36C25219B0056-0003013.pdf
PDF 861 KB Posted
- Solicitation number
- 36C25219B0056
About this file
36C25219B0056 0003 S06 - GC103 - FLOOR LEVEL 2 FLOOR PLAN.pdf
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
D
E
F
I
G
1 3 4
5 76
2 8 9 10
11 12 13
H
A
B
RM A209
RM A206
RM A206A
RM 205A
RM
A204
MEN'S
RM
A218
WOMEN'S
RM
A219
RM A222
RM A224
RM
A220
RM A223
RM A225
RM A229
RM A232
RM A230
RM A228
RM A227
RM A233
MECHANICAL
RM A226
MEN'S
RM
B212
WOMEN'S
RM B211
HAC
HAC HAC
RM C232
RM C231
RM
C230
VACO
RM
C229
RMC228
RM
C227
RM
C221
RM C224
RM C225
RM C226
RM
C215
RM
C214
VISN
PROSTH
RM
C2313
RM
C217C216
RM
B215
RM
B208
RM
B207
RM
B209
MIS RM
B206
RM
C202
RM
C203
RM
C204
RM
C205
RM
C207
RM
C208
RM
C209
RM
C201
RM
C212
WOMEN'S
RM D211A
RM D203
RM
D206
RM
D208
RM
D205
CONFERENCE
ROOM
RM A231
RM A211
RM A212
RM
C220
MEN'S
D210
RM
D202
RM D201B
RM
D204
RM
D207
RM
B210
RM A234
RM A213
ELEVATOR
A
STAIR
A
STAIR
B
STAIR
C2
STAIR
C1
STAIR
D
RM A211A
RM A213A
CORRIDOR A / B
RM A235
RM B211A
RM C220A
CORRIDOR
C / D
WOMEN'S
RM D211
MEN'S
D210A
RM D201
RM
D201A
2a
2a
2a 2a
2 2
2a 2a
2 2
EXIT
EXIT
EXIT
EXIT
EXIT
2 X 2 CEILING
2 X 2 CEILING
NO CEILING
2 X 2 CEILING
2 X 2 CEILING
2 X 2 CEILING
NO CEILING
GYPSUM BOARD CEILING
GYPSUM BOARD CEILING
BUILDING 6
WING A
BUILDING 6
WING B
BUILDING 6
WING B
BUILDING 6
WING C
BUILDING
6 WING C
BUILDING
6 WING D
BUILDING 6
WING A
BUILDING 6
WING B
BUILDING 6
WING B
BUILDING 6
WING C
BUILDING
6 WING C
BUILDING
6 WING D
LIFE SAFETY LEGEND
1 HR HAZARD AREA & 1 HR SMOKE BARRIER
2HR EXIST. SHAFT WALL & 2 HR BUILDING
SEPARATION
TRAVEL DISTANCE
EXIT EGRESS EXIT
THE BUILDING OCCUPANCY, OCCUPANCY LOAD, MEANS OF EGRESS AND FIRE
EXTINIGUSHER LOCATIONS ARE NOT BEING MODIFIED WITHIN THIS PROJECT.
THE PROJECT SCOPE OF WORK DOES NOT ANTICIPATE DISRUPTION
OF EXISTING HAZARDOUS MATERIALS. IF EXISTING PIPING INSULATION
ON PIPES AROUND SPRINKLER PIPING IS EXPOSED DURING
CONSTRUCTION NOTIFY COR AND REFER TO SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
LEAD PAINT IS WITHIN THE BUILDING, THE PROJECT SCOPE
ANTICIPATED MINIMAL DISRUPTION OF THE EXISTING LEAD PAINT.
CONTRACTOR TO NOTIFY COR IF EXISTING PAINT SURFACE IS TO BE
BROKEN, CHIPPED, OR MODIFIED IN ANY WAY. REFER TO
SPECIFICATION FOR ADDITIONAL INFORMATION.
NO ASBESTOS PIPING INSULATION OR DI-ELECTIC UNIONS ARE
ANTICIPATED TO BE REMOVED WITHIN THE PROJECT SCOPE.
1.
2.
3.
HAZARDOUS MATERIAL GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
FLOOR PLAN GENERAL NOTES
BUILDING 6 IS A NATIONAL REGISTERED HISTORIC BUILDING. REF. NO.
70920.
CEILINGS ARE OPEN TO PLASTER CEILINGS THROUGH OUT PROJECT
SCOPE UNLESS OTHERWISE IDENTIFIED, REFER TO FLOOR PLANS FOR
ACOUSTIC PANEL CEILING LOCATIONS AND TYPE.
PLASTER CEILINGS SHALL BE PATCHED, PREPPED AND NEW PAINT
FINISH APPLIED TO MATCH EXISTING WHERE FIRE SPRINKLER
PROTECTION REPLACEMENT HAS CAUSED DAMAGE. PAINT CEILING
WITHIN ROOM BOUNDRY.
WHERE ACOUSTIC PANEL CEILING REMOVED IN ORDER TO COMPLETE
ABOVE CEILING WORK SHALL BE STORED IN A SAFE DRY LOCATION
SUCH AS THE CONTRACTOR PROVIDED JOB TRAILER.
DAMAGED OR BROKEN CEILING TILES SHALL BE REPLACED TO MATCH
EXISTING. REFER TO FLOOR PLANS FOR ACOUSTIC PANEL CEILING
LOCATIONS AND TYPE.
