S06 - Amend 0002 - RFP - Att 01-08 - DWG - 03242025 - SPS - Sioux Falls.pdf

PDF 11 MB Posted

Attached to
Y1DA--VHA Minor - Construction - Project #438-460 - Sterile Processing Services - Royal C Johnson Veteran's Memorial Hospital - VISN 23 - Sioux Falls SD
Solicitation number
36C77624R0115
Issued by

About this file

This document is an equipment drawing (QH411) for a new Sterile Processing Services (SPS) facility at the VA Medical Center in Sioux Falls, South Dakota, part of Project #438-460. The drawing provides a detailed equipment plan and schedule for a comprehensive renovation and new construction project spanning approximately 8,500 square feet of new space and 2,300 square feet of renovated area. The equipment list includes specialized medical processing equipment from manufacturers like STERIS, Cantel Medical, and others, with a focus on medical instrument reprocessing and sterilization.

The equipment schedule covers multiple functional areas including decontamination work areas, scope processing rooms, clean workrooms, and sterilization spaces. Key equipment includes multiple steam sterilizers (Amsco 600), washer/disinfectors, pass-through endoscope reprocessors, ultrasonic cleaners, transfer carts, and various supporting infrastructure like wire shelving, computer workstations, sinks, and medical technology devices. The drawing indicates a mix of VA-furnished and contractor-installed equipment, with acquisition codes specifying the procurement and installation responsibilities for each item. The project is fully sprinklered and follows current building and fire protection codes, with the design prepared by a licensed architect in Minnesota.

View the file

Other files

File Type Posted
S06 - Amend 0010 - RFP - 36C77624R0115 - SPS - Sioux Falls_rev.docx DOCX document
S06 - Amend 0010 - RFP - 36C77624R0115 - SPS - Sioux Falls.docx DOCX document
S06 - Amend 0009 - Att 12 - DWG EP111 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 07 - List of DWG Sheets - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 03 - DWG AC101 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 10 - Ele Sch - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 16 - DWG ES401 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 04 - DWG AD111 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 08 - DWG CD101 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 01 - Sign-In Sheet - Ele Site Visit- 05142025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 19 - DWG MV600 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 20 - DWG GI001 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 13 - DWG ES099 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 06 - DWG GC111 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 17 - DWG ES500 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 09 - Add Ele Questions and Responses - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 15 - DWG ES400 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 11 - DWG EP101 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 18 - DWG ES501 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 02 - Narrative to KTRs - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 14 - DWG ES100 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 05 - DWG AE111 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0008 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
36C77624R0115 0007.pdf PDF
Amend 0007 - Att 01 - RFI Attachments.pdf PDF
Amend 0007 - Att 02 - RFI QandA.pdf PDF
S06 - Amend 0006 - Att 01- RFP - Sign-In Sheet - Site Visit - 04082025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0006 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0006 - Att 02 - Wage Rates - 03142025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0005 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0004 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0003 - RFP - Sign-in Sheet - Site Visit - 03252025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0003 - RFP - Site Visit Presentation - SPS - Sioux Falls.pdf PDF
S06 - Amend 0003 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-05 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-02 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-03 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-09 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-07 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-11 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-10 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-01 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-06 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-04 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amendment 0001 - SPS - Sioux Falls.pdf PDF
RFP - Att 02 - 02142025 - Specs - Vol I - SPS - Sioux Falls.pdf PDF
36C77624R0115_1.docx DOCX document
RFP - Att 01-01 - DWG - 02142025 - SPS - Sioux Falls.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AE2114 2

AE211

AE412

AE412

AE211

AE211

H21

DECONTAMINATION

WORK AREA

H22

SOILED HAC

H23

DETERGENT

H24

CART

HOLDING

H25

ANTEROOM,

SOILED

TRANSITION/DROP-OFF

H26

SCOPE

PROCESSING

DECONTAMINATION

ROOM

H20B

AUTOMATIC

CART WASH

AREA

H20A

MANUAL

CART WASH

H20

CART

HOLDING

H19

STEAM

STERILIZATION

AREA

H15

CLEAN

WORKROOM,

ASSEMBLY

C50

CORRIDOR

H17A

SCOPE

STAGING

ROOM

AE412 12

S1905

S9610

S9610

S9610 F2700

F2700

F2700 S9610S9610F2700

F2700S9610

S5505

S5505

S5505

S5505

S0005

S0005

S0004

S0003

S0002

A0018

S0495

F0048

F0048

F0048

F0048

F0048 F0048

F0048

F0048

F0048

S0942

S0941

S0941

S0941

S0941

S0940

S0940

S0940

S0940

S0046 S2635

S2

S2

S2

S3185

S0007

A5135

M2055

S0442R

S0442

S0442 S0495

M3160M3160M3160M3160

S2627 S2627

F2700

F2700

F2700

M1803

M1803

M1803

M1803

F2015

F2015

F2015

F2000

M2055A

M2055A

M2055A

M2055A F2700

M1801

M1801

M1801

M1801

M1801

AE412

AE4128

A1195

A1195

A1195

A1195

A1195A

A1195A

S0442R

S0495

S0495

A1014

A5075

A5082

M0512

M0512

S2627

AE211

A5077A5082

H15A

STEAM

STERILIZER

TO BE RELOCATED FROM EXITING

SPACE AS LATE IN THE

CONSTRUCTION AS POSSIBLE.

COORDINATE RELOCATION OF

EQUIPMENT WITH VA COR.

F0860

T0544

M1803

M1803

VA ACQUISITION CODE LEGEND

CONTRACTOR FURNISHED AND INSTALLED CC

VA FURNISHED - CONTRACTOR INSTALLED VC

V V

VC(CF)

VA FURNISHED AND INSTALLED

VA FURNISHED - CONTRACTOR INSTALLED WITH CONSTRUCTION FUNDS

V V(CF)VA FURNISHED - VA INSTALLED WITH CONSTRUCTION FUNDS

RRELOCATED

SEE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL CONTRACTOR FURNISHED

AND CONTRACTOR INSTALLED (CC) EQUIPMENT NOT INDICATED ON EQUIPMENT

SCHEDULE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name:

Tom Olesak

Date: 02/14/2025

License Number: 18157

2882 106th St, Urbandale, IA 50322

C U s e rs

\g b a rb a ri \O n e D ri v e

A N

D E

R S

O N

E N

G

IN

E E

R

IN

G O

F M

N \D o c u m e n ts

\1

-R

G io v a n n i- B a rb a ri .r v t

/2

/2

:0

:1

P

M

QH411

ENLARGED EQUIPMENT PLAN &

SCHEDULE

CONSTRUCT NEW SPS

Sioux Falls, SD.

438-460

02/14/2025 LA GJB16584

1/4" = 1'-0"1 ENLARGED EQUIPMENT PLAN

EQUIPMENT SCHEDULE

EQUIPMENT # EQUIPMENT NAME MANUFACTURER DESCRIPTION

ACQUISITION

CODE QTY ROOM # ROOM NAME

A0018 RENNCO HEAT SEALER RENCO RENNCO HEAT SEALER V V 1 H15 CLEAN WORKROOM, ASSEMBLY

A1014 TELEPHONE, WALL MOUNTED V V 7

A1015 TELEPHONE, DESK V V 8

A1195 AMSCO 50 STAINLESS STEEL 3 COMPARTMENT SINK 120" STERIS

Corporation Amsco 50 Reprocessing Sink - 3 Bay/120" Long/Height Adjustable/Left to Right Work Flow (Delivery may be restricted by hallway width. STERIS installation and delivery teams to verify prior to shipping.)

