About this file

36C25219B0056 0003 S06 - GI001 - GENERAL INFORMATION.pdf

View the file

Other files

File Type Posted
36C25219C0222-000.docx DOCX document
36C25219B0056-0005000.docx DOCX document
36C25219B0056-0004002.pdf PDF
36C25219B0056-0004000.docx DOCX document
36C25219B0056-0004001.pdf PDF
36C25219B0056-0003007.pdf PDF
36C25219B0056-0003008.pdf PDF
36C25219B0056-0003001.pdf PDF
36C25219B0056-0003003.pdf PDF
36C25219B0056-0003004.pdf PDF
36C25219B0056-0003005.pdf PDF
36C25219B0056-0003020.pdf PDF
36C25219B0056-0003015.pdf PDF
36C25219B0056-0003013.pdf PDF
36C25219B0056-0003014.pdf PDF
36C25219B0056-0003019.pdf PDF
36C25219B0056-0003006.pdf PDF
36C25219B0056-0003012.pdf PDF
36C25219B0056-0003017.pdf PDF
36C25219B0056-0003011.pdf PDF
36C25219B0056-0003009.pdf PDF
36C25219B0056-0003010.pdf PDF
36C25219B0056-0003018.pdf PDF
36C25219B0056-0003002.pdf PDF
36C25219B0056-0003000.docx DOCX document
36C25219B0056-0002001.pdf PDF
36C25219B0056-0002000.docx DOCX document
36C25219B0056-0002002.pdf PDF
36C25219B0056-0001000.docx DOCX document
36C25219B0056-001.docx DOCX document
36C25219B0056-002.pdf PDF
36C25219B0056-005.pdf PDF
36C25219B0056-004.pdf PDF
36C25219B0056-003.pdf PDF
36C25219B0056-006.pdf PDF
36C25219B0056-000.docx DOCX document
36C25219B0056-000.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL CONSTRUCTION NOTES

THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT® SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING, SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES MANAGEMENT.

THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE CONSTRUCTION SPECIFICATIONS

INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE NATIONAL CAD STANDARD AS GUIDES.

DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR. CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY THE BID DUE DATE.

CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE

SAFETY, ACCESS CONTROL, ECT.

ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN

FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK AND ACCESS TO EXISTING UTILITIES FOR TIE IN.

DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS AND THE SURROUNDING CONSTRUCTION.

CONTRACTOR SHALL VERIFY DIMENSIONS, ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION

REQUIREMENTS.

CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY CERTAIN SHEETS AND SPECIFICATIONS, CROSS

COORDINATION IS REQUIRED.

CONTRACTOR AND SUB-CONTRACTOR’S ARE BOTH RESPONSIBLE FOR UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES, GENERAL NOTES, LEGEND, CODES, ECT., PROVIDED IN THE CONTRACT DOCUMENTS.

CONTRACTOR AND SUB-CONTRACTOR’S ARE BOTH RESPONSIBLE FOR PROVIDING AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. AND/OR I.C.B.O. APPROVED METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.

MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION DRAWINGS SHOW INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING AND ELECTRICAL EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND STRUCTURAL

DETAILING OF SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.

CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY

DISCREPANCIES OR MISSING DIMENSIONS.

DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL ORIENTATION AND CONTEXT ONLY.

THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF CONSTRUCTION TO PROVIDE A FLUSH

FINISH SURFACE.

ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW STRUCTURAL MEMBERS, FACE OF

NEW MASONRY, FACE OF NEW STUDS OR COLUMN GRID LINES UNLESS NOTED OTHERWISE.

FLOOR ELEVATION 0’-0” IS EQUAL TO THE FINISH FLOOR SLAB OF THE EXISTING SLAB FLOOR CONSTRUCTION.

ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.

CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS “TYPICAL” OR “SIMILAR” EACH

INSTANCE THAT IS THE SAME IN NATURE TO THE DETAIL, AREA, OR ITEM REFERENCED.

PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR. CONTRACTOR IS RESPONSIBLE FOR

COORDINATION OF DELIVERY, MOUNTING, INSTALLATION AND ROUGH-IN.

INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.

FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND EQUIPMENT TO THE OWNER. CONTRACTOR IS

RESPONSIBLE FOR COORDINATION OF DELIVERY AND ROUGH-IN.

ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY CALLED OUT AS SALVAGED OR

RELOCATED WITHIN THE CONTRACT DOCUMENTS.

ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO

THIS PROJECT.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO

THE OWNER.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING REQUIRED DURING

CONSTRUCTION.

CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER.

DESIGN TO BE IN ACCORDANCE WITH VA FIRE PROTECTION DESIGN MANUAL, DECEMBER 2015.

CONTRACTOR TO PROVIDE INFECTION CONTROL AND LIFE SAFETY MEASURES DURING CONSTRUCTION. DRAWINGS AND SPECIFICATIONS OUTLINE GENERAL PHASING AND DAILY PROTECTIVE MEASURES. CONTRACTOR TO PROVIDE ANY ADDITIONAL MEASURES THAT ALIGN WITH MEANS AND METHODS OF THE INSTALLATION OF THEIR FIRE PROTECTION

SYSTEM.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

CODE ANALYSIS

A. CONSTRUCTION CLASSIFICATION

1.THE BUILDING IS AN EXISTING 3-STORY BUILDING WITH A B (BUSINESS) OCCUPANCY.

2. THE PROJECT SCOPE DOES NOT CHANGE THE CONSTRUCTION TYPE OR EXPAND THE OVERALL BUILDING HEIGHT

OR ALLOWABLE AREA. (CHAPTER 5).

3. EXISTING BUILDING, ASSUME: TYPE III B, 3 STORY LIMIT

A. PRIMARY STRUCTURAL ELEMENTS ARE EXISTING TO REMAIN.

4. PARTIALLY SPRINKLED EXISTING BUILDING

B. FIRE RESISTANCE RATED SEPARATIONS

1. FIRE-RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS (HOURS) (CHAPTER 6, TABLE 601)

EXISTING BUILDING, ASSUME:

PRIMARY STRUCTURE 0 HR

BEARING WALLS:

EXTERIOR 0 HR

INTERIOR 0 HR

NON-BEARING WALLS INTERIOR 0 HR

FLOOR CONSTRUCTION AND SECONDARY MEMBERS 0 HR

ROOF CONSTRUCTION AND SECONDARY MEMBERS 0 HR

C. FIRE AND SMOKE PROTECTION FEATURES

1. FIRE BARRIERS AND SHAFT ENCLOSURES SHALL MEET TABLE 707.3.9 WHICH REQUIRES A 2-HOUR FIRE-

RESISTANCE RATING FOR B OCCUPANCIES.

2. EXISTING FIRE/SMOKE RATED BARRIERS SHALL BE MAINTAIN WITHIN PROJECT BOUNDARY.

3. NFPA 101 38.3.2 PROTECTION FROM HAZARDS. 38.3.2.1 GENERAL. HAZARDOUS AREAS INCLUDING, BUT NOT

LIMITED TO, AREAS USED FOR GENERAL STORAGE, BOILER, FURNACE ROOMS, AND MAINTENANCE SHOPS THAT INCLUDE WOODWORKING AND PAINTING AREAS SHALL BE PROTECTED IN ACCORDANCE WITH SECTION 8.7.

EXISTING HIGH HAZARD AREAS WITHIN PROJECT BOUNDARY SHALL BE MAINTAINED.

4. NFPA 101. 8.7.1.1 PROTECTION FROM ANY AREA HAVING A DEGREE OF HAZARD GREATER THAT OF NORMAL TO THE GENERAL OCCUPANCY OF THE BUILDING OR STRUCTURE SHALL BE PROVIDED BY ONE OF THE FOLLOWING MEANS: (1) ENCLOSING THE AREA WITH A FIRE BARRIER WITHOUT WINDOWS THAT HAS A 1-HOUR FIRE RESISTANCE RATING IN ACCORDANCE WITH SECTION 8.3. (2) PROTECTING THE AREA WITH AUTOMATIC EXTINGUISHING SYSTEMS IN ACCORDANCE WITH SECTION 9.7. ALL STORAGE ROOMS WITHIN PROJECT BOUNDARY

SHALL BE PROTECTED BY ITEM 2.

D. INTERIOR FINISH

1. INTERIOR WALL AND CEILING FINISH TO BE DESIGNED IN ACCORDANCE WITH TABLE 803.11. (CHAPTER 8, TABLE 803.11)

2. NO CHANGE TO EXISTING FINISHES.

E. FIRE PROTECTION SYSTEMS

1. AUTOMATIC SPRINKLER SYSTEM IS PROVIDED WITHIN THE BUILDING AND SHALL BE MODIFIED IN COMPLIANCE WITH

NFPA 13. (CHAPTER 9, (F) 903.2.11.4)

2. NFPA 101, 38.3.5 EXTINGUISHING REQUIREMENTS. PORTABLE FIRE EXTINGUISHERS SHALL NOT BE RELOCATED

WITHIN

THE PROJECT SCOPE.

