S06 - Amend 0002 - RFP - Att 01-08 - DWG - 03242025 - SPS - Sioux Falls.pdf
PDF 11 MB Posted
- Solicitation number
- 36C77624R0115
About this file
This document is an equipment drawing (QH411) for a new Sterile Processing Services (SPS) facility at the VA Medical Center in Sioux Falls, South Dakota, part of Project #438-460. The drawing provides a detailed equipment plan and schedule for a comprehensive renovation and new construction project spanning approximately 8,500 square feet of new space and 2,300 square feet of renovated area. The equipment list includes specialized medical processing equipment from manufacturers like STERIS, Cantel Medical, and others, with a focus on medical instrument reprocessing and sterilization.
The equipment schedule covers multiple functional areas including decontamination work areas, scope processing rooms, clean workrooms, and sterilization spaces. Key equipment includes multiple steam sterilizers (Amsco 600), washer/disinfectors, pass-through endoscope reprocessors, ultrasonic cleaners, transfer carts, and various supporting infrastructure like wire shelving, computer workstations, sinks, and medical technology devices. The drawing indicates a mix of VA-furnished and contractor-installed equipment, with acquisition codes specifying the procurement and installation responsibilities for each item. The project is fully sprinklered and follows current building and fire protection codes, with the design prepared by a licensed architect in Minnesota.
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AE2114 2
AE211
AE412
AE412
AE211
AE211
H21
DECONTAMINATION
WORK AREA
H22
SOILED HAC
H23
DETERGENT
H24
CART
HOLDING
H25
ANTEROOM,
SOILED
TRANSITION/DROP-OFF
H26
SCOPE
PROCESSING
DECONTAMINATION
ROOM
H20B
AUTOMATIC
CART WASH
AREA
H20A
MANUAL
CART WASH
H20
CART
HOLDING
H19
STEAM
STERILIZATION
AREA
H15
CLEAN
WORKROOM,
ASSEMBLY
C50
CORRIDOR
H17A
SCOPE
STAGING
ROOM
AE412 12
S1905
S9610
S9610
S9610 F2700
F2700
F2700 S9610S9610F2700
F2700S9610
S5505
S5505
S5505
S5505
S0005
S0005
S0004
S0003
S0002
A0018
S0495
F0048
F0048
F0048
F0048
F0048 F0048
F0048
F0048
F0048
S0942
S0941
S0941
S0941
S0941
S0940
S0940
S0940
S0940
S0046 S2635
S2
S2
S2
S3185
S0007
A5135
M2055
S0442R
S0442
S0442 S0495
M3160M3160M3160M3160
S2627 S2627
F2700
F2700
F2700
M1803
M1803
M1803
M1803
F2015
F2015
F2015
F2000
M2055A
M2055A
M2055A
M2055A F2700
M1801
M1801
M1801
M1801
M1801
AE412
AE4128
A1195
A1195
A1195
A1195
A1195A
A1195A
S0442R
S0495
S0495
A1014
A5075
A5082
M0512
M0512
S2627
AE211
A5077A5082
H15A
STEAM
STERILIZER
TO BE RELOCATED FROM EXITING
SPACE AS LATE IN THE
CONSTRUCTION AS POSSIBLE.
COORDINATE RELOCATION OF
EQUIPMENT WITH VA COR.
F0860
T0544
M1803
M1803
VA ACQUISITION CODE LEGEND
CONTRACTOR FURNISHED AND INSTALLED CC
VA FURNISHED - CONTRACTOR INSTALLED VC
V V
VC(CF)
VA FURNISHED AND INSTALLED
VA FURNISHED - CONTRACTOR INSTALLED WITH CONSTRUCTION FUNDS
V V(CF)VA FURNISHED - VA INSTALLED WITH CONSTRUCTION FUNDS
RRELOCATED
SEE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL CONTRACTOR FURNISHED
AND CONTRACTOR INSTALLED (CC) EQUIPMENT NOT INDICATED ON EQUIPMENT
SCHEDULE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name:
Tom Olesak
Date: 02/14/2025
License Number: 18157
2882 106th St, Urbandale, IA 50322
C U s e rs
\g b a rb a ri \O n e D ri v e
A N
D E
R S
O N
E N
G
IN
E E
R
IN
G O
F M
N \D o c u m e n ts
\1
-R
G io v a n n i- B a rb a ri .r v t
/2
/2
:0
:1
P
M
QH411
ENLARGED EQUIPMENT PLAN &
SCHEDULE
CONSTRUCT NEW SPS
Sioux Falls, SD.
438-460
02/14/2025 LA GJB16584
1/4" = 1'-0"1 ENLARGED EQUIPMENT PLAN
EQUIPMENT SCHEDULE
EQUIPMENT # EQUIPMENT NAME MANUFACTURER DESCRIPTION
ACQUISITION
CODE QTY ROOM # ROOM NAME
A0018 RENNCO HEAT SEALER RENCO RENNCO HEAT SEALER V V 1 H15 CLEAN WORKROOM, ASSEMBLY
A1014 TELEPHONE, WALL MOUNTED V V 7
A1015 TELEPHONE, DESK V V 8
A1195 AMSCO 50 STAINLESS STEEL 3 COMPARTMENT SINK 120" STERIS
Corporation Amsco 50 Reprocessing Sink - 3 Bay/120" Long/Height Adjustable/Left to Right Work Flow (Delivery may be restricted by hallway width. STERIS installation and delivery teams to verify prior to shipping.)
V C 4 H21 DECONTAMINATION WORK AREA
A1195A AMSCO 50 STAINLESS STEEL 3 COMPARTMENT
REPROCESSING SINK 97.5"
STERIS
Corporation
Amsco 50 Reprocessing Sink - 3 Bay/97.5" Long/Height Adjustable/Left to Right Work Flow
V C 2 H26 SCOPE PROCESSING DECONTAMINATION
ROOM
A5020 BENCH, FLOOR MOUNTED Scranton Products Lockers as Specified in 10 51 00 V C 2
A5075 SOAP DISPENSER V V 11
A5077 HAND SANITIZER DISPENSER V V 8
A5082 HANDS FREE PAPER TOWEL DISPENSER V V 12
A5090 SANITARY NAPKIN DISPOSAL V V 3
A5107 GLOVE DISPNSER (3 BOX) V V 1 H26 SCOPE PROCESSING DECONTAMINATION
ROOM
A5108 SHARPS A container for collecting and transporting syringes and other sharps for decontamination and disposal. Available in 2 gallon and 8 gallon with locking rotor.
Complies with OSHA regulations for handling sharps.