V C 4 H21 DECONTAMINATION WORK AREA

A1195A AMSCO 50 STAINLESS STEEL 3 COMPARTMENT

REPROCESSING SINK 97.5"

STERIS

Corporation

Amsco 50 Reprocessing Sink - 3 Bay/97.5" Long/Height Adjustable/Left to Right Work Flow

V C 2 H26 SCOPE PROCESSING DECONTAMINATION

ROOM

A5020 BENCH, FLOOR MOUNTED Scranton Products Lockers as Specified in 10 51 00 V C 2

A5075 SOAP DISPENSER V V 11

A5077 HAND SANITIZER DISPENSER V V 8

A5082 HANDS FREE PAPER TOWEL DISPENSER V V 12

A5090 SANITARY NAPKIN DISPOSAL V V 3

A5107 GLOVE DISPNSER (3 BOX) V V 1 H26 SCOPE PROCESSING DECONTAMINATION

ROOM

A5108 SHARPS A container for collecting and transporting syringes and other sharps for decontamination and disposal. Available in 2 gallon and 8 gallon with locking rotor.

Complies with OSHA regulations for handling sharps.

1 H26 SCOPE PROCESSING DECONTAMINATION

ROOM

A5135 MOP HOLDER WITH SHELF Bradley Corporation

Utility Shelf w/2 Hooks 3 Holders & 1 Drying Rod - 30" W V C 3

A5145 HOOK, GARMENT, DOUBLE A SURFACE MOUNTED, SATIN FINISH STAINLESS STEEL, GARMENT HOOK, WITH A CONCEALED MOUNTING BRACKET THAT IS SECURED TO A

CONCEALED WALL PLATE. FOR GENERAL PURPOSE

V C 12

A5202 TOILET PAPER HOLDER 2 ROLL WITH SHELF V V 5

E2624 SCOPE BLOCK HOLDER 1 H26 SCOPE PROCESSING DECONTAMINATION

ROOM

F0048 TRANSFER CART STERIS

Corporation Reliance Transfer Cart V V 9

F0860 STAINLESS STEEL TABLE 7

F2000 TRASH CAN 16" DIA Wastepaper basket, fire resistant, approximately 40 quart capacity. This unit is used to collect and temporarily store small quantities of paper refuse in patient rooms, administrative areas and nursing stations. Size and shape varies depending on the app

V V 6

F2010 BASKET, WASTE PAPER, STEP-ON STEP ON TRASH CAN V V 1 H7 TOILET

F2015 TRASH CAN 18"x18" METAL OR PLASTIC WASTEPAPER BASKET WITH SWING DOORS AND

REMOVABLE LID, 18" X 18"

V V 7

F2700 BAR CODE READER V V 9

F3200 CLOCK, BATTERY, 12IN DIA V V 1 H8 STAFF LOUNGE

M0512 FLAT SCREEN MONITOR 60" WITH WALL BRACKET V V 4

M1801 COMPUTER WITH FLAT PANEL MONITOR V V 14

M1803 WALL MOUNTED COMPUTER WORKSTATION V V 8

M2055 WIRE SHELVING 48"X 18" STROAGE RACK 10

M2055A WIRE SHELVING 36"x18" STROAGE RACK V C 5 M2056 HIGH DENSITY SHELVING SYSTEM 78"H X 108"D X 156"W TOTAL V V 2 H17 STERILE INSTRUMENT STORAGE

M3160 MEDIVATOR ADVANATAGE PLUS AER SCOPE DRYING

CABINET

CANTEL MEDICAL ADVANTAGE PLUS AER - Single-side V C 4 H17A SCOPE STAGING ROOM

R7250 REFRIGERATOR REFRIGERATOR V V 1 H8 STAFF LOUNGE

S0002 3M ATTEST AUTO READER 390 3M ATTEST AUTO READER 390 V V 1 H15 CLEAN WORKROOM, ASSEMBLY S0003 CENSATRAC SCANNER CHARGING STATION CENSATRAC SCANNER CHARGING STATION V V 1 H15 CLEAN WORKROOM, ASSEMBLY S0004 INCUBATOR, BIOLOGICAL INDICATOR INCUBATOR, BIOLOGICAL INDICATOR V V 1 H15 CLEAN WORKROOM, ASSEMBLY S0005 STRYKER BATTERY CHARGING STATION STRYKER BATTERY CHARGING STATION V V 2 H15 CLEAN WORKROOM, ASSEMBLY S0006 TEE PROBE STORAGE CABINET TEE PROBE STORAGE CABINET V C 1 H17 STERILE INSTRUMENT STORAGE S0007 COUNTERTOP ULTRASONIC CLEANER COUNTERTOP ULTRASONIC CLEANER V V 1 H21 DECONTAMINATION WORK AREA

S0046 STERIS AMSCO DRYING CABINET STERIS

Corporation Amsco Drying Cabinet - 38"/Single Door (110-120 Volt/20 Amp Dedicated Wall Plug)

V C 1 H15 CLEAN WORKROOM, ASSEMBLY

S0442 AMSCO 600 STEAM STERLISER - 26.5x26.5x63" STERIS Corporation

Amsco 600 Medium Steam Sterilizer - 26.5x26.5x63" (673x673x1600mm)/Single Sliding Door/Recessed/Steam Heat

V C 2 H19 STEAM STERILIZATION AREA

S0442R AMSCO 600 STEAM STERLISER - 26.5x26.5x63" STERIS Corporation

Amsco 600 Medium Steam Sterilizer - 26.5x26.5x63" (673x673x1600mm)/Single Sliding Door/Recessed/Steam Heat

V C R 2

S0495 STERIS AMSCO 600 LOADING / TRANSFER CART STERIS

Corporation

Amsco 600 Loading Car and Transfer Carriage - 26.5x26.5x63"/Fixed Height V V 4 H15 CLEAN WORKROOM, ASSEMBLY

S0940 STERIS AMSCO 7052HP WASHER / DISINFECTOR STERIS

CORPORATION

AMSCO 7052HP SINGLE-CHAMBER WASHER/DISINFECTOR - DOUBLE

DOOR/STEAM HEAT/VENTED/FLUSH MOUNTED

V C 4 H21 DECONTAMINATION WORK AREA

S0940A AMSCO AIR MANAGEMENT SYSTEM STERIS

CORPORATION

V C 2 H21 DECONTAMINATION WORK AREA

S0941 STERIS WASHER / DISINFECTOR CONVEYOR SYSTEM STERIS

Corporation

SCS Load/Unload Conveyor System - Single Load/Single Unload V C 4 H21 DECONTAMINATION WORK AREA

S0942 STERIS MOTORIZED RETURN CONVEYOR SYSTEM WITH

DOOR

STERIS

Corporation

SCS-L Motorized Return Conveyor System - 3 Module/Return Door/Flush Mounted V C 1 H21 DECONTAMINATION WORK AREA

S1905 STERRIS AUTOMATED PASS THOUGH WINDOW 34"x45" STERIS Corporation

STERIS Automated Pass-Through Window - Endoscopy Application (40x45" Window)

V C 1 H15 CLEAN WORKROOM, ASSEMBLY

S2627 ADVANTAGE PLUS PASS-THRU ENDOSCOPE REPROSSER CANTEL MEDICAL ADVANTAGE PLUS Pass-Thru Reprocessor, 230V (with air compressor) V C 3 H26 SCOPE PROCESSING DECONTAMINATION