CEILING TILES WITH PENETRATIONS TO ACCOMMODATE ORIGINAL
FIRE SPRINKLER SYSTEM HEADS SHALL BE REPLACED WITH NEW
ACOUSTIC PANEL CEILING PADS.
AT THROUGHFLOOR PENETRATIONS CREATED FROM REMOVED
PIPING PROVIDE METAL PLATE ON UNDERSIDE OF FLOOR SLAB
WHERE CONCRETE INFILL IS REQUIRED. CHIP AWAY CONCRETE AT
FLOOR LEVEL TO CREATE A SLOPED OPENING/LIP TO PATCH
PENETRATIONS AND PREVENT CONCRETE INFILL CORE FROM FALLING
THROUGH OPENING TO FLOOR BELOW.
PATCH AND PREP AREA OF WALLS AND CEILING WHERE PIPING IS
REMOVED AT THROUGHWALL PENETRATIONS AND IS NOT REPLACED.
PATCH SHALL MATCH WALL CONSTRUCTION. PROVIDE PAINT TO
MATCH EXISTING AND WALL SHALL BE PAINTED FROM FLOOR TO
CEILING AND CORNER TO CORNER.
EXISTING FURNITURE AND EQUIPMENT SHALL BE COVERED AND
PROTECTED WITHIN AREAS OF WORK BEING COMPLETED. PROJECT
AREA SHALL BE PROFESSIONALLY CLEANED AND READY FOR OWNER
OCCUPANCY BY 5:00 AM.
PROVIDE CORE DRILLED PENETRATIONS THROUGH THE STAIRWAYS
AS REQUIRED BY THE SPRINKLER SHOP DRAWINGS FOR NEW RISER
AND DRAIN LINES. A TOTAL OF 4 STAIRWAY. REFER TO FLOOR PLAN
NOTES AND FIRE SPRINKLER ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
FIRE SPRINKLER PIPE SHALL BE CONCEALED IN LOCATIONS WITH
ACOUSTIC PANEL CEILINGS.
FIRE SPRINKLER PIPE SHALL BE PAINTED RED PER SPECIFICATIONS IN
LOCATIONS WITH OPEN PLASTER CEILINGS.
FIRE SPRINKLER DESIGN HAS BEEN DESIGNED IN A WAY TO UTILIZE
EXISTING WALL AND FLOOR PENETRATIONS. IF A NEW PERPETRATION
IS REQUIRED LEAD, ASBESTOS TESTING AND ABATEMENTS SHALL BE
PROVIDED BY CONTRACTOR. ASSUME 24 PENETRATIONS REQUIRED, 2
PER FLOOR PER WING.
PROVIDE PLASTIC DUSTWALL CONSTRUCTION AT OPENINGS AND
TAPE DOORS TO SEAL PROJECT AREAS AT THE START OF WORK
EACH EVENING AND REMOVE AND UNSEAL EACH MORNING. REFER TO
IC SPECIFICATION FOR ADDITIONAL INFORMATION.
COVER EQUIPMENT AND OFFICE FURNITURE AT THE START OF WORK
SHIFT AND UNCOVER AT THE END. EQUIPMENT AND FURNITURE TO
REMAIN WHERE IT IS. RELOCATION TO BE REIVEWED WITH COR TWO
WEEKS PRIOR FOR NEED OF RELOCATION FOR APPROVAL.
ROOM IS PROVIDED WITH A 2X2 ACOUSTIC GRID CEILING AND
TYPICAL OFFICE GRADE ACOUSTIC PANEL CEILING, EQUAL TO
ARMSTRONG FISSURE.
A. SMOOTH CEILING TILE IS INSTALLED, EQUAL TO
ARMSTRONG CLEAN ROOM XL
ROOM IS PROVIDED WITH A 2X4 ACOUSTIC GRID CEILING AND
TYPICAL OFFICE GRADE ACOUSTIC PANEL CEILING, EQUAL TO
ARMSTRONG FISSURE.
A. SMOOTH CEILING TILE IS INSTALLED, EQUAL TO
ARMSTRONG CLEAN ROOM XL
PROVIDE PENETRATION FOR NEW FIRE SPRINKLER RISER. REFER
TO ENGINEER DRAWINGS FOR ADDITIONAL INFORMATION.
1.
1a.
2.
2a.
3.
FLOOR PLAN KEYED NOTES X
0 16' 32'
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
CLEMENT J. ZABLOCKI VAMC
#6 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
COR : MATTHEW OSGOOD 695-16-112
FIRE SPRINKLER ENGINEER
RTM CONSULTANTS, INC
6640 Parkdale Place, Suite J, Indianapolis, IN 46254
PHONE: (317) 329-7700
1220 N. PENNYSYLVANIA ST. SUITE 200 INDIANAPOLIS, IN. 46202
317.800.6388 WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
CLEMENT J. ZABLOCKI VA MEDICAL CENTER
MILWAUKEE, WISCONSIN
C U s e rs
\j g o o d e n \D o c u m e n ts
\1 .1
.0
B ld g .S p ri n k le r R e p la c e m e n t -1
-1 v jg o o d e n g u id o n d e s ig n .c o m
.r v t
BID DOCUMENTS
GC103
KNLL
FLOOR LEVEL 2 FLOOR PLAN
2019/04/24
14.1020.06
BUILDING 6 FIRE
SPRINKLER REPLACEMENT
SCALE: 1/16" = 1'-0"GC103
1 FLOOR 2
N
ACCOMPANYING 36C25219B0056 0003
File details come from the government source that posted it.