S06 - Amend 0009 - Att 12 - DWG EP111 - Rvd - SPS - Sioux Falls.pdf

PDF 453 KB Posted

Attached to
Y1DA--VHA Minor - Construction - Project #438-460 - Sterile Processing Services - Royal C Johnson Veteran's Memorial Hospital - VISN 23 - Sioux Falls SD
Solicitation number
36C77624R0115
Issued by

About this file

This is an electrical power floor plan drawing (EP111) for a new Sterile Processing Services (SPS) construction project at the Sioux Falls VA Health Care System. The detailed architectural engineering drawing depicts the interstitial/first level floor plan showing electrical power distribution, including various equipment and systems such as air handling units (AHU-1, AHU-2), fan coil units (FCU-1, FCU-2), heat trace systems, variable frequency drives (VFDs), condensate pumps, and multiple electrical panels and circuits.

Key technical specifications include installation instructions for digital camera screens, heat trace in storm piping, and Sky Factory window installations. The drawing is part of a VA construction project (Project #438-460) for expanding sterile processing services, with the new space covering approximately 8,500 square feet of new construction and 2,300 square feet of renovated space. The document is dated 07/17/2024, prepared by IMEG Corp for the VA Office of Construction and Facilities Management, and includes a professional engineering stamp from Iowa-licensed engineer Kristen L. Spina.

View the file

Other files

File Type Posted
S06 - Amend 0010 - RFP - 36C77624R0115 - SPS - Sioux Falls_rev.docx DOCX document
S06 - Amend 0010 - RFP - 36C77624R0115 - SPS - Sioux Falls.docx DOCX document
S06 - Amend 0009 - Att 07 - List of DWG Sheets - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 03 - DWG AC101 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 10 - Ele Sch - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 16 - DWG ES401 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 04 - DWG AD111 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 08 - DWG CD101 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 01 - Sign-In Sheet - Ele Site Visit- 05142025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 19 - DWG MV600 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 20 - DWG GI001 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 13 - DWG ES099 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 06 - DWG GC111 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 17 - DWG ES500 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 09 - Add Ele Questions and Responses - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 15 - DWG ES400 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 11 - DWG EP101 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 18 - DWG ES501 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 02 - Narrative to KTRs - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 14 - DWG ES100 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0009 - Att 05 - DWG AE111 - Rvd - SPS - Sioux Falls.pdf PDF
S06 - Amend 0008 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
36C77624R0115 0007.pdf PDF
Amend 0007 - Att 01 - RFI Attachments.pdf PDF
Amend 0007 - Att 02 - RFI QandA.pdf PDF
S06 - Amend 0006 - Att 01- RFP - Sign-In Sheet - Site Visit - 04082025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0006 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0006 - Att 02 - Wage Rates - 03142025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0005 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0004 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0003 - RFP - Sign-in Sheet - Site Visit - 03252025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0003 - RFP - Site Visit Presentation - SPS - Sioux Falls.pdf PDF
S06 - Amend 0003 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - 36C77624R0115 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-05 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-02 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-08 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-03 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-09 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-07 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-11 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-10 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-01 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-06 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amend 0002 - RFP - Att 01-04 - DWG - 03242025 - SPS - Sioux Falls.pdf PDF
S06 - Amendment 0001 - SPS - Sioux Falls.pdf PDF
RFP - Att 02 - 02142025 - Specs - Vol I - SPS - Sioux Falls.pdf PDF
36C77624R0115_1.docx DOCX document
RFP - Att 01-01 - DWG - 02142025 - SPS - Sioux Falls.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EE

E E

E

E

E

E

E

E

E

E

E

EEE

E

E

E

E

E

E

EE E E

E E E

E

E

E

E E E E E E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E E

E E

E E E E

E

E

E

L

M

N

O

SB

S2

23 24

1S

0S

A1

A2

30 Y

A

C

B

D

H

G

5.3

G.2

1.8

F

E

4 54.94.3

30.4

Z1

30.6

A1.8 uuuu

A1.9 wwww

A3.5

A3

1.7

STAIR #5

121A

TOILET

WORK ROOM

PROCEDURE ROOM

TOILET

CORRIDOR

MECH

SOILED

CLEAN

M.H.