ROOM

S2628 STERIS ACU-HOLD SYSTEM - WALL MOUNTED 3

CONTAINER

STERIS

Corporation

Acu-Hold System - Wall Mounted/ 3 Container V C 4 H23 DETERGENT

S2635 INNOWAVE ULTRASONIC IRRIGATOR & CLEANER STERIS

Corporation

InnoWave Unity Ultrasonic Irrigator - 15 Gallon V C 4 H21 DECONTAMINATION WORK AREA

S3185 STERIS VISSION 1327 CART AND UTENSIL WASHER STERIS

Corporation

Vision 1327 Cart and Utensil Washer/Disinfector - Standard Orientation/Double Door/Pit Mounted

V C 1 H20B AUTOMATIC CART WASH AREA

S5505 STERIS AMSCO V-PRO MAX LOW TEMP STERILIZER STERIS

Corporation

Amsco V-PRO Max Low Temperature Sterilization System - Single Door/Cabinet V C 4 H15 CLEAN WORKROOM, ASSEMBLY

S9610 AMSCO PREP AND PACK WORK STATION 36' X 72"

(ELECTRIC)

STERIS

Corporation

Amsco Deluxe Prep and Pack Workstation - 36x72"/Electric V C 6 H15 CLEAN WORKROOM, ASSEMBLY

T0544 MOBLE CART V V 1 H21 DECONTAMINATION WORK AREA

Revisions: Date:

FIRE PROTECTION SYMBOL LIST

SYMBOL: DESCRIPTION:

FIRE PROTECTIONFP

SERVICE WATER - POTABLEW

AIR PRESSURE MAINTENANCE DEVICE

AIR SUPERVISORY SWITCH

ANGLE VALVE

BUTTERFLY VALVE WITH MONITOR SWITCH

OS&Y GATE VALVE

OS&Y GATE VALVE WITH MONITOR SWITCH

PRESSURE SWITCH

P

NO HATCH LIGHT HAZARD

ORDINARY GROUP 1

ORDINARY GROUP 2

SPRINKLER - WALL MOUNTED

SPRINKLER

INSPECTOR TEST AND DRAIN VALVE

MONITOR SWITCH

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

SHUTOFF VALVE NORMALLY OPEN

DEMOLITION

DRAINDFP

NOT ALL SYMBOLS MAY APPLY.

AUTOMATIC DRAIN VALVE

UNION/FLANGE

DIRECTION OF FLOW IN PIPE

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

CHECK VALVE

FLOW SWITCH

F

ROUTE TO DRAIN

AREA BOUNDARY

BACKFLOW PREVENTER

FIRE PROTECTION ABBREVIATION KEY

AD ACCESS DOOR

BFP BACKFLOW PREVENTER

N.C. NORMALLY CLOSED

ABOVE FINISHED FLOORAFF

NOT IN CONTRACTNIC

NORMALLY OPENN.O.

ABBR: DESCRIPTION:

TYPICALTYP

UNLESS OTHERWISE NOTESUON

I.E. INVERT ELEVATION

SHORT CIRCUIT CURRENT RATINGSCCR

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10'-0" HEIGHT ABOVE

PROJECT 0'-0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

BUILDING CODE: IBC 2021 EDITION

FIRE CODE: IFC 2021 EDITION

PLUMBING CODE: IPC 2021 EDITION

MECHANICAL CODE: IMC 2021 EDITION

ELECTRICAL CODE: NFPA 70 (NEC) 2020 EDITION

LIFE SAFETY CODE: NFPA 101 2021 EDITION

ENERGY CONSERVATION CODE: IECC 2021

HEALTH DEPARTMENT CODE: CURRENT EDITION

LOCAL BUILDING CODE: CURRENT EDITION

APPLICABLE CODES

CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.

CONTACT PERSONS:

PROJECT MANAGER

MECHANICAL

ELECTRICAL

TECHNOLOGY

ERIC J. HENDERSON, PE

DELLAN J. LLEWELLYN, PE

KRISTEN SPINA, PE

DAMON M. DEEN

DESCRIPTION: PERSON:

TEMPERATURE CONTROLS CONTRACTORT.C.C.

CIVIL CONTRACTORC.C.

ASBESTOS ABATEMENT CONTRACTOR

FIRE PROTECTION CONTRACTORF.P.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

ELECTRICAL CONTRACTORE.C.

A.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

CONTRACTING OFFICER'S REPRESENTATIVEC.O.R.

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,

AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE

SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER

FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE

TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS

WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL

EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT

LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,

TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.

16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH

OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE

EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO

THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED

ELECTRICAL SPACE INCLUDING; DUCTWORK, PIPING, ETC.

17. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL

EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.

18. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE

FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD

CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND

SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE

REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.

5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF

ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.

CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.

6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL

CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO

BIDDING.

7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW

SYSTEMS ARE INSTALLED.

10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

TEST DATE:

LOCATION:

STATIC PRESSURE:

RESIDUAL PRESSURE:

TOTAL FLOW:

SIZE OF MAIN:

FIRE FLOW TEST DATA

SEPTEMBER 16, 2019

FIRE PUMP, FIRE PUMP ROOM, GROUND FLOOR, BUILDING 5

133 PSI

82 PSI

1,500 GPM

4" DIAMETER, ROUGHLY 320 FEET OF PIPE FROM FIRE PUMP TO WEST

WING RISER

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE

CONTRACTOR. CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS

REQUIRED FOR FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID

TO THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS

RESPONSIBLE FOR COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND

IN THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL

TAKES PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER IS THE

BASIS OF DESIGN.

3. CENTER SPRINKLERS IN CEILING TILES IN BOTH DIRECTIONS IN ALL AREAS. IN AREAS

WITH 2’X4’ CEILING TILES CENTERING USING A 2’X2’ CEILING PATTERN IS ACCEPTABLE.

SPRINKLER HEADS SHALL BE ALIGNED WITH OTHER SPRINKLER HEADS, LIGHTING,

DIFFUSERS, AND ANY OTHER FEATURES IN THE CEILING.

4. NEW SPRINKLERS SHALL BE QUICK RESPONSE TYPE, UNLESS OTHERWISE NOTED.

CONTRACTOR SHALL NOT MIX STANDARD RESPONSE SPRINKLERS WITH QUICK

RESPONSE SPRINKLERS IN UNPARTITIONED SPACES.

5. PROVIDE COVERAGE ABOVE AND BELOW ALL DUCTWORK GREATER THAN 48" WIDE.

6. PROVIDE COVERAGE ABOVE (IF APPLICABLE) AND BELOW FLOATING CEILINGS, REFER

TO ARCHITECTURAL PLANS.

7. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT

NUMBER OF SPRINKLERS, PIPE SIZING, AND PIPE ROUTING.

8. ALL BUILDING AREA SHALL BE FULLY SPRINKLERED INCLUDING CANOPIES, WALKWAYS,

OVERHANGS, SOFFITS, AND BUILDING PROJECTIONS. ALL ACCESSIBLE COMBUSTIBLE

CONCEALED SPACES SHALL BE FULLY PROTECTED BY THE SPRINKLER SYSTEM.

9. EACH RISER ASSEMBLY SHALL INCLUDE CHECK VALVE BUTTERFLY CONTROL VALVE

INDICATING "OPEN" OR "CLOSED" POSITION, TEST INSPECTION VALVE, FLOW SWITCH

AND PRESSURE GAUGES.

