This is an electrical power floor plan drawing (EP111) for a new Sterile Processing Services (SPS) construction project at the Sioux Falls VA Health Care System. The detailed architectural engineering drawing depicts the interstitial/first level floor plan showing electrical power distribution, including various equipment and systems such as air handling units (AHU-1, AHU-2), fan coil units (FCU-1, FCU-2), heat trace systems, variable frequency drives (VFDs), condensate pumps, and multiple electrical panels and circuits.
Key technical specifications include installation instructions for digital camera screens, heat trace in storm piping, and Sky Factory window installations. The drawing is part of a VA construction project (Project #438-460) for expanding sterile processing services, with the new space covering approximately 8,500 square feet of new construction and 2,300 square feet of renovated space. The document is dated 07/17/2024, prepared by IMEG Corp for the VA Office of Construction and Facilities Management, and includes a professional engineering stamp from Iowa-licensed engineer Kristen L. Spina.
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EE
E E
E
E
E
E
E
E
E
E
E
EEE
E
E
E
E
E
E
EE E E
E E E
E
E
E
E E E E E E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E E E
E
E
E
L
M
N
O
SB
S2
23 24
1S
0S
A1
A2
30 Y
A
C
B
D
H
G
5.3
G.2
1.8
F
E
4 54.94.3
30.4
Z1
30.6
A1.8 uuuu
A1.9 wwww
A3.5
A3
1.7
STAIR #5
121A
TOILET
WORK ROOM
PROCEDURE ROOM
TOILET
CORRIDOR
MECH
SOILED
CLEAN
M.H.
ELEC
WORK ROOM
WAITING
RECEPTION
HAC
129A
STAIR #4
Room
Room
131A
Room
120A
STAIR
126B
Room
Room
111A
INTERSTITIAL SPACE
Room
CORRIDOR
C52
HN6-1
ACC-1
HN6-13
GWP-2
LN6B-8
CP-1
LN6B-1
WH-1
HN6-6
GWP-1B
HN6-5
GWP-1A
QH3-5
CWP-1A
QH3-6
CWP-1B
HN6-10
AC-1
TLN6B LN6B
HN6
QL3-9
CP-4
QH3-13
RO-1
QH3-1
AHU-1
HN6-9
AHU-2-SUPPLY
HN6-12
FCU-3
HN6-15
HWP-1B
HN6-14
HWP-1A
VFD-GWP-1B
7.5HP
VFD-GWP-1A
7.5HP
QH3-9
EF-1
VFD-CWP-1A
10HP
VFD-CWP-1B
10HP
VFD-HWP-1B
7.5HP
VFD-HWP-1A
7.5HP
LN6B-2
LN6B-2
W
LN6B-2
W
LN4-61
LN4-61
LN4-61
LN4-61
LN6B-5/W
LN6B-5/W
LN6B-4
LN6B-4
LN6B-4
W
LN6B-4
LN6B-4
LN6B-2
QH3-2
EF-2B
LN6B-12
EF-4
MX-CP-4
30A
MX-WH-1
30A
HN6-12
FCU-1
HN6-12
FCU-2
HN6-11
SF-1
DS-SF-1
30A
HN6-8
AHU-2-RETURN
LN6B-7
RECEPTACLE
LN6B-6
LIGHTS
LN6B-3
UV LIGHT
QL3-4
UV LIGHT
QL3-8
LIGHTS
QL3-6
RECEPTACLE
LN6B-9
WH-1
DS-EF-3
30A
DS-EF-1
30A
VFD-GWP-2
2HP
QH3-11/CP-2
QH3-12/CP-2
MX-CP-1
30A
MX-WH-1
30A
MX-EF-4
30A
DS-EF-2B
30A
LN6B-13/SKYFACTORY
WINDOW
LN6B-13/SKYFACTORY
WINDOW LN6B-13/SKYFACTORY
WINDOW
LN6B-13/SKYFACTORY
WINDOW
LN6B-15/SKYFACTORY
WINDOW
LN6B-15/SKYFACTORY
WINDOW
LN6B-15/SKYFACTORY
WINDOW
1 1
DS-CP-2
30A
DS-CP-2
30A
QL3-2
CFS-1
QL3-1
CFS-1
DS-ACC-1
600A
HN6-3
CRS-1
HN6-2
CRS-1
LN6B-16
GFS-1
LN6B-18
GFS-2
QL3-14,16/SSOU-2,OUTDOOR
UNIT
QL3-10,12
SSOU-1,OUTDOOR
UNIT
DS-EF-2A
30A
QH3-4
EF-2A
LN6B-11
WS-1/W
QL3-19
WH-2
QL3-5
UV-1
QL3-7
T-1
QL3-11
RO-1,CONTROL
QL3-21/MV-3
FDS-AHU-1
60A
FDS-AHU-2, RF
30AFDS-AHU-2, SF
60A
LN6B-17
CONDENSATE PUMP
LN6B-19
CONDENSATE PUMP
LN6B-21
CONDENSATE PUMP
HN6-4
AC-1
2 2
2 2
2 2 2
2 2
2 2 2 2
LN6B-30
HEAT TRACE
LN6B-30
HEAT TRACE
LN6B-28
HEAT TRACE
LN6B-28
HEAT TRACE
LN6B-28
HEAT TRACE
LN6B-28
HEAT TRACE
LN6B-26
HEAT TRACE
LN6B-26
HEAT TRACE
LN6B-20
HEAT TRACE
LN6B-20
HEAT TRACE
LN6B-24
HEAT TRACE
LN6B-24
HEAT TRACE
LN6B-22
HEAT TRACE
LN6B-22
HEAT TRACE
DS-CP-3
30A
DS-CP-3
30A
QH3-14
CP-3
QH3-15
CP-3
QL3-22/T-2
AD-3
AD-3
AD-3
I O W A
S E
D
PROFESS IONA
21081
L
IC
E N
L E
N G
I N E
E R
KRISTEN L.