ELEC

WORK ROOM

WAITING

RECEPTION

HAC

129A

STAIR #4

Room

Room

131A

Room

120A

STAIR

126B

Room

Room

111A

INTERSTITIAL SPACE

Room

CORRIDOR

C52

HN6-1

ACC-1

HN6-13

GWP-2

LN6B-8

CP-1

LN6B-1

WH-1

HN6-6

GWP-1B

HN6-5

GWP-1A

QH3-5

CWP-1A

QH3-6

CWP-1B

HN6-10

AC-1

TLN6B LN6B

HN6

QL3-9

CP-4

QH3-13

RO-1

QH3-1

AHU-1

HN6-9

AHU-2-SUPPLY

HN6-12

FCU-3

HN6-15

HWP-1B

HN6-14

HWP-1A

VFD-GWP-1B

7.5HP

VFD-GWP-1A

7.5HP

QH3-9

EF-1

VFD-CWP-1A

10HP

VFD-CWP-1B

10HP

VFD-HWP-1B

7.5HP

VFD-HWP-1A

7.5HP

LN6B-2

LN6B-2

W

LN6B-2

W

LN4-61

LN4-61

LN4-61

LN4-61

LN6B-5/W

LN6B-5/W

LN6B-4

LN6B-4

LN6B-4

W

LN6B-4

LN6B-4

LN6B-2

QH3-2

EF-2B

LN6B-12

EF-4

MX-CP-4

30A

MX-WH-1

30A

HN6-12

FCU-1

HN6-12

FCU-2

HN6-11

SF-1

DS-SF-1

30A

HN6-8

AHU-2-RETURN

LN6B-7

RECEPTACLE

LN6B-6

LIGHTS

LN6B-3

UV LIGHT

QL3-4

UV LIGHT

QL3-8

LIGHTS

QL3-6

RECEPTACLE

LN6B-9

WH-1

DS-EF-3

30A

DS-EF-1

30A

VFD-GWP-2

2HP

QH3-11/CP-2

QH3-12/CP-2

MX-CP-1

30A

MX-WH-1

30A

MX-EF-4

30A

DS-EF-2B

30A

LN6B-13/SKYFACTORY

WINDOW

LN6B-13/SKYFACTORY

WINDOW LN6B-13/SKYFACTORY

WINDOW

LN6B-13/SKYFACTORY

WINDOW

LN6B-15/SKYFACTORY

WINDOW

LN6B-15/SKYFACTORY

WINDOW

LN6B-15/SKYFACTORY

WINDOW

1 1

DS-CP-2

30A

DS-CP-2

30A

QL3-2

CFS-1

QL3-1

CFS-1

DS-ACC-1

600A

HN6-3

CRS-1

HN6-2

CRS-1

LN6B-16

GFS-1

LN6B-18

GFS-2

QL3-14,16/SSOU-2,OUTDOOR

UNIT

QL3-10,12

SSOU-1,OUTDOOR

UNIT

DS-EF-2A

30A

QH3-4

EF-2A

LN6B-11

WS-1/W

QL3-19

WH-2

QL3-5

UV-1

QL3-7

T-1

QL3-11

RO-1,CONTROL

QL3-21/MV-3

FDS-AHU-1

60A

FDS-AHU-2, RF

30AFDS-AHU-2, SF

60A

LN6B-17

CONDENSATE PUMP

LN6B-19

CONDENSATE PUMP

LN6B-21

CONDENSATE PUMP

HN6-4

AC-1

2 2

2 2

2 2 2

2 2

2 2 2 2

LN6B-30

HEAT TRACE

LN6B-30

HEAT TRACE

LN6B-28

HEAT TRACE

LN6B-28

HEAT TRACE

LN6B-28

HEAT TRACE

LN6B-28

HEAT TRACE

LN6B-26

HEAT TRACE

LN6B-26

HEAT TRACE

LN6B-20

HEAT TRACE

LN6B-20

HEAT TRACE

LN6B-24

HEAT TRACE

LN6B-24

HEAT TRACE

LN6B-22

HEAT TRACE

LN6B-22

HEAT TRACE

DS-CP-3

30A

DS-CP-3

30A

QH3-14

CP-3

QH3-15

CP-3

QL3-22/T-2

AD-3

AD-3

AD-3

I O W A

S E

D

PROFESS IONA

21081

L

IC

E N

L E

N G

I N E

E R

KRISTEN L.

