About this file

36C25219B0056 0003 S06 - GI204 - PROJECT PHASING PLAN-THIRD FLOOR AND ATTIC.pdf

View the file

Other files

File Type Posted
36C25219C0222-000.docx DOCX document
36C25219B0056-0005000.docx DOCX document
36C25219B0056-0004002.pdf PDF
36C25219B0056-0004000.docx DOCX document
36C25219B0056-0004001.pdf PDF
36C25219B0056-0003007.pdf PDF
36C25219B0056-0003008.pdf PDF
36C25219B0056-0003001.pdf PDF
36C25219B0056-0003003.pdf PDF
36C25219B0056-0003004.pdf PDF
36C25219B0056-0003005.pdf PDF
36C25219B0056-0003015.pdf PDF
36C25219B0056-0003013.pdf PDF
36C25219B0056-0003014.pdf PDF
36C25219B0056-0003019.pdf PDF
36C25219B0056-0003006.pdf PDF
36C25219B0056-0003012.pdf PDF
36C25219B0056-0003017.pdf PDF
36C25219B0056-0003016.pdf PDF
36C25219B0056-0003011.pdf PDF
36C25219B0056-0003009.pdf PDF
36C25219B0056-0003010.pdf PDF
36C25219B0056-0003018.pdf PDF
36C25219B0056-0003002.pdf PDF
36C25219B0056-0003000.docx DOCX document
36C25219B0056-0002001.pdf PDF
36C25219B0056-0002000.docx DOCX document
36C25219B0056-0002002.pdf PDF
36C25219B0056-0001000.docx DOCX document
36C25219B0056-001.docx DOCX document
36C25219B0056-002.pdf PDF
36C25219B0056-005.pdf PDF
36C25219B0056-004.pdf PDF
36C25219B0056-003.pdf PDF
36C25219B0056-006.pdf PDF
36C25219B0056-000.docx DOCX document
36C25219B0056-000.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WING A WING B WING C WING D

PHASE 4

PHASE 10

PHASE 9

PHASE 13

PHASE 9

PHASE 9

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

CLEMENT J. ZABLOCKI VAMC

#6 o n e e i g h t h i n c h o n e f o o t 1 t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number 695-16-112

FIRE SPRINKLER ENGINEER

RTM CONSULTANTS, INC

6640 Parkdale Place, Suite J, Indianapolis, IN 46254

PHONE: (317) 329-7700

905 N. CAPITOL AVE. SUITE 100 INDIANAPOLIS, IN. 46204

317.800.6388 WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

CLEMENT J. ZABLOCKI VA MEDICAL CENTER

MILWAUKEE, WISCONSIN

C :\U se rs

\k al le n\

D oc um en ts \1

4.

.0

Bl dg .S pr in kl er

R ep la ce m en t 6

-1 6-

2_ ka lle n_ ka lle n.

rv t

GI204

FDCMC

PROJECT PHASING PLANS - THIRD FLOOR AND

ATTIC

14.1020.06BUILDING 6 FIRE

SPRINKLER REPLACEMENT

SCALE: 1/16" = 1'-0"GI204

1 PROJECT PHASING PLAN - ATTIC

N

SCALE: 1/16" = 1'-0"GI204

3 PROJECT PHASING PLAN - THIRD FLOOR SOUTH/WING C1

SCALE: 1/16" = 1'-0"GI204

2 PROJECT PHASING PLAN - THIRD FLOOR NORTH/WING C2

ABBREVIATED CRITICAL PATH METHOD/ PHASING (SEE GI201-GI203 FOR COMPLETE DESCRIPTION)

PHASE 4: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING A SECOND FLR AND ATTIC.

PHASE 9: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING C THIRD FLR AND ATTIC.

PHASE 10: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING B SECOND FLR AND

ATTIC.

PHASE 13: REMOVE EXISTING SPRINKLER SYSTEM AND INSTALL NEW SPRINKLER SYSTEM IN WING D SECOND FLR AND

ATTIC.

PHASING NOTES:

CONSTRUCTION WILL BE PHASED AS NECESSARY TO ENSURE THAT OBSTRUCTION OF EXITS IS MINIMIZED OR AVOIDED. IF EXITS ARE OBSTRUCTED DURING CONSTRUCTION, ALTERNATE EXIT ROUTES DURING EACH PHASE OF CONSTRUCTION WILL BE PROVIDED AND IDENTIFIED ON THE CONSTRUCTION DRAWINGS. FIRE PROTECTION SYSTEMS SERVICES WILL BE DISRUPTED.

PROCEDURES WILL BE INCORPORATED TO MAINTAIN EQUIVALENT LEVELS OF SAFETY WHILE SYSTEMS ARE DOWN. AREAS WHERE THE SPRINKLER SYSTEM IS OUT OF SERVICE WILL BE SEPARATED BY TEMPORARY SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM BOARD OR OTHER APPROVED NON- COMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. PARTITIONS SHALL BE FULL HEIGHT, EXTENDING TO SUSPENDED CEILINGS OR TO THE FLOOR SLAB OR ROOF DECK ABOVE.

MAXIMUM TIME AREAS MAY BE OUT OF SERVICE PER PHASE AS FOLLOWS:

PHASE: DURATION: APPROXIMATE COVERAGE AREA:

PHASE:4 3 WEEKS 27,550 FT^2

PHASE:9 3 WEEKS 16,700 FT^2

PHASE:11 2 WEEKS 10,350 FT^2

PHASE:13 2 WEEKS 10,300 FT^2

BID DOCUMENTS

COR : MATTHEW OSGOOD

5/20/2019

P M

ACCOMPANYING 36C25219B0056 0003