SYSTEM C
COVERAGESYSTEM A
COVERAGE
WING A WING B WING C WING D
SYSTEM B
COVERAGE
SYSTEM B
COVERAGE
SYSTEM A
COVERAGE
SYSTEM C
COVERAGE
SYSTEM D
COVERAGE
SYSTEM D
COVERAGE
SYSTEM C
COVERAGE
SYSTEM B
COVERAGE
SYSTEM B
COVERAGE
SYSTEM C
COVERAGE
SYSTEM A
COVERAGE
SYSTEM B
COVERAGE
SYSTEM A
COVERAGE
SYSTEM B
COVERAGE
SYSTEM B
COVERAGE
SYSTEM C
COVERAGE
SYSTEM B
COVERAGE
SYSTEM C
COVERAGE
SYSTEM C
COVERAGE
B
A
D
C
F E
H
G
SYSTEM D
COVERAGE
SYSTEM C
COVERAGE
SYSTEM D
COVERAGE
K
L
I
J
EXTERIOR
BALCONY/ROOF
OVERHANG TO BE
PROTECTED VIA
WING A DRY SYSTEM
RISER.
FX105 FX107
FX108
FX
FX
FX
FX105 FX107
FX108
FX106 FX107
FX108
FX106 FX107
FX108
FX105 FX107
FX108
FX
FX
FX
FX106 FX107
FX108
FX106 FX107
FX108
FX
FX
FX
FX
FX
FX
FX105 FX107
FX108
WING A
WING B
WING C
WING D
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
CLEMENT J. ZABLOCKI VAMC
#6 o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number 695-16-112
FIRE SPRINKLER ENGINEER
RTM CONSULTANTS, INC
6640 Parkdale Place, Suite J, Indianapolis, IN 46254
PHONE: (317) 329-7700
905 N. CAPITOL AVE. SUITE 100 INDIANAPOLIS, IN. 46204
317.800.6388 WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
CLEMENT J. ZABLOCKI VA MEDICAL CENTER
MILWAUKEE, WISCONSIN
C :\U se rs
\k al le n\
D oc um en ts \1
4.
.0
Bl dg .S pr in kl er
R ep la ce m en t 6
-1 6-
2_ ka lle n_ ka lle n.
rv t
FX101
FDCMC
FIRE SPRINKLER RISER
LOCATIONS BASEMENT FLOOR
PLAN 0
14.1020.06BUILDING 6 FIRE
SPRINKLER REPLACEMENT
SCALE: 1/16" = 1'-0"FX101
1 FIRE SPRINKLER RISER LOCATIONS BASEMENT FLOOR 0
N
1. SPRINKLER SYSTEMS SHALL BE DESIGNED AND HYDRAULICALLY CALCULATED IN
ACCORDANCE WITH NFPA 13 AND THE VA FIRE PROTECTION DESIGN MANUAL, SIXTH
EDITION.
2. A SAFETY FACTOR SHALL BE INCLUDED BY CALCULATING THE DEMAND TO A POINT NO
GREATER THAN 10% BELOW THE AVAILABLE WATER SUPPLY CURVE. OR, A TEN
PERCENT SAFETY FACTOR SHALL BE PROVIDED (SUBTRACT 10% FROM THE AVAILABLE
WATER SUPPLY CURVE) FOR EACH SPRINKLER DEMAND INCLUDING THE REQUIRED
HOSE STREAMS.
3. ROUTE THE DRAIN PIPES FOR EACH SPRINKLER RISER AND TEST CONNECTION TO THE
BUILDING EXTERIOR TO FACILITATE TESTING. DO NOT TERMINATE AT SERVICE SINKS
AS THEIR DRAINS ARE INADEQUATE FOR TEST FLOW. DRAIN PIPING SHALL BE 50 MM (2
IN) MINIMUM TO ACCOMMODATE DISCHARGE FROM FULL FLOW TESTS AT MAXIMUM
SYSTEM PRESSURE. DESIGN EXTERIOR DRAINS TO PREVENT FLOODING OR DAMAGE
TO LANDSCAPING, AND TO PREVENT WETTING OF WALKWAYS.
4. SEISMIC PROTECTION IS NOT REQUIRED IN THE BUILDING AS IT IS LOCATED IN AN
AREA OF LOW SEISMICITY AS IDENTIFIED IN THE MAP TAKEN FROM VA SEISMIC DESIGN
REQUIREMENTS H-18-8.
5. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE
SPECIFICALLY PROHIBITED BY NFPA 13 (2019). SPRINKLERS TO BE INSTALLED IN VA
FACILITIES ARE REQUIRED TO BE FACTORY MUTUAL (FM) APPROVED.
6. INSTALL STANDARD RESPONSE SPRINKLERS WITH INTERMEDIATE TEMPERATURE
RATING 93°C (200°F) OR HIGHER IN ELEVATOR SHAFTS, ELEVATOR PITS, AND
ELEVATOR MACHINE ROOMS. INSTALL SPRINKLERS IN ELEVATOR SHAFTS AND PITS
ONLY WHERE REQUIRED BY NFPA 13.