3. FIRE ALARM AND DETECTION SYSTEMS IS AN EXISTING SYSTEM AND SHALL BE BROUGHT TO CURRENT NFPA 72 .

4. NFPA 101. 38.3.4.1 DETECTION, ALARM AND COMMUNICATIONS SYSTEMS. GENERAL. A FIRE ALARM SYSTEM IN ACCORDANCE WITH SECTION 9.6 SHALL BE PROVIDED IN ALL BUSINESS OCCUPANCIES WHERE (2) THE OCCUPANCY

IS SUBJECT TO 50 OF MORE OCCUPANTS ABOVE OR BELOW THE LEVEL OF EXIT DISCHARGE.

5. NFPA 101. 38.3.4.2 INITIATION. INITIATION OF THE REQUIRED FIRE ALARM SYSTEM SHALL BE BY ANY ONE OF THE

FOLLOWING MEANS (3) APPROVED AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH 9.6.2.1(3) THAT PROVIDES

PROTECTION THROUGH THE BUILDING AND PROVISIONS 9.6.2.6 SHALL APPLY.

6. NFPA 101. 38.3.4.3 OCCUPANT NOTIFICATION. DURING ALL TIMES THAT THE BUILDING IS OCCUPIED THE REQUIRED

FIRE

ALARM SYSTEM, ONCE INITIATION SHALL PERFORM ON OF THE FOLLOWING FUNCTIONS: (1) IT SHALL ACTIVATE A GENERAL ALARM IN ACCORDANCE WITH 9.6.3. (2) A POSITIVE ALARM SEQUENCE IN ACCORDANCE WITH 9.6.3.4 SHALL

BE PERMITTED.

7. NFPA 101. 38.3.4.4. EMERGENCY FORCES NOTIFICATIONS. EMERGENCY FORCES SHALL BE PROVIDED AND SHALL INCLUDE NOTIFYING BOTH OF THE FOLLOWING: (1) FIRE DEPARTMENT IN ACCORDANCE WITH 9.6.4. (2) APPROVED

LOCAL EMERGENCY ORGANIZATION, IF PROVIDED.

F. MEANS OF EGRESS

MEANS OF EGRESS. THE BUILDING IS EQUIPPED WITH AN AUTOMATED SPRINKLER SYSTEM.

1. MAXIMUM TRAVEL DISTANCE: 300 FEET

2. COMMON PATH OF TRAVEL: 50 FEET

3. DEAD ENDS: 50 FEET

4. CORRIDORS: TABLE 1018.1: CORRIDORS ARE NOT REQUIRED TO BE RATED.

5. EXISTING MEANS OF EGRESS SHALL NOT BE MODIFIED WITHIN PROJECT SCOPE.

H. TEMPORARY SMOKE BARRIER WALL CONSTRUCTION , NFPA 241. A TEMPORARY SMOKE BARRIER WALL

CONSTRUCTION

WILL BE CONSTRUCTED IN LOCATION IDENTIFIED IN THE GI PHASING PLANS TO SEPARATE PHASES OF WORK WERE THE FIRE SPRINKLER WILL BE TEMPORARILY SHUT DOWN, PROVIDING ISOLATION AND PROTECTION BETWEEN BUILDING AREAS. REFER TO SPECIFICATIONS AND DETAIL 1/GI001 AND 2/GI101 FOR WALL CONSTRUCTION INFORMATION.

REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND REGULATIONS, BELOW LISTING IS NOT

COMPREHENSIVE.

ICC, INTERNATIONAL BUILDING CODE, 2015 EDITION (IBC)

ICC, INTERNATIONAL PLUMBING CODE, 2015 EDITION (IPC)

ASCE-07-10

ACI 318-11

ACI 530-11

AISC 341-10

AISC 360-10

PCI MNL 120-10, DESIGN HANDBOOK

NFPA 101, LIFE SAFETY CODE, 2018 EDITION (LSC).

NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION.

NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2019 EDITION.

NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018 EDITION.

NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION, 2019 EDITION.

NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCE, 2019 EDITION.