1 H26 SCOPE PROCESSING DECONTAMINATION
ROOM
A5135 MOP HOLDER WITH SHELF Bradley Corporation
Utility Shelf w/2 Hooks 3 Holders & 1 Drying Rod - 30" W V C 3
A5145 HOOK, GARMENT, DOUBLE A SURFACE MOUNTED, SATIN FINISH STAINLESS STEEL, GARMENT HOOK, WITH A CONCEALED MOUNTING BRACKET THAT IS SECURED TO A
CONCEALED WALL PLATE. FOR GENERAL PURPOSE
V C 12
A5202 TOILET PAPER HOLDER 2 ROLL WITH SHELF V V 5
E2624 SCOPE BLOCK HOLDER 1 H26 SCOPE PROCESSING DECONTAMINATION
ROOM
F0048 TRANSFER CART STERIS
Corporation Reliance Transfer Cart V V 9
F0860 STAINLESS STEEL TABLE 7
F2000 TRASH CAN 16" DIA Wastepaper basket, fire resistant, approximately 40 quart capacity. This unit is used to collect and temporarily store small quantities of paper refuse in patient rooms, administrative areas and nursing stations. Size and shape varies depending on the app
V V 6
F2010 BASKET, WASTE PAPER, STEP-ON STEP ON TRASH CAN V V 1 H7 TOILET
F2015 TRASH CAN 18"x18" METAL OR PLASTIC WASTEPAPER BASKET WITH SWING DOORS AND
REMOVABLE LID, 18" X 18"
V V 7
F2700 BAR CODE READER V V 9
F3200 CLOCK, BATTERY, 12IN DIA V V 1 H8 STAFF LOUNGE
M0512 FLAT SCREEN MONITOR 60" WITH WALL BRACKET V V 4
M1801 COMPUTER WITH FLAT PANEL MONITOR V V 14
M1803 WALL MOUNTED COMPUTER WORKSTATION V V 8
M2055 WIRE SHELVING 48"X 18" STROAGE RACK 10
M2055A WIRE SHELVING 36"x18" STROAGE RACK V C 5 M2056 HIGH DENSITY SHELVING SYSTEM 78"H X 108"D X 156"W TOTAL V V 2 H17 STERILE INSTRUMENT STORAGE
M3160 MEDIVATOR ADVANATAGE PLUS AER SCOPE DRYING
CABINET
CANTEL MEDICAL ADVANTAGE PLUS AER - Single-side V C 4 H17A SCOPE STAGING ROOM
R7250 REFRIGERATOR REFRIGERATOR V V 1 H8 STAFF LOUNGE
S0002 3M ATTEST AUTO READER 390 3M ATTEST AUTO READER 390 V V 1 H15 CLEAN WORKROOM, ASSEMBLY S0003 CENSATRAC SCANNER CHARGING STATION CENSATRAC SCANNER CHARGING STATION V V 1 H15 CLEAN WORKROOM, ASSEMBLY S0004 INCUBATOR, BIOLOGICAL INDICATOR INCUBATOR, BIOLOGICAL INDICATOR V V 1 H15 CLEAN WORKROOM, ASSEMBLY S0005 STRYKER BATTERY CHARGING STATION STRYKER BATTERY CHARGING STATION V V 2 H15 CLEAN WORKROOM, ASSEMBLY S0006 TEE PROBE STORAGE CABINET TEE PROBE STORAGE CABINET V C 1 H17 STERILE INSTRUMENT STORAGE S0007 COUNTERTOP ULTRASONIC CLEANER COUNTERTOP ULTRASONIC CLEANER V V 1 H21 DECONTAMINATION WORK AREA
S0046 STERIS AMSCO DRYING CABINET STERIS
Corporation Amsco Drying Cabinet - 38"/Single Door (110-120 Volt/20 Amp Dedicated Wall Plug)
V C 1 H15 CLEAN WORKROOM, ASSEMBLY
S0442 AMSCO 600 STEAM STERLISER - 26.5x26.5x63" STERIS Corporation
Amsco 600 Medium Steam Sterilizer - 26.5x26.5x63" (673x673x1600mm)/Single Sliding Door/Recessed/Steam Heat
V C 2 H19 STEAM STERILIZATION AREA
S0442R AMSCO 600 STEAM STERLISER - 26.5x26.5x63" STERIS Corporation
Amsco 600 Medium Steam Sterilizer - 26.5x26.5x63" (673x673x1600mm)/Single Sliding Door/Recessed/Steam Heat
V C R 2
S0495 STERIS AMSCO 600 LOADING / TRANSFER CART STERIS
Corporation
Amsco 600 Loading Car and Transfer Carriage - 26.5x26.5x63"/Fixed Height V V 4 H15 CLEAN WORKROOM, ASSEMBLY
S0940 STERIS AMSCO 7052HP WASHER / DISINFECTOR STERIS
CORPORATION
AMSCO 7052HP SINGLE-CHAMBER WASHER/DISINFECTOR - DOUBLE
DOOR/STEAM HEAT/VENTED/FLUSH MOUNTED
V C 4 H21 DECONTAMINATION WORK AREA
S0940A AMSCO AIR MANAGEMENT SYSTEM STERIS
CORPORATION
V C 2 H21 DECONTAMINATION WORK AREA
S0941 STERIS WASHER / DISINFECTOR CONVEYOR SYSTEM STERIS
Corporation
SCS Load/Unload Conveyor System - Single Load/Single Unload V C 4 H21 DECONTAMINATION WORK AREA
S0942 STERIS MOTORIZED RETURN CONVEYOR SYSTEM WITH
DOOR
STERIS
Corporation
SCS-L Motorized Return Conveyor System - 3 Module/Return Door/Flush Mounted V C 1 H21 DECONTAMINATION WORK AREA
S1905 STERRIS AUTOMATED PASS THOUGH WINDOW 34"x45" STERIS Corporation
STERIS Automated Pass-Through Window - Endoscopy Application (40x45" Window)
V C 1 H15 CLEAN WORKROOM, ASSEMBLY
S2627 ADVANTAGE PLUS PASS-THRU ENDOSCOPE REPROSSER CANTEL MEDICAL ADVANTAGE PLUS Pass-Thru Reprocessor, 230V (with air compressor) V C 3 H26 SCOPE PROCESSING DECONTAMINATION
ROOM
S2628 STERIS ACU-HOLD SYSTEM - WALL MOUNTED 3
CONTAINER
STERIS
Corporation
Acu-Hold System - Wall Mounted/ 3 Container V C 4 H23 DETERGENT
S2635 INNOWAVE ULTRASONIC IRRIGATOR & CLEANER STERIS
Corporation
InnoWave Unity Ultrasonic Irrigator - 15 Gallon V C 4 H21 DECONTAMINATION WORK AREA
S3185 STERIS VISSION 1327 CART AND UTENSIL WASHER STERIS
Corporation
Vision 1327 Cart and Utensil Washer/Disinfector - Standard Orientation/Double Door/Pit Mounted
V C 1 H20B AUTOMATIC CART WASH AREA
S5505 STERIS AMSCO V-PRO MAX LOW TEMP STERILIZER STERIS
Corporation
Amsco V-PRO Max Low Temperature Sterilization System - Single Door/Cabinet V C 4 H15 CLEAN WORKROOM, ASSEMBLY
S9610 AMSCO PREP AND PACK WORK STATION 36' X 72"
(ELECTRIC)
STERIS
Corporation
Amsco Deluxe Prep and Pack Workstation - 36x72"/Electric V C 6 H15 CLEAN WORKROOM, ASSEMBLY
T0544 MOBLE CART V V 1 H21 DECONTAMINATION WORK AREA
Revisions: Date:
FIRE PROTECTION SYMBOL LIST
SYMBOL: DESCRIPTION:
FIRE PROTECTIONFP
SERVICE WATER - POTABLEW
AIR PRESSURE MAINTENANCE DEVICE
AIR SUPERVISORY SWITCH
ANGLE VALVE
BUTTERFLY VALVE WITH MONITOR SWITCH
OS&Y GATE VALVE
OS&Y GATE VALVE WITH MONITOR SWITCH
PRESSURE SWITCH
P
NO HATCH LIGHT HAZARD
ORDINARY GROUP 1
ORDINARY GROUP 2
SPRINKLER - WALL MOUNTED
SPRINKLER
INSPECTOR TEST AND DRAIN VALVE
MONITOR SWITCH
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
SHUTOFF VALVE NORMALLY OPEN
DEMOLITION
DRAINDFP
NOT ALL SYMBOLS MAY APPLY.
