUME

DAMPER

REQUIRED MANUFACTURER MODEL NOTES

EG-1 12x12 PERFORATED FACE NOTE 1 STEEL WHITE NO TITUS PAR NOTES 3 & 6

EG-2 12x12 PERFORATED FACE NOTE 1 ALUMINUM WHITE NO TITUS PAR NOTES 3 & 6

EG-3 24x24 PERFORATED FACE NOTE 1 STEEL WHITE NO TITUS PAR NOTES 3 & 6

EG-4 24x24 PERFORATED FACE NOTE 1 ALUMINUM WHITE NO TITUS PAR NOTES 3 & 6

ER-1 INLET +2 35 DEGREE DEFLECTION NOTE 1 ALUMINUM WHITE YES TITUS 350F NOTE 4 & 6

RG-3 24x24 PERFORATED FACE NOTE 1 STEEL WHITE NO TITUS PAR NOTES 3 & 6

RG-4 24x24 PERFORATED FACE NOTE 1 ALUMINUM WHITE NO TITUS PAR NOTES 3 & 6

SD-1 12x12 PANEL FACE NOTE 1 STEEL WHITE NO TITUS OMNI NOTE 5 & 6

SD-3 24x24 PANEL FACE NOTE 1 STEEL WHITE NO TITUS OMNI NOTE 5 & 6

SD-4 24x24 PANEL FACE NOTE 1 ALUMINUM WHITE NO TITUS OMNI NOTE 5 & 6

SR-1 INLET +2 35 DEGREE DEFLECTION NOTE 1 STEEL WHITE YES TITUS 350R NOTE 4 & 6

NOTES:

1.REFERENCE SPECIFICATION SECTION 23 73 00 INDOOR CENTRAL-STATION AIR-HANDLING UNITS.

2.PROVIDE SHAFT GROUNDING AS REQUIRED IN THE MOTOR SPECIFICATION 23 05 12.

3.ONE FULLY REDUNDANT (N+1) SUPPLY/RETURN FAN SHALL BE PROVIDED FOR EACH FAN ARRAY. SCHEDULED RPM AND BHP REPRESENT N PERFORMANCE.

4.PROVIDE 1 VFD PER SUPPLY/RETURN FAN.

5.CHILLED AND HEATING WATER COILS ARE SELECTED WITH 100% WATER.

6.TOTAL EXTERNAL STATIC PRESSURE DOES NOT INCLUDE FILTER LOADING. MANUFACTURER SHALL INCLUDE DIRTY FILTER ALLOWANCE IN TOTAL STATIC PRESSURE CALCULATION.

7.STEAM PRESSURE INDICATED IS THE PRESSURE AVAILABLE DOWNSTREAM OF THE CONTROL VALVE.

8.PROVIDE AHU WITH INTERNAL MOTOR REMOVAL RAILS FOR FAN MOTOR SERVICING.

AIR HANDLING SCHEDULE - MIXED AIR VAV

TAG

NAME SERVICE

SUPPLY FAN (NOTE 2, 3, & 4) RETURN FAN (NOTE 2, 3, & 4)

MINIMUM

OUTSIDE

AIR CFM

HEATING COIL - HEATING WATER (NOTE 5) HUMIDIFIER (NOTE 7) COOLING COIL - CHILLED WATER (NOTE 5) ULTRA-VIOLET LIGHT ELECTRICAL COMBINATION FILTER (NOTE 6) MAXIMUM DIMENSIONS

WEIGHT MANUFACTURER MODEL NOTES

NO.

OF

FANS

CFM

TOTAL

MIN.

CFM

EXT.

S.P. TYPE

RPM

(NOTE D)

BHP

EACH

(NOTE E)

MHP

EACH

(NOTE E)

NO.

OF

FANS

CFM

TOTAL

MIN.

CFM

EXT.

S.P. TYPE

RPM

(NOTE D)

BHP

EACH

(NOTE E)

MHP

EACH

(NOTE E)

EAT

°F

LAT

°F

EWT

°F

LWT

°F GPM MBH

MAX.

A.P.D.

IN.

W.C.

W.P.D

. FEET

HEAD TYPE CFM

STEAM

CAPACITY

(LBS/HR)

STEAM

PSIG

MANUFAC

TURER

EAT

DB

°F

EAT

WB

°F

LAT

DB

°F

LAT

WB

°F

EWT

°F

LWT

°F

TOTAL

MBH GPM

W.P.D.