10. WHERE FEASIBLE INSTALL PIPES HIGH AS POSSIBLE TO AVOID CONFLICT WITH OTHER

DISCIPLINES.

11. INSTALL SYSTEM DRAINS AT LOW POCKET AREAS CONTAINING FIVE GALLONS OF

WATER OR MORE, PROVIDE WITH ISOLATION VALVE AND THREADED HOSE

CONNECTION.

12. MAIN PIPING PASSING BELOW SKYLIGHTS OR CLERESTORIES ARE NOT PERMITTED.

13. FOLLOW STRUCTURAL DETAILS WHEN PENETRATING OR PASSING THROUGH

STRUCTURAL ELEMENTS. ALTERNATE DESIGNS WILL NEED TO BE APPROVED THROUGH

THE STRUCTURAL ENGINEER.

14. PROVIDE INTERMEDIATE TEMPERATURE SPRINKLER HEADS WHERE REQUIRED BY NFPA

13 UNLESS OTHERWISE NOTED.

15. FINAL HEAD LOCATION, TYPE AND FINISH SHALL BE REVIEWED AND APPROVED BY THE

ARCHITECT.

16. A GRAPHIC ANNUNCIATOR PANEL SHALL BE PROVIDED TO INCLUDE AREAS BEING

PROVIDED WITH A PRE-ACTION OR CLEAN AGENT SYSTEM WHICH HAVE CONCEALED

AREAS.

17. EXACT LOCATION OF THE ALL PANELS SHALL BE VERIFIED ON SITE AND COORDINATED

WITH THE ELECTRICAL CONTRACTOR.

18. PAINT ALL EXPOSED PIPING TO MATCH BACKGROUND OR AS DIRECTED BY THE

ARCHITECT.

19. THE OWNER MUST BE NOTIFIED PRIOR TO EACH AND EVERY DRAINING OR RECHARGING

OF THE SPRINKLER SYSTEM.

20. THE CONTRACTOR SHALL PREPARE A COORDINATED SET OF SHOP DRAWINGS AND

SHALL OBTAIN APPROVAL FROM THE AUTHORITIES HAVING JURISDICTION AND THE

LOCAL FIRE DEPARTMENT PRIOR TO ANY INSTALLATION.

21. DRAWING SHOW LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT,

ETC. AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

22. VERIFY ALL DIMENSIONS AND CLEARANCES FROM ARCHITECTURAL, STRUCTURAL,

SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR PHYSICALLY AT SITE. REVIEW

ALL DRAWINGS. INCLUDING THOSE OF OTHER TRADES.

FIRE PROTECTION GENERAL NOTES:

FIRE PROTECTION SHEET INDEX

FP000 FIRE PROTECTION COVERSHEET

FPD101 GROUND LEVEL DEMOLITION PLAN - FIRE PROTECTION

FP101 GROUND LEVEL FLOOR PLAN - FIRE PROTECTION

FP111 INTERSTITIAL/FIRST LEVEL FLOOR PLAN - FIRE PROTECTION

FP400 FIRE PROTECTION DETAILS

GRAND TOTAL: 5

I O W A

S E

D

PROFESS IONA

27052

L

IC

E N

L E

N G

I N E

E R

DELLAN J.

LLEWELLYN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/1

.0

V A

-W a s h

D C

-V A

S io u x F a lls

N e w

S P

S /M

E P

T

.0

V A

W a s h D

C -V

A S io u x F a lls

N e w S

P S

C

.r v t

/1

/2

:2

:5

A

M

FP000

FIRE PROTECTION COVERSHEET CONSTRUCT NEW SPS

Sioux Falls, SD.

438-460

02/14/2025 BLAOBR DELLLE16584

REFERENCE SCALE IN INCHES

0 1 2 3

PROJECT #

IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS

DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE

THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN

APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.

2882 106TH STREET

DES MOINES, IA 50322

515.334.9906 FAX: 515.334.9908

www.imegcorp.com

19004249.04

L

M

N

O

SB

S2

23 24

1S

0S

A1

A2

30 Y

A

C

B

D

H

G

5.3

G.2

1.8

F

E

4 54.94.3

30.4

Z1

30.6

A1.8 uuuu

A1.9 wwww

A3.5

A3

1.7

3"FP

2"FP2"FP1"FP1"FP

1"FP 2"FP

2"FP

2 1/2"FP

"F

P

"F

P

1 1/2"FP

1"FP

ZONE

EXISTING

4" FP DN TO PIPE

BASEMENT

COMBINATION AUTOMATIC

SPRINKLER/STANDPIPE RISER

2" DFP UP

COMBINATION AUTOMATIC

SPRINKLER/STANDPIPE RISER

FP

F

P

F P

DFP

STANDPIPE RISER

HOSE VALVE

2" DFP TERMINATION

THROUGH EXTERIOR

WALL

D

FP

DFP

FP BULK FEED DOWN

TO PIPE BASEMENT

FPD UP

FPD DISCHARGES

OVER GRADE

STANDPIPE DOWN

TO PIPE BASEMENT

HOSE VALVE

I O W A

S E

D

PROFESS IONA

27052

L

IC

E N

L E

N G

I N E

E R

DELLAN J.

LLEWELLYN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/1

.0

V A

-W a s h

D C

-V A

S io u x F a lls

N e w

S P

S /M

E P

T

.0

V A

W a s h D

C -V

A S io u x F a lls

N e w S

P S

C

.r v t

/1

/2

:2

:1

A

M

FPD101

GROUND LEVEL DEMOLITION

PLAN - FIRE PROTECTION

CONSTRUCT NEW SPS

Sioux Falls, SD.

438-460

02/14/2025 BLAOBR DELLLE16584

REFERENCE SCALE IN INCHES

0 1 2 3

PROJECT #

IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS

DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE

THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN

APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.

2882 106TH STREET

DES MOINES, IA 50322

515.334.9906 FAX: 515.334.9908

www.imegcorp.com

19004249.04

N O R

HT

1/8" = 1'-0"

GROUND LEVEL DEMOLITION PLAN - FIRE PROTECTION

GENERAL FIRE PROTECTION NOTES:

1. REFERENCE F000 – FIRE PROTECTION

COVERSHEET FOR FIRE PROTECTION

SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

2. REMOVE MAIN SPRINKLER PIPE, BRANCHES,

AND SPRINKLERS THROUGHOUT THE PROJECT

AREA BACK TO RISER LOCATED IN STAIR #4.

KEYNOTES:

1. EXISTING PRESSURE GAUGE INSTALLED IN

STAIR #4 READS 145 PSI AT THIS LEVEL.

2. EXISTING STANDPIPE DOWN TO PIPE

BASEMENT. HORIZONTAL PIPING SHOWN

ROUTES ALONG FLOOR TO STANDPIPE RISER

IN STAIR TOWER. REMOVE PIPING ON FLOOR

AND PREPARE TO EXTEND PIPING FROM PIPE

BASEMENT VERTICALLY TO ABOVE GROUND

FLOOR CEILING BEFORE OFFSETTING

HORIZONTALLY TO CONNECT TO STANDPIPE

RISING UP THROUGH REMAINDER OF STAIR

TOWER.

3. REMOVE EXISTING STANDPIPE DRAIN PIPE

FROM EXTERIOR WALL PENETRATION TO

STAIRWELL. DRAIN WILL BE REROUTED TO

MOP BASIN IN HAC G74-5.