NFPA 70, NATIONAL ELECTRIC CODE, 2017 EDITION.

NFPA 72, NATIONAL FIRE ALARM CODE, 2019 EDITION.

NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA PROCESSING EQUIPMENT, 2017 EDITION.

NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2019 EDITION.

NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2019 EDITION.

NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS, 2018 EDITION.

NFPA 92A, RECOMMENDED PRACTICE FOR SMOKE CONTROL SYSTEMS, 2009 EDITION.

NFPA 92B, GUIDE FOR SMOKE MANAGEMENT SYSTEMS IN MALLS, ATRIA, AND LARGE AREAS, 2009 EDITION.

NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2018 EDITION.

NFPA,99B, STANDARD FOR HYPOBARIC FACILITIES, 2018 EDITION.

NFPA 101, LIFE SAFETY CODE, 2018 EDITION.

NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS, 2019 EDITION.

NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2018 EDITION.

NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION SYSTEMS, 2017 EDITION.

NFPA 54 TYPE 2 CLOTHES DRYER UL 705 DEDPY, 2018 EDITION.

ASHRAE 90.1-2007 HVAC SYSTEMS

ASHRAE 189.1 -2009 STANDARD FOR THE DESIGN OF HIGH PERFORMANCE GREEN BUILDINGS

ASHRAE 180 - 2009 VENTILATION FOR HEALTH CARE FACILITIES

ASHRAE 62.1 - 2007 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY

ASHRAE 1.1 - 2007 HVAC & R TECHNICAL REQUIREMENTS FOR COMMISSIONING PROCESS

ASHRAE 0 - 2005 COMMISSIONING PROCESS

ASHRAE 55- 2004 THERMAL ENVIRONMENTAL CONDITIONS FOR HUMAN OCCUPANCY

ANSI A117.1-2009 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES

2010 ADA STANDARDS FOR ACCESSIBLE DESIGN

2012 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES

BELOW)

2012 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)

MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900 OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

NATIONAL ELECTRICAL CODE (NEC)

INTERNATIONAL PLUMBING CODE (IPC)

ENERGY POLICY ACT OF 2005 (EPACT)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND TRANSPORTATION MANAGEMENT.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2004.

SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007.

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/). ALL OF THE MOST RECENT VERSIONS

OF THE DOCUMENTS SHOULD BE USED FOR REFERENCE.

VA MENTAL HEALTH FACILITIES DESIGN GUIDE DECEMBER 2010

VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS

ARCHITECTURAL, AUGUST 1, 2014

ASBESTOS ABATEMENT, JULY 2011

CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2011 2012

ELECTRICAL, DECEMBER 2015

ENERGY REDUCTION/ SUSTAINABILITY, MAY 2014

EQUIPMENT, JUNE 2006

ESTIMATING, MARCH 8, 2011

NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010

FIRE PROTECTION, SIXTH EDITION REVISED SEPTEMBER 2011

HVAC FOR NEW, REPLACEMENT, ADDITION AND RENOVATION OF EXISTING CA FACILITIES, MARCH 2011

INTERIOR DESIGN, MAY 2008

PHYSICAL SECURITY DESIGN MANUAL: LIFE-SAFETY PROTECTED FACILITIES, JANUARY 2015

PLUMBING, NOVEMBER 2014

STRUCTURAL, FEBRUARY 1, 2014

WAY FINDING AND SIGNAGE, INTERIOR DECEMBER 2012

SEISMIC DESIGN REQUIREMENTS, H-18-8

ENVIRONMENTAL PLANNING GUIDANCE PG-18-17

VA DESIGN MANUALS PG-18-10:

GOVERNING CODES:

INFECTION CONTROL PROJECT INFORMATION

REFER TO SPECIFICATION 010110 FOR ADDITIONAL REQUIREMENTS.

PROVIDE IC PLANS AND FACILITATE MEETING WITH VA PATIENT SAFETY AND INFECTION CONTROL STAFF PRIOR TO INSTALLATION OF TEMPORARY SMOKE BARRIER WALL FOR APPROVAL OF LOCATION AND PROTOCOLS. PLAN SHALL NOT

BLOCK OR HINDER THE USE OF THE BUILDINGS BY PATIENTS OR USERS.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY WALK OFF MAT AND HAND SANITIZER AT

EACH TEMPORARY DOOR LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE REQUIRED VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC, MULTI-PURPOSE SPILL CONTROL SORBENTS

TO ABSORB NON AGGRESSIVE LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH 4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY STORED IN DESIGNATED AREAS AND

APPROVED CONTAINERS. FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE FACILITY.