SPINA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/1

.0

V A

-W a s h

D C

-V A

S io u x F a lls

N e w

S P

S /M

E P

T

.0

V A

W a s h D

C -V

A S io u x F a lls

N e w S

P S

C

.r v t

/1

/2

:2

:1

P

M

EP111

INTERSTITIAL/FIRST LEVEL FLOOR

PLAN - POWER

CONSTRUCT NEW SPS

Sioux Falls, SD.

438-460

07/17/2024 JMK JDR16584

REFERENCE SCALE IN INCHES

0 1 2 3

PROJECT #

IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS

DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE

THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN

APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.

2882 106TH STREET

DES MOINES, IA 50322

515.334.9906 FAX: 515.334.9908

www.imegcorp.com

19004249.04

N O R

HT

1/8" = 1'-0"

INTERSTITIAL/FIRST LEVEL FLOOR PLAN - POWER

KEYNOTES:

1. INSTALL DIGITAL CAMERA SCREEN AT

REMOVED WINDOW LOCATION. SEE

ARCHITECTURAL DRAWINGS FOR

INFORMATION ON ROUGH OPENING WITH

HEADER POCKET. FROM LOCATION ABOVE OR

AT HEADER POCKET PROVIDE SURFACE

METAL RACEWAY WIREMOLD OR EQUAL TO

CONTROL STATION LOCATED ADJACENT TO

WINDOW. PROVIDE SURFACE METAL

RACEWAY FOR SPEAKER WIRES FROM

HEADER POCKET LOCATION UP TO CEILING

SPACE. LOCATE AND MOUNT SPEAKERS IN

GRID CEILING OR PROVIDE SURFACE

ENCLOSURE FOR SPEAKERS. PROVIDE

TOGGLE SWITCH NEAR EVERY WINDOW TO

SERVE AS DISCONNECT MEANS FOR POWER

TO LUMINAIRE. PROVIDE CONTROL STATION

FOR WAITING AREA WINDOW LUMINAIRE IN

RECEPTION AREA.

2. ELECTRICAL CONNECTION FOR HEAT TRACE IN

STORM PIPING. APPROXIMATELY 15 FEET OF

HEAT TRACE LOCATED INSIDE STORM PIPING.

REFER TO PLUMBING DRAWINGS FOR EXACT

LOCATION OF ROOF DRAINS AND ROOF DRAIN

BASINS. REFER TO DETAIL 3/E401 FOR HEAT

TAPE CONTROL DIAGRAM.

3. PROVIDE SKY FACTORY MODEL 4726 WITH

CLASSIC TRIM. REFER TO ARCHITECTURAL

DRAWINGS FOR SIZE REQUIREMENTS.

COORDINATE TRIM FINISH AND OPTIONS WITH

ARCHTIECT AND COR.

SHEET NOTES:

1. IT IS THE RESPONSIBILITY OF CONTRACTOR TO

VERIFY ALL EQUIPMENT AND REQUIRED

OPENINGS SHOWN ON THE DRAWINGS MATCH

WHAT EQUIPMENT IS ACTUALLY PROVIDED.

ANY CHANGES REQUIRED TO BE MADE IS THE

CONTRACTOR'S RESPONSIBILITY TO REVISE

DRAWINGS AS NEEDED, INCLUDING ANY

PROFESSIONAL ENGINEERING FEES

ASSOCIATED AND SHALL BE AT NO ADDITIONAL

COST TO THE VA.

Revisions: Date:

Addendum 3 (AD-3) 05/20/2025

AD-3

Sheets
EP101 - GROUND LEVEL FLOOR PLAN - POWER
EP111 - INTERSTITIAL/FIRST LEVEL FLOOR PLAN - POWER

File details come from the government source that posted it. Updated .