AUTOMATIC DRAIN VALVE
UNION/FLANGE
DIRECTION OF FLOW IN PIPE
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
CHECK VALVE
FLOW SWITCH
F
ROUTE TO DRAIN
AREA BOUNDARY
BACKFLOW PREVENTER
FIRE PROTECTION ABBREVIATION KEY
AD ACCESS DOOR
BFP BACKFLOW PREVENTER
N.C. NORMALLY CLOSED
ABOVE FINISHED FLOORAFF
NOT IN CONTRACTNIC
NORMALLY OPENN.O.
ABBR: DESCRIPTION:
TYPICALTYP
UNLESS OTHERWISE NOTESUON
I.E. INVERT ELEVATION
SHORT CIRCUIT CURRENT RATINGSCCR
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10'-0" HEIGHT ABOVE
PROJECT 0'-0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N
O R HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
BUILDING CODE: IBC 2021 EDITION
FIRE CODE: IFC 2021 EDITION
PLUMBING CODE: IPC 2021 EDITION
MECHANICAL CODE: IMC 2021 EDITION
ELECTRICAL CODE: NFPA 70 (NEC) 2020 EDITION
LIFE SAFETY CODE: NFPA 101 2021 EDITION
ENERGY CONSERVATION CODE: IECC 2021
HEALTH DEPARTMENT CODE: CURRENT EDITION
LOCAL BUILDING CODE: CURRENT EDITION
APPLICABLE CODES
CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.
CONTACT PERSONS:
PROJECT MANAGER
MECHANICAL
ELECTRICAL
TECHNOLOGY
ERIC J. HENDERSON, PE
DELLAN J. LLEWELLYN, PE
KRISTEN SPINA, PE
DAMON M. DEEN
DESCRIPTION: PERSON:
TEMPERATURE CONTROLS CONTRACTORT.C.C.
CIVIL CONTRACTORC.C.
ASBESTOS ABATEMENT CONTRACTOR
FIRE PROTECTION CONTRACTORF.P.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
ELECTRICAL CONTRACTORE.C.
A.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
CONTRACTING OFFICER'S REPRESENTATIVEC.O.R.
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
PANELS PRIOR TO BIDDING.
10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
FOR OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL
EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT
LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,
TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.
16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH
OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE
EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO
THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED
ELECTRICAL SPACE INCLUDING; DUCTWORK, PIPING, ETC.
17. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL
EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.
18. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
MECHANICAL RENOVATION NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND
SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE
REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
BIDDING.
7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
SYSTEMS ARE INSTALLED.
10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
TEST DATE:
LOCATION:
STATIC PRESSURE:
RESIDUAL PRESSURE:
TOTAL FLOW:
SIZE OF MAIN:
FIRE FLOW TEST DATA
SEPTEMBER 16, 2019
FIRE PUMP, FIRE PUMP ROOM, GROUND FLOOR, BUILDING 5
133 PSI
82 PSI
1,500 GPM
4" DIAMETER, ROUGHLY 320 FEET OF PIPE FROM FIRE PUMP TO WEST
WING RISER
1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE
CONTRACTOR. CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS
REQUIRED FOR FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.
2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID
TO THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS
RESPONSIBLE FOR COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND
IN THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL
TAKES PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER IS THE
BASIS OF DESIGN.
3. CENTER SPRINKLERS IN CEILING TILES IN BOTH DIRECTIONS IN ALL AREAS. IN AREAS
WITH 2’X4’ CEILING TILES CENTERING USING A 2’X2’ CEILING PATTERN IS ACCEPTABLE.
SPRINKLER HEADS SHALL BE ALIGNED WITH OTHER SPRINKLER HEADS, LIGHTING,
DIFFUSERS, AND ANY OTHER FEATURES IN THE CEILING.
4. NEW SPRINKLERS SHALL BE QUICK RESPONSE TYPE, UNLESS OTHERWISE NOTED.
CONTRACTOR SHALL NOT MIX STANDARD RESPONSE SPRINKLERS WITH QUICK
RESPONSE SPRINKLERS IN UNPARTITIONED SPACES.
5. PROVIDE COVERAGE ABOVE AND BELOW ALL DUCTWORK GREATER THAN 48" WIDE.
6. PROVIDE COVERAGE ABOVE (IF APPLICABLE) AND BELOW FLOATING CEILINGS, REFER
TO ARCHITECTURAL PLANS.
7. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT
NUMBER OF SPRINKLERS, PIPE SIZING, AND PIPE ROUTING.
8. ALL BUILDING AREA SHALL BE FULLY SPRINKLERED INCLUDING CANOPIES, WALKWAYS,
OVERHANGS, SOFFITS, AND BUILDING PROJECTIONS. ALL ACCESSIBLE COMBUSTIBLE
CONCEALED SPACES SHALL BE FULLY PROTECTED BY THE SPRINKLER SYSTEM.
9. EACH RISER ASSEMBLY SHALL INCLUDE CHECK VALVE BUTTERFLY CONTROL VALVE
INDICATING "OPEN" OR "CLOSED" POSITION, TEST INSPECTION VALVE, FLOW SWITCH
AND PRESSURE GAUGES.
10. WHERE FEASIBLE INSTALL PIPES HIGH AS POSSIBLE TO AVOID CONFLICT WITH OTHER
DISCIPLINES.
11. INSTALL SYSTEM DRAINS AT LOW POCKET AREAS CONTAINING FIVE GALLONS OF
WATER OR MORE, PROVIDE WITH ISOLATION VALVE AND THREADED HOSE
CONNECTION.
12. MAIN PIPING PASSING BELOW SKYLIGHTS OR CLERESTORIES ARE NOT PERMITTED.
13. FOLLOW STRUCTURAL DETAILS WHEN PENETRATING OR PASSING THROUGH
STRUCTURAL ELEMENTS. ALTERNATE DESIGNS WILL NEED TO BE APPROVED THROUGH
THE STRUCTURAL ENGINEER.
14. PROVIDE INTERMEDIATE TEMPERATURE SPRINKLER HEADS WHERE REQUIRED BY NFPA
13 UNLESS OTHERWISE NOTED.
15. FINAL HEAD LOCATION, TYPE AND FINISH SHALL BE REVIEWED AND APPROVED BY THE
ARCHITECT.
16. A GRAPHIC ANNUNCIATOR PANEL SHALL BE PROVIDED TO INCLUDE AREAS BEING
PROVIDED WITH A PRE-ACTION OR CLEAN AGENT SYSTEM WHICH HAVE CONCEALED
AREAS.