TEMPORARY SMOKE BARRIER WALL CONSTRUCTION DOES NOT ELIMINATE THE REQUIREMENT FOR INFECTION CONTROL DUST WALL BARRIE BEING REQUIRED FOR WORK WITHIN PHASED AREAS WHICH WILL BE OCCUPIED DURING

CONSTRUCTION.

A PROFESSIONAL CLEANING CREW SHALL BE PROVIDED BY CONTRACTOR TO CLEAN THE CONSTRUCTION AREA EVERY MORNING AFTER WORK IS COMPLETE BEFORE OCCUPANTS OCCUPY THE BUILDING FOR THE WORK DAY.

PROVIDE PLASTIC DUSTWALL CONSTRUCTION AT OPENINGS AND TAPE DOORS TO SEAL PROJECT AREAS AT THE START OF WORK EACH EVENING AND REMOVE AND UNSEAL EACH MORNING. REFER TO IC SPECIFICATION FOR ADDITIONAL

INFORMATION.

COVER EQUIPMENT AND OFFICE FURNITURE AT THE START OF WORK SHIFT AND UNCOVER AT THE END. EQUIPMENT AND FURNITURE TO REMAIN WHERE IT IS. RELOCATION TO BE REIVEWED WITH COR TWO WEEKS PRIOR FOR NEED OF

RELOCATION FOR APPROVAL.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

INFECTION CONTROL GENERAL NOTESPATIENT RISK GROUP: LOW RISK, OFFICE

CLASS OF PRECAUTION: III

CONSTRUCTION PROJECT TYPE: D

DURING CONSTRUCTION WORK

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF

DUCT SYSTEM .

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEET ROCK, PLYWOOD,PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IMPLEMENT CONTROL TUBE METHOD ( CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE

WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILRATION UNITS.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

5. COVER TRANSPORT RECEPTABLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

UPON COMPLETION OF CONSTRUCTION WORK, BEFORE SPACE OCCUPED BY STAFF

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION PREVENTION & CONTROL DEPARTMENT AND THROUGHLY CLEANED BY THE

OWNER'S ENVIROMENTAL SERVICES DEPARTMENT.

2. REMOVE BARRIERS MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA FILTERED VACUMMS.

4. WET MOP AREA WITH CLEANER/DISINFECTANT.

5. UPON, COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.

CLASS OF PRECAUTION: III

TYPE D

LIMITED FIRE RISK

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS.

INCLUDES, BUT IS NOT LIMITED TO:

• ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS.

• REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING SYSTEM.

• NEW CONSTRUCTION.

CONSTRUCTION PROJECT TYPE: D

TYPE III

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE

WORK IS BEING DONE TO PREVENT CONTAMINATION OF

DUCT SYSTEM .

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEET ROCK,

PLYWOOD,PLASTIC, TO SEAL AREA FROM NON WORK A

REA OR IMPLEMENT CONTROL TUBE METHOD ( CART

WITH PLASTIC COVERING AND SEALED CONNECTION TO

WORK SITE WITH HEPA VACUUM FOR VACUUMING

PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILRATION UNITS.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT

IN TIGHTLY COVERED CONTAINERS.

5. COVER TRANSPORT RECEPTABLES OR CARTS. TAPE

COVERING UNLESS SOLID LID.

UPON COMPLETION OF CONSTRUCTION WORK, BEFORE

SPACE OCCUPED BY STAFF

1. DO NOT REMOVE BARRIERS FROM WORK AREA

UNTIL COMPLETED PROJECT IS INSPECTED BY

THE OWNER'S SAFETY DEPARTMENT AND

INFECTION PREVENTION & CONTROL DEPARTMENT

AND THROUGHLY CLEANED BY THE OWNER'S

ENVIROMENTAL SERVICES DEPARTMENT.

2. REMOVE BARRIERS MATERIALS CAREFULLY TO

MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA FILTERED

VACUMMS.

4. WET MOP AREA WITH CLEANER/DISINFECTANT.

5. UPON, COMPLETION, RESTORE HVAC SYSTEM

WHERE WORK WAS PERFORMED.