4. REMOVE 2” STANDPIPE DRAIN ROUTED ON

EXTERIOR WALL. DRAIN SHALL BE REROUTED

THROUGH NEW INTERSTITIAL LEVEL

MECHANICAL ROOM AS SHOWN ON FP111.

N

O

SB

S2

23 24

1S

0S

A1

A2

30 Y

A

C

B

D

H

G

5.3

G.2

1.8

F

E

4 54.94.3

30.4

Z1

30.6

A1.8 uuuu

A1.9 wwww

A3.5

A3

1.7

TELECOM

H1

CLEAN HAC

H16

ANTE-ROOM CLEAN

H14

CLEAN WORKROOM, ASSEMBLY

H15

SPS CHIEF OFFICE

H11

ASSISTANT CHIEF OFFICE

H10

RME OFFICE

H9

STAFF LOUNGE

H8

HAC

H6

CORRIDOR

C52

DECONTAMINATION WORK AREA

H21

SOILED HAC

H22

DETERGENT

H23

CART HOLDING

H24

ANTEROOM, SOILED

TRANSITION/DROP-OFF

H25

TOILET

H7

LEAD TECH OFFICE

H5

OPEN OFFICE

H4

CONFERENCE/ TRAINING ROOM

H2

SCOPE PROCESSING

DECONTAMINATION ROOM

H26

LOGISTICS STORAGE ROOM

H18

CORRIDOR

C50

CORRIDOR

C51

SCOPE STAGING ROOM

H17A

MANUAL CART WASH

H20A

CART HOLDING

H20

AUTOMATIC CART WASH AREA

H20B

STERILE INSTRUMENT STORAGE

H17

MENS TOILET/LOCKER

H12

WOMENS TOILET/LOCKER

H13

STEAM STERILIZATION AREA

H19

WOMENS SHOWER

H13A

MENS SHOWER

H12A

OR #1

G25

CLEAN CORE

G26

OR #4

G27

CORRIDOR

C43

STORAGE

G28

STORAGE

G29

Room

D10

STAIR #4

D12

Room

D12A

Room

G02

TELE

G03

EMS

G04

ELEV EQUIP

G05

Room

G42A

CORRIDOR

C50

ELEVATOR LOBBY

G79-5

STAIR 9

G81-5

STEAM STERILIZER

H15A

ELECTRICAL

H3

DR WORK ROOM

D18

CORRIDOR

C12

ZONE

ZONE

FP

F P

F P

FP

FP

4" FP DN TO PIPE

BASEMENT

COMBINATION AUTOMATIC

SPRINKLER/STANDPIPE RISER

FP

F

P

F

P2" DFP UP

COMBINATION

AUTOMATIC SPRINKLER/

STANDPIPE RISER

NC

STANDPIPE RISER

STANDPIPE DOWN

TO PIPE BASEMENT

2 1/2"FP

FP BULK FEED DOWN

TO PIPE BASEMENT

FP UP TO

INTERSTITIAL

LEVEL

BF-1

FS-1

CK-1

IT-1

NC

2"DFP

I O W A

S E

D

PROFESS IONA

27052

L

IC

E N

L E

N G

I N E

E R

DELLAN J.

LLEWELLYN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/1

.0

V A

-W a s h

D C

-V A

S io u x F a lls

N e w

S P

S /M

E P

T

.0

V A

W a s h D

C -V

A S io u x F a lls

N e w S

P S

C

.r v t

/1

/2

:2

:0

A

M

FP101

GROUND LEVEL FLOOR PLAN -

FIRE PROTECTION

CONSTRUCT NEW SPS

Sioux Falls, SD.

438-460

02/14/2025 BLAOBR DELLLE16584

REFERENCE SCALE IN INCHES

0 1 2 3

PROJECT #

IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS

DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE

THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN

APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.

2882 106TH STREET

DES MOINES, IA 50322

515.334.9906 FAX: 515.334.9908

www.imegcorp.com

19004249.04

N O R

HT

1/8" = 1'-0"

GROUND LEVEL FLOOR PLAN - FIRE PROTECTION

GENERAL FIRE PROTECTION NOTES:

1. REFERENCE F000 – FIRE PROTECTION

COVERSHEET FOR FIRE PROTECTION

SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

2. REFERENCE FP400FOR FIRE SPRINKLER

USAGE SCHEDULE AND FIRE PROTECTION

MATERIAL LIST.

3. REFERENCE 1/FP400 FOR RATED FIRE

BARRIER PENETRATIONS. REFER TO

ARCHITECTURAL PLANS FOR FIRE BARRIER

LOCATIONS.

4. REFERENCE 2/FP400 FOR PIPE THROUGH NON-

RATED WALL DETAIL.

5. REFERENCE 3/FP400 FOR SPRINKLER PIPE

HANGER DETAIL.

6. REFERENCE 4/FP400 FOR SPRINKLER HEAD

MOUNTING DETAIL.

7. THE SYMBOLS AND THE MATERIAL LIST ARE

FOR THE CONVENIENCE OF THE

CONTRACTOR. CONTRACTOR SHALL VERIFY

QUANTITIES AND FURNISH ALL MATERIALS

REQUIRED FOR FULLY OPERATIONAL

SYSTEMS, WHETHER SPECIFIED OR NOT.

8. CATALOG NUMBERS SHALL NOT BE

CONSIDERED COMPLETE BUT ARE GIVEN AS

AN AID TO THE CONTRACTOR AND TO

INDICATE THE QUALITY REQUIRED.

CONTRACTOR IS RESPONSIBLE FOR A

COMPLETE DESCRIPTION OF MATERIAL ON

THESE DRAWINGS AND IN THE

SPECIFICATIONS BEFORE ORDERING. THE

DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER.

THE FIRST MANUFACTURER IS THE BASIS OF

DESIGN.

9. FIRE PROTECTION PIPE ROUTING IS SHOWN

TO INDICATE DESIGN INTENT. FIRE

PROTECTION CONTRACTOR SHALL

DETERMINE EXACT NUMBER OF SPRINKLERS,

PIPE SIZING, AND PIPE ROUTING BASED ON

HYDRAULIC CALCULATIONS AND DETAILED

WORKING DRAWINGS REQUIRED IN NFPA 13.

10. DRAWINGS SHOWING LOCATIONS OF

EQUIPMENT, AND PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS

REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL

ARRANGEMENT OF PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND

FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE

FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS

WILL PERMIT.

11. DO NOT SCALE DRAWINGS. VERIFY ALL

DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS,

AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS,

INCLUDING THOSE OF OTHER TRADES.

12. COORDINATE ALL WORK WITH ALL OTHER

TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION,

MAINTENANCE, CODE COMPLIANCE AND TO

VERIFY NON-INTERFERENCE WITH OTHER

WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES

FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE

ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

13. REVIEW SPACE REQUIREMENTS OF

EQUIPMENT SPECIFIED OR SUBSTITUTED AND

MAKE REASONABLE ACCOMMODATIONS IN

LAYOUT AND POSITIONING TO PROVIDE

PROPER ACCESS.

14. CENTER SPRINKLERS IN CEILING TILES IN

BOTH DIRECTIONS IN ALL AREAS. IN AREAS

WITH 2'X4' CEILING TILES, CENTERING USING A

2'X2' CEILING PATTERN IN ACCEPTABLE.

15. PROVIDE SPRINKLER COVERAGE ABOVE AND

BELOW ALL DUCTWORK GREATER THAN 48"

WIDE.