17. EXACT LOCATION OF THE ALL PANELS SHALL BE VERIFIED ON SITE AND COORDINATED
WITH THE ELECTRICAL CONTRACTOR.
18. PAINT ALL EXPOSED PIPING TO MATCH BACKGROUND OR AS DIRECTED BY THE
ARCHITECT.
19. THE OWNER MUST BE NOTIFIED PRIOR TO EACH AND EVERY DRAINING OR RECHARGING
OF THE SPRINKLER SYSTEM.
20. THE CONTRACTOR SHALL PREPARE A COORDINATED SET OF SHOP DRAWINGS AND
SHALL OBTAIN APPROVAL FROM THE AUTHORITIES HAVING JURISDICTION AND THE
LOCAL FIRE DEPARTMENT PRIOR TO ANY INSTALLATION.
21. DRAWING SHOW LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT,
ETC. AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
22. VERIFY ALL DIMENSIONS AND CLEARANCES FROM ARCHITECTURAL, STRUCTURAL,
SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR PHYSICALLY AT SITE. REVIEW
ALL DRAWINGS. INCLUDING THOSE OF OTHER TRADES.
FIRE PROTECTION GENERAL NOTES:
FIRE PROTECTION SHEET INDEX
FP000 FIRE PROTECTION COVERSHEET
FPD101 GROUND LEVEL DEMOLITION PLAN - FIRE PROTECTION
FP101 GROUND LEVEL FLOOR PLAN - FIRE PROTECTION
FP111 INTERSTITIAL/FIRST LEVEL FLOOR PLAN - FIRE PROTECTION
FP400 FIRE PROTECTION DETAILS
GRAND TOTAL: 5
I O W A
S E
D
PROFESS IONA
27052
L
IC
E N
L E
N G
I N E
E R
DELLAN J.
LLEWELLYN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/1
.0
V A
-W a s h
D C
-V A
S io u x F a lls
N e w
S P
S /M
E P
T
.0
V A
W a s h D
C -V
A S io u x F a lls
N e w S
P S
C
.r v t
/1
/2
:2
:5
A
M
FP000
FIRE PROTECTION COVERSHEET CONSTRUCT NEW SPS
Sioux Falls, SD.
438-460
02/14/2025 BLAOBR DELLLE16584
REFERENCE SCALE IN INCHES
0 1 2 3
PROJECT #
IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS
DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE
THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN
APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.
2882 106TH STREET
DES MOINES, IA 50322
515.334.9906 FAX: 515.334.9908
www.imegcorp.com
19004249.04
L
M
N
O
SB
S2
23 24
1S
0S
A1
A2
30 Y
A
C
B
D
H
G
5.3
G.2
1.8
F
E
4 54.94.3
30.4
Z1
30.6
A1.8 uuuu
A1.9 wwww
A3.5
A3
1.7
3"FP
2"FP2"FP1"FP1"FP
1"FP 2"FP
2"FP
2 1/2"FP
"F
P
"F
P
1 1/2"FP
1"FP
ZONE
EXISTING
4" FP DN TO PIPE
BASEMENT
COMBINATION AUTOMATIC
SPRINKLER/STANDPIPE RISER
2" DFP UP
COMBINATION AUTOMATIC
SPRINKLER/STANDPIPE RISER
FP
F
P
F P
DFP
STANDPIPE RISER
HOSE VALVE
2" DFP TERMINATION
THROUGH EXTERIOR
WALL
D
FP
DFP
FP BULK FEED DOWN
TO PIPE BASEMENT
FPD UP
FPD DISCHARGES
OVER GRADE
STANDPIPE DOWN
TO PIPE BASEMENT
HOSE VALVE
I O W A
S E
D
PROFESS IONA
27052
L
IC
E N
L E
N G
I N E
E R
DELLAN J.
LLEWELLYN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/1
.0
V A
-W a s h
D C
-V A
S io u x F a lls
N e w
S P
S /M
E P
T
.0
V A
W a s h D
C -V
A S io u x F a lls
N e w S
P S
C
.r v t
/1
/2
:2
:1
A
M
FPD101
GROUND LEVEL DEMOLITION
PLAN - FIRE PROTECTION
CONSTRUCT NEW SPS
Sioux Falls, SD.
438-460
02/14/2025 BLAOBR DELLLE16584
REFERENCE SCALE IN INCHES
0 1 2 3
PROJECT #
IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS
DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE
THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN
APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.
2882 106TH STREET
DES MOINES, IA 50322
515.334.9906 FAX: 515.334.9908
www.imegcorp.com
19004249.04
N O R
HT
1/8" = 1'-0"
GROUND LEVEL DEMOLITION PLAN - FIRE PROTECTION
GENERAL FIRE PROTECTION NOTES:
1. REFERENCE F000 – FIRE PROTECTION
COVERSHEET FOR FIRE PROTECTION
SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
2. REMOVE MAIN SPRINKLER PIPE, BRANCHES,
AND SPRINKLERS THROUGHOUT THE PROJECT
AREA BACK TO RISER LOCATED IN STAIR #4.
KEYNOTES:
1. EXISTING PRESSURE GAUGE INSTALLED IN
STAIR #4 READS 145 PSI AT THIS LEVEL.
2. EXISTING STANDPIPE DOWN TO PIPE
BASEMENT. HORIZONTAL PIPING SHOWN
ROUTES ALONG FLOOR TO STANDPIPE RISER
IN STAIR TOWER. REMOVE PIPING ON FLOOR
AND PREPARE TO EXTEND PIPING FROM PIPE
BASEMENT VERTICALLY TO ABOVE GROUND
FLOOR CEILING BEFORE OFFSETTING
HORIZONTALLY TO CONNECT TO STANDPIPE
RISING UP THROUGH REMAINDER OF STAIR
TOWER.
3. REMOVE EXISTING STANDPIPE DRAIN PIPE
FROM EXTERIOR WALL PENETRATION TO
STAIRWELL. DRAIN WILL BE REROUTED TO
MOP BASIN IN HAC G74-5.
4. REMOVE 2” STANDPIPE DRAIN ROUTED ON
EXTERIOR WALL. DRAIN SHALL BE REROUTED
THROUGH NEW INTERSTITIAL LEVEL
MECHANICAL ROOM AS SHOWN ON FP111.