A/C AIR CONDITIONING

ACOUS ACOUSTICAL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

A&E ARCHITECT AND ENGINEERS

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITIES HAVING JURISDICTION

AHU AIR HANDLING UNIT

ALT ALTERNATIVE

ALT TRANS ALTERNATIVE TRANSPORTATION

ALUM ALUMINUM

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AVG AVERAGE

BB BULLETIN BOARD

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BM BEAM

BOD BASIS OF DESIGN

BRG BEARING

CB CATCH BASIN

CBB CEMENTITIOUS BACKER BOARD

CER CERAMIC

CF CUBIC FEET

CFCI CONTRACTOR FURNISH CONTRACTOR INSTALL

CFM CUBIC FEET PER MINUTE

CG CORNER GUARD

C & G CURB & GUTTER

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNITS

CO CLEANOUT(S)

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

CP CONCRETE PIPE

CPT CARPET

CR CRASHRAIL

CRS COLD ROLLED STEEL

CS CAST STONE

CSB CONCRETE SPLASH BLOCK

CSI CONSTRUCTION SPECIFICATIONS INSTITUTE

CT CERAMIC TILE

CTR CENTER

CU FT CUBIC FEET

CUH CABINET UNIT HEATER

CY CUBIC YARD

D DRYER

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DISP DISPENSER

DIV DIVISION

DN DOWN

DR DOOR

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

E EAST

(E) EXISTING

EA EACH

EF EXHAUST FAN

EFTR EXISTING FINISH TO REMAIN

EIFS EXTERIOR INSULATION AND FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EQ EQUAL

EQUIP EQUIPMENT

EST ESTIMATED

ETR EXISTING TO REMAIN

ETS EXPOSED TO STRUCTURE

ARCHITECTURAL ABBREVIATIONS

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FF & E FURNITURE FIXTURES & EQUIPMENT

FIN FINISH

FIXT FIXTURE

FL FLOW LINE

FLR FLOOR

FLUOR FLUORESCENT

FO FINISH OPENING

FOS FACE OF STUD

FR FIRE RATED

FSP FIRE STANDPIPE

FT FOOT / FEET

FTG FOOTING

FURR FURRING

FV FIELD VERIFY

FVC FIRE VALVE CABINET

FWC FABRIC WALLCOVERING

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GARBAGE DISPOSAL

GF CMU GROUND FACE CMU

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLACK

GLU LAM GLUE LAMINATED WOOD

GND GROUND

GT GROUT

GYP BD GYPSUM BOARD

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIB

HC HOLLOW CORE

HCP HANDICAPPED

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HGT HEIGHT

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR, HANDRAIL

HT HEIGHT

HVAC HEATING, VENTILATING & AIR CONDITIONING

IBC INTERNATIONAL BUILDING CODE

ID INSIDE DIAMETER

IG INSULATING GLASS

IN INCH

INCAN INCANDESCENT

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INV INVERT

ITG INSULATED TEMPERED GLASS

JAN JANITOR

J-BOX JUNCTION BOX

JT JOINT

L LONG

LAV LAVATORY

LB(S) # POUND(S)

LF LINEAL FEET

LLV LONG LEG VERTICAL

LT LIGHT

LVR LOUVER

M & BH MOP AND BROOM HOLDER

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MB MARKER BOARD

MECH MECHANICAL

MEPF MECHANICAL, ELECTRICAL, PLUMBING,

FIRE PROTECTION (CONDUIT)

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MO MASONRY OPENING

MSB MOP SERVICE BASIN

MTD MOUNTED

MTL METAL

N NORTH

NA NOT APPLICABLE

NECY NECESSARY

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER,

OVERFLOW DRAIN

OFCI OWNER FURNISHED

CONTRACTOR INSTALLED

OFOI OWNER FURNISHED

OWNER INSTALLED

OH OPPOSITE HAND

OPN OPENING

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN

P PAINT

PARTN PARTITION

PBD PARTICLE BOARD

PBSW PATIENT BED SERVICE WALL

PCC PRECAST CONCRETE

PI INPATIENT PSYCHIATRIC

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PMU PSYCHIATRIC MEDICAL UNIT

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATED

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT CONC POST-TENSIONED CONCRETE