16. PROVIDE SPRINKLER COVERAGE ABOVE AND

BELOW ALL CLOUD CEILINGS. REFER TO

ARCHITECTURAL REFLECTED CEILING PLANS

FOR LOCATIONS.

KEYNOTES:

1. 2” FPD UP. TERMINATE FPD THROUGH 45°

ELBOW OVER SPLASH BLOCK ON GRADE.

2. EXTEND STANDPIPE FEED RISER UP FROM

EXISTING GROUND LEVEL SLAB PENETRATION

TO ABOVE GROUND LEVEL CEILING BEFORE

RECONNECTING TO EXISTING STANDPIPE IN

STAIRWELL. EXISTING STAIR TOWER NO

LONGER HAS ACCESS TO THIS LEVEL OF THE

FACILITY UNDER NEW WORK.

3. PROVIDE INTERMEDIATE TEMPERATURE

SPRINKLERS ADJACENT TO STEAM UTILIZING

EQUIPMENT AND WHERE STEAM SPILLOUT

MAY OCCUR.

N

O

SB

S2

23 24

1S

0S

A1

A2

30 Y

A

C

B

D

H

G

5.3

G.2

1.8

F

E

4 54.94.3

30.4

Z1

30.6

A1.8 uuuu

A1.9 wwww

A3.5

A3

1.7

STAIR #5

121A

TOILET

WORK ROOM

PROCEDURE ROOM

TOILET

CORRIDOR

MECH

SOILED

CLEAN

M.H.

ELEC

WORK ROOM

WAITING

RECEPTION

HAC

129A

STAIR #4

Room

Room

131A

Room

120A

STAIR

126B

Room

Room

111A

INTERSTITIAL SPACE

Room

CORRIDOR

C52

ZONE

2" DFP UP/DN

COMBINATION AUTOMATIC

SPRINKLER/STANDPIPE RISER

FP

2"DFP

2"DFP

COMBINATION

AUTOMATIC SPRINKLER/

STANDPIPE RISER

FPD UP

2"DFP

2" DFP DN

STANDPIPE UP/DN

HOSE VALVE

FP DOWN TO

GROUND LEVEL

FP

I O W A

S E

D

PROFESS IONA

27052

L

IC

E N

L E

N G

I N E

E R

DELLAN J.

LLEWELLYN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/1

.0

V A

-W a s h

D C

-V A

S io u x F a lls

N e w

S P

S /M

E P

T

.0

V A

W a s h D

C -V

A S io u x F a lls

N e w S

P S

C

.r v t

/1

/2

:2

:0

A

M

FP111

INTERSTITIAL/FIRST LEVEL FLOOR

PLAN - FIRE PROTECTION

CONSTRUCT NEW SPS

Sioux Falls, SD.

438-460

02/14/2025 BLAOBR DELLLE16584

REFERENCE SCALE IN INCHES

0 1 2 3

PROJECT #

IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS

DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE

THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN

APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.

2882 106TH STREET

DES MOINES, IA 50322

515.334.9906 FAX: 515.334.9908

www.imegcorp.com

19004249.04

N O R

HT

1/8" = 1'-0"

INTERSTITIAL/FIRST LEVEL FLOOR PLAN - FIRE PROTECTION

GENERAL FIRE PROTECTION NOTES:

1. REFERENCE F000 – FIRE PROTECTION

COVERSHEET FOR FIRE PROTECTION

SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

2. REFERENCE FP400FOR FIRE SPRINKLER

USAGE SCHEDULE AND FIRE PROTECTION

MATERIAL LIST.

3. REFERENCE 1/FP400 FOR RATED FIRE

BARRIER PENETRATIONS. REFER TO

ARCHITECTURAL PLANS FOR FIRE BARRIER

LOCATIONS.

4. REFERENCE 2/FP400 FOR PIPE THROUGH NON-

RATED WALL DETAIL.

5. Reference 3/fp400 for sprinkler pipe hanger detail.

6. Reference 4/fp400 for sprinkler head mounting detail.

7. THE SYMBOLS AND THE MATERIAL LIST ARE

FOR THE CONVENIENCE OF THE

CONTRACTOR. CONTRACTOR SHALL VERIFY

QUANTITIES AND FURNISH ALL MATERIALS

REQUIRED FOR FULLY OPERATIONAL

SYSTEMS, WHETHER SPECIFIED OR NOT.

8. CATALOG NUMBERS SHALL NOT BE

CONSIDERED COMPLETE BUT ARE GIVEN AS

AN AID TO THE CONTRACTOR AND TO

INDICATE THE QUALITY REQUIRED.

CONTRACTOR IS RESPONSIBLE FOR A

COMPLETE DESCRIPTION OF MATERIAL ON

THESE DRAWINGS AND IN THE

SPECIFICATIONS BEFORE ORDERING. THE

DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER.

THE FIRST MANUFACTURER IS THE BASIS OF

DESIGN.

9. FIRE PROTECTION PIPE ROUTING IS SHOWN

TO INDICATE DESIGN INTENT. FIRE

PROTECTION CONTRACTOR SHALL

DETERMINE EXACT NUMBER OF SPRINKLERS,

PIPE SIZING, AND PIPE ROUTING BASED ON

HYDRAULIC CALCULATIONS AND DETAILED

WORKING DRAWINGS REQUIRED IN NFPA 13.

10. DRAWINGS SHOWING LOCATIONS OF

EQUIPMENT, AND PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS

REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL

ARRANGEMENT OF PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND

FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE

FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS

WILL PERMIT.

11. DO NOT SCALE DRAWINGS. VERIFY ALL

DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS,

AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS,

INCLUDING THOSE OF OTHER TRADES.

12. COORDINATE ALL WORK WITH ALL OTHER

TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION,

MAINTENANCE, CODE COMPLIANCE AND TO

VERIFY NON-INTERFERENCE WITH OTHER

WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES

FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE

ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

13. REVIEW SPACE REQUIREMENTS OF

EQUIPMENT SPECIFIED OR SUBSTITUTED AND

MAKE REASONABLE ACCOMMODATIONS IN

LAYOUT AND POSITIONING TO PROVIDE

PROPER ACCESS.

14. CENTER SPRINKLERS IN CEILING TILES IN

BOTH DIRECTIONS IN ALL AREAS. IN AREAS

WITH 2'X4' CEILING TILES, CENTERING USING A

2'X2' CEILING PATTERN IN ACCEPTABLE.

15. PROVIDE SPRINKLER COVERAGE ABOVE AND

BELOW ALL DUCTWORK GREATER THAN 48"

WIDE.

16. PROVIDE SPRINKLER COVERAGE ABOVE AND

BELOW ALL CLOUD CEILINGS. REFER TO

ARCHITECTURAL REFLECTED CEILING PLANS

FOR LOCATIONS.

FIRE SEALANT

FIRE SEALANT

NOTE 2

NOTE 3

PENETRATING ITEM

NOTE 4

NOTE 3

NOTE 4

PENETRATING ITEM

NOTE 2

NOTE 3

RATED WALL

(CONSTRUCTION

VARIES)

RATED FLOOR

(CONSTRUCTION

VARIES)

NOTES:

1. THIS GENERAL DETAIL APPLIES TO ALL ITEMS PENETRATING FIRE RATED WALLS OR FLOORS. THE INTENT IS TO MAINTAIN THE FIRE RATING AND TO ALLOW LONGITUDINAL MOVEMENT. REFER TO SPECIFICATION SECTION 21 05 03 FOR SELECTION OF

THROUGH PENETRATION FIRE STOPPING.