7. SPRINKLERS IN BASEMENT SHALL BE DESIGNED AS ORDINARY HAZARD - GROUP 1. IN
SPRINKLERS ON LEVELS 1, 2 AND 3 SHALL BE DESIGNED AS LIGHT HAZARD EXCEPT
WHERE OTHERWISE NOTED. MECHANICAL EQUIPMENT ROOMS, TRANSFORMER
ROOMS, ELECTRICAL SWITCHGEAR ROOMS, ELECTRIC CLOSETS, AND REPAIR SHOPS
SHALL BE ORDINARY HAZARD GROUP 1. STORAGE ROOMS, TRASH ROOMS, STORAGE
AREAS, WAREHOUSE SPACES, FILE STORAGE AREAS FOR THE ENTIRE AREA OF THE
SPACE UP TO 140 SQUARE METERS (1500 SQUARE FEET) SHALL BE ORDINARY HAZARD
GROUP 2.
8. SPRINKLERS ARE NOT REQUIRED IN INTERSTITIAL SPACES.
9. EXISTING OCCUPANT USE HOSE VALVES HAVE BEEN ABANDONED. EXPOSED PIPING
REMAINING SHALL BE DEMOLISHED AS PART OF THIS PROJECT. EXISTING PIPING IN
WALLS OR FLOOR CAN BE ABANDONED IN PLACE.
10. DESIGN WET PIPE SPRINKLER SYSTEMS, UNLESS INSTALLED IN AREAS SUBJECT TO
FREEZING. DRY PENDANT OR SIDEWALL SPRINKLERS OR DRY PIPE, SYSTEMS MAY BE
USED IN AREAS SUBJECT TO FREEZING. DRY TYPE SPRINKLERS MAY BE USED TO
PROTECT PORTIONS OF THE CONNECTING PIPING EXPOSED TO FREEZING
TEMPERATURES: FOR EXAMPLE, SPRINKLER SPRIGS FROM WET SYSTEMS INTO
UNHEATED ATTICS, OR HORIZONTAL PIPING EXTENSIONS THROUGH A WALL TO
PROTECT AN UNHEATED PORCH AREAS AND BUILDING EXTERIORS
11. A WATER FLOW TEST WAS CONDUCTED, FRIDAY, MARCH 4, 2016 AT 9:00 AM ALONG THE
ROAD WEST OF THE BUILDING. THE RESULTS WERE AS FOLLOWS:
STATIC: 71 PSI HYDRANT #32
RESIDUAL: 65 PSI HYDRANT #31
RESIDUAL AT 1,240 GALLONS PER MINUTE
11A. SPRINKLER CONTRACTOR SHALL REPEAT WATER FLOW TEST PRIOR TO HYDRAULIC
DESIGN.
GENERAL INSTALLATION NOTES :
1. PROVIDE AND INSTALL NEW WET RISER FOR EACH WING IN STAIRWELL LANDING
CORNER TIGHT TO WALLS TO MINIMIZE OBSTRUCTION. SUPPLY STAIRWELL SPRINKLERS
FROM MAIN RISER. SUPPLY EACH FLOOR WITH BRANCH FROM RISER.
2. PROVIDE AND INSTALL NEW DRY RISER FOR A & C WINGS IN STAIRWELL LANDING
CORNER TIGHT TO WALLS TO MINIMIZE OBSTRUCTION. SUPPLY BALCONY AND ATTIC
AREAS AS INDICATED.
3. PIV LOCATED OUTSIDE FOR EACH INCOMING SERVICE. PIV ALTERATIONS OR
REPLACEMENT ARE NOT INCLUDED IN SCOPE OF WORK.
4. PROVIDE A NEW PRE-ENGINEERED NITROGEN GENERATION SYSTEM FOR DRY PIPE
SPRINKLER SYSTEM.
5. HYDRANT # 31
6. HYDRANT # 32
7. BUILDING EXCEEDS 2 STORIES. PROVIDE CONTROL VALVE ASSEMBLY FOR EACH FLOOR
PER NFPA 13.
FIRE SPRINKLER SYSTEM PLAN NOTES:
SEE SHEET GI201 FOR APPROXIMATE COVERAGE AREAS OF EACH PHASE.
SPRINKLER DESIGN DENSITY
OCCUPANCY CLASSIFICATION
DESIGN
DENSITY
(GPM/FT2)
DESIGN
AREA (FT2)
HOSE STREAM
ALLOWANCE
(GPM)
DURATION OF
SUPPLY
(MINUTES)
LIGHT HAZARD 0.10 1,500 2 100 30
ORDINARY HAZARD - GROUP 1 0.15 1,500 2 250 60
ORDINARY HAZARD - GROUP
2 0.20 1,500 2 250 60
DRY PIPE SYSTEM 1 0.10 1,950 1 100 30
NOTES:
1. 30% DESIGN AREA INCREASE FOR DRY PIPE SYSTEMS.
2. DESIGN AREA REDUCTION FOR QUICK RESPONSE SPRINKLERS PERMITTED PER NFPA 13
11.2.3.2.3.1
3. DRY PIPE SYSTEMS SHALL COMPLY WITH SECTION 7.2.3.4.OF NFPA 13.
* ALL AREAS SHALL BE ORDINARY HAZARD GROUP 1 UNLESS OTHERWISE NOTED.
BID DOCUMENTS
COR : MATTHEW OSGOOD