This document is an Instructions to Contractor Addendum (#3) dated May 20, 2025, for the Construct New SPS (Sterile Processing Services) project at the Sioux Falls VAMC (Veterans Affairs Medical Center) in Sioux Falls, South Dakota, with Project #438-460. The addendum details extensive revisions to multiple drawings and specifications, including changes to electrical routing, electrical manholes, construction barriers, limits of construction, floor plans, MEP equipment placement, ventilation schedules, electrical site plans, one-line diagrams, power floor plans, and electrical schedules. Key specification updates include adding sheets to Specification 00 01 15 and a clarification that all light fixtures are required to be BABA compliant. The attached drawings include CU101, C-506, GI001, GC111, AD111, AE111, AC111, MV600, ES099, ES100, ES400, ES401, ES500, ES501, EP101, EP111, and E601, with the addendum issued by ANDERSON and IMEG.
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
13605 1st Avenue North Suite 100, Plymouth, MN 55441 P 763.412.4000 F 763.412.4090 ae-mn.com
INSTRUCTIONS TO CONTRACTOR
Addendum #3 May 20, 2025
Construct New SPS Sioux Falls VAMC
Sioux Falls, SD Project # 438-460
The Contents of this Revision alter and amend the original drawings and specifications:
Drawings:
1. Drawing CU101
a. Revised electrical routing (See Electrical)
b. Revised location of electrical manholes (See Electrical)
c. Added Key note 6
2. Drawing C-506
a. Revised Detail 1
3. Drawing GI001
a. Revised Electrical sheet index
4. Drawing GC111
a. Revised Location(s) and placement of ICRA / Construction Barriers.
5. Drawing AD111
a. Revised LIMITS OF CONSTRUCTION.
b. Added key notes and notes.
6. Drawing AE111
a. Re Revised LIMITS OF CONSTRUCTION.
b. Added key notes and notes.
c. Revised floor plan to show MEP equipment .
d. Added key note leader for MEP equipment pad.
7. Drawing AC111
a. Revised LIMITS OF CONSTRUCTION.
b. Added key notes and notes.
8. DRAWING MV600 – VENTILATION SCHEDULES
a. REVISE Fan Schedule Note 3.
b. REVISE EF-2A/B performance data.
9. DRAWING ES099 – CAMPUS SITE PLAN - ELECTRICAL
a. ADD this sheet in its entirety.
10. DRAWING ES100 – NEW ELECTRICAL SITE PLANS
a. REPLACE this sheet in its entirety with updated drawing ES100.
11. DRAWING ES400 – NEW ELECTRICAL SITE DETAILS
a. ADD this sheet in its entirety.
12. DRAWING ES401 – NEW ELECTRICAL SITE DETAILS
a. ADD this sheet in its entirety.
13. DRAWING ES500 – ELECTRICAL ONE LINE DIAGRAMS
a. ADD this sheet in its entirety.
14. DRAWING ES501 – ELECTRICAL ONE LINE DIAGRAMS
a. ADD this sheet in its entirety.
15. DRAWING EP101 – GROUND LEVEL FLOOR PLAN - POWER
a. ADD Keynotes 6 and 7 as shown on revised drawing EP101.
16. DRAWING EP111 – INTERSTITIAL/FIRST LEVEL - POWER
a. ADD Keynote 3 as shown on revised drawing EP111.
17. DRAWING E601 – ELECTRICAL SCHEDULES
13605 1st Avenue North Suite 100, Plymouth, MN 55441 P 763.412.4000 F 763.412.4090 ae-mn.com
a. REVISE distribution panel QH3 schedule as shown on revised drawing E601.
b. CLARIFICATION: ALL light fixtures are required to be BABA compliant.
Specifications:
1. Specification 00 01 15:
a. Revision: Added sheets
ATTACHMENTS:
DRAWINGS: CU101, C-506, GI001, GC111, AD111, AE111, AC111, MV600, ES099, ES100, ES400, ES401, ES500, ES501, EP101, EP111, & E601
SPECIFICATIONS: 00 01 00
ISSUED BY ANDERSON and IMEG: TO, GB, EH