SPINA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
B
IM
/1
.0
V A
-W a s h
D C
-V A
S io u x F a lls
N e w
S P
S /M
E P
T
.0
V A
W a s h D
C -V
A S io u x F a lls
N e w S
P S
C
.r v t
/1
/2
:2
:1
P
M
EP111
INTERSTITIAL/FIRST LEVEL FLOOR
PLAN - POWER
CONSTRUCT NEW SPS
Sioux Falls, SD.
438-460
07/17/2024 JMK JDR16584
REFERENCE SCALE IN INCHES
0 1 2 3
PROJECT #
IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS
DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE
THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN
APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.
2882 106TH STREET
DES MOINES, IA 50322
515.334.9906 FAX: 515.334.9908
www.imegcorp.com
19004249.04
N O R
HT
1/8" = 1'-0"
INTERSTITIAL/FIRST LEVEL FLOOR PLAN - POWER
KEYNOTES:
1. INSTALL DIGITAL CAMERA SCREEN AT
REMOVED WINDOW LOCATION. SEE
ARCHITECTURAL DRAWINGS FOR
INFORMATION ON ROUGH OPENING WITH
HEADER POCKET. FROM LOCATION ABOVE OR
AT HEADER POCKET PROVIDE SURFACE
METAL RACEWAY WIREMOLD OR EQUAL TO
CONTROL STATION LOCATED ADJACENT TO
WINDOW. PROVIDE SURFACE METAL
RACEWAY FOR SPEAKER WIRES FROM
HEADER POCKET LOCATION UP TO CEILING
SPACE. LOCATE AND MOUNT SPEAKERS IN
GRID CEILING OR PROVIDE SURFACE
ENCLOSURE FOR SPEAKERS. PROVIDE
TOGGLE SWITCH NEAR EVERY WINDOW TO
SERVE AS DISCONNECT MEANS FOR POWER
TO LUMINAIRE. PROVIDE CONTROL STATION
FOR WAITING AREA WINDOW LUMINAIRE IN
RECEPTION AREA.
2. ELECTRICAL CONNECTION FOR HEAT TRACE IN
STORM PIPING. APPROXIMATELY 15 FEET OF
HEAT TRACE LOCATED INSIDE STORM PIPING.
REFER TO PLUMBING DRAWINGS FOR EXACT
LOCATION OF ROOF DRAINS AND ROOF DRAIN
BASINS. REFER TO DETAIL 3/E401 FOR HEAT
TAPE CONTROL DIAGRAM.
3. PROVIDE SKY FACTORY MODEL 4726 WITH
CLASSIC TRIM. REFER TO ARCHITECTURAL
DRAWINGS FOR SIZE REQUIREMENTS.
COORDINATE TRIM FINISH AND OPTIONS WITH
ARCHTIECT AND COR.
SHEET NOTES:
1. IT IS THE RESPONSIBILITY OF CONTRACTOR TO
VERIFY ALL EQUIPMENT AND REQUIRED
OPENINGS SHOWN ON THE DRAWINGS MATCH
WHAT EQUIPMENT IS ACTUALLY PROVIDED.
ANY CHANGES REQUIRED TO BE MADE IS THE
CONTRACTOR'S RESPONSIBILITY TO REVISE
DRAWINGS AS NEEDED, INCLUDING ANY
PROFESSIONAL ENGINEERING FEES
ASSOCIATED AND SHALL BE AT NO ADDITIONAL
COST TO THE VA.
Revisions: Date:
Addendum 3 (AD-3) 05/20/2025
AD-3
| Sheets |
| EP101 - GROUND LEVEL FLOOR PLAN - POWER |
| EP111 - INTERSTITIAL/FIRST LEVEL FLOOR PLAN - POWER |