WING A WING B WING C WING D
PHASE 4
PHASE 10
PHASE 9
PHASE 13
PHASE 9
PHASE 9
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
CLEMENT J. ZABLOCKI VAMC
#6 o n e e i g h t h i n c h o n e f o o t 1 t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number 695-16-112
FIRE SPRINKLER ENGINEER
RTM CONSULTANTS, INC
6640 Parkdale Place, Suite J, Indianapolis, IN 46254
PHONE: (317) 329-7700
905 N. CAPITOL AVE. SUITE 100 INDIANAPOLIS, IN. 46204
317.800.6388 WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
CLEMENT J. ZABLOCKI VA MEDICAL CENTER
MILWAUKEE, WISCONSIN
C :\U se rs
\k al le n\
D oc um en ts \1
4.
.0
Bl dg .S pr in kl er
R ep la ce m en t 6
-1 6-
2_ ka lle n_ ka lle n.
rv t
GI204
FDCMC
PROJECT PHASING PLANS - THIRD FLOOR AND
ATTIC
14.1020.06BUILDING 6 FIRE
SPRINKLER REPLACEMENT
SCALE: 1/16" = 1'-0"GI204
1 PROJECT PHASING PLAN - ATTIC
N
SCALE: 1/16" = 1'-0"GI204
3 PROJECT PHASING PLAN - THIRD FLOOR SOUTH/WING C1
SCALE: 1/16" = 1'-0"GI204
2 PROJECT PHASING PLAN - THIRD FLOOR NORTH/WING C2
ABBREVIATED CRITICAL PATH METHOD/ PHASING (SEE GI201-GI203 FOR COMPLETE DESCRIPTION)
PHASE 4: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING A SECOND FLR AND ATTIC.
PHASE 9: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING C THIRD FLR AND ATTIC.
PHASE 10: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING B SECOND FLR AND
ATTIC.
PHASE 13: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING D SECOND FLR AND
ATTIC.
PHASING NOTES:
CONSTRUCTION WILL BE PHASED AS NECESSARY TO ENSURE THAT OBSTRUCTION OF EXITS IS MINIMIZED OR AVOIDED. IF EXITS ARE OBSTRUCTED DURING CONSTRUCTION, ALTERNATE EXIT ROUTES DURING EACH PHASE OF CONSTRUCTION WILL BE PROVIDED AND IDENTIFIED ON THE CONSTRUCTION DRAWINGS. FIRE PROTECTION SYSTEMS SERVICES WILL BE DISRUPTED.
PROCEDURES WILL BE INCORPORATED TO MAINTAIN EQUIVALENT LEVELS OF SAFETY WHILE SYSTEMS ARE DOWN. AREAS WHERE THE SPRINKLER SYSTEM IS OUT OF SERVICE WILL BE SEPARATED BY TEMPORARY SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM BOARD OR OTHER APPROVED NON- COMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. PARTITIONS SHALL BE FULL HEIGHT, EXTENDING TO SUSPENDED CEILINGS OR TO THE FLOOR SLAB OR ROOF DECK ABOVE.
MAXIMUM TIME AREAS MAY BE OUT OF SERVICE PER PHASE AS FOLLOWS:
PHASE: DURATION: APPROXIMATE COVERAGE AREA:
PHASE:4 3 WEEKS 27,550 FT^2
PHASE:9 3 WEEKS 16,700 FT^2
PHASE:11 2 WEEKS 10,350 FT^2
PHASE:13 2 WEEKS 10,300 FT^2
BID DOCUMENTS
COR : MATTHEW OSGOOD
5/20/2019
P M
ACCOMPANYING 36C25219B0056 0003