2. SCHEDULE 5 PIPE SLEEVE EMBEDDED IN WALL OR FLOOR, OR SMOOTH CORE DRILL. EACH CONTRACTOR FURNISHES SLEEVE TO G.C., COORDINATES SLEEVE LOCATIONS AND DEBURS SLEEVE. G.C. BUILDS SLEEVE INTO WALL OR FLOOR ALLOWING NO GAP AROUND SLEEVE. IF SLEEVE IS NOT PROVIDED WHEN WALL OR FLOOR IS BUILT, CONTRACTOR SHALL INSTALL SLEEVE. SLEEVE

SIZE SHALL ALLOW ANNULAR SPACE REQUIRED BY THE SELECTED FIRE STOP SYSTEM.

3. INSTALL BACKING MATERIAL, SUCH AS MINERAL WOOL SAFING, AS REQUIRED FOR FIRE STOP SYSTEM. INSTALL IN ACCORDANCE WITH FIRE STOP SYSTEM APPLICATION LISTING. SECURE TO WALL OR FLOOR TO ALLOW LONGITUDINAL MOVEMENT OF

PENETRATING ITEM WITHOUT MOVEMENT OF FIRE BARRIER.

4. WATERTIGHT WELDED 1"x1" 20 GAUGE MINIMUM GALVANIZED SHEET METAL ANGLE FRAME, BY CONTRACTOR IN EQUIPMENT ROOMS FOR WATER STOP. PLACE A BEAD OF WATERPROOF SEALANT BETWEEN FLOOR AND BOTTOM OF ANGLE FRAME.

SECURE TO FLOOR WITH MASONRY ANCHORS IN CORNERS AND ON 12" MAXIMUM CENTERS. MULTIPLE PENETRATING ITEMS MAY

BE ENCLOSED IN ONE FRAME.

INSTALL AN ESCUTCHEON AROUND PIPES

EXPOSED IN FINISHED ROOMS. IN SUCH

INSTANCES WHERE AN ESCUTCHEON IS

REQUIRED AND THE PIPING IS INSULATED,

INSTALL A PLASTIC JACKET EXTENDING 6"

BEYOND THE WALL TO PROTECT INSULATION

FROM DAMAGE FROM THE ESCUTCHEON.

MAKE A SMOOTH ROUND OPENING IN

WALL SLIGHTLY LARGER THAN OUTSIDE

DIAMETER OF THE PIPE AND INSULATION.

ADD A BEAD OF NON-HARDENING

CAULK IN THE ANNULAR SPACE.

NOTES:

1. THIS DETAIL APPLIES TO ALL PIPES. THE INTENTION IS TO CONTINUE THE INSULATION AND VAPOR

BARRIER THROUGH ALL PENETRATIONS. PERMIT THERMAL EXPANSION WITHOUT DAMAGING

INSULATION, AND TO SEAL AIRTIGHT AROUND INSULATED AND UNINSULATED PIPES FOR NOISE

TRANSMISSION CONTROL.

2. SEE SPECIFICATION SECTION 21 13 13 FOR ADDITIONAL INFORMATION.

3. FLOOR OPENINGS ARE SIMILAR, SEE SPECIFICATION SECTION 21 13 13 FOR DIFFERENCES

BETWEEN FLOOR AND WALL PENETRATIONS.

12" MAX.12" MAX.

ARMOVER TO SPRINKLER

FIRE PROTECTION

BRANCH LINE OR

CROSS MAIN.

ADJUSTABLE

SWIVEL RING PIPE

HANGER. (NOTE 3)

THREADED ROD

TIGHT TO PIPE.

ESCUTCHEO

N (TYP.)

PENDENT

SPRINKLER (TYP.)

CEILING

(TYP.)

ARMOVER (>12" IN LENGTH) ARMOVER (<12" IN LENGTH)

NOTES:

1. THIS DETAIL APPLIES TO SPRINKLER PIPES ABOVE CEILING THAT SUPPLY

PENDENT SPRINKLERS BELOW CEILINGS WHERE THE WATER PRESSURE

EXCEEDS 100 PSIG (STATIC OR RESIDUAL).

2. ALSO APPLIES TO ARMOVER WHERE CUMULATIVE HORIZONTAL LENGTH IS

GREATER THAN 12".

3. CLEVIS HANGERS AND ADJUSTABLE SWIVEL RING HANGERS WITH SURGE

SUPPRESSOR OR RESTRAINING CLIP ARE ALSO ACCEPTABLE, SEE NFPA 13.

(NOTE 2)

SPRINKLER MAIN

PROVIDE TWO ELL'S FOR

ADJUSTING HEAD TO

CENTER OF CEILING TILE

LAY IN CEILING

CEILING PLATE

AUTOMATIC SPRINKLER HEAD. REFER TO

SPRINKLER HEAD SCHEDULE FOR HEAD TYPE.

I O W A

S E

D

PROFESS IONA

27052

L

IC

E N

L E

N G

I N E

E R

DELLAN J.

LLEWELLYN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/1

.0

V A

-W a s h

D C

-V A

S io u x F a lls

N e w

S P

S /M

E P

T

.0

V A

W a s h D

C -V

A S io u x F a lls

N e w S

P S

C

.r v t

/1

/2

:2

:0

A

M

FP400

FIRE PROTECTION DETAILS CONSTRUCT NEW SPS

Sioux Falls, SD.

438-460

02/14/2025 BLAOBR DELLLE16584

REFERENCE SCALE IN INCHES

0 1 2 3

PROJECT #

IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS

DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE

THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN

APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.

2882 106TH STREET

DES MOINES, IA 50322

515.334.9906 FAX: 515.334.9908

www.imegcorp.com

19004249.04

NO SCALE

FLOOR/WALL PENETRATION - RATED FIRE BARRIER

1 NO SCALE

WALL PENETRATION - NON-FIRE RATED

NO SCALE

SPRINKLER PIPE HANGER DETAIL

3 NO SCALE

SPRINKLER HEAD MOUNTING DETAIL

FIRE PROTECTION MATERIAL LIST

TAG NAME DESCRIPTION MANUFACTURER AND MODEL

BF-1 INDICATING BUTTERFLY VALVE, NORMALLY OPEN, 175 PSI WWP, GROOVED TYPE,

DUCTILE IRON BODY WITH PROTECTIVE COATING, ELECTROLESS NICKEL OR

EPDM COATED DUCTILE IRON DISC, STAINLESS STEEL STEM AND SCREWS,

CAST OR DUCTILE IRON HANDWHEEL, EPDM SEAT, INDICATOR FLAG, FACTORY

MOUNTED INTEGRAL MONITOR SWITCHES, UL/FM.

LUGGED OR WAFER VALVES ARE ACCEPTABLE PROVIDED THEY HAVE THE

FEATURES LISTED ABOVE.

NIBCO GD-4765-8N, VICTAULIC

SERIES 705, TYCO BFV-300,

KENNEDY G300, GLOBE

GLR300G, REL-BFG-300

CK-1 SWING CHECK VALVE, 300 PSI WWP, GROOVED/FLANGED TYPE, DUCTILE IRON

BODY, STAINLESS STEEL HINGE ASSOCIATED WITH RUBBER FACED CLAPPER,

BRASS SEAT RING, ACCESS COVER, 1/2" OR 3/4" TAPPED BOSSES, VALVE LISTED

FOR HORIZONTAL OR VERTICAL INSTALLATION, UL/FM.

FLANGED TYPE IS ACCEPTABLE PROVIDED VALVE HAS THE FEATURES LISTED

ABOVE.

