S06 - Amend 0009 - Att 03 - DWG AC101 - Rvd - SPS - Sioux Falls.pdf
PDF 587 KB Posted
- Solicitation number
- 36C77624R0115
About this file
This document is a Ground Level Reflected Ceiling Plan (drawing AC101) for a new Sterile Processing Services (SPS) construction project at the Sioux Falls VA Health Care System. The detailed architectural drawing shows a comprehensive ceiling plan with multiple rooms and areas, including operating rooms, storage spaces, corridors, locker rooms, decontamination work areas, and specialized zones like scope processing and sterilization areas. The plan includes specific ceiling height annotations (ranging from 8'-0" to 11'-4" AFF - Above Finished Floor), ceiling system symbols, and general notes about ceiling installation, mounted equipment coordination, and construction requirements.
The drawing is part of a VA project (Project Number 16584) dated 02/14/2025, prepared by IMEG consultant and Anderson Architect, with the licensed architect Tom Olesak. The plan is marked as "Bid Documents" and indicates a fully sprinklered facility located in Sioux Falls, South Dakota. The drawing provides technical details for contractors, including reflected ceiling plan symbols, keyed notes about access panels, ceiling replacement, construction barriers, and general installation guidelines for ceiling-mounted equipment and systems.
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALIGN
ALIGN
ALIGN
AE301
L
M
N
O
SB
S2 X21 G.99
21 22 23 24 6
1S
0S
A2.1
5.3
J.99
30.6
30.5
G.2
A
C
A3.5
AE301
AE301
AE301
AE302
H11
SPS CHIEF
OFFICE
H10
ASSISTANT
CHIEF
OFFICE
H9
RME OFFICE H8
STAFF
LOUNGE
H6
HAC
C52
CORRIDOR
H5
LEAD TECH
OFFICE
H4
OPEN
OFFICE
C50
CORRIDOR
H23
DETERGENT
H22
SOILED HAC
H14
ANTE-ROOM
CLEAN
H16
CLEAN HAC
H15
CLEAN
WORKROOM,
ASSEMBLY
H24
CART
HOLDING
H25
ANTEROOM,
SOILED
TRANSITION/DROP-OFF
C50
CORRIDOR
H18
LOGISTICS
STORAGE
ROOM
H17
STERILE
INSTRUMENT
STORAGE
H1
TELECOM
H21
DECONTAMINATION
WORK AREA
C51
CORRIDOR
H7
TOILET
H20A
MANUAL
CART WASH
H20B
AUTOMATIC
CART WASH
AREA
H20
CART
HOLDING
H17A
SCOPE
STAGING
ROOM
H26
SCOPE
PROCESSING
DECONTAMINATION
ROOM
H2
CONFERENCE/
TRAINING
ROOM
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF8'-6"
AFF8'-6"
AFF8'-6"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF8'-0"
AFF9'-0"
AFF8'-6"
AFF9'-0"
AFF9'-0"
AFF9'-0" AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF8'-6"
AFF8'-6"
AFF8'-6"
AFF8'-9"
AE312
AE311
AE313
AE313
AE301
H13
WOMENS
TOILET/LOCKER
H12
MENS
TOILET/LOCKER
AE322
AE302
AFF9'-0"
AFF9'-0" AFF9'-0"
AFF8'-6"
AFF9'-0"
AE560
AE560
AFF8'-8"
AFF8'-8"
AFF8'-8"
AE560
AE560 AFF8'-2"
RC1
RC1
RC1
RC1
AE560
OPEN TO STRUCTURE
ABOVE
OPEN TO
STRUCTURE
ABOVE
OPEN TO
STRUCTURE
ABOVE
AFF6'-4" AFF6'-4"
AFF9'-0"
AFF9'-0"
A3
2 3 4 4.9
B
H
G
AFF8'-6"
AFF9'-0"
AE322
H15A
STEAM
STERILIZER
H19
STEAM
STERILIZATION
AREA
OPEN TO STRUCTURE
ABOVE
D
E
F
1.7 1.8 4.3 5 25 7 27
C.3
A1.1
A1.7
A2.9
A2.10
30.4
30.1
H13A
WOMENS
SHOWER
AFF9'-7"
C43
CORRIDOR
G29
STORAGE
G28
STORAGE
G27
OR #4
G26
CLEAN
CORE
G25
OR #1
G81-5
STAIR 9
G79-5
ELEVATOR
LOBBY
G02
CORRIDOR
G03
TELE
RC2
RC2
LIMITS OF CONSTRUCTION
LI
M
IT
S
O F
C O
N S
T R
U C
T
IO
N
LIM
ITS OF CONSTRUCTION
H3
ELECTRICAL
OPEN TO
STRUCTURE
ABOVE
H12A
MENS
SHOWER
AE560
AE560
TYP
AE560
AE550
SEE AC111 FOR
CEILING IN THIS AREA
AFF9'-0"
AFF11'-4"
AFF11'-4"
AFF8'-10"
FF
AE543
TYP
AFF9'-0"
8'-7 1/4"
AE560
1' -8
/4
AFF9'-0"
AE560
AFF8'-6"
RS-1
RS-1 RS-1 RS-1 RS-1
A1.0
AE560
AE560
RC1
RC1
RC3
RC3
AE560
AE543
TYP
AE543
SST HOOD AT WASHERS BY EQUIP SUPPLIER.
CJ
CJ
AE560
TYP
CAST STONE TO TERMINATE
AT THIS LOCTION. PROVIDE
FINISHED END.