N
O
SB
S2
23 24
1S
0S
A1
A2
30 Y
A
C
B
D
H
G
5.3
G.2
1.8
F
E
4 54.94.3
30.4
Z1
30.6
A1.8 uuuu
A1.9 wwww
A3.5
A3
1.7
TELECOM
H1
CLEAN HAC
H16
ANTE-ROOM CLEAN
H14
CLEAN WORKROOM, ASSEMBLY
H15
SPS CHIEF OFFICE
H11
ASSISTANT CHIEF OFFICE
H10
RME OFFICE
H9
STAFF LOUNGE
H8
HAC
H6
CORRIDOR
C52
DECONTAMINATION WORK AREA
H21
SOILED HAC
H22
DETERGENT
H23
CART HOLDING
H24
ANTEROOM, SOILED
TRANSITION/DROP-OFF
H25
TOILET
H7
LEAD TECH OFFICE
H5
OPEN OFFICE
H4
CONFERENCE/ TRAINING ROOM
H2
SCOPE PROCESSING
DECONTAMINATION ROOM
H26
LOGISTICS STORAGE ROOM
H18
CORRIDOR
C50
CORRIDOR
C51
SCOPE STAGING ROOM
H17A
MANUAL CART WASH
H20A
CART HOLDING
H20
AUTOMATIC CART WASH AREA
H20B
STERILE INSTRUMENT STORAGE
H17
MENS TOILET/LOCKER
H12
WOMENS TOILET/LOCKER
H13
STEAM STERILIZATION AREA
H19
WOMENS SHOWER
H13A
MENS SHOWER
H12A
OR #1
G25
CLEAN CORE
G26
OR #4
G27
CORRIDOR
C43
STORAGE
G28
STORAGE
G29
Room
D10
STAIR #4
D12
Room
D12A
Room
G02
TELE
G03
EMS
G04
ELEV EQUIP
G05
Room
G42A
CORRIDOR
C50
ELEVATOR LOBBY
G79-5
STAIR 9
G81-5
STEAM STERILIZER
H15A
ELECTRICAL
H3
DR WORK ROOM
D18
CORRIDOR
C12
ZONE
ZONE
FP
F P
F P
FP
FP
4" FP DN TO PIPE
BASEMENT
COMBINATION AUTOMATIC
SPRINKLER/STANDPIPE RISER
FP
F
P
F
P2" DFP UP
COMBINATION
AUTOMATIC SPRINKLER/
STANDPIPE RISER
NC
STANDPIPE RISER
STANDPIPE DOWN
TO PIPE BASEMENT
2 1/2"FP
FP BULK FEED DOWN
TO PIPE BASEMENT
FP UP TO
INTERSTITIAL
LEVEL
BF-1
FS-1
CK-1
IT-1
NC
2"DFP
I O W A
S E
D
PROFESS IONA
27052
L
IC
E N
L E
N G
I N E
E R
DELLAN J.
LLEWELLYN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/1
.0
V A
-W a s h
D C
-V A
S io u x F a lls
N e w
S P
S /M
E P
T
.0
V A
W a s h D
C -V
A S io u x F a lls
N e w S
P S
C
.r v t
/1
/2
:2
:0
A
M
FP101
GROUND LEVEL FLOOR PLAN -
FIRE PROTECTION
CONSTRUCT NEW SPS
Sioux Falls, SD.
438-460
02/14/2025 BLAOBR DELLLE16584
REFERENCE SCALE IN INCHES
0 1 2 3
PROJECT #
IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS
DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE
THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN
APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.
2882 106TH STREET
DES MOINES, IA 50322
515.334.9906 FAX: 515.334.9908
www.imegcorp.com
19004249.04
N O R
HT
1/8" = 1'-0"
GROUND LEVEL FLOOR PLAN - FIRE PROTECTION
GENERAL FIRE PROTECTION NOTES:
1. REFERENCE F000 – FIRE PROTECTION
COVERSHEET FOR FIRE PROTECTION
SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
2. REFERENCE FP400FOR FIRE SPRINKLER
USAGE SCHEDULE AND FIRE PROTECTION
MATERIAL LIST.
3. REFERENCE 1/FP400 FOR RATED FIRE
BARRIER PENETRATIONS. REFER TO
ARCHITECTURAL PLANS FOR FIRE BARRIER
LOCATIONS.
4. REFERENCE 2/FP400 FOR PIPE THROUGH NON-
RATED WALL DETAIL.
5. REFERENCE 3/FP400 FOR SPRINKLER PIPE
HANGER DETAIL.
6. REFERENCE 4/FP400 FOR SPRINKLER HEAD
MOUNTING DETAIL.
7. THE SYMBOLS AND THE MATERIAL LIST ARE
FOR THE CONVENIENCE OF THE
CONTRACTOR. CONTRACTOR SHALL VERIFY
QUANTITIES AND FURNISH ALL MATERIALS
REQUIRED FOR FULLY OPERATIONAL
SYSTEMS, WHETHER SPECIFIED OR NOT.
8. CATALOG NUMBERS SHALL NOT BE
CONSIDERED COMPLETE BUT ARE GIVEN AS
AN AID TO THE CONTRACTOR AND TO
INDICATE THE QUALITY REQUIRED.
CONTRACTOR IS RESPONSIBLE FOR A
COMPLETE DESCRIPTION OF MATERIAL ON
THESE DRAWINGS AND IN THE
SPECIFICATIONS BEFORE ORDERING. THE
DESCRIPTION OF THE MATERIAL TAKES
PRECEDENCE OVER THE CATALOG NUMBER.
THE FIRST MANUFACTURER IS THE BASIS OF
DESIGN.
9. FIRE PROTECTION PIPE ROUTING IS SHOWN
TO INDICATE DESIGN INTENT. FIRE
PROTECTION CONTRACTOR SHALL
DETERMINE EXACT NUMBER OF SPRINKLERS,
PIPE SIZING, AND PIPE ROUTING BASED ON
HYDRAULIC CALCULATIONS AND DETAILED
WORKING DRAWINGS REQUIRED IN NFPA 13.
10. DRAWINGS SHOWING LOCATIONS OF
EQUIPMENT, AND PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS
REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL
ARRANGEMENT OF PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND
FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE
FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS
WILL PERMIT.
11. DO NOT SCALE DRAWINGS. VERIFY ALL
DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS,
AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS,
INCLUDING THOSE OF OTHER TRADES.
12. COORDINATE ALL WORK WITH ALL OTHER
TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION,
MAINTENANCE, CODE COMPLIANCE AND TO
VERIFY NON-INTERFERENCE WITH OTHER
WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES
FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE
ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
13. REVIEW SPACE REQUIREMENTS OF
EQUIPMENT SPECIFIED OR SUBSTITUTED AND
MAKE REASONABLE ACCOMMODATIONS IN
LAYOUT AND POSITIONING TO PROVIDE
PROPER ACCESS.
14. CENTER SPRINKLERS IN CEILING TILES IN
BOTH DIRECTIONS IN ALL AREAS. IN AREAS
WITH 2'X4' CEILING TILES, CENTERING USING A
2'X2' CEILING PATTERN IN ACCEPTABLE.
15. PROVIDE SPRINKLER COVERAGE ABOVE AND
BELOW ALL DUCTWORK GREATER THAN 48"
WIDE.
16. PROVIDE SPRINKLER COVERAGE ABOVE AND
BELOW ALL CLOUD CEILINGS. REFER TO
ARCHITECTURAL REFLECTED CEILING PLANS
FOR LOCATIONS.
KEYNOTES:
1. 2” FPD UP. TERMINATE FPD THROUGH 45°
ELBOW OVER SPLASH BLOCK ON GRADE.
2. EXTEND STANDPIPE FEED RISER UP FROM
EXISTING GROUND LEVEL SLAB PENETRATION
TO ABOVE GROUND LEVEL CEILING BEFORE
RECONNECTING TO EXISTING STANDPIPE IN
STAIRWELL. EXISTING STAIR TOWER NO
LONGER HAS ACCESS TO THIS LEVEL OF THE
FACILITY UNDER NEW WORK.
3. PROVIDE INTERMEDIATE TEMPERATURE
SPRINKLERS ADJACENT TO STEAM UTILIZING
EQUIPMENT AND WHERE STEAM SPILLOUT
MAY OCCUR.