FEET

HEAD

MAX.

A.P.D.

IN.

W.C.

NUMBER

OF

ROWS

INTENSITY

AT COIL

SURFACE

TOTAL

POWER

(WATTS)

NO. OF

POWER

CONNE

CTIONS VOLTAGE PHASES

DISCONNECT(S)

CONTROLLER

STATER(S)

SCCR

NO. OF

AUXILIARY

CONNECTI

ONS

FIRST STAGE FILTER SECOND STAGE FILTER

LENGTH WIDTH HEIGHT

BY

(NOTE A)

TYPE

(NOTE B)

BY

(NOTE A)

TYPE

(NOTE C) TYPE

FACE

VELOCITY

PRESSURE DROP

TYPE

FACE

VELOCITY

PRESSURE DROP

CLEAN DIRTY CLEAN DIRTY

AHU-2 STERILE

PROCESSING

ADMINISTRATIVE

AREA

2 5000 2500 1.8 PLENUM 3443 6.1 7.5 2 5000 2500 1.5 PLENUM 2254 2.7 3 1250 39.3 65.0 180 150 9.8 144 0.1 2.8 DISPERSION

TUBE

5,000 142 15 DRI-STEAM 80.9 69.4 52.3 52 40 52 261.6 43.4 9.94 0.45 4 45.6 W/ft² 248 2 480 3 EC F MFR VFD 65000 3 MERV

270 .2 .85 MERV

270 .2 1 374" 46" 77" 9969 TEMTROL CUSTOM NOTE 8

NOTES:

1.NEITHER RADIATED NOR DISCHARGE SOUND LEVELS SHALL EXCEED NC 35 AT 1.5" INLET STATIC PRESSURE WHEN TESTED PER AHRI STANDARD 885-2008 USING 5/8" 20-LB

DENSITY MINERAL FIBER CEILING TILE.

2.REFER TO SPECIFICATION SECTION 23 36 00, VENTURI VALVE AIRFLOW CONTROL SYSTEM.

3.PROVIDE ROOM INTEGRATOR TO CONNECT DIRECTLY TO FMCS VIA NETWORK.

4.FAST ACTING VALVE. REFER TO CONTROL DRAWINGS FOR DESCRIPTION OF CONTROL TYPE.

5.SENSOR TYPES: 1 - SENSOR ONLY, 2 - SENSOR WITH ADJUSTMENT, 3 - SENSOR WITH OVERRIDE, 4 - SENSOR WITH ADJUSTMENT AND OVERRIDE.

AIR VALVE SCHEDULE

TAG NAME AREA SERVED

CFM MIN. INLET

SIZE (IN.)

DIA.

CONTROL

TYPE

(NOTE 4)

SENSOR

TYPE

(NOTE 5) MANUFACTURER MODEL NOTES

COOLING

MAX. MIN.