RC1
EXISTING RADIANT PANEL
EXISTING LINIER LIGHTING
EXISTING LINIER LIGHTING
RC2
RC2
AFF9'-6"
AFF8'-0"
AFF8'-0"
AFF8'-0"
AFF9'-6"
AFF9'-0"
AFF9'-0"
G04
EMS
G42A
SHAFT
G05
ELEV EQUIP
RC2
RC2
AFF9'-6"
AFF9'-0"
RC2RC4
RC4
RC4
PROVIDE MOBILE ICRA CART FOR WORK IN THIS AREA.
REFLECTED CEILING PLAN SYMBOLS
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
GYP BD
CEILING /
SOFFIT
ACT CEILING
SYSTEM
EXISTING
ACT CEILING
SYSTEM
ACCESS
PANEL
2'-0" x 4'-0"
LIGHT FIXTURE
2'-0" x 2'-0"
LIGHT FIXTURE
PENDANT STRIP
LIGHT FIXTURE
EXISING 1'-0" X 2'-0"
LIGHT FIXTURE
RECESSED
LIGHT FIXTURE
MECHANICAL
SUPPLY GRILL
MECHANICAL
RETURN GRILL
WALL SCONCE
LIGHT FIXTURE
MECHANICAL
LINEAR SUPPLY
GRILL
CEILING
ELEVATION
9'-0" AFF
OR
EXISTING GYP
BD CEILING /
SOFFIT
EXISTING
RADIANT CEILING
PANEL
REFLECTED CEILING KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
RC1
18' X 18" MIN STAINLESS STEEL ACCESS PANEL. COORDINATE LOCATION
WITH MECHANICAL, ELECTRICAL AND PLUMBING AND PER SEPC SECTION
08 31 13
RC2
REMOVE AND REPLACE CEILING, INCLUDING ANY MECHANICAL /
ELECTRICAL CEILING MOUNTED ITEMS, IN THIS AREA AS REQUIRED FOR
MECHANICAL WORK. REPLACE ANY DIRTY OR DAMAGED ACT OR CEILING
GRID. SEE MEP PLANS FOR ADDITIONAL INFORMATION
RC3 STEEL CHANNEL AND STEEL POST. SEE DETAILS
RC4
LINE OF ICRA / CONSTRUCTION BARRIER, SEE SHEETS GC101 & GC111.
ALIGN EDGE OF STARC FIREBLOCK WALL SYSTEM TO EDGE OF CEILING
GRID. SEAL WALL SYSTEM AIR TIGHT TO CEILING GRID. CHECK SEAL TWICE
A DAY AND RESEAL AS NEEDED OR AS DIRECTED BY COR.
RCP GENERAL NOTES
1. GENERAL CONTRACTOR TO COORDINATE ALL CEILING MOUNTED EQUIPMENT SUPPORT
REQUIREMENTS, LOCATIONS, DIMENSIONS, ETC WITH EQUIPMENT SUPPLIER AND OWNER,
PRIOR TO INSTALLATION.
2. ALL CEILING MOUNTED ITEMS SUCH AS LIGHT FIXTURES, GRILLES, DIFFUSERS, SPEAKERS, EXIT LIGHTS, ETC SHALL BE LOCATED IN THE CENTER OF ACT PANELS, GYP BD SOFFITS
AND/OR PLASTER SOFFIT BAYS, UNLESS NOTED OTHERWISE. COORDINATE WITH
MECHANICAL AND ELECTRICAL DRAWINGS.
3. FINISHED GYP BD SOFFITS SHALL EXTEND 1" BEYOND FACE AND EXPOSED ENDS OF WALL
CABINETS, FULL-HEIGHT CABINETS, ETC UNLESS NOTED OTHERWISE. COORDINATE CABINET
DIMENSIONS WITH SUPPLIER. GYP BD FASCIA/SOFFIT DETAILS ARE REFERENCED FROM THE
REFLECTED CEILING PLAN.
4. SEE MECHANICAL DRAWINGS FOR SPRINKLER HEAD TYPES AND LOCATIONS. CENTER ALL
HEADS IN ACT UNLESS NOTED OTHERWISE.
5. AT REMODELING WORK IN EXISTING ACT SUSPENSION SYSTEM, REMOVE EXISTING PANELS,
CUT AS REQUIRED FOR CONSTRUCTION AND RE-INSTALL. REPLACE ALL DAMAGED AND / OR
EXTREMELY SOILED PANELS WITH ACT TO MATCH EXISTING.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name:
Tom Olesak
Date: 02/14/2025
License Number: 18157
2882 106th St, Urbandale, IA 50322
C U s e rs
\g b a rb a ri
\D o c u m e n ts \1
-R
G io v a n n i- B a rb a ri .r v t
/2
/2
:4
:5
P
M
AC101
GROUND LEVEL REFLECTED
CEILING PLAN
CONSTRUCT NEW SPS
Sioux Falls, SD.
438-460
02/14/2025 LA GJB16584
1/8" = 1'-0"
GROUND LEVEL REFLECTED CEILING PLAN
0 8' 16'4'
TRUE
NORTH
PLAN
NORTH
Revisions: Date:
| Sheets |
| AC101 - GROUND LEVEL REFLECTED CEILING PLAN |
| AD111 - INTERSTITIAL/FIRST LEVEL DEMOLITION PLAN |
| AE111 - INTERSTITIAL/FIRST LEVEL FLOOR PLAN |
| GC111 - FIRST LEVEL INFECTION CONTROL & PHASING PLAN |
File details come from the government source that posted it. Updated .