N
O
SB
S2
23 24
1S
0S
A1
A2
30 Y
A
C
B
D
H
G
5.3
G.2
1.8
F
E
4 54.94.3
30.4
Z1
30.6
A1.8 uuuu
A1.9 wwww
A3.5
A3
1.7
STAIR #5
121A
TOILET
WORK ROOM
PROCEDURE ROOM
TOILET
CORRIDOR
MECH
SOILED
CLEAN
M.H.
ELEC
WORK ROOM
WAITING
RECEPTION
HAC
129A
STAIR #4
Room
Room
131A
Room
120A
STAIR
126B
Room
Room
111A
INTERSTITIAL SPACE
Room
CORRIDOR
C52
ZONE
2" DFP UP/DN
COMBINATION AUTOMATIC
SPRINKLER/STANDPIPE RISER
FP
2"DFP
2"DFP
COMBINATION
AUTOMATIC SPRINKLER/
STANDPIPE RISER
FPD UP
2"DFP
2" DFP DN
STANDPIPE UP/DN
HOSE VALVE
FP DOWN TO
GROUND LEVEL
FP
I O W A
S E
D
PROFESS IONA
27052
L
IC
E N
L E
N G
I N E
E R
DELLAN J.
LLEWELLYN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/1
.0
V A
-W a s h
D C
-V A
S io u x F a lls
N e w
S P
S /M
E P
T
.0
V A
W a s h D
C -V
A S io u x F a lls
N e w S
P S
C
.r v t
/1
/2
:2
:0
A
M
FP111
INTERSTITIAL/FIRST LEVEL FLOOR
PLAN - FIRE PROTECTION
CONSTRUCT NEW SPS
Sioux Falls, SD.
438-460
02/14/2025 BLAOBR DELLLE16584
REFERENCE SCALE IN INCHES
0 1 2 3
PROJECT #
IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS
DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE
THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN
APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.
2882 106TH STREET
DES MOINES, IA 50322
515.334.9906 FAX: 515.334.9908
www.imegcorp.com
19004249.04
N O R
HT
1/8" = 1'-0"
INTERSTITIAL/FIRST LEVEL FLOOR PLAN - FIRE PROTECTION
GENERAL FIRE PROTECTION NOTES:
1. REFERENCE F000 – FIRE PROTECTION
COVERSHEET FOR FIRE PROTECTION
SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
2. REFERENCE FP400FOR FIRE SPRINKLER
USAGE SCHEDULE AND FIRE PROTECTION
MATERIAL LIST.
3. REFERENCE 1/FP400 FOR RATED FIRE
BARRIER PENETRATIONS. REFER TO
ARCHITECTURAL PLANS FOR FIRE BARRIER
LOCATIONS.
4. REFERENCE 2/FP400 FOR PIPE THROUGH NON-
RATED WALL DETAIL.
5. Reference 3/fp400 for sprinkler pipe hanger detail.
6. Reference 4/fp400 for sprinkler head mounting detail.
7. THE SYMBOLS AND THE MATERIAL LIST ARE
FOR THE CONVENIENCE OF THE
CONTRACTOR. CONTRACTOR SHALL VERIFY
QUANTITIES AND FURNISH ALL MATERIALS
REQUIRED FOR FULLY OPERATIONAL
SYSTEMS, WHETHER SPECIFIED OR NOT.
8. CATALOG NUMBERS SHALL NOT BE
CONSIDERED COMPLETE BUT ARE GIVEN AS
AN AID TO THE CONTRACTOR AND TO
INDICATE THE QUALITY REQUIRED.
CONTRACTOR IS RESPONSIBLE FOR A
COMPLETE DESCRIPTION OF MATERIAL ON
THESE DRAWINGS AND IN THE
SPECIFICATIONS BEFORE ORDERING. THE
DESCRIPTION OF THE MATERIAL TAKES
PRECEDENCE OVER THE CATALOG NUMBER.
THE FIRST MANUFACTURER IS THE BASIS OF
DESIGN.
9. FIRE PROTECTION PIPE ROUTING IS SHOWN
TO INDICATE DESIGN INTENT. FIRE
PROTECTION CONTRACTOR SHALL
DETERMINE EXACT NUMBER OF SPRINKLERS,
PIPE SIZING, AND PIPE ROUTING BASED ON
HYDRAULIC CALCULATIONS AND DETAILED
WORKING DRAWINGS REQUIRED IN NFPA 13.
10. DRAWINGS SHOWING LOCATIONS OF
EQUIPMENT, AND PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS
REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL
ARRANGEMENT OF PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND
FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE
FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS
WILL PERMIT.
11. DO NOT SCALE DRAWINGS. VERIFY ALL
DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS,
AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS,
INCLUDING THOSE OF OTHER TRADES.
12. COORDINATE ALL WORK WITH ALL OTHER
TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION,
MAINTENANCE, CODE COMPLIANCE AND TO
VERIFY NON-INTERFERENCE WITH OTHER
WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES
FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE
ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
13. REVIEW SPACE REQUIREMENTS OF
EQUIPMENT SPECIFIED OR SUBSTITUTED AND
MAKE REASONABLE ACCOMMODATIONS IN
LAYOUT AND POSITIONING TO PROVIDE
PROPER ACCESS.
14. CENTER SPRINKLERS IN CEILING TILES IN
BOTH DIRECTIONS IN ALL AREAS. IN AREAS
WITH 2'X4' CEILING TILES, CENTERING USING A
2'X2' CEILING PATTERN IN ACCEPTABLE.
15. PROVIDE SPRINKLER COVERAGE ABOVE AND
BELOW ALL DUCTWORK GREATER THAN 48"
WIDE.
16. PROVIDE SPRINKLER COVERAGE ABOVE AND
BELOW ALL CLOUD CEILINGS. REFER TO
ARCHITECTURAL REFLECTED CEILING PLANS
FOR LOCATIONS.
FIRE SEALANT
FIRE SEALANT
NOTE 2
NOTE 3
PENETRATING ITEM
NOTE 4
NOTE 3
NOTE 4
PENETRATING ITEM
NOTE 2
NOTE 3
RATED WALL
(CONSTRUCTION
VARIES)
RATED FLOOR
(CONSTRUCTION
VARIES)
NOTES:
1. THIS GENERAL DETAIL APPLIES TO ALL ITEMS PENETRATING FIRE RATED WALLS OR FLOORS. THE INTENT IS TO MAINTAIN THE FIRE RATING AND TO ALLOW LONGITUDINAL MOVEMENT. REFER TO SPECIFICATION SECTION 21 05 03 FOR SELECTION OF
THROUGH PENETRATION FIRE STOPPING.
2. SCHEDULE 5 PIPE SLEEVE EMBEDDED IN WALL OR FLOOR, OR SMOOTH CORE DRILL. EACH CONTRACTOR FURNISHES SLEEVE TO G.C., COORDINATES SLEEVE LOCATIONS AND DEBURS SLEEVE. G.C. BUILDS SLEEVE INTO WALL OR FLOOR ALLOWING NO GAP AROUND SLEEVE. IF SLEEVE IS NOT PROVIDED WHEN WALL OR FLOOR IS BUILT, CONTRACTOR SHALL INSTALL SLEEVE. SLEEVE
SIZE SHALL ALLOW ANNULAR SPACE REQUIRED BY THE SELECTED FIRE STOP SYSTEM.