VIKING G-1, TYCO CV-1F

FS-1 FLOW SWITCH - VANE TYPE, 450 PSI, FLOW SENSITIVITY OF 4-10 GPM, TWO

SINGLE POLE DOUBLE THROW SWITCHES, PNEUMATIC RETARD ADJUSTABLE

FROM 0-90 SECONDS WITH AUTOMATIC RESET, NEMA 4 INDOOR/OUTDOOR

RATED METAL HOUSING, UL/FM.

POTTER VSR, SYSTEM

SENSOR WFD

IT-1 COMBINATION INSPECTOR'S TEST AND DRAIN VALVE, 300 PSI, INTEGRAL SIGHT

GLASS, BALL VALVE PLATE INDICATING OFF-TEST-DRAIN POSITIONS,

FURNISHED WITH TEST ORIFICE GIVING FLOW EQUIVALENT TO ONE SPRINKLER

OF A TYPE HAVING THE SMALLEST ORIFICE INSTALLED ON THE SYSTEM,

PRESSURE RELIEF VALVE, UL/FM.

AGF M1011A, RELIABLE

MODEL TD, VICTUALIC

TESTMASTER, GLOBE UTD W/

MODEL ARV PRV

NOTES:

1.SEE FLOOR PLANS FOR ZONING REQUIREMENTS.

2.SPRINKLER SHALL HAVE COLOR CODED BULB THERMAL ELEMENT.

3.ALL SPRINKLERS SHALL BE UL LISTED.

4.CONTRACTOR TO VERIFY SPRINKLER REQUIREMENTS BASED ON ACTUAL INSTALLATION, USAGE, ARCHITECTURAL CEILING PLAN AND NFPA 13 REQUIREMENTS.

5.TAG NAME IS PRIMARILY FOR IDENTIFIYING SPRINKLERS IN SUBMITTALS. IT MAY OR MAY NOT BE FOUND ELSEWHERE ON THE DRAWINGS. CONTRACTOR TO SUBMIT ALL SPRINKLER TYPES TO BE USED.

6.AREAS ARE GENERAL IN NATURE. CONTRACTOR TO MATCH UNSCHEDULED AREAS TO SIMILAR SPACES.

7.SPRINKLERS SHALL HAVE A 3mm QUICK RESPONSE BULB.

8.SPRINKLERS SPECIFIED WITHIN FIRE SPRINKLER USAGE SCHEDULE ARE STANDARD COVERAGE TYPE. EXTENDED COVERAGE SPRINKLERS ARE PERMITTED PROVIDED SPRINKLERS MEET THE REQUIREMENTS OF UL AND FM.

9.PROVIDE STANDARD RESPONSE SPRINKLER WITH FUSIBLE LINK AND MECHANICAL CAGE IN ELECTRICAL AND IT ROOMS.

FIRE SPRINKLER USAGE SCHEDULE

AREA TYPE

(NOTE 1 & 6)

AREA

HAZARD

SPRINKLER

TEMPERATURE

RATING MANUFACTURER & MODEL NOTES

TAG NAME

(NOTE 4 & 5) SPRINKLER TYPE

RESPONSE

CATEGORY FINISH

AREAS WITH CEILINGS OPEN TO STRUCTURE SEE PLANS SPR-1 UPRIGHT QUICK ROUGH BRASS PER NFPA VIKING, RELIABLE, TYCO, VICTAULIC NOTES 2, 3, 7, & 8

AREAS WITH SUSPENDED CEILINGS SEE PLANS SPR-2 RECESSED PENDENT QUICK CHROME PLATED PER NFPA VIKING, RELIABLE, TYCO, VICTAULIC NOTES 2, 3, 7, & 8

ELECTRICAL AND IT ROOMS SEE PLANS SPR-3 UPRIGHT STANDARD CHROME PLATED PER NFPA VIKING, RELIABLE, TYCO, VICTAULIC NOTES 2, 8, & 9

DIRECTION OF AIR FLOW

FLEXIBLE DUCT

MANUAL VOLUME DAMPER

DUCT CAP

DUCT DOWN

DUCT UP

SUPPLY/OUTSIDE AIR DUCT SECTION

RETURN AIR DUCT SECTION

EXHAUST/RELIEF AIR DUCT SECTION

4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION

SD-1

6/115

AIR TERMINAL PROPERTIES SYMBOL

NECK SIZE/CFM

TERMINAL AIR BOX (REFER TO SCHEDULE)###

### TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)

HUMIDIFIERH

OPPOSED BLADE DAMPER (REFER TO SCHEDULE)

PARALLEL BLADE DAMPER (REFER TO SCHEDULE)

DIFFERENTIAL PRESSURE SENSOR

H

HUMIDISTAT/SENSOR (DUCT MOUNTED)H

PRESSURE SENSOR/MONITORP

PRESSURE SENSOR (DUCT MOUNTED)P

THERMOSTAT/SENSORT

TEMPERATURE SENSOR (DUCT MOUNTED)T

THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURET

VENTILATION SYMBOL LIST

SYMBOL: DESCRIPTION:

NOT ALL SYMBOLS MAY APPLY.

HUMIDISTAT/SENSOR

DUCT TRAVERSE MEASUREMENT LOCATION

VENTILATION ABBREVIATION KEY

ABBR: DESCRIPTION:

DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")

DIFFERENTIAL PRESSURE SWITCHDPS

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

EA EXHAUST/RELIEF AIR

FD FIRE DAMPER

FSD FIRE/SMOKE DAMPER

OA OUTSIDE AIR

RA RETURN AIR

SA SUPPLY AIR

SD SMOKE DAMPER

TERMINAL AIR BOXTAB

TYPICALTYP

UON UNLESS OTHERWISE NOTED

N.C. NORMALLY CLOSED

NOT IN CONTRACTNIC

NORMALLY OPENN.O.

SCCR SHORT CIRCUIT CURRENT RATING

CFSD CONTROL FIRE/SMOKE DAMPER

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10'-0" HEIGHT ABOVE

PROJECT 0'-0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

TEMPERATURE CONTROLS CONTRACTORT.C.C.

CIVIL CONTRACTORC.C.

ASBESTOS ABATEMENT CONTRACTOR

FIRE PROTECTION CONTRACTORF.P.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

ELECTRICAL CONTRACTORE.C.

A.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

CONTRACTING OFFICER'S REPRESENTATIVEC.O.R.

BUILDING CODE: IBC 2021 EDITION

FIRE CODE: IFC 2021 EDITION

PLUMBING CODE: IPC 2021 EDITION

MECHANICAL CODE: IMC 2021 EDITION

ELECTRICAL CODE: NFPA 70 (NEC) 2020 EDITION

LIFE SAFETY CODE: NFPA 101 2021 EDITION

ENERGY CONSERVATION CODE: IECC 2021

HEALTH DEPARTMENT CODE: CURRENT EDITION

LOCAL BUILDING CODE: CURRENT EDITION

APPLICABLE CODES

CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.

CONTACT PERSONS:

PROJECT MANAGER

MECHANICAL

ELECTRICAL

TECHNOLOGY

ERIC J. HENDERSON, PE

DELLAN J. LLEWELLYN, PE

KRISTEN SPINA, PE

DAMON M. DEEN

DESCRIPTION: PERSON:

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,

AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE

SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER

FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE

TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS

WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL

EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT

LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,

TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.

16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH

OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE

EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO

THE ELECTRICAL DISTRIBUTION…