PTD PAPER TOWEL DISPENSER

PTL PORCELAIN TILE

PVC POLYVINYL CHLORIDE

QA QUALITY ASSURANCE

QT QUARRY TILE

R R-VALUE (INSULATION),

RADIUS, RISER

RB RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RE: REFERENCE

REBAR REINFORCING BAR

REC RECESSED

RECPT RECEPTACLE

REF REFRIGERATOR

REG REGISTER

REINF REINFORCE

REQD REQUIRED

RESIL RESILIENT

REV REVISION

RFT RESILIENT FLOOR TILE

RH ROOF HATCH

RM ROOM

RO ROUGH OPENING

RT RUBBER STAIR TREAD

S SOUTH

SAF SEAMLESS ACRYLIC FLOORING

SAP SUSPENDED ACOUSTICAL PANELS

SAT SUSPENDED ACOUSTICAL TILE

SB SPLASHBLOCK

SC SEALED CONCRETE, SOLID CORE

SCHED SCHEDULE

SCP SCUPPER

SD SOAP DISPENSER

SEAL SEALER

SECT SECTION

SECT SECTION

SF SQUARE FOOT

SF CMU SPLIT-FACE CMU

SHR SHOWER

SHT SHEET

SHTG SHEATHING

SIM SIMILAR

SL SLOPE

SLV SHORT LEG VERTICAL

SND SANITARY NAPKIN DISPOSER

SNV SANITARY NAPKIN VENDOR

SPECS SPECIFICATIONS

SQ SQUARE

SS SOLID SURFACE

SST STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STOR STORAGE

STRUC STRUCTURAL

SUSP SUSPENDED

SV SHEET VINYL

SYM SYMMETRICAL

SYS SYSTEM

T TREAD

TB TACKBOARD

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TBD TO BE DETERMINED

TD TUBULAR DAYLIGHTING DEVICE

TEL TELEPHONE

TEMP TEMPERATURE

TG TEMPERED GLASS,

TONGUE & GROOVE,

TRANSFER GRILLE

THRU THROUGH

TO TOP OF

TOC TOP OF CONCRETE

TOM TOP OF MASONRY

TOS TOP OF STEEL

TOW TOP OF WALL

TTD TOILET TISSUE DISPENSER

TV TELEVISION

TYP TYPICAL

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

URN URINAL

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VIF VERIFY IN FIELD

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WDP WOOD PANELING

WDW WINDOW

WF WIDE FLANGE

WGL WIRED GLASS

WH WATER HEATER

WR WASTE RECEPTACLE,

WATER RESISTANT

WS WATER STOP

WSCT WAINSCOTT

WT WEIGHT

WWF WELDED WIRE FABRIC

ARCHITECTURAL SYMBOLS

X

X

XXXX

SHEET LOCATION

VIEW NUMBER

X X

X

SHEET LOCATION

VIEW NUMBER

XXXX

SECTION REFERENCE DRAWING NUMBER

SHEET LOCATION

DRAWING NUMBER

SHEET LOCATION

DETAIL REFERENCE

OBJECT

REFERENCED

OBJECT

REFERENCED

ELEVATION REFERENCES

X

XXXX

X

XXXX

SCALE: ??

VIEW TITLE

HANDICAP SYMBOL

N

TRUE NORTH ARROW

ROOM

101 ROOM TAG

X

1 PLAN NOTE

ALTERNATE/BID DEDUCT ITEM

EXISTING WALL TO REMAIN

EXISTING DOOR

TEMPORARY IC BARRIER WALL

CONSTRUCTION (DUST WALL) OR

TEMPORARY SMOKE BARRIER WALL

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

CLEMENT J. ZABLOCKI VAMC

#6 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

COR : MATTHEW OSGOOD 695-16-112

FIRE SPRINKLER ENGINEER

RTM CONSULTANTS, INC

6640 Parkdale Place, Suite J, Indianapolis, IN 46254

PHONE: (317) 329-7700

1220 N. PENNYSYLVANIA ST. SUITE 200 INDIANAPOLIS, IN. 46202

317.800.6388 WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

CLEMENT J. ZABLOCKI VA MEDICAL CENTER

MILWAUKEE, WISCONSIN

C U s e rs

\j g o o d e n \D o c u m e n ts

\1 .1

.0

B ld g .S p ri n k le r R e p la c e m e n t -1

-1 v jg o o d e n g u id o n d e s ig n .c o m

.r v t

BID DOCUMENTS

GI001

KNLL

GENERAL INFORMATION

2019/04/24

14.1020.06

BUILDING 6 FIRE

SPRINKLER REPLACEMENT

ACCOMAPNYING 36C25219B0056 0003

File details come from the government source that posted it.