3. INSTALL BACKING MATERIAL, SUCH AS MINERAL WOOL SAFING, AS REQUIRED FOR FIRE STOP SYSTEM. INSTALL IN ACCORDANCE WITH FIRE STOP SYSTEM APPLICATION LISTING. SECURE TO WALL OR FLOOR TO ALLOW LONGITUDINAL MOVEMENT OF
PENETRATING ITEM WITHOUT MOVEMENT OF FIRE BARRIER.
4. WATERTIGHT WELDED 1"x1" 20 GAUGE MINIMUM GALVANIZED SHEET METAL ANGLE FRAME, BY CONTRACTOR IN EQUIPMENT ROOMS FOR WATER STOP. PLACE A BEAD OF WATERPROOF SEALANT BETWEEN FLOOR AND BOTTOM OF ANGLE FRAME.
SECURE TO FLOOR WITH MASONRY ANCHORS IN CORNERS AND ON 12" MAXIMUM CENTERS. MULTIPLE PENETRATING ITEMS MAY
BE ENCLOSED IN ONE FRAME.
INSTALL AN ESCUTCHEON AROUND PIPES
EXPOSED IN FINISHED ROOMS. IN SUCH
INSTANCES WHERE AN ESCUTCHEON IS
REQUIRED AND THE PIPING IS INSULATED,
INSTALL A PLASTIC JACKET EXTENDING 6"
BEYOND THE WALL TO PROTECT INSULATION
FROM DAMAGE FROM THE ESCUTCHEON.
MAKE A SMOOTH ROUND OPENING IN
WALL SLIGHTLY LARGER THAN OUTSIDE
DIAMETER OF THE PIPE AND INSULATION.
ADD A BEAD OF NON-HARDENING
CAULK IN THE ANNULAR SPACE.
NOTES:
1. THIS DETAIL APPLIES TO ALL PIPES. THE INTENTION IS TO CONTINUE THE INSULATION AND VAPOR
BARRIER THROUGH ALL PENETRATIONS. PERMIT THERMAL EXPANSION WITHOUT DAMAGING
INSULATION, AND TO SEAL AIRTIGHT AROUND INSULATED AND UNINSULATED PIPES FOR NOISE
TRANSMISSION CONTROL.
2. SEE SPECIFICATION SECTION 21 13 13 FOR ADDITIONAL INFORMATION.
3. FLOOR OPENINGS ARE SIMILAR, SEE SPECIFICATION SECTION 21 13 13 FOR DIFFERENCES
BETWEEN FLOOR AND WALL PENETRATIONS.
12" MAX.12" MAX.
ARMOVER TO SPRINKLER
FIRE PROTECTION
BRANCH LINE OR
CROSS MAIN.
ADJUSTABLE
SWIVEL RING PIPE
HANGER. (NOTE 3)
THREADED ROD
TIGHT TO PIPE.
ESCUTCHEO
N (TYP.)
PENDENT
SPRINKLER (TYP.)
CEILING
(TYP.)
ARMOVER (>12" IN LENGTH) ARMOVER (<12" IN LENGTH)
NOTES:
1. THIS DETAIL APPLIES TO SPRINKLER PIPES ABOVE CEILING THAT SUPPLY
PENDENT SPRINKLERS BELOW CEILINGS WHERE THE WATER PRESSURE
EXCEEDS 100 PSIG (STATIC OR RESIDUAL).
2. ALSO APPLIES TO ARMOVER WHERE CUMULATIVE HORIZONTAL LENGTH IS
GREATER THAN 12".
3. CLEVIS HANGERS AND ADJUSTABLE SWIVEL RING HANGERS WITH SURGE
SUPPRESSOR OR RESTRAINING CLIP ARE ALSO ACCEPTABLE, SEE NFPA 13.
(NOTE 2)
SPRINKLER MAIN
PROVIDE TWO ELL'S FOR
ADJUSTING HEAD TO
CENTER OF CEILING TILE
LAY IN CEILING
CEILING PLATE
AUTOMATIC SPRINKLER HEAD. REFER TO
SPRINKLER HEAD SCHEDULE FOR HEAD TYPE.
I O W A
S E
D
PROFESS IONA
27052
L
IC
E N
L E
N G
I N E
E R
DELLAN J.
LLEWELLYN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/1
.0
V A
-W a s h
D C
-V A
S io u x F a lls
N e w
S P
S /M
E P
T
.0
V A
W a s h D
C -V
A S io u x F a lls
N e w S
P S
C
.r v t
/1
/2
:2
:0
A
M
FP400
FIRE PROTECTION DETAILS CONSTRUCT NEW SPS
Sioux Falls, SD.
438-460
02/14/2025 BLAOBR DELLLE16584
REFERENCE SCALE IN INCHES
0 1 2 3
PROJECT #
IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS
DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE
THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN
APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.
2882 106TH STREET
DES MOINES, IA 50322
515.334.9906 FAX: 515.334.9908
www.imegcorp.com
19004249.04
NO SCALE
FLOOR/WALL PENETRATION - RATED FIRE BARRIER
1 NO SCALE
WALL PENETRATION - NON-FIRE RATED
NO SCALE
SPRINKLER PIPE HANGER DETAIL
3 NO SCALE
SPRINKLER HEAD MOUNTING DETAIL
FIRE PROTECTION MATERIAL LIST
TAG NAME DESCRIPTION MANUFACTURER AND MODEL
BF-1 INDICATING BUTTERFLY VALVE, NORMALLY OPEN, 175 PSI WWP, GROOVED TYPE,
DUCTILE IRON BODY WITH PROTECTIVE COATING, ELECTROLESS NICKEL OR
EPDM COATED DUCTILE IRON DISC, STAINLESS STEEL STEM AND SCREWS,
CAST OR DUCTILE IRON HANDWHEEL, EPDM SEAT, INDICATOR FLAG, FACTORY
MOUNTED INTEGRAL MONITOR SWITCHES, UL/FM.
LUGGED OR WAFER VALVES ARE ACCEPTABLE PROVIDED THEY HAVE THE
FEATURES LISTED ABOVE.
NIBCO GD-4765-8N, VICTAULIC
SERIES 705, TYCO BFV-300,
KENNEDY G300, GLOBE
GLR300G, REL-BFG-300
CK-1 SWING CHECK VALVE, 300 PSI WWP, GROOVED/FLANGED TYPE, DUCTILE IRON
BODY, STAINLESS STEEL HINGE ASSOCIATED WITH RUBBER FACED CLAPPER,
BRASS SEAT RING, ACCESS COVER, 1/2" OR 3/4" TAPPED BOSSES, VALVE LISTED
FOR HORIZONTAL OR VERTICAL INSTALLATION, UL/FM.
FLANGED TYPE IS ACCEPTABLE PROVIDED VALVE HAS THE FEATURES LISTED
ABOVE.
VIKING G-1, TYCO CV-1F
FS-1 FLOW SWITCH - VANE TYPE, 450 PSI, FLOW SENSITIVITY OF 4-10 GPM, TWO
SINGLE POLE DOUBLE THROW SWITCHES, PNEUMATIC RETARD ADJUSTABLE
FROM 0-90 SECONDS WITH AUTOMATIC RESET, NEMA 4 INDOOR/OUTDOOR
RATED METAL HOUSING, UL/FM.