VV1-01 C51 CORRIDOR 325 325 8" TYPE A TYPE 1 CRITICAL ROOM CLVI NOTES 1, 2, & 3

VV1-02 H17 STERILE INSTRUMENT STORAGE 875 875 8" TYPE A TYPE 1 CRITICAL ROOM CLVI NOTES 1, 2, & 3

VV1-03 H18 LOGISTICS STORAGE ROOM 125 125 8" TYPE A TYPE 1 CRITICAL ROOM CLVI NOTES 1, 2, & 3

VV1-04 H17A SCOPE STAGING ROOM 725 725 8" TYPE A TYPE 2 CRITICAL ROOM CLVI NOTES 1, 2, & 3

VV1-05 H26 SCOPE PROCESSING DECONTAMINATION AREA 550 550 8" TYPE A TYPE 2 CRITICAL ROOM CLVI NOTES 1, 2, & 3

VV1-06 H24 CART HOLDING 775 775 8" TYPE A TYPE 1 CRITICAL ROOM CLVI NOTES 1, 2, & 3

VV1-07 H20A MANUAL CARTWASH 200 200 8" TYPE A TYPE 3 CRITICAL ROOM CLVI NOTES 1, 2, & 3

VV1-08 STEAM STERILIZATION AREA 1350 1350 8" TYPE A TYPE 3 CRITICAL ROOM CLVI NOTES 1, 2, & 3

VV1-09 H25 ANTEROOM, SOILED TRANSITION/DROPOFF 175 175 8" TYPE A TYPE 1 CRITICAL ROOM CLVI NOTES 1, 2, & 3

VV1-10 H23 DETERGENT 425 425 8" TYPE A TYPE 1 CRITICAL ROOM CLVI NOTES 1, 2, & 3

VV1-11 H21 DECONTAMINATION WORK AREA 2000 2000 14" TYPE A TYPE 2 CRITICAL ROOM CLVI NOTES 1, 2, & 3

VV1-12 H15 CLEAN WORKROOM/ASSEMBLY 3035 3035 12" TYPE A TYPE 2 CRITICAL ROOM CLVI NOTES 1, 2, & 3

VV1-13 H14 ANTE-ROOM CLEAN 150 150 8" TYPE A TYPE 2 CRITICAL ROOM CLVI NOTES 1, 2, & 3

NOTES:

1.HEATING COIL SELECTION SHALL BE BASED ON A FIXED LEAVING AIR TEMPERATURE AND VARIABLE FLOW (GPM). PROVIDE FINAL MAXIMUM

FLOW RATE (GPM) TO TEST & BALANCE TEMPERATURE CONTROLS CONTRACTORS.

COIL SCHEDULE - WATER

TAG

NAME CFM

EAT LAT TOTAL

MBH

A.P.D. IN.

W.C. EWT °F LWT °F GPM

W.P.D. FT.

HEAD MANUFACTURER MODEL NOTESDB °F DB °F

HC-1-01 325 50.0 85.0 11 0.50 180 150 0.7 5.0 AAON C5 NOTE 1

HC-1-02 870 50.0 85.0 28 0.50 180 150 1.9 5.0 AAON C5 NOTE 1

HC-1-03 125 50.0 85.0 4 0.50 180 150 0.5 5.0 AAON C5 NOTE 1

HC-1-04 725 50.0 85.0 23 0.50 180 150 1.6 5.0 AAON C5 NOTE 1

HC-1-05 550 50.0 85.0 18 0.50 180 150 1.2 5.0 AAON C5 NOTE 1

HC-1-06 775 50.0 85.0 25 0.50 180 150 1.7 5.0 AAON C5 NOTE 1

HC-1-07 200 50.0 85.0 6 0.50 180 150 0.5 5.0 AAON C5 NOTE 1

HC-1-08 1350 50.0 85.0 44 0.50 180 150 2.9 5.0 AAON C5 NOTE 1

HC-1-09 175 50.0 85.0 6 0.50 180 150 0.5 5.0 AAON C5 NOTE 1

HC-1-10 425 50.0 85.0 14 0.50 180 150 0.9 5.0 AAON C5 NOTE 1

HC-1-11 2000 50.0 85.0 65 0.50 180 150 4.3 5.0 AAON C5 NOTE 1

HC-1-12 3035 50.0 85.0 98 0.50 180 150 6.6 5.0 AAON C5 NOTE 1

HC-1-13 150 50.0 85.0 5 0.50 180 150 0.5 5.0 AAON C5 NOTE 1

G. CURB TYPE:

MFR = STANDARD CURB BY MANUFACTURER

GC = BY GENERAL CONTRACTOR

F. MUST BE WITHIN +/- 10% OF SCHEDULED RPM.

E. NO EQUIPMENT SHALL BE SELECTED ABOVE 90% OF MOTOR NAME

PLATE RATING.

D. FAN RPM SHALL NOT EXCEED 110% OF SCHEDULED VALUE, WITH

THE SCHEDULED WHEEL TYPE. SUBSTITUTION OF BI OR BIA FANS

FOR FC IS ACCEPTABLE IF EFFICIENCY IS NOT LOWER.

C. CONTROLLER STARTER TYPE:

FV = FULL VOLTAGE

VFD = VARIABLE FREQUENCY DRIVE

VFD/B = VARIABLE FREQUENCY DRIVE WITH BYPASS

B. DISCONNECT TYPE:

F = FUSED

NF = NON-FUSED

A. DISCONNECT AND CONTROLLER STARTER FURNISHED AND

INSTALLED BY:

MFR = MANUFACTURER

EC = ELECTRICAL CONTRACTOR.

VENTILATION SCHEDULE

GENERAL NOTES

Revisions: Date:

Addendum 3 (AD-3) 05/12/2025

AD-3

AD-3

Sheets
MV600 - VENTILATION SCHEDULES

File details come from the government source that posted it. Updated .