POTTER VSR, SYSTEM
SENSOR WFD
IT-1 COMBINATION INSPECTOR'S TEST AND DRAIN VALVE, 300 PSI, INTEGRAL SIGHT
GLASS, BALL VALVE PLATE INDICATING OFF-TEST-DRAIN POSITIONS,
FURNISHED WITH TEST ORIFICE GIVING FLOW EQUIVALENT TO ONE SPRINKLER
OF A TYPE HAVING THE SMALLEST ORIFICE INSTALLED ON THE SYSTEM,
PRESSURE RELIEF VALVE, UL/FM.
AGF M1011A, RELIABLE
MODEL TD, VICTUALIC
TESTMASTER, GLOBE UTD W/
MODEL ARV PRV
NOTES:
1.SEE FLOOR PLANS FOR ZONING REQUIREMENTS.
2.SPRINKLER SHALL HAVE COLOR CODED BULB THERMAL ELEMENT.
3.ALL SPRINKLERS SHALL BE UL LISTED.
4.CONTRACTOR TO VERIFY SPRINKLER REQUIREMENTS BASED ON ACTUAL INSTALLATION, USAGE, ARCHITECTURAL CEILING PLAN AND NFPA 13 REQUIREMENTS.
5.TAG NAME IS PRIMARILY FOR IDENTIFIYING SPRINKLERS IN SUBMITTALS. IT MAY OR MAY NOT BE FOUND ELSEWHERE ON THE DRAWINGS. CONTRACTOR TO SUBMIT ALL SPRINKLER TYPES TO BE USED.
6.AREAS ARE GENERAL IN NATURE. CONTRACTOR TO MATCH UNSCHEDULED AREAS TO SIMILAR SPACES.
7.SPRINKLERS SHALL HAVE A 3mm QUICK RESPONSE BULB.
8.SPRINKLERS SPECIFIED WITHIN FIRE SPRINKLER USAGE SCHEDULE ARE STANDARD COVERAGE TYPE. EXTENDED COVERAGE SPRINKLERS ARE PERMITTED PROVIDED SPRINKLERS MEET THE REQUIREMENTS OF UL AND FM.
9.PROVIDE STANDARD RESPONSE SPRINKLER WITH FUSIBLE LINK AND MECHANICAL CAGE IN ELECTRICAL AND IT ROOMS.
FIRE SPRINKLER USAGE SCHEDULE
AREA TYPE
(NOTE 1 & 6)
AREA
HAZARD
SPRINKLER
TEMPERATURE
RATING MANUFACTURER & MODEL NOTES
TAG NAME
(NOTE 4 & 5) SPRINKLER TYPE
RESPONSE
CATEGORY FINISH
AREAS WITH CEILINGS OPEN TO STRUCTURE SEE PLANS SPR-1 UPRIGHT QUICK ROUGH BRASS PER NFPA VIKING, RELIABLE, TYCO, VICTAULIC NOTES 2, 3, 7, & 8
AREAS WITH SUSPENDED CEILINGS SEE PLANS SPR-2 RECESSED PENDENT QUICK CHROME PLATED PER NFPA VIKING, RELIABLE, TYCO, VICTAULIC NOTES 2, 3, 7, & 8
ELECTRICAL AND IT ROOMS SEE PLANS SPR-3 UPRIGHT STANDARD CHROME PLATED PER NFPA VIKING, RELIABLE, TYCO, VICTAULIC NOTES 2, 8, & 9
DIRECTION OF AIR FLOW
FLEXIBLE DUCT
MANUAL VOLUME DAMPER
DUCT CAP
DUCT DOWN
DUCT UP
SUPPLY/OUTSIDE AIR DUCT SECTION
RETURN AIR DUCT SECTION
EXHAUST/RELIEF AIR DUCT SECTION
4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION
SD-1
6/115
AIR TERMINAL PROPERTIES SYMBOL
NECK SIZE/CFM
TERMINAL AIR BOX (REFER TO SCHEDULE)###
### TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)
HUMIDIFIERH
OPPOSED BLADE DAMPER (REFER TO SCHEDULE)
PARALLEL BLADE DAMPER (REFER TO SCHEDULE)
DIFFERENTIAL PRESSURE SENSOR
H
HUMIDISTAT/SENSOR (DUCT MOUNTED)H
PRESSURE SENSOR/MONITORP
PRESSURE SENSOR (DUCT MOUNTED)P
THERMOSTAT/SENSORT
TEMPERATURE SENSOR (DUCT MOUNTED)T
THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURET
VENTILATION SYMBOL LIST
SYMBOL: DESCRIPTION:
NOT ALL SYMBOLS MAY APPLY.
HUMIDISTAT/SENSOR
DUCT TRAVERSE MEASUREMENT LOCATION
VENTILATION ABBREVIATION KEY
ABBR: DESCRIPTION:
DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")
DIFFERENTIAL PRESSURE SWITCHDPS
AD ACCESS DOOR
ABOVE FINISHED FLOORAFF
EA EXHAUST/RELIEF AIR
FD FIRE DAMPER
FSD FIRE/SMOKE DAMPER
OA OUTSIDE AIR
RA RETURN AIR
SA SUPPLY AIR
SD SMOKE DAMPER
TERMINAL AIR BOXTAB
TYPICALTYP
UON UNLESS OTHERWISE NOTED
N.C. NORMALLY CLOSED
NOT IN CONTRACTNIC
NORMALLY OPENN.O.
SCCR SHORT CIRCUIT CURRENT RATING
CFSD CONTROL FIRE/SMOKE DAMPER
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10'-0" HEIGHT ABOVE
PROJECT 0'-0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N
O R HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
TEMPERATURE CONTROLS CONTRACTORT.C.C.
CIVIL CONTRACTORC.C.
ASBESTOS ABATEMENT CONTRACTOR
FIRE PROTECTION CONTRACTORF.P.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
ELECTRICAL CONTRACTORE.C.
A.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
CONTRACTING OFFICER'S REPRESENTATIVEC.O.R.
BUILDING CODE: IBC 2021 EDITION
FIRE CODE: IFC 2021 EDITION
PLUMBING CODE: IPC 2021 EDITION
MECHANICAL CODE: IMC 2021 EDITION
ELECTRICAL CODE: NFPA 70 (NEC) 2020 EDITION
LIFE SAFETY CODE: NFPA 101 2021 EDITION
ENERGY CONSERVATION CODE: IECC 2021
HEALTH DEPARTMENT CODE: CURRENT EDITION
LOCAL BUILDING CODE: CURRENT EDITION
APPLICABLE CODES
CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.
CONTACT PERSONS:
PROJECT MANAGER
MECHANICAL
ELECTRICAL
TECHNOLOGY
ERIC J. HENDERSON, PE
DELLAN J. LLEWELLYN, PE
KRISTEN SPINA, PE
DAMON M. DEEN
DESCRIPTION: PERSON:
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
PANELS PRIOR TO BIDDING.
10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
FOR OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL
EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT
LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,
TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.
16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH
OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE
EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO
THE ELECTRICAL DISTRIBUTION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .